Loading...
R-12-04-12-11D2 - 4/12/2012 RESOLUTION NO. R-12-04-12-11D2 WHEREAS, the City of Round Rock ("City") desires to construct a gateway monument sign ("Gateway Monument") within the State's right-of-way on IH-35; and WHEREAS, subject to compliance with the terms and conditions of a Gateway Monument Agreement, the State will allow the City to construct a Gateway Monument at the northwest quadrant of the intersection of IH-35 and Westinghouse Road ("Monument Location"),Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, THAT: Section 1. The Monument Location is within the extra-territorial jurisdiction("ETP) of the City of Georgetown, Texas. Section 2. The Cities of Round Rock and Georgetown have entered into an interlocal agreement (R-10-03-25-10-2) wherein each City can construct a Gateway Monument within the other City's ETJ. Section 3. The City, by this Resolution, authorizes the Mayor to execute a Gateway Monument Agreement (the "Agreement") with the State of Texas, said Agreement being attached hereto and incorporated herein as Exhibit"A". Section 4. As stated in the Agreement,the City acknowledges all responsibility for all costs related to the installation of the Gateway Monument. The City additionally commits to ensuring the long-term maintenance of the Gateway Monument, including, maintaining associated landscaping and lighting, timely removing graffiti, and repairing and/or removing the Gateway Monument as stated in the Agreement. Section 5. A schematic showing the general design of the Gateway Monument is attached hereto and incorporated herein as Exhibit`B". O:\wdox\SCC1nts\0112\1204\MUNICIPAL\00247351.DOC The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of April, 2012. By: ALA CGRAW, Mayor ATTEST: ) IgorSARA L. WHITE, City Clerk 2 EXHIBIT "A" Contract No. 14-2XXF6001 GATEWAY MONUMENT AGREEMENT THE STATE OF TEXAS § COUNTY OF TRAVIS § THIS AGREEMENT is made by and between the State of Texas, acting by and through the Texas Department of Transportation, hereinafter called the "State", and the City of Round Rock, acting through its duly authorized officials, as evidenced by Resolution or Ordinance Number - , dated , hereinafter called the "Local Entity". BACKGROUND The State owns and maintains a system of highways, including IH 35 in Williamson County, Texas, for public use and benefit. The State agrees to allow for the construction of a Gateway Monument within the State's right of way and the Local Entity agrees to construct the Monument and to conduct the long term maintenance for this structure located at the northwest quadrant of the intersection of IH 35 and Westinghouse Road (County Road 111), referred to as the "Gateway Monument," more specifically described in Attachment "A," Project Map, which is attached hereto. The Local Entity will conduct the Monument's long term maintenance activities through the use of Local Entity forces, contractors, or other means satisfactory to the Local Entity and the State. THEREFORE, in consideration of the mutual promises contained in this Agreement, the parties agree to the following. AGREEMENT SECTION 1. PERIOD OF THE AGREEMENT This Agreement becomes effective when finally executed by the State and shall continue unless or until otherwise terminated as provided by this agreement. SECTION 2. FINANCIAL RESPONSIBILITIES All costs covered by this agreement including design, engineering, testing, construction, installation, access for maintenance, maintenance, labor, materials, supplies, traffic control, additional improvements, and if required, removal of the Gateway Monument, shall be the responsibility of the Local Entity. Any administrative costs associated with the Gateway Monument that are incurred by the State, such as those related to proposal review, as well as developing, issuing, and monitoring the Agreement for approved the Gateway Monument project shall be the responsibility of the State. Interlocal-interlocal_Gateway_Mon 1 02/11/2011 Contract No. 14-2XXF6001 SECTION 3. RESPONSIBILITY OF THE PARTIES A. The Local Entity agrees to: 1. Provide Gateway Monument design plans to the State before execution of this agreement according to TxDOT policy and, upon final approval, furnish and construct the Gateway Monument according to plans approved by the State, which are set out more specifically in Attachment "B," Local Entity's Final Gateway Monument Proposal, which is attached to this Agreement, and include any other related installation items that may be required; and 2. Furnish, erect, and maintain any barricades, signs and traffic handling devices, in accordance with the latest Texas Manual of Uniform Traffic Control Devices (MUTCD) and to the satisfaction of the State related to this project, as may be required to protect the safety of the public; and 3. Conduct periodic inspections of the Gateway Monument as deemed necessary; and 4. Provide for the construction and maintenance of all associated appurtenances that are considered by the State to be a part of the project. The Local Entity further agrees to remove such items from the project's location and restore the area to the satisfaction of the State upon termination of this Agreement in accordance with Section 9. B. The State agrees to: 1. Review and evaluate the Gateway Monument proposal submitted by the Local Entity with due consideration to safety (location, potential for motorist distraction, accessibility for maintenance, etc.), aesthetics, community support and maintainability; and 2. Coordinate with other TxDOT Divisions, as appropriate, as well as interact with the Federal Highway Administration (FHWA) for input, review and approval; and 3. Cooperate with the Local Entity to determine the requirements for barricades, signs, and traffic handling devices to be used by the Local Entity during the construction and maintenance of the Gateway Monument; and Interlocal-interlocal—Gateway—Mon 2 02/11/2011 Contract No. 14-2XXF6001 4. Provide maintenance access to the project location for the Local Entity or for its Contractor or group, and if possible, from outside the highway right of way; and 5. Conduct periodic inspections of the Gateway Monument as deemed necessary. C. The Local Entity and State further agree that nothing contained in this Agreement will be construed to: 1. Give either party the power to direct and control the day-to-day activities of the other; or 2. Constitute the parties as partners, joint venturers, co-owners, or otherwise as participants in a joint or common undertaking; or 3. Allow either party to create or assume any obligation on behalf of the other party for any purpose whatsoever. SECTION 4. DESIGN AND PLACEMENT OF GATEWAY MONUMENTS A. Gateway Monuments shall be designed and placed so as to: 1. Be freestanding. 2. Feature only the letters of the community name and/or officially adopted seal. 3. Include, if required by TxDOT, approved protective graffiti coatings. 4. Be appropriate to its proposed setting and community context. 5. Be in proper size and scale with its surroundings. 6. Be composed of materials that are durable for the projected life span of the project. 7. Be located beyond the clear zone, for both main lane traffic and frontage road traffic. 8. Be located where maintenance can be safely performed, as specified in the Gateway Monument Agreement, and in conformance with TxDOT procedures. 9. Be subject to the review and approval of TxDOT in consideration of design, size, and scale for appropriate integration on urban or rural highway features. Interlocal-Interlocal_Gateway_Mon 3 02/11/2011 Contract No. 14-2XXF6001 B. Gateway Monuments shall not: 1. Be allowed within the center median areas of interstate highway rights-of-way. 2. Contain religious, political, special interest, private, or commercial messages of any sort, including, but not limited to, symbols, logos, business names, trade names, jingles, or slogans. 3. Contain any displays of any sort, advertising, decorative banners, flags, or flag poles. 4. Display telephone numbers, street addresses, or Internet addresses. 5. Interfere with airspace above the roadway. 6. Create a distraction to the motoring public; for example, the Gateway Monument shall be large enough to interpret at highway speed, but not be so large that it demands attention from the motorist. 7. Include reflective or glaring surface finishes. 8. Include illumination that impairs or distracts the vision of transportation system users. Other lighting may be permitted. 9. Display blinking or intermittent or moving lights, including changeable message signs, digital displays, or lighted static displays such as LED. 10. Include moving elements (kinetic art) or simulate movement. 11. Include water features of any sort. 12. Interfere with official traffic control devices, nor interfere with the operational right-of-way above the roadway. 13. Be placed within State right-of-way upon trees, or painted or drawn upon rocks or other existing natural features. 14. Make use of or simulate colors or combinations of colors usually reserved for official traffic control devices described in the Texas Manual on Uniform Traffic Control Devices. Interlocal-interlocal—Gateway—Mon 4 02/11/2011 Contract No. 14-2XXF6001 15. Require the removal of trees or other vegetation for visibility, or harm trees during construction. Pruning of tree branches or roots, and removal of shrubs should be avoided. 