R-12-05-10-G2 - 5/10/2012 RESOLUTION NO. R-12-05-10-G2 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with HDR Engineering, Inc. for the Water Reuse System—Phase 1 Project; and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Contract No. 3 to the Contract to modify the provisions for the scope of services; and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 3 with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 3 to the Contract with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of May, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0\wdox\SCClnts\0112\1204\MUNICIPAL\00249090.DOC/rmc EXHIBIT „A„ STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING,INC. ("Engineer") ADDRESS: 4401 West Gate Blvd.,Suite 400,Austin,TX 78745 PROJECT: Water Reuse Systenr—Phase 1 This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 25th day of March, 2010 for the Water Reuse System — Phase 1 Project in the amount of$543,491.00;and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on January 7,2011 to amend the scope of services and to increase the compensation by $48,161.00 to a total of $591,652.00;and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on May 6, 2011 to amend the scope of services and. to increase the compensation by $10,407.00 to a total of $602,059.00;and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$85,452.00 to a total of$687,511.00;and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: 1. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev.12/01/08 0199.7134;00247204 84275 1 f II. Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $85,452.00 the lump sum amount payable under the Contract for a total of $687,511.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HDR ENG1,NEERING,INP. 9 /3�Z Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Alan McGraw,Mayor Stephan L. Sheets,City Attorney Date Supplemental Contract Rbv.12/01/08 0199.7134;00247204 84275 2 ADDENDUM TO EXHIBIT B Engineering Services Water Reuse System: Phase I Supplemental Engineering Services The engineering design and construction administration services listed below are related to project scope modifications requested by the City of Round Rock and/or the Brazos River Authority. Extension of construction administration services for Phase 1B is for contract time adjustments granted to the contractor for completion of change orders for the requested project modifications. Phase 1A—Old Settler's Parlc Reuse Waterline: Construction Administration 1. Prepare and revise conformed documents,which is not included in current Phase 1 engineering services. Phase IB—Reuse Water Treatment Facilities: Design 1. Design modifications to chlorination system and prepare related drawings. 2. Partially design and prepare drawings for a portion of reuse irrigation connections in Old Settler's Park. 3. Design surge relief valve vault with appurtenances and prepare related drawings and specifications. Phase 1B—Reuse Water Treatment Facilities: Construction Administration 1. Prepare and revise conformed documents, which is not included in current Phase 1 engineering services. 2. Administer additional coating work on clearwell dome ring(CPR 13). 3. Administer modifications to elevated platforms on Junction Boxes I and 2(CPR 5). 4. Administer revisions to non-potable water system(FO 3). 5. Administer modifications to chlorination system (CPRS 7 and 9). 6. Administer modifications to clearwell overflow splash pad at the City of Round Rock Water Treatment Plant(CPR 12). 7. Administer additional conduit and wire for control valve vault and clearwell overflow manhole(CPR 15). t i 8. Administer additional work related to reuse irrigation system connections in Old Settler's Park(CPR 10). 9. Administer addition of surge relief valve vault with appurtenances(CPR 16). 10.Revise change order 02. 11.Provide extended construction administration services(4 months). 