R-12-04-26-G2 - 4/26/2012 RESOLUTION NO. R-12-04-26-G2 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Huggins/Seiler & Associates, LP for the Mays Street Reconstruction Phase 1 Project; and WHEREAS, Huggins/Seiler & Associates, LP has submitted Supplemental Contract No. 2 to the Contract to modify the provisions for the scope of services; and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 2 with Huggins/Seiler&Associates, LP,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 2 to the Contract with Huggins/Seiler & Associates, LP, a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of April, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: Qb—�t— SARA'-r. WHITE, City Clerk 0Awdox\scc1nts\0112\1204\MUNICIPAL\00248314.DOC/rmc E" IBIT "AN" STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SEILER&ASSOCIATES LP C"Engineer") ADDRESS: 116 East Main Street Round Rock TX 78664 PROJECT: Mas Street Reconstruction Phase I This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Huggins/Seiler & Associates, LP,hereinafter called the"Engineer ,. WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of November, 2011 for the Mays Street Reconstruction Phase I Project in the amount of$235,288.80;and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on February 3,2012 to amend the scope of services and to increase the compensation by $6,166.00 to a total of $241,454.80;and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$324,195.00 to a total of$565,649.80; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2 En- ineerinQ Services and Exhibit B Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4 Compensation and Exhibit D Fee Schedule shall be amended by increasing by $324,195.00 the lump sum amount payable under the Contract for a total of $565,649.80, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Rev.l2/01/08 Supplemental Contract 84275 0199.7301;00247285 I HUGGINS/SEILE ASSOCIATES,LP By: 4- 6-t2 Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw,Mayor Stephan L. Sheets,City Attorney Date i Supplemental Contract Rev.12/01/08 0199.7301;00247285 84273 Ii 2 Ii 4 ADDENDUM TO EXHIBIT B ENGINEERING SERVICES The work to be performed under this contract shall consist of providing engineering services required for the development of PS&E for revisions to Mays Street from Nash Street to US 79. The proposed PS&E also consists of the widening of Mays Street to five lanes from the north end of the NPRR Bridge to the south end of Brushy Creek Bridge. Continuous Illumination will be provided from south end of Lake Creek Bridge near Nash Street to the north end of Brushy Creek Bridge. The PS&E will be developed for letting and construction by the City of Round Rock. 1) COLLECT AND REVIEW DATA(Function Code 110): a) Data Collection: The Engineer will collect, review and evaluate: I) As-built plans, existing schematics, right-of-way maps, and current unit bid prices information. ii) Utility plans and documents from appropriate municipalities and utility companies. b) Field Reconnaissance: The Engineer will conduct field reconnaissance and collect data as necessary to complete the project development. 2) UTILITY COORDINATION (Function Code 130) a) Utilities: The Engineer will perform utility coordination tasks including: i) Assist the city with the necessary information to adjust utilities as required to horizontally and vertically clear the proposed construction. ii) Assist the City in coordination with the various utility providers to incorporate utility prepared plans in this plan set to move selected utilities into a Utility Vault. Deliverables: Furnish design data for determination of adjustments required. The Engineer shall provide the following engineering services required for the preparation of the plans, specifications and estimate (PS&E) which will be complete and suitable for bidding and award of a City of Round Rock construction contract. All design shall be in accordance with current City of Round Rock requirements and policy, except where variances are permitted in writing by the City. Plans will be prepared on 11"x17" sheets and the deliverables are as follows: 3) ROADWAY DESIGN CONTROLS (Function Code 160) a) Update Geometric Design. b) Prepare Grading Design. c) Develop Typical Sections. d) Prepare a detailed Index of Sheets for all plans in the contract documents. e) Select the standard drawings applicable to the project, and develop a sheet list for review. 