16. Negatively impact existing highway features, including existing signs, irrigation systems, necessary drainage patterns, and facilities. SECTION 5. MAINTENANCE The Local Entity shall provide regularly scheduled maintenance, as described in Attachment "B," the Local Entity's Final Gateway Monument Proposal, for its projected lifespan. Maintenance shall include, but not be limited to, restoration work to maintain the integrity of the approved Gateway Monument, maintenance of any associated landscaping or lighting, and graffiti removal. Gateway Monuments shall be kept clean, free of graffiti, and in good repair. Graffiti removal shall conform to the most current TxDOT policies and guidelines, which require prompt removal of offensive messages and timely removal of all other graffiti. Maintenance practices of the Local Entity or its agent shall protect air and water quality as required by federal and state law. SECTION 6. MONUMENT REMOVAL The Local Entity shall remove the Gateway Monument covered by this agreement, if in the opinion of TxDOT, it creates safety or operational concerns due to deterioration or inadequate maintenance or upon termination of the main Gateway Monument Agreement. TxDOT will notify the Local Entity when it has determined that the Gateway Monument requires special attention. In the event the Local Entity fails to maintain, repair, rehabilitate, or remove the Gateway Monument in a timely manner, TxDOT may choose to remove the Gateway Monument after thirty (30) days following notification to the Local Entity, and bill the Local Entity for all costs of removal and restoration of the area. TxDOT reserves the right to remove the Gateway Monument due to construction, rehabilitation, violation of the terms of this agreement, or other necessary activities affecting the transportation facilities without any obligation, compensation to, or approval of the Local Entity. TxDOT will strive to notify the Local Entity of its intent to remove the Gateway Monument to allow for timely removal and salvage by the Local Entity, if possible. TxDOT reserves the right to remove or alter any Gateway Monument that presents an immediate safety hazard to the public without delay or advanced notification to the Local Entity. SECTION 7. USE OF CONTRACTOR OR GROUP The Local Entity shall have -the right to engage any responsible Contractor or group to perform or provide any portion of the Local Entity's Gateway Monument Interlocal-interlocal_Gateway_Mon 5 02/11/2011 Contract No. 14-2XXF6001 activities specified in this Agreement. However, notwithstanding this provision, the Local Entity shall continue to remain responsible to the State to ensure performance of all its duties and responsibilities specified in this Agreement. The Local Entity shall ensure that any Contractor or group complies with all provisions of this agreement, and federal, state, and local laws, and regulations as may be applicable. In the event the Local Entity engages a Contractor to perform Gateway Monument construction or maintenance activities under this Agreement, the Local Entity shall ensure that said Contractor shall indemnify the State for any and all damages and claims for damages by said Contractor, its employees, agents, or representatives, including any claims resulting from bodily injury or death to others, or, for loss of or damage to property of others, arising out of, incident to, or in any manner connected to Gateway Monument construction or maintenance activities, and, for any or all liability arising from the negligent acts of said Contractor, its employees, agents, or representatives. In the event the Local Entity engages and approves a responsible group to perform Gateway Monument construction or maintenance activities under this Agreement, the Local Entity shall require and ensure that said Contractor or group follow all the terms of this Agreement as well as all Attachments. SECTION 8. INDEMNIFICATION A. The Local Entity and the State each acknowledge responsibility for the acts, deeds, errors and omissions of its own employees. The parties agree that the Texas Tort Claims Act pertaining to governmental liability for tortious conduct and/or property damage shall apply to this Agreement. B. The Local Entity shall also indemnify and save harmless the State from any and all expense, including, but not limited to, attorney fees, which may be incurred by the State in litigation or otherwise resisting a claim or liabilities that may be imposed on the State as a result of error, omission, or act of the Local Entity, its agents, or its employees. SECTION 9. TERMINATION This Agreement may be terminated under any of the following conditions: A. By mutual written agreement and consent of both parties; or B. By either party upon giving the other party thirty (30) days prior written notice; or C. By the State, in the event the State determines that the Gateway Monument is not in the best interest of the traveling public. Interlocal-Interlocal_Gateway_Mon 6 02/11/2011 Contract No. 14-2XXF6001 If either party terminates this Agreement, as provided herein, the Local Entity will be responsible for repair or removal of the Gateway Monument. In the event that the Local Entity does not provide the repair or removal services, the State may remove or repair the Gateway Monument and shall be entitled to reimbursement from the Local Entity for any reasonable costs incurred by the State to restore the State's right of way to its original condition. SECTION 10. AMENDMENTS Amendments to this Agreement shall be in writing and shall be executed by both parties. SECTION 11. AUDIT The state auditor may conduct an audit or investigation of any entity receiving funds from the state directly under the contract or indirectly through a subcontract under the contract. Acceptance of funds directly under the contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit. SECTION 12. SUCCESSORS AND ASSIGNS Subject to the provisions of Section 7, the Local Entity shall not assign or otherwise transfer its rights and obligations under this Agreement except with prior written consent of the State, and any prohibited assignment or transfer shall be null and void. SECTION 13. REMEDIES This Agreement shall not be considered as specifying the exclusive remedy for any default. All legal remedies may be pursued by either party and shall be cumulative. SECTION 14. INSURANCE If this agreement authorizes the Local Entity or its contractor to perform any work on State right of way, before beginning work, the entity performing the work shall provide the State with a fully executed copy of the State's Form 1560 Certificate of Insurance verifying the existence of coverage in the amounts and types specified on the Certificate of Insurance for all persons and entities working on the State right of way. This coverage shall be maintained until all work on the State right of way is complete. If coverage is not maintained, all work on State right of way shall cease immediately, and the State may recover damages and all costs of completing the work. Interlocal-Interlocal_Gateway_Mon 7 02/11/2011 Contract No. 14-2XXF6001 SECTION 15. NOTICES All notices to either party by the other under this Agreement shall be delivered personally or sent by U.S. mail, postage prepaid, addressed to such party at the following addresses: STATE : LOCAL ENTITY: Texas Department of Transportation City of Round Rock Austin District Engineer Attn: Alan McGraw, Mayor P.O. Drawer 15426 221 East Main Street Austin, Texas 78761-5426 Round Rock, Texas 78664 SECTION 16. GRATUITIES Texas Transportation Commission policy mandates that employees of the State shall not accept any benefits, gifts, or favors from any person doing business or who reasonably speaking may do business with the State under this Agreement. The only exceptions allowed are ordinary business lunches and items that have received advanced written approval of the Texas Department of Transportation Executive Director. Any person doing business with or who may reasonably speaking do business with the State under this Agreement may not make any offer of benefits, gifts or favors to State employees, except as mentioned here above. Failure on the part of the Local Entity to adhere to this policy may result in the termination of this Agreement. SECTION 17. SIGNATORY WARRANTY Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity represented. SECTION 18. INCORPORATION OF PROVISIONS Attachments "A" and "B" are made part of this contract. The parties shall comply with the provisions of Attachments "A" and "B" as if they were set forth in full within the body of this contract. Interlocal-Interlocal_Gateway_Mon 8 02/11/2011 Contract No. 14-2XXF6001 THEREFORE, the Parties have executed this Agreement in duplicate originals. THE CITY OF ROUND ROCK THE STATE OF TEXAS Certified as being executed for the By: purpose and effect of activating and/or carrying out the orders, Title: established policies or work programs heretofore approved and Date: authorized by The Texas Transportation Commission Attest: By: City Clerk Carlos A. Lopez, P.E. District Engineer Austin District Date: Approved as to form: City Attorney List of Attachments: "A" — Project Map for Gateway Monument "B" - Local Entity's Final Gateway Monument Proposal Interlocal-interlocal_Gateway_Mon 9 02/11/2011 DIL, Attachment C City of Round Rock Community Entry Gateway Signage Construction Schedule z Z Z 0 ON 0M 0� 1 2 3 4 1 2 1 3 1 4 1 1 2 1 3 1 4 1 1 2 1 3 1 4 Notice to Proceed Installation of traffic control, erosion _ controls and tree protection Site work, structural walls, pylon/letter fabrication, sculpted rock Removal of traffic control, erosion controls and tree protection Project Completion ATTACHMENT A Project Map for Gateway Monument ;lp h +� UJ l ,V 4 P. r ATTACHEMENT B Gateway Monument Proposal Round Rock Gateway Sign(WS/Westinghouse) Maintenance Plan The City of Round Rock based on the current design of the Gateway sign proposes the following maintenance schedule: Project area is the sign,and approx.140,000 sq ft surrounding the sign(see Maintenance Site Plan). The intent is to keep a large visibility triangle maintained through the sign zone. Litter Control Biweekly- 26 cycles per year Mow,Edge,Trimming Biweekly*- 18 cycles per year *Mowing Crews will be respectful of wildflowers that may be growing in the area and will either mow around patches of wildflowers or cease mowing operations until the end of wildflower season(at City's discretion). Bed Maintenance Monthly- 12 cycles per year Tree Maintenance Biannually- 2 cycles per year Gateway Sign Inspection** Biannually- 2 cycles per year **Includes Sign Letters,Lighting,Stone,Concrete Masonry,Metal,etc Gateway Sign maintenance- As needed E " F i tffi lot _ 14 S 11 F100% CONSTRUCTION DOCUMENTS ROUND ROCK GATEWAY SIGN SHEET INDEX: OWNER: CITY OF ROUND ROCK, TEXAS SHEET DESCRIPTION 221 East Main Sheet COVER SHEETRDUlO)ROQCTF]IIS Round Rods,Texas 78884 N-1 CONSTRUCTION NOTES - Phone No.