R-12-05-24-G8 - 5/24/2012 a RESOLUTION NO. R-12-05-24-G8 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Kimley-Horn and Associates, Inc. for the Signal Improvements on University at Teravista Club Dr., Sandy Brook Dr., and College Park Dr., and on A.W. Grimes at Creek Ridge Blvd. Project; and WHEREAS, Kimley-Horn and Associates, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services; and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 1 with Kimley-Horn and Associates, Inc.,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 1 to the Contract with Kimley-Horn and Associates, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of May, 2012. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0.\wdox\SCC1nts\01 12\1204\MUNICIPAL\00250217.DOC/rmc I 's EXHIBIT i uA» I STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL G�IEERING SERVICES TRACT NO. I TO CONTRACT FOR EN FSM; KIMLEE ORN AND ASSOCIATES INC. ("Engineer") ADDRESS: 10415 Morado Circle Bldg- lSte.3MO.TAustin vista Club Dr. Sand BroolcDr. PROJECT: Signal Im roveu>ents on Untvers>< and College Park Dr. and on A.W.Grimes at Creek Rid a Blvcl. This supplemental Contract No. 1 to Contract for Engineerig Services is Morn and ade by aAssociates, between the City of Round Rock, Texas, hereinafter called the "City" and y Inc.,hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Improvements Services, on Univers er called the "Contract", on the l4th day of July, 2011 for the Signa ty at Teravista Club Dr., Sandy Brook Dr., and College Park Dr., and on A.W. Grimes at Creek Ridge Blvd.Project in the amount of$79,097.71;and WHEREAS, it has become necessary to amend the Contract to modify lthe provisions ro sio 34;for the scope of services and to increase the compensation by$65,838.63 to a NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. mended as et Article 2 En ineerin Services and Exhibit B, EnlrineerinServiC�ledule shalls shall be abe amendedas forth in the attached Addendum To Exhibit E. Exhibit C Werk S set forth in the attached Addendum To Exhibit C. II. by Ait icle 4 Com ensation and Exhibit D Fee Schedule shall be amendedof increasing n easing, as • $65,838.63 the lump slla�e 4doi n{ payable under the Contract for a tots shown by the attached A IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Rev.12101/08 supplemental Contract 84275 0199.7175;00249567 i t i KIMLEY-HORN AND ASSOCIATES,INC. By: F 20dZ Date CITY OF ROUND ROCK APPROVED AS TO FORM: By: Stephan L. Sheets,City Attorney Alan McGra«',Mayor Date Rev.12/01/08 Supplemental Contract 84275 0199.7175;00249567 2 ADDENDUM TO EXHIBIT B Services to be Provided by the Engineer City: Round Rock, Texas . Location(s): Multiple University Boulevard @ Teravista Club Drive University Boulevard @ Sandy Brook Drive University Boulevard @ College Park Drive A.W. Grimes Boulevard @ Creek Ridge Boulevard Signal Improvements at existing signals - FM 3406-Old Settlers Blvd — Chisolm Trail to Sunrise Road Signal Improvements at existing signals - Gattis School Road— S Mays St to Redbud Lane University Blvd—IH-35 to A. W. Grimes Blvd Project: Signal Improvements and Corridor Traffic Signal Synchronization SCOPE OF WORK OVERVIEW Kimley-Horn and Associates, Inc. ("KHA") will provide the following additional services to the Signal Improvements project on University at Teravista Club Dr., Sandy Brook Dr., and College Park Dr., and on A. W. Grimes at Creek Ridge Blvd. project as described below. TASK 1.0 PROJECT ADMINISTRATION Project management spans the entire duration of the project and involves monitoring and coordination of services provided to the City to assure timely and efficient completion of the project. Included in this task are project control and scheduling, documentation, reporting requirements, staff forums, meetings, and quality control. Subtask IA. Documentation Reports, technical memoranda, status reports, invoices, and other correspondence relevant to the project will be summarized and turned over to the City at the conclusion of the project. Subtask 1B. Reporting Requirements Monthly email status reports will be prepared and submitted to the City. The emails will contain a general report of project progress and contract fulfillment. Subtask 1C. Meetings Project review and project specific technical meetings will be conducted under this subtask. Unless otherwise stated herein, it is assumed that all Project review meetings will be held at the City's Public Works Department offices. It is agreed for budgeting purposes that one kickoff meeting, one field review meeting, one timing plan review meeting, and one implementation / field fine tuning meeting will be held relative to the project. 