1 f) Update Engineer's Opinion of Probable Construction Costs. 4) DRAINAGE (Function Code 161) a) Prepare Hydrologic and Hydraulic studies and documentation. b) Prepare layouts and detailing of drainage features. 1) Storm Sewers and Inlets. ii) Outfall channels. iii) Summary of Quantities. c) Prepare SW3P Sheets. d) Prepare temporary and permanent Erosion Control Sheets e) Prepare WPAP f) Provide BMP devices/treatment requirements per TCEQ approval requirements. 5) SIGNING, MARKING AND SIGNALIZATION (Function Code 162) a) Prepare Signing and Marking Layout. 1) Roadway Layout. ii) Existing sign to remain, to be removed, to be relocated. iii) Proposed signs(illustrated and numbered). iv) Proposed markings(illustrated and quantified)including pavement markings, object markings and delineation. v) Quantities of existing markings to be removed. b) Prepare Summary of Small Signs. c) Traffic Signals. 1) Layouts. (1) Condition diagram. (2) Plan sheets. (3) Elevation Sheets. (4) Phase sequence diagrams. (5) Standards. d) Summary of Quantities. 6) MISCELLANEOUS (ROADWAY) (Function Code 163) a) Prepare Traffic Control Plan, Detours and Sequence of Construction. i) Layouts. (1) Sequence of construction and method of handling traffic during each phase. (2) Existing and proposed traffic control devices for each construction sequence. 2 (3) If detours are provided, typical sections and horizontal and vertical alignment shown on plan layout. (4) General Notes providing construction work hours and any conditions relating to the various construction phases. b) Retaining Wall Design. i) Layouts. (1) Horizontal and vertical location of wall. (2) Type of wall design to be used. (3) Summary of Quantities. c) Prepare continuous Illumination Design i) Layouts. (1) Horizontal location of illumination poles. (2) Conduit location and size. (3) Conductor runs and size (4) Power drop locations (5) Special mounting details for bridges and retaining walls (6) Summary of Quantities (7) Standards d) Coordinate with PARD for Irrigation and Landscape Design I) Incorporate Irrigation and Landscape plan sheets prepared by PARD into plan set and prepare Summaries of Quantities e) Miscellaneous Q Prepare Estimate and Basis of Estimate ii) Prepare General Notes/Specifications/Provisions iii) Prepare Project Manual. 7) GATEWAY ARCH DESIGN (Function Code 165) a) Alternates will be prepared by the City and proposed conceptual design selected. b) Prepare Opinions of Probable Costs. c) Provide structural design for selected alternative. d) Prepare Plan Sheets. e) Summary of Quantities f) Prepare Special Specifications 3 8) PROJECT MANAGEMENT(Function Code 190): a) Proiect Coordination: The Engineer will direct and coordinate the various elements and activities associated with project development. b) Proiect Administration: The Engineer will perform administrative duties, including: i) Coordination with subconsuitants. ii) Preparing and executing contracts with subconsuitants. iii) Monitoring subconsultant activities. iv) Reviewing and recommending approval of subconsultant invoices. Deliverables • Monthly progress reports. • Monthly invoice and billings. c) QA/QC: The Engineer will provide ongoing quality assurance and quality control to ensure completeness of product and compliance with City of Round Rock procedures. d) Progress Meetings: The Engineer will attend progress meetings with the City of Round Rock on an as needed basis. 