R-12-03-22-11B1 - 3/22/2012 RESOLUTION NO. R-12-03-22-11111 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Matous Construction, Ltd. for the Phase 1 B—Reuse Water Treatment Facilities Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Matous Construction, Ltd. for the Phase 1 B — Reuse Water Treatment Facilities Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of March, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 1�4" . SARA L. WHITE, City Clerk 0:\wdox\SCClnts\Ol 12\1204\MUMCIPAL\00245616.DOC/rmc EXHIBIT "'An Page 1 of 3 Contract Quantity Adjustment/Change Order rev,06111 Department: Utilities&Environmental Services Project Phase 18 - Reuse Water Treatment Name: Facilities Date: 3/14/2012 City Project Change Order/Quantity Adjustment ID Number wr05wwtp No. 2 3ustification See Change Prdposai Requests listed below and supporting documentation. SUMMARY Amount %Change Original Contract Price: $3,801,780.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): 0.00 Total Contract Price with Quantity Adjustment(s): $3,801,780.00 Previous Change Order(s): $39,043.25 1.03% This Change Order: $829,464.45 21.82% Total Change Order(s)To Date: $868,507.70 22.84% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $4,670,287.70 Difference between Original and Adjusted Contract Prices: $868,507.70 Original Contract lime: 400 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 2 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 229 Calendar Days New Contract Time: 631 Calendar Days city staff: Signa re Printed Name,Tide Date Printed Contractor Company Name: Matous Construction,ltd. &4(Z.2 For Contractor: [?cr.A Z. c. U {�IZGhtp� T 3114111. Signature Printed Name,Tide Date For City of Round Rock: Signature Printed Name,Tide Date Page 2 of 3 Contract Quantity Adjustment/Change Order MV,06111 Project Name: Phase 1B-Reuse Water Treatment Facilities Quan.Adj./Change Order No.: 2 Chan a Order Data Contract Time Adjustment Item# Item Description Unit Unit Price Amount (Days) Add 20'gate at existing chain link fence to access Oncor's easement from CPR 04 the plant site LS 1 $2,570.00 $2,570.00 2 Relocation of stairs on 361&2 and CPR 05 addition of elevated walkway to each LS 1 $19,472.00 $19,472.00 0 Addition of an Inserta Tee for connecting 24 IN dearweii drain line to CPR 06 eAsting fiberglass manhole LS 1 $2,372.57 $2,372.57 2 Additional 1.5 IN CVAC from CPR 07 chlorination building to effluent filter LS 1 $2,692.00 $2,692.00 0 CPR 08 lWalkway at high servke pump station LS 1 $16,322.00 $16,322.00 15 Chlorination system modifications- CPR 09R Revised for Hydro Instruments LS 1 $72,672.00 $72,672.00 30 Old Settler's Park reuse Irrigation CPR 10 connections IS 1 $562,00.00 $562,400.00 180 Add stainless steel piping for future CPR 11 filter IS 1 1 $5,137.88 $5,137.88 0 CPR 13 Add coating on dearwell dome ring LS 1 1000.00 1000.00 0 Add check valve at dearweli overflow CPR 14 manhole LS 1 $10,629.00 $10,629.00 0 Add conduit and wire at control valve CPR 15 vault and dearwell overflow manhole LS 1 $22,371.00 $22,371.00 0 Add surge relief valve and CPR 16 appurtenances LS 1 $111,826.00 $111,826.00 0 .00 0 .00 00 .00 0.00 0.00 .00 $0.00 0.00 TOTALS: $829,464.45 229 Page 3 of 3 Contract Quantity Adjustment/Change Order rev.OvI l Project Name: Phase 1B-Reuse Water Treatment Facilltles Quan.Adj./Change Order No.: 2 ua tltV Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Unit Price Amount (Days) 0.00 0.00 0.00 0.00 0.00 .00 0.00 0.00 .00 .00 .00 0.00 .00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 $0.00 .00 0.00 TOTALS• $0.001 0 �RouNnRoclt, xAs City Council Agenda Summary Sheet Agenda Item No. 1161. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with Matous Construction, Ltd. for the Phase 1B — Reuse Water Treatment Agenda Caption: Facilities Project. Meeting Date: March 22,2012 Department: Utilities and Environmental Services Staff Person making presentation: Michael Thane, P.E. Utilities Director Item Summary: This Change Order No. 2 is for costs associated with various and significant modifications to Matos' scope of work under their current contract for the construction of the Phase 1B— Reuse Water Treatment Facilities located at the Brushy Creek Regional Wastewater Treatment Plant (BCRWWTP). The completion of Phase 1B, along with the