Loading...
R-2018-5167 - 2/8/2018 RESOLUTION NO. R-2018-5167 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Southwest Downtown District Infrastructure Improvements Phase 5B Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Cash Construction for the Southwest Downtown District Infrastructure Improvements Phase 513 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of February, 2018. CRAI OR , Mayor City of Roun ock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1804;00394130 EXHIBIT !!A Il Page I of 3 Contract Quantity Adjustment/Change Order M11\IINM sVlix;< rev,W12 Department: Transportation Project Name: CORR SWDT Ph 5B Date: 12/27/17 City Project Change Order/Quantity ID Number SWDT5 Adjustment No. 3 Justification Additional concrete items such as turndown rockwails,sidewalk,steps,and driveways added to project scope. Also,dumpster pads,and rock pedestal added too. SUMMARY Amount %Change Original Contract Price: _ $4,315,214.001 Previous Quantity Adjustment(s): $B3,988.00'' This Quantity Adjustment: $55,310.00 Total Quantity Adjustment(s): $139,298.00 Total Contract Price with Quantity Adjustment(s): =4,454,512.001 Previous Change Order(s): $50,765.00 1% This Change Order: $51,367.00 1% Total Change Order(s)To Date: $102,132.00 2% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): $4,556,644.00 Difference between Original and Adjusted Contract Prices: $241,430.00 Original Contract Time: 360 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 0 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 0 Calendar Days New Contract Time: 360 Calendar Days Submitted for Approval Prepared By: B.J.Cash,Cash Construction Signature Printed Name,Title,Company Date .............. ........... Approvals Contractor: B.J.Cash,Cash Construction L TS SI ure Prinked Name,Title,Company Date City Project �r �-. Manager: !"^— Bill Stablein,Project Manager,CORK Signature Printed Name,Title Date Mayor/City Manager Alan McGraw,Mayor,CORR Signature Printed Name,Title Date Page 2 of Contract Quantity Adjustment/Change Order A'C1I,h1T,i1fK'3t.TftAS rev,08,,12 Project Name:CORR SWDT Ph 5B Quan.Adj./Change Order No.: 3 Chan a Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) Leffingwell Sign Fix LS 1 $1,450.00 $1,450.00 Handrail at Leffingwell LS 1 $495.00 $495.00 Lee's Body Shop Gate remove&replace(6'x20'swing gate with wheels,'sch 40 posts set in concrete footers, &3 strand barb wire) LS 1 $3,460.00 $3,460.00 Business ADA Ramp Layout LS 1 $427.00 $427.00 Dumpster Pad(34.5'x 8') LS 1 $7,865.00 $7,865.00 6'Tall CMU Walls LS 1 $8,305.00 $8,305.00 Bollards EA 18 $615.00 $11,070.00 Rock Pedestal Excluding the Engraving LS 1 $18,295.00 $18,295.00 $0.00 $0.00 $0.00 TOTALS: $51,367. 0 0 Page 3 of 3 Contract Quantity Adjustment/Change Order Rl71"h3/lfN'�ft']L� feV:0a;12? Project Name:CORR SWDT Ph 5B Quan.Adj./Change Order No.: 3 uantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty, Unit Price Amount (Days) Contract Adds P.C.Rein orced Concrete Steps(for Fire Station 14-360-6046 2)(Leffingwell18) LF 20 $330.00 $6,600.00 5-530-6004 P.C.Reinforced Concrete Driveway SY 68 $60.00 $4,080.00 9-529-6033 P.C.Reinforced Concrete Retainer Curb,Type A, LF 38 $75.00 $2,850.00 Portland ement Reinforced Concrete Sidewalks to 4- inch Thickness(as needed to match existing sidewalk on site for each address at ROW)24SY WHERE+75SY 8-531-6042 SICFIT SY 99 $85.00 $8,415.00 Turndown Mortared Rock Limestone Block(6"x6"x up to 24")Wall,with mortared joints up to 3-feet tall, including foundation,(measured square feet of face of 11-423-6015 block)complete in place per square foot(WHERE) SF 297 $45.00 $13,365.00 50 Trench Drain per LF(if required)(RFI 46) LF 10 $2,000.00 $20,000.00 $0.00 $0.00 $0.00 $o.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $55,310.00, 0