9) CONSTRUCTION SERVICES (Function Code 330) a) Attend Project Meetings as requested. b) Provide review and approval of submitted Shop Drawings. c) Prepare required Change Orders. d) Provide review and approval of Contractor monthly submittals. e) Prepare"As-Built" Plans at completion of project 4 z ADDENDUM TO EXHIBIT C Work Schedule Imm 2012 1 2073 1 M4 DG$Cripdon Jan Fob Mar Apr Mav Jun Jul Aug Sop pet Nov Dee Inn Fop Mar Apr May Jun Jul Aug Sep Oct Nov Doe Jan Fob Mar Aor Mav Jun Jul Aug Sep Oct Nov Doe Aulhodsadon to n WA No.1 oteI get e utotty Coordination AWN Ckywith Develop 60%Plans Pen Progwallam parCw&ad R Irofmats W%Plan Review MID Review Develop 90%Plans Plan Poopmatim sor Convaq 90%Plan RrAow 1 and Sldtedaal. FkW PS&E DedmwWu- Pro Ready for Lotdm c-.wuw Wwk Pmol Rr Pmal 1 � � lamp aNPOI: rWte I aomta.�n ADDENDUM TO Exhibit D Fee Schedule Total Total Other Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants TOTALS Task 1: (e.g.surveying) 0 $0.00 $0.00 $0.00 $0.00 Task 2:(e.g. public outreach and concept design development 0 $0.00 $0.00 $0.00 $0.00 Task 3: (e.g. preliminary design/30%plans) 0 $0.00 $0.00 $0.00 $0.00 Task 4: (e.g.final design/60%,90%, 100%plans) 2438 $269,953.60 $0.00 $14,750.00 $284,703.60 Task 5: (e.g. bid phase services) 40 $5,152.00 $0.00 $0.00 $5,152.00 Task 6: (e.g. construction phase services) 164 $19,913.60 $0.00 $0.00 $5,152.00 Task 7: (e.g. project management) 112 $14,425.80 $0.00 $0.001 $14,425.80 GRAND TOTAL: 27641— $309,445.00 $0.00 $14,750.00 1 $324,195.00 1PRrOUNDROCK,TEXAS City Council Agenda Summary Sheet URPOSE.FMOK PROSPERM. Agenda Item No. G2. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 2 with Agenda Caption: Huggins/Seiler&Associates, LP for the Mays Street Reconstruction Phase 1 Project. Meeting Date: April 26, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: Mays Street Reconstruction Phase I provides for widening North Mays Street from a four lane arterial to a five lane section including wide sidewalks; street trees and lighting; utility relocations; and gateway features. Phase I services consisted of a Preliminary Schematic, Subsurface Utility Engineering, Utility Coordination, Field Surveying and Mapping, Land Appraisal Services,TCEQ Coordination,and a 30% Design Schematic. Supplemental Contract No. 1 provided for surveying services not included in the scope of the original contract with Huggins/Seiler and Associates, Inc. in the amount of$6, 166. Supplemental Contract No. 2 consists of provision of Phase II professional services for the development of complete Plans, Specifications, and Estimate (PS&E) from the approved 30% Design Schematic completed in Phase 1. In addition to the roadway improvements between the Brushy Creek Bridge and the Union Pacific Railroad/Lake Creek Bridge, detail design includes pedestrian/sidewalk improvements, street trees and lighting; utility relocations; and gateway features at the entrances to downtown. The fee for these services(not included in the scope of the original contract or Supplemental Contract No. 1)with Huggins/Seiler and Associates, Inc. is$324,195.00 Cost: 324,195.00 Source of Funds: Round Rock Transportation and Economic Development Corp(Type B) Date of Public Hearing(if required): Recommended Action: Approval EXECUTED DOCUMENT FOLLOWS STATE OF TEXAS § § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HUGGINS/SEILER& ASSOCIATES LP _{''Engineer") ADDRESS: 116 East Main Street Round Rock TX 78664 PROJECT: Mays Street Reconstruction Phase 1 This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Huggins/Seiler & Associates, LP,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 10th day of November, 2011 for the Mays Street Reconstruction Phase I Project in the amount of$235,288.80; and WHEREAS, the City and Engineer executed Supplemental Contract No. I on February 3, 2012 to amend the scope of services and to increase the compensation by $6,166.00 to a total of $241,454.80;and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$324,195.00 to a total of$565,649.80; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2 En ineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. II. Article 4 Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $324,195.00 the lump sum amount payable under the Contract for a total of $565,649.80, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Rev.12/01/08 Supplemental Contract 84275 0199.7301;00247285 1 62-- i �l i HUGGINS/SEILE ASSOCIATES,LP By: 4. 