(512)218-6400 L-1 SITE/LAYOUT PLAN N L-2 LANDSCAPE PLAN 0 L3 DETAILS-EROSION/SEDIMENTATION CONTROLS SITE LOCATION MAP L-4 DETAILS-SIGN PLAN L5 DETAILS-SIGN ELEVATION&SECTION Souftound WU and Wes*Vhouse Road 45 DETAILS-SCULPTURED ROCK&CHOP BLOCK WALL ,�s APPROVED FOR CONSTRUCTION BY: S-1 STRUCTURAL NOTES co S-2 STRUCTURAL NOTES - a d1CO"a' Z S3 STRUCTURAL NOTES S-4 STRUCTURAL NOTES S5 FOUNDATION PLAN S3 STRUCTURAL RETAINING WALL �°""� • 0 S-7 SCHEDULES Georgetown ' p"'a "0qi O S-8 ALTERNATE STRUCTURAL RETAINING WALL Tem ° :,am�a v000 V S-9 PYLON FRAMING ELEVATION mx! S-10 CONNECTION DETAILS 4 ,. r nanwe�mmlwn—�m ¢roa moa�x F _.'.•' mwmmww/ m®�OIY.OWIr•IMY! IR I E-1 ELECTRICAL LEGEND -ea tOh rownnri y E-2 LUMINARE SCHEDULE SITE c 2 .�e�`^- x n.wuia. mnwauliaxo,mns auw oaee�a�on�wowo Z RNIM!l�1�rq'pLY.MO IR Y CdAaMYlVrOxBIf: E3 RISER DIAGRAMlneaTM aMM w� rnuwRoortww, O MEME-4 ELECTRICAL SITE PLAN .' , �rw■6��� remaBavAr•ancisaY,ors Z E5 ° LARGE SCALE PLAN/SIGN LIGHTING fie.; y _ ��„r c r,nurewa awr ,ao,anaa O, 4 SHTS. TXDOT TRAFFIC CONTROL STANDARDS a ' WAT=x°""' e,aruwrtll I mnr,woonwoa ananueah SUBMITTED FOR CONSTRUCTION BY: `_ - �^ hound Rock awwloowraer w nu�pamroR„raoao wtroa„gena! anor„oun�oo a `N+OSC -�. 'e' im«...am.i.oaaca.u.,x�ngw,c.iswm xax..nmulu�ue U' ��QQ��rrpp eA•RQ''.�'V { tt "�'" ,xx rwnacnusneannaouoaoac enaoimcmw>ww a r '1iy: iJ 3 r..: oo n�cai�iw,pwncwascanc o"w�iwaamwnr U nww nw�lta•Aa w,a tm wie �* h!M p`✓` �, E..,i'' NQ REVISION DEeCRPION... APPROVED BY DATE Z `ir•awu•arx. �.°r.'p11ir�i.�w4` 0 i.r...+rrrr.v. •'arvr. a ••Pg O OF 3.2312 CONSULTANTS: .,...+..+...vas BAKER-AICKLEN i 1�:/IA&ASSOCIATES, INC. n.o.�.�raw,arxa!I x+n�ran,:nw�L..��,o.�,■ Call utas you dlp. DasaROUND ROCK-CEDAR PARK lw,x..maao.a«nw.•.,alar..xa.r,a. are CAUTION-ELECTRICITY PRESENT i �'i"�"o"�. •'�,®•�+.,�,,. 4)3.213.12 BO')WErT LJEIERrYAVE1VtlE ROIMVD 12124 ENs 7ae6461IDaw4veaDwiraw oA eMu.�a`i.s:a�ia'�w ei.dun o• ENONEERINO FIRM#P45 aw�.Y CCIa01aiW/xn Il:lIMLN IxYalI.11Yala01MRi1YY ,r•,t��,�r�a�� BIURVEY FlRM#lm231-0 aaawwoaawaaaoa,.swon•aaar,n,w I TfA"1707 #g #g NY! fil Mpg ail t M N F F N S P P P P r 92 9 l ilk Ix ill 1 1 1111 oil $ i g is r M N Y r M N six X1 Hip ;00 , z City of Round Rock z Gateway Sign s - 0 ■ N :{r ? � z —' r—v SOUTHBOUND IH-35 AND ' �- 323.72 WESTINGHOUSE ROAD BAKER-AICKLEN / G ASSW ATEEi.INC. nGtPCtLm[,C.,.'A.b. stmB4�Ba>m m�s4tttttamtlt+4s tnwLarEBrJtt2ntoto ys 3rtB/tom ;'i ' I 5z BFUBB BpH BBQ 1 �g N 10184892.14 E 3127546.18 j I M N 10184861.06 � Q E 3127597.92 ^ti � 0 O � Lo 0 I ABUTME R/GRIPRAP ` M Lu � J STABILIZED COUCTIO SILT 3"� (u Z O ENTRANCE REFIM-3 -3 - 00 - _ - - E UMITS OF CONSTRUCTION:O.SAC -^— 46 4-0 m Z CO /c^ H ~ 564n Lu Low — 0) Lo. ELECTRI POINT SSCNORD o ' ` STOP OF CONN ON �i v REF.ELECTR TCP WESTINGHOUSE RD. BRIDGE I N M CHORD {E TDP 1355 !43.50 ONE wAY BOX CULVERT M 4 X '. R 4'X6' 1/ BOX CULVERT I I 199.14 n 9 m TBA1/7 x.':, 24•neP SQUARE CUT ON S.E.ENO $04.60 n LD OF HEADWALL FOR DRAINAGE $,[iy Ktarrbdsb�elow. NU\aEH STRUCTURE 3 CBll bMm ym ft 0601-2-126 srA-toae+ez CAUTION-ELECTRICI Y PRESENT ISHEET NUVAER 0/S-74'RT w'�onlat�n.Bnni.+nr�ira.�u �i.a�uw�nt ami Mttu9necuttuttnT�naL�.wLttLw�toAtoumetatww �-� ELEV-S0&06 nrr° ina0r°Pr"�aimwnownraRwrrw wrrw RM aN n..L not Atn ataratea t9nx ttt9 BumBo a'R9r °uoo�BM°rwwMu'v0R°A,Mn° ons�i\DnRn�on n•n4�rvRB�iw'r10A SITE/LAYOUT PLAN Dp\B IMIY Mn\W Y91L nAM ILY\9R 11�RBIDMI�YK lA911BI014!M1o1111ORM\AMBO\IO MO T6 DMB11111011 SCALE:1"=60'-0" ,vnut�nrarwrcwat9c oily H1 g Z ya $ g bzH 914 1 3 0 g a gill 3 '1 11 lie M C Im N9 ` N 17Jill I Flu, �- ❑ ❑ ❑ , $ Isi 't' .❑ ❑ ❑ .�. oaov❑ m ° n City of Round Rock 0 CD °' o �;.. i •� il �, Gateway Sign N sgry SOUTHBOUND IH-35 AND 323.12 WESTINGHOUSE ROAD ! . BAKER-AICIdEN ljk&ASSOCIATES,INC. tttnwrtaonrw,� WOaOttt>O[lOf�/WtW,t ststu�ro ttt�.Wnstltw aw�a n.+tt®w TMCItWn DElIIIH® DRAWN IRIVIEW® RECOMMENDED TOE-IN METHOD BHVBB BN BB STEEL FENCE POSTS (MAXIMUM 8' SPACING) WOVEN WIRE SUPPORT Z (12-1/2 GAUGE NET STREET R.O.W. 50' MIN CEOTEXIILE FABRIC BACKING) GRADE TO PREVENT SILT FENCE MONN ICT RUNOFF FROM LEAVING � TRANSITION SITE EXISTING GRADE Y TO ROADWAY U p p 2 TRENCH(BACKFILLED) _ I z O In V/ =Do LL CROSS SECTIONZ O cu O =) = FABRIC %I.— _W TOE-IN O (U F' U) CROSS SECTION (9 4.0 O LI I_ U 1. STEEL POSTS WHICH SUPPORT THE SILT FENCE SHALL BE INSTALLED ON A SLKIIT ANGLE TOWARD THE ANTICIPATED RUNOFF SOURCE POST MUST BE EMBEDDED A MIN.OF ONE((17 FOOT. NOTESL 2. THE TOE OF THE SILT FENCE SHALL BE TRENCHED IN WITH A SPADE OR MECFUWICAL TRENCHER.SO THAT THE DOWNSLOPE FACE OF THE TRENCH IS MT AND PERPENDICULAR TO THE LINE OF FLOW, WHERE FENCE CANNOT 1. STONE SIZE SHALL BE 3'-8'OPEN GRADED ROCK. BE TRENCHED IN(E.G.PAVEMENT)WEIGHT FABRIC FLAP WITH WASHED GRAVEL ON UPHILL SIDE TO PREVENT FLOW 2. THICKNESS OF CRUSHED STONE PAD TO BE NOT LESS THAI 8'. UNDER FENCE 3. THE TRENCH MUST BE A MINIMUM OF 0 INCHES DEEP AND 6 INCHES WIDE TO ALLOW FOR THE SILT FENCE 3. LENGTH SHALL BE A MINIMUM OF SO'FROM ACTUAL ROADWAY,AND WIDTH NOT LESS THAN FULL WIDTH OF FABRIC TO BE WD N THE GROUND AND BACKFILLED WITH COMPACTED MATERIAL � INGRESS/EGRESS. 4. SILT FENCE SHALL BE SECURELY FASTENED TO EACH STEEL SUPPORT POST OR TO WOVEN WIRE,WHICH IN TURN 4. EHTNANDE SHALL BE PROPERLY GRADED TO PREVENT RUNOFF FROM LEAVING THE CONSTRUCTION SITE. IS SECURELY FASTENED TO TIC STEEL FENCE POSTS. S. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF 8. INSPECTION SHALL BE MADE WEEKLY OR AFTER EACH RAMFALL EVENT AND REPAIR OR REPLACEMENT SHALL.BE 9p•••• 41�a SEDIMENT ONTO PUBLIC MONTS OF WAY.ALL SEDIMENT SPILLED,DROPPED,WASHED OR TRACKED ONTO PUBLIC MADE PROMPTLY AS NEEDED. t RIGHTS OF WAY MUST BE REMOVED IMMEDIATELY BY CONTRACTOR. S. SILT FENCE SHALL BE REMOVED WHEN THE SITE IS COMPLETELY STABILIZED SO AS NOT TO BLOCK OR IMPEDE .• i# 6. AS NECESSARY,WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT OF STORM FLAW OR DRAINAGE l WAY.WHEN WASHING IS REQUIRED,R SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH 7. ACCUMULATED SILT SIAM BE REMOVED WHEN R REACHES A DEPTH OF 6 INCHES. THE SILT SLML.BE DRAMS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN.ALL SEDIMENT SHALL BE PREVENTED FROM DISPOSED OF IN AN APPROVED SITE AND IN SUCH A MANNER AS TO NOT CONTRIBUTE TO ADDITIONAL SILTATION. ENTERING ANY STORM DRAIN,DITCH OR WATERCOURSE USING APPROVED METHODS. 8. SRT FENCE SHALL BE REMOVED AS SOON AS THE SOURCE OF SEDIMENT IS STABILIZED •� OM CITY OF ROUND ROC1DRAWING EC-009N0: -py CITY OF ROUND ROCK DRAWINGECONO: A OH ITDi AT PDBLIC WOB>O ON)IIIc AT 1tD81IC WOMB X11 STABILIZED CONSTRUCTION Dsatl SILT FENCE DETAIL C7N ASL (,w.= ENTRANCE DETAIL„ 0601-2-126 to t/W0 ttMlnv. >ro tIs a a NIQY.own on" r 61EIT Numm D STABALIZED CONSTRUCTION ENTRANCE D SILT FENCE L-3 NTS WEI DETAILS-EIS CONTROL L L"LCd LO a Z IY ' I 1 1'd I . 1 1 1 1 I 1 � I ' I 1 / 1I II s 1 y� I 1 I I ® ® ® ® ® © ® o o G o 9o9891 lie 9 9 S City of Round Rock co 01 Gateway Sign " 046 N z ,;q '* SOUTHBOUND IH-35 AND m { 323.12 WESTINGHOUSE ROAD �x ,aa ,w �••a uo to Z 4m 3 r� z o ii Z co Z Al IAV � /'.j jlljlj i o ljl lllll� / � a wx m jr— �n ,sa - Z a � a � a rr Md, YTo 0 r agge MIR 3ig i ry v City of Round Rock 1 s 000,,4Gateway Sign o OM z a; • • ' SOUTHBOUND IH-35 AND an 623.12 WESTINGHOUSE ROAD Z 0 000 00 000 y s _ N. g H S YRl "!t d Ct 24 t 2 g s� fig_ q W V W fs A (J N to SO O 0 0 i 40 §.� 11 Ia -! W 4 � IF m r I H 5�•' `� N �' City of Round Rock F n ° o `` Gateway Sign aa �� r s �° • ' SOUTHBOUND IH-35 AND N 4 32&12 WESTINGHOUSE ROAD m 'e p z Jim R R P A 7 r R9- will gg 9 9 IN xx 3 o ae.3x _ 9Rig Q # Oil log R $ q � � $ F R $ IE •• City of Round Rock Gateway Sign ,t SOUTHBOUND IH-35 AND 3.23.12 WESTINGHOUSE ROAD v u - e ^ r > n r r g Zo n pp r > r > Y . ypFA, _ mw ��MQac i t3 o u a n r r A o r r > 5580 yy 9 PPP• yQ$ p p O? PAlip s F ill < g y �� � gill 9 � 1 o � � fill 9 L 8 Oil R �'¢ _ $ a ®T1111 7 Jim, 3� A Ila go 9 ox In, o� •• City of Round Rock (� g Gateway Sign 1 I ; _ r 1 �r SOUTHBOUND IH-35 AND N 3.23.12 WESTINGHOUSE ROAD I Z u Y 8O;8R P Nf YNY` Y N N Y N fYN� s N g U 1911(1 Z g �� � R� �¢ � � "_r 1 y P R ih i'Ryi71! 7! IIf < tl > M O > s§ a� AA s e� aRIF � € I is a s !pA o $ aR, 121 a a 4 a IM : a f � �> a � � o f - � Y PPf PPS- Ink. 9 HO asa Hill g a ajig as a a a a a a a a"FilR1 q9 q§ if I . a 11 l a spa a Q s a O R$ f gm 8 G 8 �t7 $ 11 9 g 1 ill e _ a a a it I � $a spa a 5 �_, l € a a9 � ga a acgha a M SL ji Iicill oil x Ea Sia 1 •• City of Round Rock Gateway Sign V J r SOUTHBOUND IH-35 AND (� 323.12 WESTINGHOUSE ROAD i i I■ |.,. | , t'll 0919199914 |■ | I .,|..!| . qq�■■ �■ | § � { { gq\110 lei /\ �� �§ � § | | �|�� |` ■ § � ��k | � § | |■ ■ § �| �\ | 1 11 §�|| | |■|22|| § § | A | | 1 1 | 1�� | P1 | | k|[k � � ■�|§ ! ■ | j! . | City of Round Rock - . Gateway Sign ( Cn . �� & § � SOUTHBOUND AND i \ � $. g �| -Ph. 3.23.12 WESTINGHOUSE ROAD n \ g | BAKER-AICKLEN A ASSW IATBS.INC. ' •vswor�rwwt - •nn�oonewvra s�sar•� oo�anr�w rw�avrwH�®w TMSI�wr 0[!101!0 OMMM .11lVEW® BHIBB BH .BB �I�---- -- I 12'-71- WALL TYPE A 2'-71-WALLTYPEA WALL TYPE B WALL TYPE A U o0 v I I 8'CMU WALL AROUND PYLONZ--------------- DENOTES BOT.OF FOOTING DROPS (OQ 0 RETAINING WALL SCHED.FOR '•� � M � ---- —_�_ --"XIRGTpfC---------- ,—t ' W co3'-2%WALL TYPE C I \ REINF.CONC.RETAINING WALL 0 SEE SCHED. y_.: m ? 0 cu L------------L---� — r-- —SIGNLETTERSANDLIGHT W SHOWN-SEE ARCH.&E RICAL�' T-7–cam— 3a-7' (2)15X6'-0•LONG @ T&B AT ALL ' CORNERS , .•� NOTES: CHOP BLOCK PLANTER WALL-SEE ARCH • ,�� i 1.SEE SHEET S6&S7 FOR RETAINING WALL DESIGN. 2.BID ALTERNATE:SEGMENTED MASONRY UNIT WITH GEOGRID SYSTEM TO BE DESIGNED BY GEOGRID MANUFACTURER.SEE SHEET S8 FOR DIAGRAMATIC WALL SECTION. FOUNDATION PLAN sne�•ra- Ecr luea 0601-2-126 MEET NI.IBH1 gene,!. S5 --' BAKER-AICKLEN &A8880L4TEB.INC. 1= „�R�Ro�icw�e�es i osaRa wwiw MOW STRIP-SEELU Ly ARCH. oeeRR,eo !wuxx '.Revmm SCULPTURE WALL-SEE �1 ARCH. I ------ 4 - -- -- i\ ..