2 ADDENDUM TO EXHIBIT C WORK SCHEDULE 2010 2011 2012 TASKS J JA SIO NI D J I FIM A M J J 1 A S O I N D JIF M AIM J J 1 A S Phase 1A:Construction Administration 1.Conformed Documents Phase 16:Design � 1 Chlorination Modifications 2 Old Settler's Park Reuse Irrigation Connections — — -- ----- ------- 3.Addition of Surge Relief Valve&Appurtenances Phase 1B:Construction Administration _ 1.Conformed Documents 2.Additional Clearwell Coating 3.Redesign of Junction Box 1&2 Platforms 4.Revisions to Non Potable Water System S.Chlorination Modifications _ 6.Modifications to Overflow Splash Pad at WTP 7.Additional Conduit&Wire for Control Valve Vault&Ciearwell Overflow MH- S.Old Settler's Park Reuse Irrigation Connections 9.Addition of Surge Relief Valve&Appurtenances 10.Revisions of Change Order 02 11.Contract Extension(4 months) f ADDENDUM TO EXHIBIT D Fee Schedules Attached Behind This Page Attached fee schedules include listings of tasks and fee development information for supplemental design and construction administration services related to the Phase ]A — Old Settler's Park Reuse Waterline and Phase 1B—Reuse Water Treatment Facilities projects, which are part of the Water Reuse System—Phase 1 contract. The individual and total lump sum costs for the supplemental design and construction administration services are below. Phase lA Construction Administration $3,070 Phase 1 B Design $33,008 Phase 1 B Construction Administration $49,375 TOTAL $85,452 1 k a s s Water Reuse System-Phase 1 Addendum to Exhibit D FEE SCHEDULE Phase 1A-Contruction Administration Table 1 of 3 TASKS Hours Task Description PM TECH CLER Task 1 -Conformed Documents Preparation&Revision of Project Manual 16 10 Preparation of Drawings 2 4 Total 18 4 10 PM: Project Manager TECH: CADD Technician CLER: Clerical Table 2 of 3 HOURLY SUMMARY SHEET Employee Direct Direct Labor Category Hours Labor Rate Cost PM 18 $47.34 $852 TECH 4 $26.25 $105 CLER 10 $21.25 $212 Subtotal $957 Table 3 of 3 LUMP SUM COST-BASIC SERVICES LABOR COST Overhead Total-Labor Fixed Fee- Total Phase Labor Percent Plus Overhead Percent Cost Construction $957 175% $2,632 12% $2,948 DIRECT COSTS Expense Quantity Unit Rate Total Printing Conformed Docs 1 LS $ 122 $122 Total Direct Costs Subtotal $122 Total Lump Sum Cost $3,070 Water Reuse System-Phase 1 Addendum to Exhibit D FEE SCHEDULE Phase 1B-Design Table 1 of 3 TASKS Hours Task Description PM SE TECH SRTECH Task 1 -Chlorination Modifications Hoist Replacement Analysis 4 Scrubber Rehab Analysis 8 Chlorination System Analysis&Design 24 2 Opinion of Probable Construction Cost 4 Develop Drawings 12 6 12 Administration&Correspondence 4 Internal Quality Assurance Monitoring 1 1 Subtotal 57 3 6 12 Task 2- OSP Reuse Irrigation Connections Partial Design of Modifications-Task 3 8 2 Partial Drawing Pians for CPR 10-Task 3 4 12 Partial Drawing Details for CPR 10 8 1 18 Meeting with City&Contractor 4 Meeting Minutes&Documentation 8 1 Administration&Correspondence 12 Subtotal 44 4 0 30 Task 3-Surge Relief Valve&Appurtenances Surge Relief Valve Design 12 2 Develop Drawings 12 16 Develop Specification 2 Meeting with City 4 4 Administration&Correspondence 8 Internal Quality Assurance Monitoring 1 1 Subtotal 39 7 16 0 Totals 140 14 22 42 PM: Project Manager SE: Senior Engineer TECH: CADD Technician SRTECH: Senior CADD Technician Table 2 of 3 HOURLY SUMMARY SHEET Employee Direct Direct Labor Category Hours Labor Rate Cost PM 140 $49.65 $6,950 SE 14 $85.19 $1,193 TECH 22 $28.45 $626 SRTECH 42 $45.75 $1,921 Subtotal $10,690 i Table 3 of 3 LUMP SUM COST-BASIC SERVICES LABOR COST Overhead Total-Labor Fixed Fee- Phase Labor Percent Pius Overhead Percent Total Fee Construction $10,690 175% $29,397 12% $32,925 DIRECT COSTS Expense Quantity Unit Rate Total Printing/Xerox 1 LS $ 25.00 $25 Travel 104 Miles $ 0.56 $58 Total Direct Costs Subtotal $83 Total Lump Sum Cost $33,008 s Water Reuse System-Phase 1 Addendum to Exhibit D FEE SCHEDULE Phase 1 B-Construction Administration Table 1 of 3 TASKS Hours Task Description IPM SE TECH SRTECH CLER Task 1 -Conformed Documents Preparation&Revision of Project Manual 8 2 8 Preparation of Drawings 2 4 Subtotal 10 2 4 0 8 Task 2-Additional Painting on Clearwell Exterior Correspondence with Owner&Contractor 1.5 Shop Drawing Review 0.5 0.5 Prepare&Process CPR 13 1 1 Task 3-Redesign of JB 1 &2 Platforms per BRA Subtotal 3 0 0 0 1.5 Prepare&Process CPR 5. 