R-12-04-26-G1 - 4/26/2012 RESOLUTION NO. R-12-04-26-G1 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Southwest Downtown Infrastructure Improvements (Main Street) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 4,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 4 to the Contract with Cash Construction for the Southwest Downtown Infrastructure Improvements (Main Street) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of April, 2012. AL MCGRAW, Mayor City of Round Rock, Texas ATTEST: 1?3MA,!At3t- SARA L. WHITE, City Clerk O:\wdox\SCClnts\0112\1204\MUNICIPAL\00248310.DOC/rmc EXHIBIT Page 1 of „A» Contract Quantity Adjustment/Change Order rev,owls Department: Transportation Project Southwest Downtown District Name: Infrastructure(Main Street) Date: 4/2/2012 Ory project Change Order/Quantity Adjustment ID Number TX02AREA No. 4 Justification Quantity Adjustment/Change Order No. 4 is the final Quanty adjustment and Change Order required for the project close out. These items were a result of conditions found after construction began that required additoinal items to be adjusted or added to complete the project. SUMMARY Amount %Change Original Contract Price: $3,191,202.00 Previous Quantity Adjustment(s): ($16,970.00) This Quantity Adjustment: $350,855.80 Total Quantity Adjustment(s): $333,885.80 Total Contract Price with Quantity Adjustment(s): $3,525,087.80 Previous Change Order(s): $693,282.00 21.72% This Change Order: $36,990.00 1.16% Total Change Order(s)To Date: $730,272.00 22.88% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: L $4,255,359.80 Difference between Original and Adjusted Contract Prices: $1,064,157.80 Original Contract Time: 270 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 80 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 45 Calendar Days New Contract Time: 395 Calendar Days mI Su VI Prepared By: CTodd Kelt en Operations Manager 4/3/2012 naturePrinted Name,Title Date a Printed Contractor Company Name: For Contractor: n fL= B]Cash Project Manager 4/2/2012 Sign ture Printed Name,Title Date For City of Round Rock: Alan McGraw, Mayor, Coity of Ropund Rock Signature Printed Name,Title Date Page 2 of 4 Contract Quantity Adjustment/Change Order rev,06111 Project Name: Southwest Downtown District Infrastructure(Main Street) Quan.Adj./Change Order No.: 4 Chan a Order Data n Time Adjustment Item# Item Description'on Unit Unit Price Amount (Days) 178 Hand Railing LF 133 $80.00 $10,640.00 Additional conduit o on Blair St. 46OLF of 4"conduit, and tie into 179 existing MH LS 1 $23,500.00 $23,500.00 Irrigation FrA 400 West Main Street 180 Office Building LS 1 $2,000.00 $2,000.00 181 Mail Box Relocation Barber Shop LS 1 $850.00 $850.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 0.00 0.00 $0.00 0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: 36 990.00 1 0 Southwest Downtown District Infrastructure(Main Project Name: Street) Quan.Adj./Change Order No.: 4 Quantity Adjustment Data Page 3 of 4 Contract Quantity Adjustment/Change Order IIOUNDROOL TFXAS n..w_wro..wtr.n. Rv,04111 n Time Adjustment Bid Item# Item Description Unit Unit Price Amount (Days) French Safety Pan and Trench 4 (all Depths) LF 66 $1.00 $66.00 Reconstruct Concrete Sidewalks to 4 5 Thickness SF 412 $6.00 $2,472.00 12 P.C. Concrete Driveway SF 2227 $5.00 $11,135.00 P.C. Concrete Retainer Curb Type"A" 15LF 68 _$13.00 $884.00 Remove an Replace(less an 5 to 16 P.C. Concrete Retaining Wall LF -110 $180.00 ($19,800.00) 28 Sodding SY -405 $4.00 $1,620.00 E2 Duct Ban Gas, Electric, & 30 Communications LF -224 $220.00 $49,280.00 E4 Duct Ban Gas, Electric, & 31 Communications LF 463 $270.00 $125,010.00 E8 Duct Ban Gas, Electric, & 32 Communications) LF 187 $320.00 $59,840.00 35 Precast Concrete Switch Gear Pad EA 1 $10,000.00 $10,000.00 48 2" Dia SQ-180 PVC Street Light Conduit LF 2801 $35.00 $98,035.00 Installation of Street Tree including excavation (6'x 6'x 30", planting mix, 59 tree installation, and mulch installation EA 2 $2,000.00 $4,000.00 62 5'Curb Inlet EA 1 $2,200.00 $2,200.00 63 10'Curb Inlet EA 1 $3,200.00 $3,200.00 64 2'x2'Area Inlet EA 1 $1,200.00 $1,200.00 65 TxT Area Inlet-- EA -1 $1,800.00 ($1,800.00) PVC Pipe o, mu ing cava on 66 and Backfill