R-12-02-23-8E1 - 2/23/2012 RESOLUTION NO. R-12-02-23-8E1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RGM Constructors, L.P. for the Sam Bass Road/Chisholm Trail Modifications and Water/Wastewater Relocation Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with RGM Constructors, L.P. for the Sam Bass Road/Chisholm Trail Modifications and Water/Wastewater Relocation Project„ a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of February, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: - SWVL-19�*— SARA L. WHITE, City Clerk 0:\wdox\SCC1nts\0112\1204\MUNICIPAL\00243523.DOC/me Page 1 of 3 EXHIBIT Contract Quantity Adjustment/Change Order "A" rt,,06/11 Department: Transportation Department Project Sam Bass Road/Chisholm Trail Name: Modifications and W/WW Relocation Date: 1/17/2012 City Project Change Order/Quantity Adjustment ID Number ST09BASS No. 2 Justification 1EA 6X4 BOX MANHOLE ADJUSTMENT, 3EA INLET ADJUSTMENTS, GAS LINE AND AT&T GRADE CONFLICTS, ADDITIONAL STRIPING, 2EA ADDITIONAL GATE VALVES SUMMARY Amount %Change Original Contract Price: $3,920,141.61 Previous Quantity Adjustment(s): $23,225.00 This Quantity Adjustment: $12,298.00 Total Quantity Adjustment(s): $35,523.00 Total Contract Price with Quantity Adjustment(s): $3,955,664.61 Previous Change Order(s): $10,500.00 0.00 This Change Order: $47,122.03 0.01 Total Change Order(s)To Date: $57,622.03 0.01 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $4,013,286.64 Difference between Original and Adjusted Contract Prices: $93,145.03 Original Contract Time: Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 15 0 New Contract Time: 15 0 City staff :OQ Signature &II Stablein,City of Round Rods,Project Manager Date Printed n r Company Name: RGM Constructors, L.P. For Contractor: (1p Signature Printed Name,Tide Date For City of Round Rods: Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order rev,06/11 Project Name: Sam Bass Road/Chisholm Trail Modifications and W/WW Relocation Quan.Adj./Change Order No.: 2 Change Order Data Contiac Time Adjustment Item# Item Description Unit QW. Unit Price Amount (Days) X4 CONC BOX-ADDED MANN - 559S STA. 2+50 EA 1 $7,926.35 $7,926.35 3 5085-G2 30"GRATE INLET ADJUSTMENTS EA 2 $3,267.77 $6,535.54 3 508S-I10 10'CURB INLET TY I EA 1 $3,267.77 $3,267.77 2 X4 BOX GA LINE MUNFucr sTA. 559S 0+55 LS 1 $11,200.42 $11,200.42 3 X4 BOX AT&T LINE CONFLICT STA. 559S 0+44 LS 1 $10,621.45 $10,621.45 2 WK ZN PAV MRK REM 8"WHITE LF 968 $5.25 $5,082.00 WK ZN PAV MRK REM 24"WHTTE LF 237 $10.50 $2,488.50 $0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 .00 TOTALS:1 $47fl22.03 1 13 Page 3 of 3 Contract Quantity Adjustment/Change Order rw,06/11 Project Name: Sam Bass Road/Chisholm Trail Modifications and W/WW Relocation Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Contrac Time Adjustment Bid Item # Item Description Unit QW. Unit Price Amount (Days) 5115-A-6 6"GATE VALVE STA. 3+00 EA 1 $1,300.00 $1,300.00 1 511-A-8 8"GATE VALVE STA. 3+02 EA 1 $1,400.00 $1,400.00 1 8625-4W WK ZN PAV MRK REM 4"W LF -440 $2.55 $1,122.00 862-4Y WK ZN PAV MRK REM 4"Y LF 3900 $2.55 $9,945.00 862-TSW WK ZN PAV MRK REM SYMBOL EA 5 $155.00 $775.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTALS:1 $1 296,, 2 ROUN7 K,TEXAS Ci Council Agenda Summar Sheet PURPOSE.PASSION.PROSPERITY.. Agenda Item No. 8E1. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No.2 with RGM Constructors, LP for the Sam Bass/Chisholm Trail Modifications and Agenda Caption: Water/Wastewater Relocation Project. Meeting Date: February 23,2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: City Council accepted the bid of RGM Constructors, L.P. for$3,920,141.61 on May 26, 2011. Sam Bass Road will be reconstructed from the IH 35 south bound frontage road to Meadows Drive. The scope also includes the reconstruction of Chisholm Trail north from Sam Bass Road for approximately four hundred feet. Quantity Adjustment/Change Order No. 1 was approved by the City Manager on November 4, 2011 to install a temporary water line due to existing utility conflicts and to add two water line services and three wastewater service connections at the cost of$33,725.00. Quantity Adjustment/Change Order No.2 is needed to make needed to address gas line and AT&T conflicts,to make manhole and inlet adjustments,and to add two gate valves at a cost of$59,420.03. The revised contract total would be$4,013,286.64. Cost: $59,420.03 Source of Funds: 2002 General Obligation Bonds Date of Public Hearing(if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW Page 1 of 3 Contract Quantity Adjustment/Change Order rev,06/11 Department: Transportation Department Project Sam Bass Road/Chisholm Trail Name: Modifications and W/WW Relocation Date: 1/17/2012 City Project Change Order/Quantity Adjustment ID Number ST09BASS No. 2 justification 1EA 6X4 BOX MANHOLE ADJUSTMENT, 3EA INLET ADJUSTMENTS, GAS LINE AND AT&T GRADE CONFLICTS, ADDITIONAL STRIPING, 2EA ADDITIONAL GATE VALVES SUMMARY Amount %Change Original Contract Price: :$23,225.00 141.61 Previous Quantity Adjustment(s):This Quantity Adjustment: 98.00Total Quantity Adjustment(s): 23.00Total Contract Price with Quantity Adjustment(s): 64.61 Previous Change Order(s): $10,500.00 0.00 This Change Order: $47,122.03 0.01 Total Change Order(s)To Date: $57,622.03 0.01 Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Pius Change Order(s)]: $4,013,286.64 ]M Difference between Original and Adjusted Contract Prices: $93,145.03 Original Contract Time: Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 15 0 New Contract Time: 15 0 city staff �QQ — 31 — 12 M� Signature Bill Stablein,City of Round Rock, Project Manager Date Printed n r Company Name: RGM Constructors, L.P. For Contractor: Ai4'!�f /� —?�" I Signature Printed Name,Tide Date For City of Round Rock: L- Signature Printed Name,Title t Date R-12.-02-, Page 2 of 3 Contract Quantity Adjustment/Change Order ►r,awll Project Name: Sam Bass Road/Chisholm Trail Modifications and W/WW Relocation Quan. Adj./Change Order No.: 2 Change Order Data contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount Da 6X4 CONC BOX-ADDED MANHOLE - 559S STA. 2+50 EA 1 $7,926.35 $7,926.35 3 508S-G2 30"GRATE INLET ADJUSTMENTS EA 2 $3,267.77 $6,535.54 3 508S-I10 10'CURB INLET TY I EA 1 $3,267.77 $3,267.77 2 4 BOX GAS LINE CONFLICr STA. 559S 0+55 LS 1 $11,200.42 $11,200.42 3 4 BOX AT&TLINE CONFLICrA. 559S 0+44 LS 1 $10,621.45 10 621.45 2 WK ZN PAV MRK REM 8"WHITE LF 968 $5.25 $5,082.00 WK ZN PAV MRK REM 24"WHITE LF 237 $10.50 $2,488.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTAILS:1 $47,122.03 1 13 • Page 3 of 3 Contract Quantity Adjustment/Change Order rev,06/11 Project Name: Sam Bass Road/Chisholm Trail Modifications and W/WW Relocation Quan.Adj./Change Order No.: 2 Qua ti Adjustment Data contract Time Adjustment Bid Item # Item Description Unit QtV. Unit Price Amount (Days 511S-A-6 6"GATE VALVE STA. 3+00 EA 1 $1,300.00 $1,300.00 1 511-A-8 8"GATE VALVE STA. 3+02 EA 1 $1,400.00 $1,400.00 1 862S-4W WK ZN PAV MRK REM 4"W LF -440 $2.55 ($1,122.00) 862-4Y WK ZN PAV MRK REM 4"Y LF 3900 $2.55 $9,945.00 862-TSW WK ZN PAV MRK REM SYMBOL EA 5 $155.00 $775.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TOTALS: $12,298.00 2