05/01/12 Traffic Signal Designs Supplemental 1 1 City of Round Rock TASK 4.0 FINAL PLANS, SPECIFICATIONS & ESTIMATES Based on City review comments, substantial re-design of multiple intersections will be performed as described below: 1. Re-design the proposed signal at A. W. Grimes at Creek Ridge Blvd. at 90 percent plan submittal stage. The re-design will include the following changes: a. Update "Proposed Signal Layout" sheet to change single mast-arm pole assemblies to dual mast-arm pole assemblies. b. To counter sight distance and visibility issues, add an advanced flashing beacon assembly to inform motorists of a possible stop at the new signal ahead. c. Update"Conduit and Cable Chart" sheet based on updated signal pole locations. d. Update "Wiring and Phasing" sheet. e. Update "Signal Elevation" sheet. f. Update "Quantities" sheet. 2. Update signal design plans to include flashing yellow arrow signal head displays for all left- turn movements at University Blvd. at Teravista Club Dr., Sandy Brook Dr., and College Park Dr. The following modifications will be made at each intersection: a. Update "Wiring and Phasing" sheet. b. Update "Signal Elevation" sheet. c. Update"Quantities" sheet. d. Using SignCAD design a new 24"00" plaque sign to be installed next to a flashing yellow arrow signal head display. 3. Add three new sheets to the planset to include the upgrade of existing signals at University Blvd. at University Oaks Blvd., Oakmont Dr., and Sunrise Rd. installing flashing yellow arrow displays for left-turn movements. 4. Estimate quantities to upgrade existing signals along FM 3406/Old Settlers Blvd. and Gattis School Rd to include flashing yellow arrow displays for all left-turn movements. The signals will include six (6) existing signals along FM 3406/Old Settlers Blvd. and 12 existing signals along Gattis School Road. In addition to the above services, KHA will provide coordinated signal timing plans for AM Peak, PM Peak, Off-Peak, and Weekend-Peak periods for six (6) existing signals and three (3) proposed future signals along University Blvd. The detailed scope of services is as below: TASK 8.0 DATA COLLECTION KHA will collect turning movement counts at the intersections listed below along University Blvd. Corridor. The counts will be collected on a Tuesday or Wednesday from 7-9 AM (morning peak), and 4-6 PM (afternoon peak). 05/01/12 Traffic Signal Designs Supplemental 1 2 City of Round Rock 1. IH 35 Southbound Frontage Road 6. Teravista Club Dr. (Future) 2. IH 35 Northbound Frontage Road 7. Sandy Brook Dr. (Future) 3. University Oaks Blvd. 8. College Park Dr. (Future) 4. Oakmont Dr. 9. Seton Parkway 5. Sunrise Rd. 10. A. W. Grimes Blvd. Subtask 8A. Field Observations KHA will monitor operations at critical signals which will be determined in consultation with the City staff. KHA will identify and note any operational challenges and improvement potentials at these intersections. Subtask 8B. Intersection Data KHA will collect existing lane geometries, traffic control, speed limits, and signal phasing information for each corridor and intersection listed above. Subtask 8C. Photo Log KHA will photograph the approaches to each intersection for verification of field data. These photographs will be provided as an appendix to the final report. Subtask 8D. Daily Traffic Volumes KHA will collect directional 24-hour tube counts at up to two locations to determine daily and weekend traffic peaking patterns along the project corridor. Subtask 8E. Travel Time Runs KHA will collect existing travel times from one end of the project corridor to the other end during AM Peak, PM Peak, Off-Peak, and Weekend Peak periods. KHA will use this data to compute delay savings after implementing proposed optimized signal timings along the corridor. TASK 9.0 DEVELOP SYNCHRONIZED SIGNAL TIMING PLANS KHA will perform the following tasks to develop synchronized signal timing plans for the corridors listed in Task 8.0: Subtask 9A. Base Models KHA will develop base models using traffic simulation software Synchro 7.0 with existing signal timings, lane geometries, and roadway speeds. Models will be created for each of AM Peak, PM Peak, Off-Peak, and Weekend-Peak periods. 05/01/12 Traffic Signal Designs Supplemental 1 3 City of Round Rock Subtask 913. Cycle Length Analysis After setting up the base models, different cycle lengths will be analyzed using Synchro 7 to identify the optimum system cycle lengths and lead/lag sequences for the corridor. The optimum cycle length for the diamond interchange at IH-35 and University Blvd. will be determined using PASSER III software. Subtask 9C. Optimized Models Optimized splits, offsets and phase sequences will be developed for the corridor to maximize green bands for the AM, PM, Off Peak, and Weekend Peak period. The off peak period will be modeled by factoring down the afternoon model using data from the 24 hour counts along the corridor. The green band splits will be based on peak period traffic demand, with larger green bands favoring predominant traffic flows. The new timing plans will be discussed with City staff for their review and approval. Modifications will be made to the timing plans based on the City's comments and a set of timing plans and time- space diagrams will be presented to the City. TASK 10.0 SIGNAL TIMING IMPLEMENTATION AND FINE TUNING KHA will assist in the implementation of the signal timing plans as follows: Subtask 