2 2 1 Shop Drawing Review 2 1 Prepare Record Drawings 1 2 Administration&Correspondence 3 1 Subtotal 8 2 0 2 3 Task 4-Revisions to NPW system per BRA Correspondence w/Owner,Operator&Contractor 1.5 Evaluation of NPW Pipe Design 1 Prepare&Process Field Order 3 2 1 Prepare Record Drawings 0.5 Subtotal 5 0 0 1 1 Task 5-Chlorination Modifications Prepare&Process CPRs 7&9 4 2 Revise CPR 9 4 1 Shop Drawing and O&M Review 3 1 Prepare Record Drawings 2 4 Administration&Correspondence 6 1 1 Subtotal 19 1 0 4 5 Task 6-Splash Pad Modifications at WTP Clearwell Prepare&Process CPR 12 1 1 Subtotal 1 0 0 0 1 Task 7-Additional Conduit&Wire Prepare&Process CPR 15 1 1 Prepare Record Drawings 1 2 Administration&Correspondence 4 1 Subtotal 6 0 0 2 2 Task 8-OSP Reuse Irrigation Connections Site Visit with Contractor 2 Prepare&Process CPR 10 6 1 Pre-Construction Meeting 4 2 Submittal,Shop Drawing&O&M Review 24 2 8 Administration&Correspondence 12 4 4 Subtotal 48 6 0 0 15 Task 9-Surge Relief Valve&Appurtenances Prepare&Process CPR 16 4 2 Shop Drawing and O&M Review 6 1 1 Prepare Record Drawings 2 4 Administration&Correspondence 8 2 1.5 Subtotal 20 3 0 4 4.5 i Task 10-Revisions of Change Order 02 Revise CO 02 8 2 Subtotal 8 0 0 0 2 Totals Tasks 1 -10 128 14 4 13 43 Task 11 -Contract Extension(4 months) Meetings(Estimate 4),Site Visits,Documentation 20 2 20 Respond to RFis 16 2 4 6 Submittals&Test Reports 4 1 2 Review Pay Applications(Estimate 5) 12 1 4 Administration&Correspondence 24 2 12 Start-Up&Observation 8 1 Punch List&Final Inspection 8 1 2 Subtotal 92 10 0 4 46 Total 220 24 4 17 89 PM: Project Manager SE: Senior Engineer TECH: CADD Technician SRTECH: Senior CADD Technician CLER: Clerical Table 2 of 3 HOURLY SUMMARY SHEET Employee Direct Direct Labor Category Hours Labor Rate Cost { PM 220 $49.65 $10,922 SE 24 $85.19 $2,044 TECH 4 $28.45 $114 SRTECH 17 $45.75 $778 CLER 89 $22.15 $1,971 Subtotal $15,829 f Table 3 of 3 LUMP SUM COST-BASIC SERVICES LABOR COST Overhead Total-Labor Fixed Fee- Phase Labor Percent Plus Overhead Percent Total Fee Construction $15,829 175% $43,529 12% $48,753 DIRECT COSTS Expense Quantity Unit Rate Total Pdnting/Xerox 1 LS $ 300 $300 Travel 580 Miles $ 0.56 $322 Total Direct Costs Subtotal Total Lump Sum Cost $49,375 4 } Y { ROUND ROCK,TEXAS City Council Agenda Summary Sheet PURPOSE.PASSION.PROSPERITY. Agenda Item No. G2. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 3 with Agenda Caption: HDR Engineering, Inc.for the Water Reuse System—Phase 1 project. Meeting Date: May 10, 2012 Department: Utilities and Environmental Services Staff Person making presentation: Michael Thane, P.E. Utilities Director Item Summary: The City of Round Rock water reuse system includes treatment, pumping and distribution facilities to treat and distribute effluent from the Brushy Creek Regional Wastewater Treatment Plant (BCWWTP). The Type I treated effluent is being conveyed to reuse customers in the northeast part of Round Rock for irrigation and potentially other non-potable water purposes. The City plans to implement the reuse system in five phases as described in the CORR Water Reuse Master Plan dated September 2009. These engineering services are for Phase 1 and include construction of filtration, disinfection and pumping facilities at the BCWWTP and installation of reuse water distribution piping to serve Old Settler's