6-l2 Date CITY O UND ROCK APP ED AS T ORM: By. l.. Alan McGraw,Mayor Stephan . Sheets,City Attorney 2Dateq-2 1-2- Date I I i i Supplemental Contmet Rev. 2101/08 8 0199.7301;00247285 4273 I l 2 I ADDENDUM TO EXHIBIT B ENGINEERING SERVICES The work to be performed under this contract shall consist of providing engineering services required for the development of PS&E for revisions to Mays Street from Nash Street to US 79. The proposed PS&E also consists of the widening of Mays Street to five lanes from the north end of the NPRR Bridge to the south end of Brushy Creek Bridge. Continuous Illumination will be provided from south end of Lake Creek Bridge near Nash Street to the north end of Brushy Creek Bridge. The PS&E will be developed for letting and construction by the City of Round Rock. 1) COLLECT AND REVIEW DATA (Function Code 110): a) Data Collection: The Engineer will collect, review and evaluate: i) As-built plans, existing schematics, right-of-way maps, and current unit bid prices information. ii) Utility plans and documents from appropriate municipalities and utility companies. b) Field Reconnaissance: The Engineer will conduct field reconnaissance and collect data as necessary to complete the project development. 2) UTILITY COORDINATION (Function Code 130) a) Utilities: The Engineer will perform utility coordination tasks including: i) Assist the city with the necessary information to adjust utilities as required to horizontally and vertically clear the proposed construction. ii) Assist the City in coordination with the various utility providers to incorporate utility prepared plans in this plan set to move selected utilities into a Utility Vault. Deliverables: • Furnish design data for determination of adjustments required. The Engineer shall provide the following engineering services required for the preparation of the plans, specifications and estimate (PS&E) which will be complete and suitable for bidding and award of a City of Round Rock construction contract. All design shall be in accordance with current City of Round Rock requirements and policy, except where variances are permitted in writing by the City. Plans will be prepared on 17"x17" sheets and the deliverables are as follows: 3) ROADWAY DESIGN CONTROLS (Function Code 160) a) Update Geometric Design. b) Prepare Grading Design. c) Develop Typical Sections. d) Prepare a detailed Index of Sheets for all plans in the contract documents. e) Select the standard drawings applicable to the project, and develop a sheet list for review. 1 f) Update Engineer's Opinion of Probable Construction Costs. 4) DRAINAGE (Function Code 161) a) Prepare Hydrologic and Hydraulic studies and documentation. b) Prepare layouts and detailing of drainage features. f i) Storm Sewers and Inlets. ii) Outfall channels. iii) Summary of Quantities. c) Prepare SW3P Sheets. d) Prepare temporary and permanent Erosion Control Sheets e) Prepare WPAP f) Provide BMP devices/treatment requirements per TCEQ approval requirements. i. 5) SIGNING, MARKING AND SIGNALIZATION (Function Code 162) I a) Prepare Signing and Marking Layout. I i) Roadway Layout. ii) Existing sign to remain, to be removed, to be relocated. iii) Proposed signs(illustrated and numbered). iv) Proposed markings(illustrated and quantified) including pavement markings, object markings and delineation. v) Quantities of existing markings to be removed. b) Prepare Summary of Small Signs. c) Traffic Signals. i) Layouts. (1) Condition diagram. (2) Plan sheets. (3) Elevation Sheets. (4) Phase sequence diagrams. j (5) Standards. d) Summary of Quantities. 