Loading...
CM-2018-1633 - 2/9/2018STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: K FRIESE & ASSOCIATES INC. ("Engineer") ADDRESS: 1120 S. Capital of Texas Highway, Building 2, Suite 100, Austin. TX 78746 PROJECT: Kensin ton Detention and Channel Improvements This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and K Friese & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 22nd day of October, 2015 for the Kensington Detention and Channel Improvements Project in the amount of $169,843.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. l on October 2, 2017 to amend the scope of services and to increase the compensation by $10,478.11 to a total of $180,321.11; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on November 3, 2017 to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $4,000.00 to a total of $184,32I.11; WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $4,199.89 to a total of $188,521.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineerin Services ervices shall be amended as set forth in the attached Addendum to Exhibit B. Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $4,199.89 the maximum amount payable under the Contract for a total of $188,52I.00, as shown by the attached Addendum to Exhibit D. Supplemental Contract Rev.06.16 0199.1547;D0394576 � �3 84275 M , 201 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follottj Supplemental Contract Rev.06:: 16 0199,1547.40394576 84275 K FRIESE & ASSOCIATES, INC. By:l - Thomas M. Owens P.E., Executive Vice President Date Supplemental Contract Rev,06: 16 0199.1547; 00394576 84275 CITY ROUND ROCK *APPDS TO F RM:sy. 1Laurie Hadley, City Manager ets, City Attorney zA l a Date Supplemental Contract Rev.06 16 0199.1547;00394570 84275 ADDENDUM TO EXHIBIT B Engineering Services The City is expanding the scope of the Supplemental Contract No. 1 between the City of Round Rock and K Friese + Associates dated November 3, 2017. Sections 2.6.1 in the original contract shall add the following: 2.6.1.1 Coordination with Structural Engineer The Engineer will coordinate with Aguirre & Fields and the City to develop an alternative outlet structure design for the larger north detention pond. It is anticipated that this will include the following up to three (3) design concept coordination meetings with the structural engineer to discuss constructiblity and cost of the proposed design. Hydrologic modeling will be conducted to optimize the outlet structure function in coordination with the structural engineer. The engineer will also include revisions to the construction documents and bid set to include the design as an alternative bid item if desired by the City. 2.6.1.2 Manhole Adjustment Plan Sheet The Engineer will produce one (1) plan sheet that includes manhole adustments that will be required due to the Kensington north pond construction. This sheet will include relevant information to allow the City to conduct manhole adjustments prior to the Kensington Detention project. B-1 of 1 d E O Q. E G7 C C cc t V M C C 0 C ate+ d O Q% S .y C d Y 1 O O W x v W W LL J O N 00000 AaNcOv O 0 AM LbM0010 cau]Qu7 LO M CLOOOOa MVN C00 In r a N M 0 o N 00 TN p �y PJ rlhN r I Nh CI u7o ti 00 cl -C!00 r% u7 N cl N In 10 0 4 rTCSNO 69 — 69If9 Ln N CO-cr00 V V f9 Vi N V> M O MN MQ 64 69 V) W V) to 10 0 0 - W M O M Cc 3 ~ ❑ M fA N N 7 O ' G M G00a:0 MMw U)60 0 V► 000000 69 w 6 www 0Ou7000 " c, V►N oV"W uJ 0 O O 'O- V O O ca N ul ul c N co G W i9 co N +r+ N N uo (0 co 4` V 60 40) 0 a u. V c m (D r. 000000 Q aNI07 m An LOV)0pp 0 M(D9 M M Ooc coo W NN UW CO 0 t+ 0 O M O 017 O '—�++ O r rr h N co N N I+ 01 an i0 r7 A u7 ICJ R IO M Ir .0 N Qr c4 Ln V) TVi' rt9 W" q N Ivo c V V M EFi V) N M c6 c6 V}.V) Ill W T y e fA O � O cs _ fie wC Cl) 69 69 M CO W � �.�"� � eon C) a n co v V) N T uagi di 69 IRN V O r VY O N M b A c � V E c � m � CL W = eoo0 V '—w0aa0a 000000 to n m r In M m� Ol L 0 10 Lm. N 9 I I N N N H N N "" O a F� I� F� F� a a a O v a to ~ SM m '~�° -M :° c oca q E .2 a 0 0 X r- ° 42 3' m � a Z W 0 �y cd C c4 v1 h co 0) N CD R W M 0.O 3 V V` R O m C C� Z Ip L cE T o F= IO v c i) c °u E m L) C amm m O ��E Io q m u1 tp� a m O .1t a w w 7 U) } y m � e� iJ a Y In v F m c a _� C m D C y m c Y e d L o�n u m V ISn (L m O 3y O C# 7 G i6 0 C 9 Q m M ',On� vr,, c m e y m W m e9 � O y N m� oy O� N GuIJ T W O o � Io c� N 4 D CC a0M E ISM 4M u W a aJ N Q r y i >Q m Ia L(D 0FL tto co e0oo�E Ecm�OD�E oCy Lv(Du(n�t N 0 T L W m ?} m 0 p LL C G U V w e C N N m N ' t" C N 0 W CO fn rC = C N v Q p O W m C a L Q e m m 2 - d d LL [a . ,m LL W0_UJiO ' ❑WUadd 0 lLLL.W.JW0 .. ' � � �IL r .. 4 N M - V N m h YY 0C4 Y rNM V Ln Co 11 Y rNMNM V % Y Y x ❑ ICO I� ~ T r F11 Ia tto o N 7- -Kensington Detention and - p SIDECIR ` ' �> Channel Improvements Q RI S SIXP �'�H arra WOOD r in v Gds. GpT� � I rt+1 � G'� I ` S� oGa oNG � 5��,►s���E�P ��aQ' Channel Repair Oqp 3 O�RflR � rY y�� ,r�P{ o� y � � v 3 {y G o ENS w / N ANDY PA,� �y� P P G U r o� oy �,`'• En cl O roN 4� Q Detention Improvements 110 0 �4y AY 4 � o sao 1,000 2,000 Feet City of Round Rock ROUND ROCK 7EXA Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 3 with K Friese & Associates, Inc. for the Kensington Detention and Channel Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date. 2/9/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $4,199.89 Indexes: Regional Detention Fund Attachments: SC#3, LAF, Map Department: Utilities and Environmental Services Text of Legislative File CM -2418-1633 Consider executing Supplemental Contract No. 3 with K Friese & Associates, Inc. for the Kensington Detention and Channel Improvements Project. The City previously entered into an Engineering Services Contract with K Friese & Associates, Inc. to design a regional stormwater detention pond and channel repairs for the Dry Branch Tributary 1 traversing through the Kensington Place neighborhood. The scope of services for the original contract included the design of the detention pond facility and the design of the channel improvements and repairs to the existing drop structures located within the channel for the Dry Branch Tributary 1. The design of the channel repairs and improvements have already been completed and constructed. This Supplemental Contract No. 3 is to provide additional Engineering services for the design of an alternative outlet structure for the detention pond and to provide one additional plan sheet for the adjustments of the existing wastewater manholes that will conflict with the proposed berms. The current Engineering Services Contract provided for a maximum payment of $184,321.11. This supplement will increase the engineering services contract by $4,199.89 for a maximum of $188,521. City of Round Rock Page i Pdnted on 2/9/2018 A ends Item Summary Continued (CM -2018-1633) Utility staff recommends award of this contract to K. Friese and Associates, Inc. Cost: $4,199.89 Source of Funds: Utility System Projects (Regional Detention Fund) City of Round Rock Page 2 Printed on 2MI2016