recently completed Phase 1A (Old Settlers Park Reuse line) will complete the first phase of our reuse water system. At that time will be able to provide adequate reuse water for the irrigation of Old Settlers Park and Dell Diamond. The additional work to be performed under this Change Order No. 2 are in general various upgrades,variations and modifications to provide a more functional Water Reuse Treatment Plant Facility. These include the addition of an elevated walkway, a walkway at High Service Pump Station, addition of a Surge Relief Valve and Controls, and additional conduits and wire at Control Vault and Clearwell. The major additional work items are the modifications to the Chlorination System and the Old Settler's Park(OSP) Irrigation System conversion from potable water to reuse water. This OSP's Irrigation conversion from potable water to reuse water is very time consuming and complex requiring the coordination of many task between the Contractor and City Staff in order to minimize any and all perceived health risks that might be associated with a cross-connection. The Original Contract amount was $3,801,780.00 with a completion date of April 17, 2012. Change Order No. 2 is for $875,073.00 and an additional 180 calendar days to complete. Therefore, the new Contract amount, including both Change Orders No. 1 and No. 2, is$4,676,853.64 with a completion date of October 15, 2012. Cost: $829,464.45 Source of Funds: Self-Financed Wastewater Construction Date of Public Hearing(if required): N/A Recommended Action: Approval EXECUTED DOCUMENTS FOLLOW Page 1 of 3 Coad Quandt►Adjusbnant/Change Order K,«✓11 Department: UtllBies&&Wlror>fnecital SwAces PMJ$d Phaee 10 • Reuse Water Treatment Nadrt Nd"W Die: 3/1'1/21112 City Project Change Order/Quantity AdMtment ID Number wrOSwwtpi No. 2 tun See CharW Proposal Requests listed below and supporting documentation. SUMMARY Anreunt CluNge Original Contract Price: $3,801780. Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00- Total Contract Price with Quantity Adjustment(s): 1-780. Previous Change Order(s): $39,043.25 1.03% This Change Order: $829,464.45 21.5296 Total Change Order(s)To Date: $861k507.70 22.114% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Phos Change Order(s)l: 670 287. Difference between WOW and Adjusted Contract Prices: $868,507.70 Original Contract Time: 400 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 2 Calendar Days Time Adjustno t by this Quan.Adj./Change Order: 229 Calendar Days New Contract Time: 631 Calendar Days City Staff: 1k, 4,12 Primed Name,Title Date Printed Contractor Company Name: Matous Construction,LW. For contractor: 42 Nowa iZ Mr 4 tZ Printed Name,Title Date RoundFor city�: !Km ov 3 �- Signature Printed Name,Title Date C�--IZ-02 22 1 l 81 Page 2 of 3 C'M tr Quantity Mqusbne►t/Cha ge We ar,oE�►11 Project Name: Ro W�The*M* Quan.P4/Change Onder No.: 2 D11t# Tune Adjusb wrt T # DOXCItOw AAPR AM 1140, Add 2W gaft at edftg chain ft ftwe to access Oncoes easement from CPR 04 the plot site LS 1 $2,570.00 $2,570.00 2 of stairs on 361&2 and CPR 05 addition of elevated to each LS 1 19 472.00 $19,472.00 0 Addition of an In erta Tee for connecting 24 IN clearwell drain One to CPR 06 manhole LS i $M72.57 $2,372.57 2 Additional 1.5 IN CVAC from CPR 07 to effluent filter LS 1 $2,692.% $2,692.00 0 CPR 06 WiWy at'high service purnp station LS i i 22.001 $10,322.00 i5 Chlorination system modillicatiom- CPR 09R Revisedfror ntD Instruments LS 1 $72,672.00 $n,672.00 30 Oki Settler's Panic muse irrigation CPR 10 connections LS 1 $S62,400.00 $562,400.00 i80 Add stainless s steel piping for ht" CPR 11 fiftu LS 1 $5,137.86 $5,137-88 0 CPR 13 Add coatiry on dome LS 1 jAW.001 $1,000.00 0 Add dxkck valve at dearwell overflow CPR 14 manhole LS 1 $10,629.00 $10,629.00 0 Add conduit and wire at control valve CPR 15 vault and clearwelf overflow manhole LS 1 $22,371.00 $22,371.00 0 Add Z—W relief valve and CPR 16 aWurtenarxres LS 1 $111,826.00 $111,826.00 0 .00 0 .00 .00 .00 $0.00, .00 .00 .00 .00 .00 TOTALS: .4 2241 Page 3 of 3 Contrad QuwMtp AdjudmeWCla nge Oider nv,o4/lt , Project Name: Phase#8-1 wIw,%"t Fosift Quan.Adj./Change Order No.: 2 Cetdxset Th" Admit ram D"WID"M itftft Am" .00 .00 $00-000 '0 00 D .00 .00 .00 .00 .00 .00 .00 0.00 .00 .00 .00 .00 .00 .00 .00 T�I�TALS: $6.001 0