\. w ° DRAINAGE FILL 3/4" w ° 1 CRUSHED ROCK OR STONE(MIN.5%FINE) C) p p w c J O Z j < #8018"O.C.HORZ.EF Q 0 '� (n " w r i _ = fn pp 3 FOR#8 BAR-LAP 4'-0" O cu Zcu Z _ O j NON-WOVEN N m Z R=2" GEOTEXTILE(TYP.) = H 314"CHAMFER X I O (cu ~ cl) CONT. 1 1°0" — 4"PERFORATED v ' W MIN,. DRAINAGE 2%SLOPE (A FINISHED ° TO GRAVEL SUMP-SEE GRADE i ARCH. I `-Q I' ° X CONT. I I — STD.90 DEG.HOOK i N (3Nf4 X CONT. 4 #4 DOWELS 18"O.C. ~I SEE PLAN T SEE PLAN COMPACTED FILLWW" }' h, � SIGNAGE RETAINING WALL SECTION 1 REINF. CONCRETE RETAINING WALL Ecr RUYBER 0601-2-126 NOTE: '� SEE RETAINING WALL SCHEDULE ON SHEET S7 sxEer Yo •sit FOR DESIGN INFO. �° S6 roup.B w'..:. BAKEFI-AJCKLEN a AsSuCLaa es.INC. RETAINING WALL SCHEDULE oism..ww♦rw ww.srnrhaoaa�o TYPE T D 1O(SOIL SIDE) O2 O3 ® REMARK oee,o,�o auMw i newereo A 12" 12" #6012"O.C. i1M18"O.C. #0012.O.C. #4018-O.C. BHIBB BH 88 B 12" 18" 118a9"O.C. #8018"O.C. 9"O.C. M4@12"0.C.a WALL STEM REINF.Wl C 8" 12" N8018"D.C. 88018"O.C. -- --- MID DEPTH #4018"O.C. SINGLE LAYER REINF. maeCT RETAINING WALL SCHEDULE U o 0 1 NTS Q O LO _ w c o5 (aZ 0 TOPMORIZ.BARS SOTTOMWERT.BARS O =) _ SPLICE SCHEDULE SPLICE SCHEDULE 3 O CONC.STRENGTH CONC.STRENGTH y.. m Z BAR (PSI) BAR (PSI) O M SIZE 4000 SIZE 4000 O Lu Lu 3 24 3 18 0 U 4 32 4 25 5 40 5 31 8 48 8 37 7 70 7 54 F 8 80 8 82 9 90 9 89 w eIWRBIIr 10 100 10 11 110 11 85 cT�uweea BAR SPLICE SCHEDULE 0601-2-126 2 NTS fl. ..L fl .. C rou .p,IV- S7 6AI�R-AICIdEN. 8 ASS .INC. ■nw lmnow•,.... e�ss."�aao os�sa.welw --- I I U oeex�Nen ox�v* IKvev�eo BHfBB I BH BB MOW STRIP-SEE ARCH. AVA1444"i lly\19\9 SRW UNIT(TYP.) _ lz K ROCKWORK-BY i OTHERS ;, V le _ QO Lo V I LENGTH TO BE DESIGNED BY GEOGRID SUPPLIER '^ 2 iA W I V! _ Lu y ter- DRAINAGE FILL 3/4" p 5 CRUSHED ROCK OR (u Z O STONE(MIN.5%FINE) n0 � NOTE: 8"TYP. n m 7 ALL RETAINING WALL COMPONENT TO BE DESIGNED 6 PROVIDED BY GEOGRID w GEOGRID(TYP.)TO BE Q (� = MANUFACTURER,INCLUDING SRW UNIT 6 = i DESIGNED&PROVIDED W GEOGRID REINFORCING. BY SUPPLIER a�+ v Q R=2" S" NON-WOVEN 1'0" 3 0" 1'-0" GEOTEXTILE(TYP.) „a a MIN. (3)/4 X CONT. �a Ts' h 5 I 4"PERFORATED c DRAINAGE 2%SLOPE- 1 (7)#4 X CONT. —` I a a v $ SEE CML #4012•p,C, 8. a 8. COMPACTED FILL #4 DOWELS 0 18-O.C. a a a LEVELING PAD (f(--3000PS1)MIN. — SIGNAGE RETAINING WALL SECTION r0601-2-126 1 ALTERNATE: MODULAR CONCRETE BLOCK UNITS W/GEOGRID ,„E..„u,.M erq nee ng ^^ group,Ik. S8 HSS2X2Xv4"(TYP.) gq q.,ql N f b� I 3/,8 \TYP. a easeNr�arEe.INc. �� •I• 3/18 TYP. m....:,.... ww.arr.s,Fmw,a ir,�Fvn RENEWED I I BH/BB !BH BB I 1 I PROJECT IHSS2=1/4'(YI-) _ 'W^ V/I I Ao =5 O Z = I 1 SEE DETAIL I =)I _ 2/S,0 I .CD m z -- --- --- — o ca co . U 0 b I I HSS8X8X5/18" I � I F R 1 I 1 r —-—- _— SEE ELECTRICAL �[ �a (1)#4 X CONT. &OIR&lT fill, (4)#4 HAIRPINS NOTE: IIS 1 Eyy yy/gTp.90 I T#440322.O.0 C/9 GA ALL STEEL SHOWN HEREIN ARE TO BE HOT SIO DEG.HOOK DIPPED GALV.INCLUDING BASE PLATES& n►, �i CENTEREDI THREADED RODS. COL. /" 8"CMU WALL W/STONE CLADDING-SEE ARCH FOR 1112" FINISHING REQUIREMENTS NON-SHRINK GROUT W/ A r Ecr"uwEea I, bl LEVELING \ (2�i4CLOSED I II�^ f�I 0601-2-126 NOTE TIES IPp�l1 ,{h — hh EnEErxuweEn penole 18"THK.FOOTING REINF.W/ #— 744 (10)#5T&B EW 1 PYLON FRAMING ELEVATION e�pnee^9 S" `V BAKER-acldEN 8 A681INCIN7eB.INC. .n„K.T,�Dv„cac vasa RDIX,CM=SRO. .!OlImRIi RAM.rN ww,arrw,l,am,a Ton�H� DlegNM .DRANK RfVIlNlD BHBB BH BB 1"X14"X14"BASE PLATE W/ ---— (4)7/8'DIA.F1554 THREADED QCT ROD X 12"EMBEDMENT `a (1)1/2'DIA.A307 BOLTS FROM Y L3X3 TO HSS2X2 L3X3X1/4(fYP.)-(2)PER. I.A. Z Q SIDE,VERT.LEG FACING Q DOWN AT OTHER O ' DIRECTION �^ M W ...... .. ._.L ... ..... ....._r HSS2X2X1/4'(TYP.) \IJ = co m Z \ \� 0 rrenn DW (2)1/2"DIA.A307 BOLTS -N V O FROM L3X3 TO HSS8X8 cl) COL. !1 N BASE PLATE CONNECTION DETAIL q.• F h � '�1a PP r--R 0601-2-126 sm"Num"R o sole germh enpnee np A O 9mP.� `J .'.:. CC Oo I �It fiti ld 18 City of Round Rock m Gateway Signf oil!11 N - ; �'I 11 m g�h _ SOUTHBOUND IH-35 AND o »*`= WESTINGHOUSE ROAD 32112 G r W N 21 Pas gas N1 � H lei g x { sd Inn ` �� I$ City of Round Rock I G rtrt 4h lL � p m 1 s y Gateway Sign SOUTHBOUND IH-35 AND i _ D ' WESTINGHOUSE ROAD JilI 32312 a z Pith D Q i ►ri ^ � m 3dP�6 + Sail 111rrr111 gas m! "A Ish rrrr 4 IIan P 2.r>d� omen M 86686 6 P;VP OtlV cocoaall; , A� 00000 ra �z onmvw p $ g�(y to City of Round Rock m Gateway Sign41, r SOUTHBOUND IH-35 AND f i WESTINGHOUSE ROAD BAKER•AICK 6 ABBOCLAaMS.INC. trm�vmuarwuc / aaaonmc�ar�aEan s�aarrEo / HAYS CKEATWOO l.Olialllaa IqC aulw'aMh®lO MtlIV/TC[MO>�n1D 1YL�1'If! Ilaaa+aonauunaas amyl YMI REVIEWW IMOKbftllallr wuxwsw. FJP FJP TFH SEE LARGE SCALE •�••• -• •'".••• LAYOUT SHEET E-5 RWEcr i Q Q / -0 U) = cwn o cu D ° N co z o � NOT ENTER� '' 0 t� FOR RISER DWCRIA71ON ^ORR % 1 U) AND ��� ITY V —�--�— LMTS BORE AS REQUIRED.NO OPEN ® LLT ALLOYED 25643 It, RM1 ,, _POLE / / PODIT OF SERV! CONNECTION • • STOP STOP / — WESTINGHOUSE RD. Q. r N aaEQ NIaEIBt Top 1355 PARTIAL SITE PLAN 0601-2-126 ONE WAY / w, ,E 13zc�0 IEEEN►6!R o 10203040 30 so 40 4o eo j .S SITE PLAN E-4 CTRM BAKER-MCKLEN G A9EI0CIATM,M i..--I—,... I —.....e. rmwsruc�r�wic wounononciwara 6f'1YwO HAYS CHEATWOOD —�L'oKaFfllta InE� �lnClnnN IIODDa wr+mwYownx �rciivn norn+aon.uura..ww we.r aw nQnaw® n�acx�ws- - ,rrw,��� FJP FJP TFH i 2 -Z1� MEM 2 1�. c: o Q 2 LL _^� o 2 '`? uWi 2 L? 2 -.� O z 0 O 3 0 0 co CU ' nil Ts 2 ,s Q =O 3 NOTE 1 PROVIDE AS AUERNAIE ��+ LLI fn FOR COIL M OF U ALTERNATE ROB UAUNAIRE TWE u e 4 LIAENPu sE,tullN loanCONTROLLER,PROVIDE HEMMCOF ry't ll�i ENCLONAM PRWME ASA MNATE � �• •� N RP-1 LARGE SCALE PLAN _ W E SIGN — EILCTRICAL 0 2 4 8 8 18 S 0601-2-126 NOTes: 1. PROVIDE BRANCH CIRCU NQ AS REQUIRED BY MANUFACUM FOR LED CONIROLI.EB HEET"L'MIR L FOR UAGNAIRES N07ED PROVIDE WIm1AIRE TYPE L1 AS ADD ALTERNATE. E-5 LARGE SCALE PLAN SIGN LIGHTING LiS= Only pn-°uol Itled pi odwl.NwlI W Lm" Tlw'CM1[a* Barricade and Construction (BC) Standard Sheets General Notes: '°"`_°"'rraHio°°""°'°"''°"Llan• (CUM)dapriba prapl0I Iflad pr°0bfa ab Asir°air°w ab w w farad �F 1. The Barricade and Construction Standard Sheets (BC sheets) are intended to show typical al-Itrb at rM vap a)draw ptval below or by arMarlrgl examples for placement of temporary traffic control devices, construction pavement markings, T"0on Do"ho°r of Trorespori0lon Troffo Op and typical work zone signs. The i nformat i on contained in these sheets meet or exceed the RWO Isl:121rariab Olvlalan-TE requirements shown in the "Texas Manual on Uniform Traffic Control Devices" (TMUTCD). )4l1 '"� yFb 2. The development and design of the Traffic Control Plan (TCP) is the responsibility of E = the Engineer. ,oAMMM A„RUMMM MAIM F- 3. The Contractor may propose changes to the TCP that are signed and sealed by a I i censed (4191l4fM Work zar rrmfl°Cartrol pavlow Llan aura) professional engineer for approval. The Engineer may develop, sign and seal Contractor °++ailvow.Met g rrowlla rla.nr°nl..Me proposed changes. Tom Nonual on alfa„Tro"la Ca I Devices army) 4. The Contractor is responsible for i nsta I l i ng and maintaining the traffic control devices "'''p"^""f0"001'p1 Ilo0lWw'ro'f'°•"~ ' as shown in the plans. The Contractor may not move or change the approximate location of alaboro NlyaRy elan 0aalalr far Tmn to ) any device without the approval of the Engineer. ""inIAMM'N"°''0°v/p6l loottoneftrehi. b 5. Geometr i c design of lone shifts and detours should, when possible, meet the applicable i cab I e Tr°'f1O�'"ppr'NO ptai0an°'""" M,p��111,.,Neaf,aor�w.,l.wul.°IaI..M. design criteria contained in manuals such as the American Association of State Highway ot " �l and Transportation Officials (AASHTO), "A Policy on Geometric Design of Highways and MW ° w,m.l ,p•Iale, let.Ma Streets", the TxDOT "Roadway Design Manual" or engineering judgment. 6. When projects abut, the Engineer(s) may omit the END ROAD WORK, TRAFFIC FINES DOUBLE, tg and other advance warning signs i f the signing wou l d be redundant and the work areas Goad ay halon rmum appear continuous to the motorists. If the adjacent project is completed first, the Contractor shall erect the necessary warning signs as shown on these sheets, the TCP f " sheets or as directed by the Engineer. The BEGIN ROAD WORK NEXT X MILES sign shall be Si€ revised to show appropriate work zone distance. pt 7. The Engineer may require duplicate warning signs on the median side of divided highways where median width will permit and traffic volumes justify the signing. S. All signs shall be constructed in accordance with the details found in the "Standard Highway Sign Designs for Texas, " latest edition. Sign details not shown in this manual shall be shown in the plans or the Engineer shall provide a detail to the Contractor before the sign is manufactured. 9. The temporary traffic control devices shown in the illustrations of the BC sheets are examples. As necessary, the Engineer will determine the most appropriate traffic control devices to be used. 10. As shown on BC(2), the OBEY WARNING SIGNS STATE LAW sign and the WORK ZONE TRAFFIC FINES DOUBLE sign with plaque shall be erected in advance of the CSJ limits. The BEGIN ROAD WORK NEXT X MILES, CONTRACTOR and END ROAD WORK signs shall be erected at or near the CSJ limits. 11. Except for devices required by Note 10, traffic control devices should be in place only while work is actually in progress or a definite need exists. 12. The Engineer has the final decision on the location of all traffic control devices. 13. Inactive equipment and work vehicles, including workers' private vehicles must be parked away from travel lanes. They should be as close to the right-of-way line as possible, or located behind a barrier or guardrail, or as approved by the Engineer. Teras D*Whw t of Trar4wno!!ao Worker Safety Apparel Notes: 1. Workers on foot who are exposed to traffic or to construction equipment within the BARRICADE AND CONSTRUCTION right-of-way shall wear high-visibility safety apparel meeting the requirements of ISEA "American National Standard for High-Visibility Apparel" labeled as ANSI 107-2004 GENERAL NOTES standard performance for Class 2 or 3 risk exposure. Class 3 garments should be considered AND REQUIREMENTS for high traffic volume work areas or night time work. 1 of 12 BCM-07 T.apT 11-4•b 4-07 a-oT WW 1`•.� A.r 04 nal 0 TYPICAL LOCATION OF CROSSROAD SIGNS T-INTERSECTION TYPICAL CONSTRUCTION WARNING SIGN SIZE AND SPACING`s'e 8=S ROAD Kd1p WORK I10RK tzae-tD Kap pIK SPACING otM-ta ® AAHEAD 1WWx,W80 o!o-lx slWgiWs SIZE ROM spur National etc art-Itlt \+ s Pae 02g-,a g t.e o f f Ston a- GF OSSIIpdO i- INMR!O[Cim J �n�- Posted ac ,bla9•City Exprasway/ Spacing n of srtaKoaO FraaaY X. % % IWMr Ib C> 1°tak Gn% 4 Feetx CW20 1VN ( x % / ) F M, / . Limit per' C122 .6•x I6• 48• x 46• 30 120 t$ �3 ss tee l pKaO°OKIcFADES crn 40 240 g AHEAD IR[1FI Im80 K20-8 1,20•[ �apn �� �-6 CgI� �� .s 320 laQO-,D 020-14 National 20 KDIli1Diu[ ® RAE �W' F' G7, Curb, 76'x 38' 48• x 48' SO 400 s D. CWB, con 1, 53 000 Owl. I and 4) C11 w 6008 620.28 C113, C114. 