Park. The original contract with HDR Engineering, Inc. was completed in March 2010 with Supplemental Contracts No. 1 and No. 2 following in January 2011 and May 2011, respectively. The combined owners of the BCRWWTP do not want the Reuse Water Facility to share the Wastewater Treatment Plants chlorination equipment or vacuum lines. It has become necessary to add separate equipment and distribution lines which were provided by Change Order No. 2 of the construction contract. This additional engineering design work was not anticipated in the original contract. This Supplemental Contract No. 3 is for the additional engineering services for design and construction administration pertaining to the new chlorine equipment to separate the Reuse Facility chlorination from the Wastewater Treatment Facilities as well as the design of a surge relief valve and appurtenances for the Reuse Waterline, as requested by the City. HDR spent additional design time on the tie-in for Dell Diamond which includes a tapping saddle, isolation valve and piping to their existing irrigation meter and disconnection from the potable waterline system. In addition, this contract also includes additional fees for construction phase services for HDR due to the extension of the construction time. Cost: $85,452 Source of Funds: Self-financed Water Construction Date of Public Hearing(if required): N/A Recommended Action: Approval i i 8 3: z k 9 { a t C t t i t. f k, I STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING,INC. ("Engineer") ADDRESS: 4401 West Gate Blvd.,Suite 400,Austin,TX 78745 PROJECT: Water Reuse System—Phase 1 This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 25th day of March, 2010 for the Water Reuse System — Phase 1 Project in the amount of$543,491.00;and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on January 7, 2011 to amend the scope of services and to increase the compensation by $48,161.00 to a total of $591,652.00;and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on May 6, 2011 to amend the scope of services and to increase the compensation by $10,407.00 to a total of $602,059.00;and 3 WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$85,452.00 to a total of$687,511.00;and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services, and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. E i Supplemental Contract Rev.12/01/08 0199.7134;00247204 84275 e 1 r i -05-to-&a- I { E I II I I rr. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $85,452.00 the lump stmt amount payable u3ider the Contract for a total of $687,511.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. HDR ENGINE NG,INC. s �3�17 Date CITY O ROUND OCK AP VED S TO ORM: By: , ' / J1 Alan McGraw,Mayor Step, L. Sheets,City Attorney Date i i I I s 3 I (6t Y t 1 l 5 { Supplemental Contract Rev.12/01/08 0199.7134;00247204 84275 2 1 ADDENDUM TO EXHIBIT B Engineering Services Water Reuse System: Phase I Supplemental Engineering Services The engineering design and construction administration services listed below are related to project scope modifications requested by the City of Round Rock and/or the Brazos River Authority. Extension of construction administration services for Phase 1B is for contract time adjustments granted to the contractor for completion of change orders for the requested project modifications. Phase 1A—Old Settler's Park Reuse Waterline: Construction Administration 1. Prepare and revise conformed documents,which is not included in current Phase 1 engineering services. Phase 1B—Reuse Water Treatment Facilities: Design 1. Design modifications to chlorination system and prepare related drawings. 2. Partially design and prepare drawings for a portion of reuse irrigation connections in Old Settler's Park. 3. Design surge relief valve vault with appurtenances and prepare related drawings and specifications. Phase 1B—Reuse Water Treatment Facilities: Construction Administration 1. Prepare and revise conformed documents, which is not included in current Phase 1 engineering services. 