LF 87 $65.00 $5,655.00 12 Pipe PVC AWWA C-900 CL 200 or 82 DI AWWA C-100 Min CL 100) LF 300 $80.00 $24,000.00 8 Pipe PV AWWA C- 00 CL 200 or 83 DI AWWA C-100 Min CL 100 LF 220 $65.00 $14,300.00 4 Pipe PVC AWWA C-900 CL 200 or 85 DI AWWA C-100 Min CL 200) LF 90 $70.00 $6,300.00 89 6"Gate Valve EA 2 $900.00 $1,800.00 90 8"Gate Valve EA -1 $1,200.00 $1,200.00 95 New WW Standard Manhole 48"Dia EA 1 $4,000.00 $4,000.00 96 New WW Drop Manhole 48" Dia EA 1 $5,000.00 $5,000.00 97 6"PVC ASTM D2241 SDR26 Pipe LF 128 $100.00 $12,800.00 98 18- PVC ASTM UZZ41 SUKZb Pipe LF 1 $150.00 $150.00 TOTALS: 318 347.001 0 Project Name: Item Description f Page 4 of 4 Contract Quantity Adjustment/Change Order IIDUND NOIXTIXAS n.roa..wieu wwnwn rev,06/11 Quan.Adj./Change Order No.: 0 Qua ti Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Unit Price Amount (Days) Remove,wrap,and manifest Asbestos 103 Containing Pipe LF -25 $100.00 $2,500.00 106 Barricades, Signs,and Traffic Handling CD 129 $40.00 $5,160.00 107 12"Steel Encasement Pipe LF -334 $80.00 $26,720.00 108 18"Steel Encasement Pipe LF -313 $90.00 ($28,170-00 109 Duct Bank E-6 LF 176 $392.00 $68,992.00 51 Street Light Wiring LS 0.3 $25,000.00 $7,500.00 121 10.5"HMAC Type B SY 778 $10.60 $8,246.80 0.00 $0.00 0.00 $0.00 0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 Y X11 TOTALS: $32,508.80 0 ROUNDROCK,TEW City Council Agenda Summary Sheet PURPOSE PASSION.PROSPERn1C Agenda Item No. G1. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 4 with Cash Construction for the Southwest Downtown District Infrastructure Agenda Caption: Improvements(Main Street) Project. Meeting Date: April 26, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: The City Council awarded the Southwest Downtown Infrastructure Improvements (Main Street) Project to Cash Construction on October 18, 2010 for $3,191,202 to reconstruct Main Street from San Saba Street to Blair Street. Main Street will be rebuilt to match the previous Southwest Downtown Projects. This project includes the installation of storm water, water, wastewater and a duct bank for dry utilities. Also included is the installation of pedestrian facilities, paver sidewalks and other street scape items matching our Downtown Master Plan. Quantity Adjustment/Change Order No. 1 was approved by the City Council on June 9, 2011 at a cost of$111,982 for additional linear footage in the duct bank, additional excavation to complete the duct bank, removal of wastewater line and a 15" pecan tree, and the construction of a headwall at Lake Creek. Quantity Adjustment/Change Order No. 2 was approved by the City Council June 23, 2011 at a cost of$431,096.10 to complete construction of the 200 block of Harris Street and to complete a 12" water main and connection to Liberty Street. Quantity Adjustment/Change Order No. 3 at a cost of$150,203.90 was required to complete the underground utilities on Blair Street and to fund additional surface scape street items . Quantity Adjustment No.4 is needed for final quantity adjustments and change orders to close out the project. The revised total cost of the construction contract with Cash Construction would be$4,255,359.80 which includes all construction costs associated with the addition of Harris Street. Included on the final cost of construction are quantity adjustments of $190,624.04 and change orders relative to additional work of$862,192.34, which represents 22.7%of the original contract amount. Cost: $387,845.80 Source of Funds: Round Rock Transportation and Economic Development Corp(Type B) Date of Public Hearing(if required): N/A Recommended Action: Approval EXECUTED DOCUMENT FOLLOW S ` Page 1 of 4. Contract Quantity Adjustment/Change Order rev,Wil Department: Transportation Project Southwest Downtown District Name: Infrastructure(Main Street) Date: 4/2/2012 City Project Change Order/Quantity Adjustment ID Number TX02AREA No. 4 justification Quantity Adjustrnent/Change Order No. 4 is the final Quanty adjustment and Change Order required for the project close out. These items were a result of conditions found after construction began that required additoinal items to be adjusted or added to complete the project. SUMMARY Amount %Change Original Contract