6S 7002 ®.6I w.aeht.d m emir d COO-19 sign with approval of eWlher. (Sm rotw 2 b@104 420.28 CW6, 48• x 46• 46•x 46' 70 S00 • 1.Tn fypfWl minima signing a nnrsl a aead OW sl=id be AD 1001111(a CM-10 1001111(YWAO sign and 4 CSA LIMITS AT T-D=tM 10N C111113, 75 600 b RD to M KORO°pet st0ryawse M1rC OMrwise In plan. L710, C112 60 1000 L The OWiner may use the nane.d sin 3r x W MAD.gK MA(10120-10)sign sevMs6 DOME to book I.TM Engineer rt 11 dol- fro ih types ad lenttan of any additional traffic aw a 16ntaa,men as a with the reared sin 36'x Ir BW ROAD 9=(020-20 sign an lar ration aewese.two Naw 4 undo ftalser awl aampatIng sign,or olar Wgu,flat anwld be used when work Is being am land at Or •7*1981°an.ktgttan°antro Sign Sln and Spactng').Sn the'Standard Highway Sign Ossighe for how an I ho stun. Tsxn'marel fr sign dstoi ls.The Eng to r may aft the atvane waling Slgo an Iw vola. L If mafivetlan slows the road d a T-hNrseatlon to contractor awl I pts fho 620-0•CW*rWW Paw' oveaaaw.The End iner wit I dstentM Wather a raw Is law valm 71h1s Id ret an cwt t be.Inn sign bahine the Type III barlaows for the road aleare Is bt(10)clad.no 020-oL art 620-IOR ♦ For ttp[wt sip awDP n d.WW hill 10 rOrseme)•one a qY S a tr D In 1M plan, sign and l be replaced by 1M asTehr signing eel led tr in tlr plat. 4s MM On IMM TeMta Owk°I Mtae'OMKM t)piml aDplbDlw akg°a p 3.bend an aiding flold aagittans,the E nglM /Ingwtar slily npnn otattforwl sips MM an FLAosiga Tp Shrewd eah. .,kg MWA%LOW°RAYR,Or miler apprODrtow signs.When awittaal sigw re rsasignsa,those signs rl l I e wnya dida a hw ark One to first Aaaa°rMro sign newt n wA One aura be°awiarW W+of the mint"reylra.Ms.The E giMr/IM°nlar rt I I dwaaine 1M WvW aeNwm,wins own eMtland sip6 location aro aiming of any sign not awn on the se.tests,Traffic Cartrol via ants Or the Wark Zane Standard Showa. sash Palm 4.The III sign awl I n rewind ct nigh when a woods to advise ewtrisse d to length d 1. a%nlnwtton In elder direction from Me intersection.The Engineer rl l l deta.IM whoter a L S1eeta r h m an don nal N wed.hweeay. f Is saetdrW high when, rOOdvd L 0isfae setnw else awed a kaseew w"M to sew IMO I. .Orme =vi L elelew whom sip cram be'meom, w bep[rse w sew ahs r we www wwtte S iF L WMntwak ooan'tn Mho lMarseti a+q appropri irdt'nlo oar Int dwlkaw,wwewn al�ieewi In L N tlr�tO6lar.Tw lie!uwrlW._Ig M ash I �hwT�eseewM a 1w dlsratta '=E the plan a as dstsnelnec by tlr Engla er/Ihrpwlar,shot I w In plan. S Only same aures waehe do aim m hdlo@ML F5 L So sip sb Ilstlse l 7W0•.$ton AW.Wx a Mr 3tandea Rimm ton Colon fir TOW s:• WORK AREAS IN MULTIPLE LOCATIONS WITHIN CSJ LIMITS SAMPLE LAYOUT OF SIGNING FOR WORK BEGINNING AT THE CSJ LIMITS eel f<aamll list of mllol sign lip awe. RO-fT ltit nnNF Wath SM o CW20-ID O M-1 fa ANEAO i R203M# ms se- ODAD WORK gR-sK M W 020-0 ' `W'-FORK " appraprtaN) STA7E W S.Y MEAD ❑X rnrt LM2o-,D R Klo-3ItR OBEY s•E .cnr, rye.[[[serlope.r x x % x z al-110.9 dnts ] a 4 4 a 4x- A/�/�1,1�;U��//U��awhUMM�/O�1�V G '•0 b a _ C/U VUV N/ °•D � f1W ptwsMSNIIwld WIDSpianelnR nlzlnp t rowith sign Inutlon STATE UY 0P C s Wen extended dlstan a awr between minimal murk amus,the Fnginwr/Lhpwlar awls cera additional 's Ran III mak Almond(CRC-10)sign ore Viand to advance d Mew mark aeon to mine atvrs hear are off s I 00-n it tE within its project l units.Sw the applla0le TO reds for amt lawns and spacing of sign and aomnl[zing Onion RIO-3 u6enlerwr-11109 SAMPLE LAYOUT OF SIGNING FOR WORK BEGINNING DOWNSTREAM OF THE CSJ LIMITS - NmFs °mown-mattw * *M020-s WORR r-rdeet To Ca trmlar awl I determine the a0Oprtaw dishes t0 be pier a tho **C!0-ST 11MFFM sllsrtlw RO-I ertoo else and RO-ST elgh fr Tb=Qspg/1W5/tof TrarapoFlgAgn FDt3 Mma repseslan the'X Faint. be r .°t dad to" LEGEND �"'4"W""'tQwd4 CLOSEDWDORK WOIIK ', **K20-3 STATE W W. neae.t twee.Ise with tie approval �tmi Tye pet JC113 c20-s = tM 6nglner.No an[male II be Dartaawr , to �o-IE M* - nAWiE Rea* nems. d $to BARRICADE AND CONSTRUCTION algelixira * PROJECT LIMIT x \ _. - % x whn°2ed 8199 ON nptlnds°wtsin 0 0 gavel Nine 0w1ne In.aA amine 1'e; Mr.mierid STANDARD d Onfsrlrq r hew rq a mak xae Mars I Tye III berlaaa We"Ic fines may dept.I1 wrkre one mslisinp +CSJ Limit tt if II See Typical Canstinxtian Irma CSA Limit slgeng.See Si X annV Sign$in and �✓ � MIs 10 a OCH). Ina n1.4-n 0.nor a row, r nor w ]pastry aha[r the f-oi e.r.w a...e. row.• - t'� 620-20 tf tF ..r .�l acid oll,rd:°A0'°°` TMTCO far sign seem semi gh ge r minis spacing ro♦drwrnta a setlw for a ile Tra"I.Cenral 102 p TYPICAL MINIMUM CLEARANCES FOR LONG TERM AND INTERMEDIATE TERM SIGHS OMM MM IN MK MM UM b I. Caxratar out Install ane mintaln etahs In a straight she slue conditionaWr a 411 acted by the Engr. ins . b L wooden sign posts shotl be pointed Mlts. 3. barricaded dot I Na be wee a sign anarts. Iz'sin. Lhot Is doll MI to used to~•IOm ts anywOprt. y jlQ� L ►11 sign dols be Instal led In alordawe with IN plan or as atas by the BMiror. Sign•shot be used to ngutats,wmh,and 1'F kL ROAD sinlww ROAD AORII wide Mw trawling"Its barely tlraWn Mr work mot IL To CaxreaW ady hrdsh sinr tie sign design am In the atom r In to'Stags Nlgta�l Sign bealgur for Tse•'tNMO).lie jM �C h'^k �OIIK � ANUG 6Mlnsr/Drpectar eau rpuln the CaMraotr to furnish ether work are sight that a7 dean In tie IApfA but may lave ben altted R=8 odes MILAO tra tie alae.Mry vrlat.n to Mm plane doll be dmumaded by rites demist bere.n tie Figlasr ad Mw Cadr~ .SE 3 I IegrrIbl•Pro►►II aa- wet be deaesntN In writing bean being Implemented. mi•an Unglues dmr.rrtlro Me dtago In Y 0' t e InpsaWA T700T alcry ad twine both Me Inspector aid Cadrafor Initial and de%the age qn aha. N S /, alis tH tl T. Te Cenhmfr del l furnish sigh supports Iisied In the•Capt lata Werk Tar Traffic Control 0-IM LIW ICIM).TN Whlraalr v elm ar Wall Install the sign do" In aooardres with the rrasmhrr's rmov n d0lar If Herb Is a pwstla riming Instal Iola Pb wove gestsr Tf.N sedimmy. a proosaeae,tie 001 asks dell prniah he NMI ar a apo of the enuPoohisr's Instal lata r or•weottae N to Ingimr son d 7.0'aim vrl y Ue m set Psoft e•we estate fat lea0. LO'war. LO'atm L The 00 ho is responsible for Insist t Ing alae an aide- suppat•and replacing stem with doped r arrived wOstrofN am/ar aarpea r mrred Mlsaiw slhesling a OlrNled by-.10-0 ie[ryln.r/Iropsotar. L far*Iftaatan wrkingb mbe be son anly an Mm book a ilr•tan aWhata In wmlwa Iola*a Iattr•NWr amp fry lease used [ tar IOarFifiaaln dial l be t lam 1s.The Contractor sol I rglo denied and poets.N-r doopea coed sign pats dei 1 rot be Sal load. Pawl /a Pave . X DMTM OF ION[kr eeNhod by tis'Two Waal n Amifarm 1raMle hynlral D-Iase'Irl a dmlldr shoulder 1. The types a sigh sh0oarfs,elan denting tela*,he•la a sties,aid the type a sigh wbhates an wry boned n Me type a ark being peAaNL Te BMIner a r dim 10 tot selecting she app Who%stn sign tr the type of work being per to The tE Man placing skid wpprle an nl•vsl grouse,the Ip pest I-iollr wet be adjusted Be the sigu oppsrs straight dee phm0. =Vow 19 rep",ble Zruring tie blah•pert,•Ugh manting height and sulan. •mets vam*aohrr'e rsomendosia s In Objects dol I IAT be plated andrr skids a o Neo a IMI Ing• rears ta al)dssmthihop dee draft•a wherk raqutrarM•. L We tots•MINry-work that=111.4 71 o laoatn mere Mvh 3 days. f b, tnMwedtare-taw&Wlwry-we*that aewpiN a l000ttn are than am 0o011SM pried q to 3 dao,or nlgtles vrk lasting F b tE tf Awn plagued r.rifted an dual-loo p supports,they should be defamed to the hpright nsaest the travele,taere than dee tsar. %ol aantol places(advisory r dlatawsl Oeule at cover Its surface of the gra*siou L Apert-tare statlanry-satire worn that ocaigles a location far are hon I her In a single dayl tent bled. 0. Trf,duration-work Mot oeeplN a location hp to 1 her. a. )mei le-work Met mwws oantinmaly r Inreuelttalily Iaepping for up to aoprexlaately IS■in les.) ATTACHMENT FOR SIGN SUPPORTS AMesanf to Baan ap00rts $Ia maNITINp IEUNT Apart Bill I I be by belts and nuts 1. the bofta a La e-faO/h^uoedlale-tae slam del l be a least 7 fat,but net are than I fat,abme Mr and wrfase,exsept .� dell net es don for mplanntoI PIOW asded bel-other sig• WIIK-rprolrhea r'�Treo�wOrd L no dna of 9rt-IMlrt Wain star dol l be a siniwa a I foot above to poe M surface but ro won Man Y feet aeon g Zu E sow doh scrufflactur2= plasma fr atoobtng sign L �Lan�p*avedtare-taw state way,be used in I i-of Shirt-hraHert gratin sign no. watraM ts oar types a a. 9rt-NnV71vt Watlan•hem dN1I be used only dring dayl Ig*and del I be reaves a the dee of tho m may.r ralsed to sign wpprts apra0rlots Lang•trVlM.rr01oM sign halo*. SgpoM ® Na i I S W i I I NOT L bpulaNry sign dot I be nulled a least 7 fret,but M ve Mn o feet,above the paved silage r"a lead a work dratal Yp dol I rot ROA® 1--l"1777/1 be a I I owed. ides UThEi fl�i ode of lw Mm use a Nal lr sin orelnptln waning sloe an a odo7 rat!r ally dr«ts ere apeede deo Iwo If ts now sign i i ®��r 1 « Each s i the sten sin 1 Itsted a an option an tis'Tygtal Carlrualan Nothing storm Sin are Ipalng'shat anon an SC10. L The Cala mi. dol I fanlsh ttr sigh slue dram In plan,the SC Seas,the TCP aheas r a directed by Oho EvInver. =S I i I I \ 70 sha I I be attached 1. Them Beta shel l sere the sign■Mstrere to Installed to 000rdrs with Me sNWaelrr's mocks nastlahs hr the type r sign ff8fr 11���. I bpprt toot le being hnrrd.lho L7GTC0 Iibts can aaetrahe ter dean be deed n tlr Otffsta*type oro deal•a.tan msortL F+T+ d i rect I y to the Sign L 'ern'type NMI Ilalam IAT an cop- elan warns,man lest a to t1f a of Me asew. St��wp SII Support. MU I t i p I e 3. All aeon Ialvidrl sign parts rarloared tram y r.re places sal I Ihcee dee r won plywood oleo,1/28 Mia by{•ode, ta•tstwd ts the book a tint.Ian are st*e lIng ful ly crass the sigh.Te elect dol l be am!acted to the baht a tin•tan ming reed 1te rq m the screw 1W a not pshotraN the foes r the sign pool.The screw doll be plead an beth sided r the sellas and spend a I' Gook wa the sigh signs shall I I not be OwlvrL The Enpirosr way approve eta sethede a apt icing the atom twos. wO•Irate. joined or spliced by 1 All NOIECTIsig be rah araleatw are constructed a swung noting Mn air are Mro-MIN}Wlty requirements a MO-03a e FpaR ELEVATION far rigid atam r AA-81t0 her rel a-rep side.Ito wb address far OE speolfloettan Is don an gill). Wood,ectal r any means. Wood L Adie a It%Name the r quirmants r as-8100 Type C align%settle Irdwelty),dol l be used far atom with o wilts baak- Fiber holMarad Plaalo supports sha I I not beL Orrm sidmtln&meatng to ngulrsaa*•of 0)6-8101)Type E tfluammont Prtmotld,dial be used for rigid signs with wangs Sol Icing absdaa perforated sire 0001*Ling in afar to setww past extended or repaired app I� Mlg*wi l l only be at lewd Mn the ql Im Is vase using far belts,two SIE ELEVATION 1. All•len Isttsre an naabre Mall be Olen,and son raided type upproses algnaet letters a approved by the Fedsel Nighwry dove dee two belts tie qia pela.Spl la weed be 10aated a*InIY bating by Sp I i 0 i ng or Adsins•hetian ill=)and a purl Ides in tho'stanra Mlouwp slat Design far lea•vawwl.slam, Iafere are umosre ONI I be a 1st dam a at least rot now the bass a 1st wart.Span Insert Iwam wood Tied aloes wortonshlp In aardaoe with Do"and SfaerOs and Specifioatlam. squid be a Idea S final nt the pat sin, he roe an Mw glia dee Other means. IIwUpUg ONE OOtAIIIA a a heat live Nes guape maerlol. 