R-12-05-24-G6 - 5/24/2012 s i RESOLUTION NO. R-12-05-24-G6 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with r. APAC—Texas, Inc. for the 2011 Street Maintenance Program (Overlay) Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said 4 F; Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore k BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity 4 Adjustment/Change Order No. 1 to the Contract with APAC — Texas, Inc. for the 2011 Street q Y- Maintenance Program (Overlay) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter E 1 1 hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of May, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk O:\wdox\SCC1nts\01 12\1204\MUNICIPAL\00250215.DOC/rmc Y EXHIBIT Page 1 of 3 «A» AL Contract Quantity Adjustment/Change Order 's rev,09/10 i Department: Transportation Department t Project 2011 Street Maintenance Program Name: (Overlay) Date: 4/20/2012 =` R 4 City Project Change Order/Quantity Adjustment k ID Number ST05MNT11 No. 1 3ustification K The purpose of this submission is to add additional work through Change Order #1. This will be for streets added to the original contract with APAC—Texas, Inc. for the construction of the 2011 Street Maintenance Program (Overlay) project. Change Order #1 addresses the additional repairs associated with these additional streets. SUMMARY Amount %Change Original Contract Price: $2,455,755.00' Previous Quantity Adjustment(s): $0.00; This Quantity Adjustment: $0.00 F Total Quantity Adjustment(s): $0.00: t Total Contract Price with Quantity Adjustment(s): $2,455,755.00 Previous Change Order(s): $0.00 0.000/0 This Change Order: $221,694.92 9.03% Total Change Order(s)To Date: $221,694.92 9.03% Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): $2,677,449.92' Original Contract Time: 180 Days Contract me Prior to this Change Order: 180 Days Ti Additional Contract Time with This Change Order: 18 Days Signatures and Approvals Prepared By: Todd Keltgen, Public Works Ops. Mgr. Si ture Printed Name,Title and Company Date i Contractor Approval: Ben Liggett APAC-Texas Inc. Signature Printed Name,Title and Company Date City Staff 47K-2411 YZ Approval: Todd Keltgen Public Works Ops. Mgr. ignature Printed Name,Title Date City Official Approval: Signature Printed Name,Title Date Page 2 of 3 Contract Quantity Adjustment/Change Order MV,09/10 x Change Order Data ; P S t f Contract Time Adjustment Bid Item# Item Description and Change Unit Qty. Unit Price Amount (Days) Macnine Edid HMAC I ype at a Nominal 1 1/2" inch in depth including Tack Coat 1 Ton 0 $72.75 $0.00 2 Pavement Repair Ton 117 $103.50 $12,101.22 3 Pavement Repair(Minor) Ton 0 $109.00 $0.00 at street cuts, depressions and t areas of curb and gutter replacement prior to Overlay E g including tack coat 4 Ton 0 $86.00 $0.00 6 Edge Milling 5 (Varies 0"to 1'J Asphalt SY 0 $1.75 $0.00 Surface Mil ing 6 11/4"Asphalt SY 6456 $2.00 $12,912.00 Remove and Replace Concrete Curb and Gutter 7 LF 2311 $29.25 $67,596.00 emove and Replace Reinforced Concrete Driveway 8 SF 1471 $7.70 $11,326.70 Remove and Replace Reinforced Concrete Sidewalk 9 SF 15115 $6.60 $99,759.00 Utility Manhole Adjusting Rings -24" Lids(11/2" Rise) 10 EA 0 $450.00 $0.00 utility valve Can Riser Rings -7 3/8" Lids(11/2 Rise) 11 EA 0 $350.00 $0.00 emove ana Replace Reinforced Concrete ADA Handicap Ramp 12 EA 18 $1,000.00 $18,000.00 Remove and Replace Reinforced Concrete Valley Gutter 13 SF 0 $9.50 $0.00 14 Crack Sealing LF 0 $0.48 $0.00 hermoplasucavemen a ng (Reflectorized)Yellow and White 4"width 15 LF 0 $0.75 $0.00 16 Traffic Control MO 1 0 $1,500.00 $0.00 18 TOTALS: $221,694.92 Page 3 of 3 Contract Quantity Adjustment/Change Order rev,09/10 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description and Change Unit Qty- Unit Price Amount (Days) f 7- TOTALS:l $0.00 i t 'f ROUND ROCK,TEXAS City Council Agenda Summary Sheet a PURPOSE.PASSION.PROSPERITY. S i Agenda Item No. G6. Consider a resolution authorizing the Mayor to execute Quantity Adjustment / Change I Agenda