Price: $3,191,202.00 Previous Quantity Adjustment(s): ($16,970.00) This Quay Adjustment: $350,855.80 Total Quantity Adjustment(s): $333,885.80 Total Contract Price with Quantity Adjustment(s): $3,525,087.80 Previous Change Order(s): $693,282.00 21.72% This Change Order: $36,990.00 1.16% Total Change Order(s)To Date: $730,272.00 22.88% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $4,255,359.80 Difference between Original and Adjusted Contract Prices: $1,064,157.80 Original Contract Time: 270 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 80 Calendar Days Time Adjustment by this Quan.Adj./Change Order: 45 Calendar Days New Contract Time: 395 Calendar Days Prepared By; Todd Kelt en Operations Manager 4/3/2012 nature Printed Name,Title Date Printed Contractor Company Name: ForContractor: BI Cash Project Manager 4/2/2012 NIIWe Printed Name,Tine 4•L!�Date/J/For City of 'IZ Round Rode; � Alan McGraw Ma of Rock Signature Printed Name,Title Date ��laeo�-io&- C7.1 Page 2 of 4 Contract Quantity Adjustment/Change Order rev,06/11 Project Name: Southwest Downtown District Imre(Main Street) Quan.Adj./Change Order No.: 4 Change Order Data Contract Time Adjustment Item# Ian Description Unit QW. Unit Price Amount (Days) 178 Hand Rail ng LF 133 $80.00 $10,640.00 Additiona Conduit Work on it 46OLF of 4"conduit,and tie into 179 existing MH LS 1 $23,500.00 $23,500.00 Irrigation Fox 400 West Main Street 180 Office Builth LS 1 $2,000.00 $2,000.00 181 Mail Box Relocation Barber Shop LS 1 $850.00 $850.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 TOTALS: $36,990.00 1 0 Southwest Downtown District Infrastructure(Main Project Name: Street) Quan.Adj./Change Order No.: 4 Adjustment Data Page 3 of 4 Contract Quantity Adjustment/Change Order rev,06/11 Conti Time Adjustment Bid Item# Item Description Unit Unit Price Amount (Days) Trench Safety Pan and Trench 4 (all Depths) LF 66 $1.00 $66.00 Reconstruct Concrete Sidewalks to 4 5 Thickness SF 412 $6.00 $2,472.00 12 P.C. Concrete Driveway SF 2227 $5.00 $11,135.00 P.C. Concrete Retainer Curb Type"A" 15 LF 68 $13.00 $884.00 Remove and Rep n 5 to 16 P.C. Concrete Retaining Wall LF -110 $180.00 ($19,800.00) 28 Sodding SY -405 $4.00 1620.00 Duct Bank(Gas, Electric, & 30 Communications) LF -224 $220.00 ($49,280.00) E4 Duct Ban Gas, E & 31 Communications LF 463 $270.00 $125,010.00 E8 Duct Ban Gas, Electric, & 32 Communications) LF 187 $320.00 $59,840.00 35 Precast Concrete Switch Gear Pad EA 1 $10,000.00 $10,000.00 48 2" Dia SCH80 PVC Street Light Conduit LF 2801 $35.00 $98,035.00 Installation of Street Tree including excavation(6'x 6'x 30", planting mux, 59 tree installation,and mulch installation EA 2 $2,000.00 $4,000.00 62 5'Curb Inlet EA 1 $2,200.00 $2,200.00 63 10'Curb Inlet EA 1 $3,200.00 $3,200.00 64 2'x2'Area Inlet EA 1 $1,200.00 $1,200.00 65 3W'Area Inlet EA -1 $1,800.00 $1,800.00) PVC PipeDia, including Excavation 66 and Backfill LF 87 $65.00 $5,655.00 12 Pipe PVC AWWA C-900 CL 200 or 82 DI AWWA C-100 Min CL 100) LF 300 $80.00 $24,000.00 Pipe PVC AWWA C-900 CL 200 or 83 DI AWWA C-100 Min CL 100 LF 220 $65.00 $14,300.00 4 'pe PVC AWWA C-900 CL 200 or 85 DI AWWA C-100 Min CL 200) LF 90 $70.00 $6,300.00 89 6"Gate Valve EA 2 $900.00 $1800.00 90 8"Gate Valve EA -1 $1200.00 ($1,200.00) 95 New WW Standard Manhole 48" Dia EA 1 $4,000.00 $4,000.00 96 New WW Drop Manhole 48" Dia EA 1 1 $5,000-00 $5,000.001 97 6" PVC ASTM D2241 SDR26 Pipe LF 128 $100.00 $12,800.00 Pipe LF 1 $150.00 $150.00 TOTALS- $318,347.00 0 Project Name: Item Description Page 4 of 4 Contract Quantity Adjustment/Change Order MV,OWii Quan.Adj./Change Order No.: 0 Quantity Adjustment Data Time Adjustment Bid Item# Item Description Unit Unit Price Amount (Days) Remove,wrap,a manifest Asbestos 103 Containing Pipe LF -25 $100.00 ($2,500.00) 106 Barricades,Signs,and Traffic Handling CD 129 $40.00 $5,160.00 107 12"Steel Encasement Pipe LF -334 $80.00 ($26,720.00) 108 18"Steel Encasement Pipe LF -313 $90.00 ($28,170.00) 109 Duct Bank E-6 LF 176 $392.00 $68,992.00 51 Street Light Wiring LS 0.3 $25,000.00 $7,500.00 121 10.5" HMAC Type B SY 778 $10.60 $8,246.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 .00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $32,508.80 1 0