1. Sen sign mesaapes eq be canpetng or de at apply,the signs dol l be moved r oasplatsty cover" L Lend'lae stalnry or IMawedloft stationary don Installed an same Ntol tubing very be he we free trafflo a dagreee Mn CONTRACTOR REQUIREMENTS FOR MAINTAINING PERMANENT SIGNS the slush erten I.uwt apeltodblL mts type af sign wart meets Me a....... afaerde ragralw a the dirsotin a STOP/SLOW PADDLES Iepest.mi•tedm qn s,rot be used ter sign latah led in the Nein of alvtded hiol to r der as Intersections won the sign 1 STOP/0.111 peddled dee the Prhery eamod ta 0awr01+raffle WITHIN THE PROJECT LIMITS ear be am froe apraoshIng heMIL by flagprs.Two S1oNStp paddfe sin should M H'x N• L Sign Installed an wooden skids dwl I not be tuned a N degree angles to the seaway Tees sign should be re e ed r awplahly «nrd Moth Wil a detai led bslw. 1. Pavanrnt signs am used ts Give notice of traffio ism r regulations, -11 L Ae en sir "awned,the material used doll be opaque,such a haovy N I blas*plastle,r other materials which will sower tis mis L Aused a night,the STOP/Aa smile sushi be afsnMian heeandltiae*mi dee pefw*lolly horann to traffic epralam, statin sign face ad mlnteln Meir assets aam mIN ser adwobt Is hoodl loft at night,without domging tho sigh darting. rserreffastarin6 ave route destg attaa,de•tlnatia s,dlrsatian,dei laved,srviose,points L Wlq out I ADT be used to cover atom 3.SU/Sm Paddiesmeg be atednd ts a alai with a winivus of Interest,we•Mer go"dohloci,mroatleash,or cultural Inhe ma Im. L Duct tape or si*r odweiw malarial Owl l IAT be affixed to a sign facts.Than=trials can dceps therehom lsalvlty r dusting. Istnlh a g'to 1st both a the sign, Driven areardIng tlwahgn a work sae need the saw, It rot bamuremtha dol I be rem batt mute T. Signs aa • ore reached ahot"bamar tl led upon completion work. •.Aury I ly*s tnocrporated Into the STa r STAN paddle rows wldstes a norol ly petal led an a rseem without caminwtlan SUN SlIsm EIOM sal l any be at geclflal ly dosrlbea In Section OL03 L anell pome- regulatory r warning slam oanfl la with work nm aalttae, 1. Arne sigh supports require the use a wpg*s to NM frw turning over, Nae Signal Ing Dalcee In"he INIICL mems r aver the sraannt align a t11 the persons bion meeeape otdwb 1st use of andmis with 407.consolation•ata Is rftowwerd. TOM DqWftWdr TrmporWon the rBOOM condition. L The smdba0s vel l I be tied da*to keep the ease fro dog ling and to ryyM OosrdAce Ogaden L Awn adalng gas mom A signs rat moved and retooatsa due to mmtimWian ealntaln o aansta*who*. prpaeey"my dol I be Visible to oheria.at at I tINL L Nook somas, Iran,steel r deer wild objects dol I M be prdtted s. If misting sign cre to be relocated an their original supports,they she be far use a sigh support volt*•. 10• - lo- /''a% Instal led an ararla arty bases a don an the Ape Staara sorts.The sign w Sandbag•should wish a dntwee a m deams r The w a twa30 IbL BARRICADE AND CONSTRUCTION Owl east the required mounting halo*•son an the IC Shan•or to SLo L s V t. shell be ands of a Orale aolarlal that tens pan vehi-Ir MandrdL This work should be paid far deer the appropriate pas Has for Invest. TEMPORARY SIGN NOTES L timber teach a fire lar tamed dol l IM be used far sondbgs. Ys. O a•O Ya. g•p If so ows m1am stow. 7. Nchbr bel hats assigned far droved Who devion should M be uses fr L If perawn•Ian oat to be n.veed dew nlaxded ming t.rprrr«,ppatk STANDARD 5LLLJJJ �LL SIL 1st Cgtrmtr sh011 eves a•adawrMo wpparis a sign n Mr DC dosis r to bel lot an pes to•ton s pprtL Sign a=*a designed as memsoahNed CIYTN.The sign awl l ant the required eating hot"den n the with oprubdi base asp be used Mon awn an o the b Iia. p.y L Saxape doll an1Y be aN d ala*r laid ower the base atm le a that r ee Ara.r the sIo 9landrde owing aaetrnNtlah,mts was dosis be pet• 4 Of 12 BC(4)-07 W deer Mn appmerlete pap IM far nlaating witting signs. itafto h rape,atlas dee sa11 rot f wades.mien game Intl r �(y K. lured BIM racer Wed,a skid r o sig ftha rh.ra sign n sups shall a aimed mat L Mgr lOh r baffle aanlrel device*het is•hark r doped by On Onfr-tor Slag gs IalI r e p ane to in.drat ism sign mot be T.br h-a-a waves a++.. m Yd, 2s• r NsAr mmhuslin•qulpme*Iwl1 be replaced a wen a possible by the _ —...owr to store proper guidance for Hat WWI*tL This will be valet L Aendbpp arts laT d slq Uldef the skid dew Goll not be aced to level f-0T ts Utes Soz. dry elgu wppree Olmed an Hopes. <w e.aww a bwdr-aafi l.edw ee�aNt NP M.r CLL IOa s � SKID MOUNTED WOOD SIGN SUPPORTS GROUND MOUNTED SIGN SUPPORTS Wer to the Ia2TN and lir samlaohrwr's Instil Irtlm oroo.drx•for each type sins a1Dpn+. Ft LONG/INTERMEDIATE TERM STATIONARY - PORTABLE SKID MOUNTED SIGN SUPPORTS 0 Tao The socimm Stan Soho 0001091 emotI ORWO to Mr naufaotrr'S recommendation.y Tae pat Instal lotta s an be used for larger sign. Fg Front alae Top Front Nut" glee 2,•J Ad US 12 sec.ft.of f'— skid PERFORATED SQUARE METAL TUBING 21 yft ft M Sued e sign far 0 2.6 n /sign far a �� 1 I / II ! - • sign Sign f jl 1 1 I i Ld 27• 11 '!Pact !Paef 11 11 US 11 jt woodpat* ,x, iadt flf72• block ,x, LavTh et Mcfa nay ,• g a Irrroaad tar eec ,Llrml.s«Sea) ;,� aecitlarl•, naility.farSialZxt x N' , N'aln.In optionalnslyn. nS• * See seal p• S• rtralISetas, ralifarorowirennt 2xs for Hyl pinkm 'A'Hn,in slesw2,' 2x1 Oran . in h lrw •S vedc 001100 than'Iarp t•gnitasnf ]h'eclh en/nrls Anchor atm Mxn stye • stray 0011•, jt der me',x f 1/n• (1/4'lager •S j j SS'Mn. In part)x IM .. 9Yn.) 100 tlol Sly) j 1 w•de sells. sa•sw pest) 2 CG$ l p• I f a. l one SxS brook block 111/S/4'"larger than tly art)�Im S S 'bR SKID MOUNTED PERFORATED SQUARE STEEL TUBING SIGN SUPPORTS 6-S/IIl'bolt x 2 1/1' S bol N z,s•-t0om t albION I �51 e1 and Rei 7 M x M'-IOom grow to .xfropme Ls' atnxra <Dlroof EnOedrennfl urrin9r stub as Mlnacrelnp slaw>) 1-1 IZ'platin"man's thinSal I plartto thfnolI plastlo • 12- ftp flat nmhsrS, Hyl a Hyl SiF 6-not pr cion slxaE LEG BASE KING CHANNEL S SP Sia Ylev FS e e Lap-spl lac/bass 001hd eMs e . !sign x• 2• ............... In OL upright Ibf Z'x V x 1 7/4'x 1 7/S'x 11 foot dptA n 12 os.uprights It aro past a 1 3/4'x 1 3/4'x 11 foot \ / IDo Ivf SPLICE) s• In gar pat Lr �k s� CID IqT SPLICE) 1 7/,•gel'.ramr with 5/19'holes ,e. D9AL LEa 855E or 1 s/S•.1 7/4' upright vera sees••• Front Ylaw upright most e0uae tceino 8mm hl..oaa h 7h'x S nS' M. hl•axp 10 Sar the QtiCO Past pwmwfdl 7'Night Shows pm So �andhot, 2' above Tri far•secant. �� OEIERAL IIDIES p. N• geld belt Mau 1.Nails deg b.Lead In ins assembly of wooden sign tWin9 at 1'off / - aloper?S,but Ns' bolts with nut r 7/4'x 7 1/2' top of skid Vola to start m loo scrams nrt ar used an every joint for final 1 opposite sides doing aamsetim 9• j to appoeth atnotlaa s, L Yah deft is a appered Lap/Imamdlot and 1 7/4'z 1 s/S'x 15 go .x0000 Ylnlra veto,de rot groes erg said back ft II puMls. slot.Tans II)far ons ar fauN m the CgLTW s' I Irt.Sar sett)far ameih 100rtlac said rtarts here Said state Insro pin at avis L No an them 2 slo n pat out h be placed within a 2•x 2•x �/ to —► aafpin tosslops 7 ft.alrol•,exempt far aalfic nphrlots roto a the 12 as.Mcids W COM List. TOXOB Q4DOrIilW of TrWalsparWart ,.•tins project is co plotd,a'I Sign appats dew fY rrdm aasiver atmew, M fasxitla s al I wna rsysd from the project sift Oho.(Rtyw HOOD POST SYSTEM This will a considered aesidlary to)tom SOL BARRICADE AND CONSTRUCTION WEDGE ANCHORS a. Q FOR GROUND MOUNTED SIGN SUPPORTS TYPICAL SIGN SUPPORT Both steel and platto gsdge Alrlrr%VtM a Mon an the 9s Standard shorts �. Marinol Ymtisom WhistleDril led 13 Sam sea)for definition of*No*Dagtlm.• STANDARD NOW be used a tmpavpps y sign ats for Sign up h to sgacre fat of sign Polb,o1 ss.fat of soft "I ft) fas.They nay w at In con ret r in chs*Sol t If approved to the OVInamr. It' rt tea wm address for'Traffic Engineering StandsS1rrts'm Wflll. O I $121 Pat sign Few FeOeanM MWtred �E Need a sign part Poets e anot I place. ce.poiSol loft wl I I 5 Of 12 BC(5)—07 S' IIs. Q live the L1<2TC0 for Ito a itAs of sign estrat Teel 11-,-at z that San be deed far own OF sins appst. g,gy anmrs Dlrsolia, 4 x 1 2 n ~, F<J of Traffic 04 TOS EXHIBIT ' �` ���� .� s-Sc` �� "� �.� �. ��;• -.r�r � �#ffi r k ? '`.,u. �.y's:..:....:r gra c �,r�.. ..� y„,,� -�;�`��w k "�yyi�.cy r�• "'�a d�'i s� s r �.�'�"y f � 'k^"' .y � r d s' „� , , a ,x n.. N..:. sy.