2. Administer additional coating work on clearwell dome ring(CPR 13). 3. Administer modifications to elevated platforms on Junction Boxes 1 and 2(CPR 5). 4. Administer revisions to non-potable water system(FO 3). 5. Administer modifications to chlorination system (CPRs 7 and 9). a 6. Administer modifications to clearwell overflow splash pad at the City of Round Rock Water Treatment Plant(CPR 12). 7. Administer additional conduit and wire for control valve vault and clearwell overflow manhole(CPR 15). 1 t I i 3 E i 8. Administer additional work related to reuse irrigation system connections in Old Settler's I Park(CPR 10). 9. Administer addition of surge relief valve vault with appurtenances(CPR 16). 10.Revise change order 02. 11.Provide extended construction administration services(4 months). f { r b; 2 r ADDENDUM TO EXHIBIT C WORK SCHEDULE 2010 2011 2012 TASKS J J A S 0 N i D J 1 F I M A M J J A S 01 N D J I F M A M J J A S Phase 1A:Construction Administration I i 1.Conformed DocumentsNow { Phase 113:Design 1.Chlorination Modifications -2.Old Settler's Park Reuse Irrigation Connections 3.Addition of Surge Relief Valve&Appurtenances 1 � Phase 113:Construction Administration 1.Conformed Documents I 2.Additional Clearwell Coating 3.Redesign of Junction Box 1&2 Platforms L 4.Revisions to Non Potable Water System S.Chlorination Modifications 6.Modifications to Overflow Splash Pad at WTP I ( L 7.Additional Conduit&Wire for Control Valve Vault&Clearwell Overflow MH ; { — -- 8.Old Settler's Park Reuse Irrigation Connections I _.._. 9.Addition of Surge Relief Valve&Appurtenances I i 10.Revisions of Change Order 02 11.Contract Extension 4 months) i i ADDENDUM TO EXHIBIT D Fee Schedules Attached Behind This Page Attached fee schedules include listings of tasks and fee development information for supplemental design and construction administration services related to the Phase ]A — Old Settler's Park Reuse Waterline and Phase 1B—Reuse Water Treatment Facilities projects, which are part of the Water Reuse System—Phase 1 contract. The individual and total limp sum costs for the supplemental design and construction administration set-vices are below. Phase lA Construction Administration $3,070 Phase 1 B Design $33,008 Phase 1B Construction Administration $49,375 TOTAL $85,452 f Water Reuse System -Phase 1 Addendum to Exhibit D FEE SCHEDULE Phase 1A-Contruction Administration Table 1 of 3 TASKS Hours Task Description PM TECH CLER Task 1 -Conformed Documents Preparation&Revision of Project Manual 16 10 Preparation of Drawings 2 4 Total 18 4 10 PM: Project Manager TECH: CADD Technician CLER: Clerical i Table 2 of 3 i HOURLY SUMMARY SHEET i Employee Direct Direct Labor Category Hours Labor Rate Cost PM 18 $47.34 $852 TECH 4 $26.25 $105 ff CLER 10 $21.25 $212 Subtotal $957 Table 3 of 3 LUMP SUM COST-BASIC SERVICES LABOR COST Overhead Total-Labor Fixed Fee- Total Phase Labor Percent Plus Overhead Percent Cost Construction $957 175% $2,632 12% $2,948 } DIRECT COSTS Expense Quantity Unit Rate Total Printing Conformed Docs 1 LS $ 122 $122 Total Direct Costs Subtotal $122 Total Lump Sum Cost $3,070 s I e. i Water Reuse System -Phase 1 Addendum to Exhibit D FEE SCHEDULE Phase 18-Design Table 1 of 3 i TASKS Hours Task Description PM SE TECH SRTECH Task 1 -Chlorination Modifications g Hoist Replacement Analysis 4 Scrubber Rehab Analysis 8 Chlorination System Analysis& Design 24 2 I Opinion of Probable Construction Cost 4 Develop Drawings 12 6 12 i Administration&Correspondence 4 k Internal Quality Assurance Monitoring 1 1 Subtotal 57 3 6 12 i Task 2- OSP Reuse Irrigation Connections Partial Design of Modifications-Task 3 8 2 Partial Drawing Plans for CPR 10-Task 3 4 12 Partial Drawing Details for CPR 10 8 1 18 Meeting