6) MISCELLANEOUS (ROADWAY) (Function Code 163) a) Prepare Traffic Control Plan, Detours and Sequence of Construction. i) Layouts. (1) Sequence of construction and method of handling traffic during each phase. (2) Existing and proposed traffic control devices for each construction sequence. i 2 ' r (3) If detours are provided, typical sections and horizontal and vertical alignment shown on plan layout. (4) General Notes providing construction work hours and any conditions relating to the various construction phases. b) Retaining Wall Design. i) Layouts. (1) Horizontal and vertical location of wall. (2) Type of wall design to be used. (3) Summary of Quantities. c) Prepare continuous Illumination Design i) Layouts. (1) Horizontal location of illumination poles. (2) Conduit location and size. (3) Conductor runs and size (4) Power drop locations (5) Special mounting details for bridges and retaining walls (6) Summary of Quantities (7) Standards d) Coordinate with PARD for Irrigation and Landscape Design 1) Incorporate Irrigation and Landscape plan sheets prepared by PARD into plan set and prepare Summaries of Quantities e) Miscellaneous i) Prepare Estimate and Basis of Estimate ii) Prepare General Notes/Specifications/Provisions iii) Prepare Project Manual. 7) GATEWAY ARCH DESIGN (Function Code 165) a) Alternates will be prepared by the City and proposed conceptual design selected. b) Prepare Opinions of Probable Costs. c) Provide structural design for selected alternative. d) Prepare Plan Sheets. i e) Summary of Quantities f) Prepare Special Specifications 3 I 8) PROJECT MANAGEMENT(Function Code 190): a) Pro'ect Coordination: The Engineer will direct and coordinate the various elements and activities associated with project development. b) Project Administration: The Engineer will perform administrative duties, including: i) Coordination with subconsultants. ii) Preparing and executing contracts with subconsultants. iii) Monitoring subconsultant activities. iv) Reviewing and recommending approval of subconsultant invoices. Deliverables • Monthly progress reports. • Monthly invoice and billings. c} QA/QC: The Engineer will provide ongoing quality assurance and quality control to ensure completeness of product and compliance with City of Round Rock procedures. d) Progress Meetings: The Engineer will attend progress meetings with the City of Round Rock on an as needed basis. 9) CONSTRUCTION SERVICES (Function Code 330) a) Attend Project Meetings as requested. b) Provide review and approval of submitted Shop Drawings. c) Prepare required Change Orders. d) Provide review and approval of Contractor monthly submittals. e) Prepare"As-Built" Plans at completion of project 1 4 I I ADDENDUM TO EXHIBIT C Work Schedule Mont 2012 1 2013 2014 Description Jan Feb Mar Aor WAY Jun Jul Auo Sep Oct Nov Dec Jan Feb Mar Aor May Jun Jul Am Soo Oct Nov pee Jan Feb Mar ADr May Jun Jul Auo Soo Oct Nov pec arlastlorl to In WA No.1 Tbm UdIlly CooMbution Aaaia Ckv wlef Develop 60%Plans Plan Preparation W Connael Roquiremoft 60%Plan Review mtm Review Develop 70%Plan Pan Pmpmmtm w C ma Requittllbms Pan R4nllew 100%Revkbm and SuenNna- FhW PSW 0GCIWWftOW - Ready for Lealng $1 t4pmd: _ 7mW NVmmDumu- - CawdOrp Wqk PMnal Aa�xw PaiaS 11► Pry#I 00:41276�IX ADDENDUM TO Exhibit D Fee Schedule ' Total Total Other Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants TOTALS Task 1: (e.g. surveying) 0 $0.00 $0.00 $0.00 $0.00 Task 2: (e.g. public outreach and concept design development 0 $0.00 $0.00 $0.00 $0.00 Task 3: (e.g. preliminary design/30%plans) 0 $0.00 $0.00 $0.00 $0.00 Task 4: (e.g.final design/60%,90%, 100%plans) 2438 $269,953.60 $0.00 $14,750.00 $284,703.60 Task 5: (e.g. bid phase services) 40 $5,152.00 $0.00 $0.00 $5,152.00 Task 6: (e.g. construction phase services) 164 $19,913.60 $0.00 $0.00 $5,152.00 Task 7: (e.g. project management) 112 $14,425.80 $0.00 $0.00 $14,425.80 GRAND TOTAL: 2754 $309,445.00 $0.00 $14,750.00 $324,195.00