` _. M Aft Attachment C City of Round Rock Community Entry Gateway Signage Construction Schedule 0 oN o"' o� 2 2 2 2 1 2 1 3=4 1 2 3 4 1 1 2 1 3 1 4 1 1 2 1 3 1 4 Notice to Proceed Installation of traffic control, erosion _ controls and tree protection Site work, structural walls, pylon/letter fabrication, sculpted rock Removal of traffic control, erosion controls and tree protection Project Completion ROUNDROCK,TEXAS Ci Council Agenda Summar Sheet PURPOSE.PASSION.PROSPERITY: Agenda Item No. 11D2. Consider a resolution authorizing the Mayor to execute a Gateway Monument Agreement Agenda Caption: with the Texas Department of Transportation. Meeting Date: April 12,2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: Since 2009, the City of Round Rock has been in the process of seeking approval from the Texas Department of Transportation (TxDOT) and the Federal Highway Administration (FHWA) to install a gateway sign on IH-35 at Westinghouse Road. This process was significantly delayed due to the introduction of new gateway sign design standards issued in December, 2010. Recently, TxDOT and FHWA approved a variance for Round Rock's revised gateway sign. The steps in authorizing the installation of the gateway sign include: 1) Execution of a contract with a design firm to prepare construction documents for the gateway sign. 2) Submission of the construction documents to the TxDOT Georgetown Area Office for review and approval. 3) Submission of a resolution indicating Round Rock's approval of the gateway sign design, content, location and commitment to fund construction and maintenance of the gateway sign, and concurrent execution of an agreement with TxDOT which will authorize installation of the gateway sign (this will occur with FHWA oversight). 4) Advertise for bids on the gateway sign construction. 5) Award bid for construction of the gateway sign. This process was initiated on February 10, 2012 with the City Manager's execution of a contract with Baker Aicklen and Associates to prepare the construction documents described in #1 above. Since that time, staff has been engaged with the TxDOT Georgetown Area Office to review interim versions of the gateway sign plans - staff has been successful in receiving approval from this office. The item under consideration this evening is the resolution and related agreement with TxDOT which will authorize the installation of the sign as described in#3 above. Cost: Source of Funds: Date of Public Hearing(if required): N/A Recommended Action: Approval w Y 3 fi F 8 5 V F i Contract No. 14-2XXF6001 GATEWAY MONUMENT AGREEMENT i b THE STATE OF TEXAS § COUNTY OF TRAVIS § 5 k THIS AGREEMENT is made by and between the State of Texas, acting by and r through the Texas Department of Transportation, hereinafter called the "State", and the City of Round Rock, acting through its duly authorized o ici Is as Al 13 evidenced by Resolution Of QFdiAa Numbe -,--dated hereinafter called the "Local Entity". BACKGROUND The State owns and maintains a system of highways, including IH 35 in Williamson County, Texas, for public use and benefit. The State agrees to allow f for the construction of a Gateway Monument within the State's right of way and the Local Entity agrees to construct the Monument and to conduct the long term maintenance for this structure located at the northwest quadrant of the intersection of IH 35 and Westinghouse Road (County Road 111), referred to as the Gateway Monument, more specifically described in Attachment "A," Project Map, which is attached hereto. The Local Entity will conduct the Monument's long term maintenance activities through the use of Local Entity forces, contractors, or other means satisfactory to the Local Entity and the State. THEREFORE, in consideration of the mutual promises contained in this Agreement, the parties agree to the following. AGREEMENT SECTION 1. PERIOD OF THE AGREEMENT This Agreement becomes effective when finally executed by the State and shall continue unless or until otherwise terminated as provided by this agreement. SECTION 2. FINANCIAL RESPONSIBILITIES All costs covered by this agreement including design, engineering, testing, construction, installation, access for maintenance, maintenance, labor, materials, supplies, traffic control, additional improvements, and if required, removal of the Gateway Monument, shall be the responsibility of the Local Entity. Any administrative costs associated with the Gateway Monument that are incurred by the State, such as those related to proposal review, as well as developing, issuing, and monitoring the Agreement for approved the Gateway Monument project shall be the responsibility of the State. Interlocal-interlocal—Gateway—Mon 1 02/11/2011 -t2-04 -2,- t 1pz. . E Contract No. 14-2XXF6001 i SECTION 3. RESPONSIBILITY OF THE PARTIES A. The Local Entity agrees to: 1. Provide Gateway Monument design plans to the State before E execution of this agreement according to TxDOT policy and, upon final approval, furnish and construct the Gateway t Monument according to plans approved by the State, which are set out more specifically in Attachment "B," Local Entity's Final Gateway Monument Proposal, which is attached to this Agreement, and include any other related installation items that 3 may be required; and 2. Furnish, erect, and maintain any barricades, signs and traffic handling devices, in accordance with the latest Texas Manual of Uniform Traffic Control Devices (MUTCD) and to the satisfaction of the State related to this project, as may be required to protect the safety of the public; and 3. Conduct periodic inspections of the Gateway Monument as deemed necessary; and 4. Provide for the construction and maintenance of all associated appurtenances that are considered by the State to be a part of I the project. The Local Entity further agrees to remove such items from the project's location and restore the area to the satisfaction of the State upon termination of this Agreement in accordance with Section 9. B. The State agrees to: 1. Review and evaluate the Gateway Monument proposal submitted by the Local Entity with due consideration to safety (location, potential for motorist distraction, accessibility for maintenance, etc.), aesthetics, community support and maintainability; and 2. Coordinate with other TxDOT Divisions, as appropriate, as well as interact with the Federal Highway Administration (FHWA) for input, review and approval; and 3. Cooperate with the Local Entity to determine the requirements for barricades, signs, and traffic handling devices to be used by the Local Entity during the construction and maintenance of the Gateway Monument; and Interlocal-Interlocal_Gateway_Mon 2 02/11/2011 4 F Contract No. 14-2XXF6001 E A 4. Provide maintenance access to the project location for the Local Entity or for its Contractor or group, and if possible, from outside l the highway right of way; and 5. Conduct periodic inspections of the Gateway Monument as deemed necessary. C. The Local Entity and State further agree that nothing contained in this : Agreement will be construed to: 1. Give either party the power to direct and control the day-to-day activities of the other; or 2. Constitute the parties as partners, joint venturers, co-owners, or otherwise as participants in a joint or common undertaking; or 3. Allow either party to create or assume any obligation on behalf of the other party for any purpose whatsoever. k SECTION 4. DESIGN AND PLACEMENT OF GATEWAY MONUMENTS A. Gateway Monuments shall be designed and placed so as to: E 1. Be freestanding. 2. Feature only the letters of the community name and/or officially adopted seal. 3. Include, if required by TxDOT, approved protective graffiti coatings. 4. Be appropriate to its proposed setting and community context. 5. Be in proper size and scale with its surroundings. 6. Be composed of materials that are durable for the projected life span of the project. 7. Be located beyond the clear zone, for both main lane traffic and frontage road traffic. 8. Be located where maintenance can be safely performed, as specified in the Gateway Monument Agreement, and in conformance with TxDOT procedures. i 9. Be subject to the review and approval of TxDOT in consideration of design, size, and scale for appropriate integration on urban or rural highway features. Interlocal-Interlocal_Gateway_Mon 3 02/11/2011 t Contract No. 14-2XXF6001 i B. Gateway Monuments shall not: l 1. Be allowed within the center median areas of interstate highway rights-of-way. 3 x 2. Contain religious, political, special interest, private, or commercial messages of any sort, including, but not limited to, symbols, logos, business names, trade names, jingles, or slogans. 3. Contain any displays of any sort, advertising, decorative banners, flags, or flag poles. 4. Display telephone numbers, street addresses, or Internet addresses. 5. Interfere with airspace above the roadway. 6. Create a distraction to the motoring public; for example, the Gateway Monument shall be large enough to interpret at highway speed, but not be so large that it demands attention from the motorist. 7. Include reflective or glaring surface finishes. 8. Include illumination that impairs or distracts the vision of transportation system users. Other lighting may be permitted. 9. Display blinking or intermittent or moving lights, including changeable message signs, digital displays, or lighted static displays such as LED. 10. Include moving elements (kinetic art) or simulate movement. 11. Include water features of any sort. 12. Interfere with official traffic control devices, nor interfere with the operational right-of-way above the roadway. 13. Be placed within State right-of-way upon trees, or painted or drawn upon rocks or other existing natural features. 14. Make use of or simulate colors or combinations of colors usually reserved for official traffic control devices described in the Texas Manual on Uniform Traffic Control Devices. Interlocal-Interlocal_Gateway_Mon 4 02/11/2011 r t Contract No. 14-2XXF6001 i 15. Require the removal of trees or other vegetation for visibility, or s harm trees during construction. Pruning of tree branches or roots, and removal of shrubs should be avoided. 