with City&Contractor 4 i Meeting Minutes& Documentation 8 1 Administration&Correspondence 12 £ Subtotal 44 4 0 30 Task 3-Surge Relief Valve&Appurtenances Surge Relief Valve Design 12 2 Develop Drawings 12 16 Develop Specification 2 Meeting with City 4 4 Administration&Correspondence 8 F Internal Quality Assurance Monitoring 1 1 Subtotal 39 7 16 0 i Totals 140 14 22 42 s: PM: Project Manager SE: Senior Engineer TECH: CADD Technician SRTECH: Senior CARD Technician Table 2 of 3 ` s` HOURLY SUMMARY SHEET Employee Direct Direct Labor Category Hours Labor Rate Cost PM 140 $49.65 $6,950 SE 14 $85.19 $1,193 TECH 22 $28.45 $626 SRTECH 42 $45.75 $1,921 Subtotal $10,690 i } 3 i Table 3 of 3 LUMP SUM COST-BASIC SERVICES LABOR COST Overhead Total-Labor Fixed Fee- Phase Labor Percent Plus Overhead Percent Total Fee Construction $10,690 175% $29,397 12% $32,925 DIRECT COSTS Expense Quantity Unit Rate Total Printing/Xerox 1 LS $ 25.00 $25 Travel 104 Miles $ 0.56 $58 Total Direct Costs Subtotal $83 Total Lump Sum Cost $33,008 i t r: i F> q i- t q pggkp C pY: ((il L a. I� yy ( H Water Reuse System-Phase 1 Addendum to Exhibit D FEE SCHEDULE Phase 1 B-Construction Administration Table 1 of 3 TASKS Hours Task Description PM SE TECH SRTECH CLER Task 1 Conformed Documents Preparation&Revision of Project Manual 8 2 8 Preparation of Drawings 2 4 Subtotal 10 2 4 0 8 Task 2-Additional Painting on Clearwell Exterior Correspondence with Owner&Contractor 1.5 Shop Drawing Review 0.5 0.5 Prepare&Process CPR 13 1 1 Subtotal 3 0 0 0 1.5 Task 3-Redesign of JB 1 &2 Platforms per BRA Prepare&Process CPR 5. 2 2 Shop Drawing Review 2 1 Prepare Record Drawings 1 2 1 Administration&Correspondence 3 Subtotal 8 2 0 2 3 Task 4-Revisions to NPW system per BRA Correspondence w/Owner,Operator&Contractor 1.5 Evaluation of NPW Pipe Design 1 Prepare&Process Field Order 3 2 1 Prepare Record Drawings 0.5 1 Subtotal 5 0 0 1 1 Task 5-Chlorination Modifications Prepare&Process CPRs 7&9 4 2 Revise CPR 9 4 1 Shop Drawing and O&M Review 3 1 Prepare Record Drawings 2 4 E Administration&Correspondence 6 1 1 Subtotal 19 1 0 4 5 Task 6-Splash Pad Modifications at WTP Clearwell Prepare&Process CPR 12 1 1 Subtotal 1 0 0 0 1 Task 7-Additional Conduit&Wire r Prepare&Process CPR 15 1 1 Prepare Record Drawings 1 2 Administration&Correspondence 4 1 Subtotal 6 0 0 2 2 Task 8-OSP Reuse Irrigation Connections Site Visit with Contractor 2 Prepare&Process CPR 10 6 1 Pre-Construction Meeting 4 2 Submittal,Shop Drawing&O&M Review 24 2 g Administration&Correspondence 12 4 4 Subtotal 48 6 0 0 15 z Task 9-Surge Relief Valve&Appurtenances Prepare&Process CPR 16 4 2 Shop Drawing and O&M Review 6 1 1 Prepare Record Drawings 2 4 Administration&Correspondence 8 2 1.5 Subtotal 20 3 0 4 4.5 i I ' I i' i i Task 10-Revisions of Change Order 02 Revise CO 02 8 2 Subtotal 8 0 0 0 2 Totals Tasks 1 -10 128 14 4 13 43 Task 11 -Contract Extension(4 months) Meetings(Estimate 4),Site Visits,Documentation 20 2 20 Respond to RFIs 16 2 q 6 Submittals&Test Reports 4 1 2 Review Pay Applications(Estimate 5) 12 1 4 Administration&Correspondence 24 2 12 Start-Up&Observation 8 1 Punch List&Final Inspection 8 1 2 Subtotal 92 10 0 4 46 Total 220 24 4 17 89 PM: Project Manager SE: Senior Engineer TECH: CADD Technician p SRTECH: Senior CADD Technician CLER: Clerical f r Table 2 of 3 HOURLY SUMMARY SHEET Employee Direct Direct Labor Category Hours Labor Rate Cost PM 220 $49.65 $10,922 SE 24 $85.19 $2,044 TECH 4 $28.45 $114 SRTECH 17 $45.75 $778 ' CLER 89 $22.15 $1,971 Subtotal $15,829 Table 3 of 3 LUMP SUM COST-BASIC SERVICES LABOR COST Overhead Total-Labor Fixed Fee- t Phase Labor Percent Plus Overhead Percent Total Fee Construction $15,829 175% $43,529 12% $48,753 DIRECT COSTS Expense Quantity Unit Rate Total Printing/Xerox 1 LS $ 300 $300 R Travel 580 Miles $ 0.56 $322 j Total Direct Costs Subtotal $622 Total Lump Sum Cost $49,375 ' i t ff x 4