Caption: Order No. 1 with APAC—Texas, Inc. for the 2011 Street Maintenance Program (Overlay). t Meeting Date: May 24, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director s t Item Summary: The bid for the construction contract for 2012 Street Maintenance Program (Overlay) was approved by the City Council on July 28, 2011 at a cost of$2,455,755. The scope of the original contract included street repairs, concrete repairs, milling and overlay for the Southern Terrace and Onion Creek Village subdivisions and portions of Oak Bluff, South Creek,Windy Park, Chisholm Valley, Round Rock West, Indian Ridge, and Trinity Place subdivisions. Pavement and concrete repairs for additional streets in the South Creek and Windy Park Subdivisions have been added to the scope of this project. Quantity Adjustment/Change Order No. 1 is needed to cover the cost of additional expenses for these additional streets. Cost: $221,694.92 a Source of Funds: General Self-Financed Construction Date of Public Hearing(if required): N/A Recommended Action: Approval r ORIGINAL DOCUMENTS Page 1 of 3 } Contract Quantity Adjustment/Change Order mv,0910 Department: Transportation Department Project 2011 Street Maintenance Program Name: (Overlay) Date: 4/20/2012 City Project Change Order/Quantity Adjustment ID Number ST05MNT11 No. 1 Justification The purpose of this submission is to add additional work through Change Order #1. This will be for streets added to the original contract with APAC—Texas, Inc. for the construction of the 2011 Street Maintenance Program (Overlay) project. Change Order #1 addresses the additional repairs associated with these additional streets. SUMMARY Amount %Change Original Contract Price: $2,455,755.00 Previous Quantity Mustment(s): $0.00 This Quantity Adjustment: $0,00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $2,455,755.00 Previous Change Order(s): $0.00 0.000/0 This Change Order: $221,694.92 9.03% Total Change Order(s)To Date: $221,694.92 9.03% Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): $2,677,449.92 Original Contract Time: 180 Days Contract Time Prior to this Change Order: 180 Days Additional Contract Time with This Change Order: 18 Days Prepared By: Todd Kelt en Public Works Ops. Mgr. Si ture Printed Name,Title and Company Date Contractor Approval: Ben Liggett APAC-Texas Inc. &P Signature Printed Name,Title and Company Date City Staff Approval: Todd Keltgen Public Works Ops. Mgr. y 3d '/_7 nature Printed Name,Title Date amity Official Approval: a" •r� Signature Printed Name,Tilde Date } Page 2 of 3 Contract Quantity Adjustment/Change Order t rev,09/10 Cha=Order Data a` 7AdJusbnent r iBid Item# Item and Cha Unit Unit Price Amount s at a Nominal 11/2" inch in depth including Tack Coat 1 Ton 0 $72.75 $0.00 2 Pavement Repair Ton 117 $103.50 $12,101.22 3 Pavement R it Minor Ton 0 $109.00 $0.00 , at street cuts, depressions and areas of curb and gutter r replacement prior to Overlay including tack coat 4 Ton 0 $86.00 $0.00 6'Edge Milling 5 (Varies 0"to 1")Asphalt SY 0 $1.75 $0.00 u Mi ing 6 11/4"Asphalt SY 6456 $2.00 $12,912.00 I. Remove and Replace CorKTete Curb and Gutter 7 LF 2311 $29.25 $67,596.00 Remove and Replace Reinforced Concrete Driveway 8 SF 1471 $7.70 $11,326.70 Remove and Rplace Reinforced Concrete Sidewalk 9 SF 15115 $6.60 $99,759.00 Utility an a Adjusting Rings -24" Lids(1 1/2" Rise) 10 EA 0 $450.00 $0.00 Utility ave Can Riser Rings - 7 3/8" Lids(1 1/2 Rise) 11 EA 0 $350.00 $0.00 emove ancl Replace Reinforced Concrete ADA Handicap Ramp 12 EA 18 $1,000.00 $18,000.00 Remove and Replace Reinforced Concrete Valley Gutter 13 SF 0 $9.50 $0.00 14 Crack Sealing LF 0 $0.48 $0.00 rmop a c avemen ng (Reflectorized)Yellow and White 4"width 15 LF 0 $0.75 1 $0.00 16 Traffic Control MO _J 0 $1 500.00 10.001 TOTALS: $221694.92 Page 3 of 3 i Contract Quantity Adjustment/Change Order rev,09/10 i QuanM i 3' 'anent Data Contract Time Adjustment ,` Bid Item# Item Description and Change UnitUnit Price Amount (Days) R, I t i i i Qty- TOTALS: $0.001 f X e1,