16. Negatively impact existing highway features, including existing f signs, irrigation systems, necessary drainage patterns, and facilities. SECTION 5. MAINTENANCE The Local Entity shall provide regularly scheduled maintenance, as described in Attachment "B," the Local Entity's Final Gateway Monument Proposal, for its f projected lifespan. Maintenance shall include, but not be limited to, restoration work to maintain the integrity of the approved Gateway Monument, maintenance of any associated landscaping or lighting, and graffiti removal. Gateway Monuments shall be kept clean, free of graffiti, and in good repair. Graffiti removal shall conform to the most current TxDOT policies and guidelines, which require prompt removal of offensive messages and timely removal of all other graffiti. Maintenance practices of the Local Entity or its agent shall protect air and water quality as required by federal and state law. SECTION 6. MONUMENT REMOVAL The Local Entity shall remove the Gateway Monument covered by this agreement, if in the opinion of TxDOT, it creates safety or operational concerns due to deterioration or inadequate maintenance or upon termination of the main Gateway Monument Agreement. TxDOT will notify the Local Entity when it has determined that the Gateway Monument requires special attention. In the event the Local Entity fails to maintain, repair, rehabilitate, or remove the Gateway Monument in a timely manner, TxDOT may choose to remove the Gateway Monument after thirty (30) days following notification to the Local Entity, and bill f' the Local Entity for all costs of removal and restoration of the area. TxDOT reserves the right to remove the Gateway Monument due to construction, rehabilitation, violation of the terms of this agreement, or other necessary activities affecting the transportation facilities without any obligation, compensation to, or approval of the Local Entity. TxDOT will strive to notify the Local Entity of its intent to remove the Gateway Monument to allow for timely removal and salvage by the Local Entity, if possible. k TxDOT reserves the right to remove or alter any Gateway Monument that presents an immediate safety hazard to the public without delay or advanced notification to the Local Entity. r SECTION 7. USE OF CONTRACTOR OR GROUP The Local Entity shall have the right to engage any responsible Contractor or group to perform or provide any portion of the Local Entity's Gateway Monument Interlocal-Interlocal_Gateway_Mon 5 02/11/2011 9 Contract No. 14-2XXF6001 I activities specified in this Agreement. However, notwithstanding this provision, the Local Entity shall continue to remain responsible to the State to ensure performance of all its duties and responsibilities specified in this Agreement. The Local Entity shall ensure that any Contractor or group complies with all provisions of this agreement, and federal, state, and local laws, and regulations as may be applicable. In the event the Local Entity engages a Contractor to perform Gateway Monument construction or maintenance activities under this Agreement, the Local Entity shall ensure that said Contractor shall indemnify the State for any k and all damages and claims for damages by said Contractor, its employees, agents, or representatives, including any claims resulting from bodily injury or 3 death to others, or, for loss of or damage to property of others, arising out of, incident to, or in any manner connected to Gateway Monument construction or maintenance activities, and, for any or all liability arising from the negligent acts of said Contractor, its employees, agents, or representatives. I In the event the Local Entity engages and approves a responsible group to perform Gateway Monument construction or maintenance activities under this Agreement, the Local Entity shall require and ensure that said Contractor or group follow all the terms of this Agreement as well as all Attachments. e r SECTION 8. INDEMNIFICATION A. The Local Entity and the State each acknowledge responsibility for the acts, deeds, errors and omissions of its own employees. The parties agree that the Texas Tort Claims Act pertaining to governmental liability for tortious conduct and/or property damage shall apply to this Agreement. i f B. The Local Entity shall also indemnify and save harmless the State from any and all expense, including, but not limited to, attorney fees, which may be incurred by the State in litigation or otherwise resisting l' a claim or liabilities that may be imposed on the State as a result of 4 error, omission, or act of the Local Entity, its agents, or its employees. SECTION 9. TERMINATION This Agreement may be terminated under any of the following conditions: A. By mutual written agreement and consent of both parties; or B. By either party upon giving the other party thirty (30) days prior written notice; or C. By the State, in the event the State determines that the Gateway Monument is not in the best interest of the traveling public. Interlocal-Interlocal_Gateway_Mon 6 02/11/2011 r" l P r E Contract No. 14-2XXF6001 If either party terminates this Agreement, as provided herein, the Local Entity will be responsible for repair or removal of the Gateway Monument. In the event that the Local Entity does not provide the repair or removal services, the State may remove or repair the Gateway Monument and shall be entitled to reimbursement from the Local Entity for any reasonable costs incurred by the State to restore the State's right of way to its original condition. SECTION 10. AMENDMENTS Amendments to this Agreement shall be in writing and shall be executed by both parties. f SECTION 11. AUDIT The state auditor may conduct an audit or investigation of any entity receiving I s funds from the state directly under the contract or indirectly through a subcontract under the contract. Acceptance of funds directly under the contract or indirectly through a subcontract under this contract acts as acceptance of the authority of the state auditor, under the direction of the legislative audit committee, to conduct an audit or investigation in connection with those funds. An entity that is the subject of an audit or investigation must provide the state auditor with access to any information the state auditor considers relevant to the investigation or audit. SECTION 12. SUCCESSORS AND ASSIGNS Subject to the provisions of Section 7, the Local Entity shall not assign or otherwise transfer its rights and obligations under this Agreement except with prior written consent of the State, and any prohibited assignment or transfer shall be null and void. SECTION 13. REMEDIES This Agreement shall not be considered as specifying the exclusive remedy for any default. All legal remedies may be pursued by either party and shall be cumulative. SECTION 14. INSURANCE If this agreement authorizes the Local Entity or its contractor to perform any work on State right of way, before beginning work, the entity performing the work shall provide the State with a fully executed copy of the State's Form 1560 Certificate of Insurance verifying the existence of coverage in the amounts and types specified on the Certificate of Insurance for all persons and entities working on the State right of way. This coverage shall be maintained until all work on the r State right of way is complete. If coverage is not maintained, all work on State right of way shall cease immediately, and the State may recover damages and all i costs of completing the work. t } 1 E d Interlocal-Interlocal_Gateway_Mon 7 02/11/2011 4 r t Contract No. 14-2XXF6001 i SECTION 15. NOTICES All notices to either party by the other under this Agreement shall be delivered personally or sent by U.S. mail, postage prepaid, addressed to such party at the following addresses: STATE : LOCAL ENTITY: Texas Department of Transportation City of Round Rock Austin District Engineer Attn: Alan McGraw, Mayor P.O. Drawer 15426 221 East Main Street E Austin, Texas 78761-5426 Round Rock, Texas 78664 SECTION 16. GRATUITIES Texas Transportation Commission policy mandates that employees of the State shall not accept any benefits, gifts, or favors from any person doing business or who reasonably speaking may do business with the State under this Agreement. The only exceptions allowed are ordinary business lunches and items that have received advanced written approval of the Texas Department of Transportation t Executive Director. Any person doing business with or who may reasonably 1 speaking do business with the State under this Agreement may not make any { offer of benefits, gifts or favors to State employees, except as mentioned here k above. Failure on the part of the Local Entity to adhere to this policy may result in the termination of this Agreement. SECTION 17. SIGNATORY WARRANTY Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity represented. SECTION 18. INCORPORATION OF PROVISIONS Attachments "A" and "B" are made part of this contract. The parties shall comply h with the provisions of Attachments "A" and "B" as if they were set forth in full within the body of this contract. I i f Interlocal-Interlocal_Gateway_Mon 8 02/11/2011 Contract No. 14-2XXF6001 i THEREFORE, the Parties have executed this Agreement in duplicate originals. THE CITY OF ROUND ROCK THE STATE OF TEXAS Certified as being executed for the By: purpose and effect of activating and/or carrying out the orders, Title: established policies or work programs heretofore approved and Date: !2 ZZ 12_ authorized by The Texas Transportation Commission Attest: By: _� �F City Clerk Carlos A. Lopez, P.E. District Engineer Austin District Date: t s ed as to f o P kAo City Attorney E 4 P k: List of Attachments: "A" — Project Map for Gateway Monument ;.. "B" - Local Entity's Final Gateway Monument Proposal Interlocal-Interlocal_Gateway_Mon9 02/11/2011 i r t r z' t Round Rock Gateway Sign(IH35/Westinghouse) Maintenance Plan E The City of Round Rock based on the current design of the Gateway sign proposes the following maintenance schedule: K f Project area is the sign,and approx. 140,000 sq ft surrounding the sign (see Maintenance Site Plan). The intent is to keep a large visibility triangle maintained through the sign zone. Litter Control Biweekly- 26 cycles per year Mow, Edge,Trimming Biweekly*- 18 cycles per year *Mowing Crews will be respectful of wildflowers that may be growing in the area and will either mow around patches of wildflowers or cease mowing operations until the end of wildflower season(at City's discretion). I' Bed Maintenance Monthly- 12 cycles per year Tree Maintenance Biannually- 2 cycles per year Gateway Sign Inspection** Biannually- 2 cycles per year **Includes Sign Letters,Lighting,Stone,Concrete Masonry,Metal,etc i Gateway Sign maintenance- As needed i s i r t i t: l s t E l I � r 1 SI a y f i j r t � r _ p4 F TO I s t