10A. Lab Test Each individual timing plan will be downloaded to a test controller at the City's traffic shop for testing prior to implementation to prevent any glitches upon implementation in the field. Subtask 10B. Input New Timings KHA will input the proposed signal timing plans at each signal using new `pattern' numbers preventing the need to overwrite existing coordination pattern. The initial implementation of the timing plans will be done remotely via the City's ACTRA/TACTICS system to increase efficiency of programming the controllers. Subtask 10C. Fine Tuning After the proposed signal timing plans have been implemented, KHA will drive'through the corridor during each peak period (AM, Off-Peak, PM, and Weekend peak) to identify any modifications that need to be made to the splits and or the offsets. Attention will be paid to vehicular delays and queuing on minor streets. Upon completion of the fine tuning, KHA will update the City's ACTRA/TACTICS database and deliver final timingplan sheets to the City. f 05/01/12 Traffic Signal Designs Supplemental 1 4 City of Round Rock A TASK 11.0 FINAL REPORT AND MODEL SUBMITTALS KHA will prepare a technical report detailing the methodology adopted, assumptions, and the results of the study. The report will include a `Before' and `After' analysis measuring the overall improvement to each corridor in terms of travel time savings and reduction in pollutants with the deployment of new signal timing plans. Additionally, numerous appendices providing details of the data collection efforts, signalized intersection reports using the Highway Capacity Manual (HOW reporting feature of Synchro 7,time-space diagrams, and timing sheets will be included as part of the report. KHA will submit three (3) draft copies of the report to the City for review. Within ten (10) working days of receiving review comments, KHA will finalize the report and provide three (3) copies to the City. All reports will be signed and sealed by a Texas registered professional engineer. All Synchro 7 models will be submitted to the City at the completion of the project. i i 3 x x f d r F k F E 05/01/12 i Traffic Signal Designs Supplemental 1 5 City of Round Rock EXHIBIT C UPDATED WORK SCHEDULE Kimley--Hom and Associates,Inc. PS&E for Traffic Signal Imrovements: University Boulevard Tertavista Club Drive University Boulevard®Sandy Brook Drive University Boulevard®College Park Drive A.W.Grimes Boulevard Q Creek Ridge Boulevard Develop&Implement Optimized Signal Timing Plans: University Blvd-IH-35 to A.W.Gdmes Bbd Month Task Time July-'11 Aug-'11 Sept-'11 Oct-.1.1 Nov--11 Dec-'21 Jan-'12 Feb-'12 Mar212 April-'12 May-'12 June-Nov'12 Dec-'12 Jan-'13 Feb-'13 Mar-'13 April-'13 Base Maps/Field Recon 3 WKS Project Scoping 1 Day Preliminary Layouts 1 WK Site Review 1 Day Utility Coordination Monthly Preliminary PS&E-30%Submittal 3 WKS Final PS&E 9096 Plans 1 MO 79 BS%Plans 1 MO Final Paper Copy 3 WKS Signed&Sealed Planset 2 WKS City Review 1 MO City's Coordination with WILCO Bidding Phase Advertisement Bid Opening/Tabulations Gty Council Notice to Proceed Construction Phase 6 MO Drawing of Record Turning Movement Counts/24-HR Tube Counts 1.S-WK Develop Synchronized Signal Timing Plans 1 MO by Review of Timing Plans 05 WK Signal Timing Implementation&Fine Tuning 1 WK Draft Report 2 WKS City Review of Draft Report 1 WK Final Report 1 WK City of Round Rock,Texas Exhibit C-Work Schedule Page 1 of 1 5/1/2012 Klmley-Horn and Associates,Inc. ADDENDUM TO EXHIBIT D: FEE SCHEDULE BY TASKS Project Name: Signal Improvements on University at Teravista Club Dr., Sandy Brook Dr., and College Park Dr., and A. W. Grimes at Creek Ridge Blvd - Supplemental No. 1 Consultant: Kimley-Horn and Associates, Inc. Budgets Increases to s Task Existing New Task Tasks I. PROJECT ADMINISTRATION* $5,443.91 — g II. BASE MAPS AND SPECIFICATIONS ASSEMBLY — — III. PRELIMINARY PLANS & SPECIFICATIONS — — IV. FINAL PLANS, SPECIFICATIONS, & ESTIMATES $11,496.42 V. BID DOCUMENTS VI. CONSTRUCTION BIDDING ASSISTANCE — — VII. CONSTRUCTION PHASE SERVICES — — VIII. DATA COLLECTION* $5,735.73 IX. DEVELOP SYNCHRONIZED SIGNAL TIMING PLANS* $14,205.76 X. SIGNAL TIMING IMPLEMENTATION & FINE TUNING* $7,769.96 XI. FINAL REPORT& MODEL SUBMITTALS* $10,629.60 TASKS SUBTOTAL $16,940.33 $38,341.05 t KHA EXPENSES $4,202.25 KHA TOTAL $59,483.63 SUB—CONSULTANTS GRAM $2,500.00 ITEMS $3,855.00 SUPPLEMENTAL TOTAL $65,838.63 *- For University Blvd Signal Timing Tasks- See Man-Hours Estimate t f 5 ROUND ROCK,TEW City Council Agenda Summary Sheet PURPOSE.PASSION.PROSPERITY. Agenda Item No. G8. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Kimley-Horn and Associates, Inc. for the Signal Improvements on University at Teravista Club Drive, Sandy Brook Drive, College Park Drive, and on A.W. Grimes at Creek Ridge Agenda Caption: Boulevard Project. Meeting Date: May 24, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: The Transportation Department requests approval and execution of Supplemental Contract No.1 with Kimley-Horn and Associates, Inc. to increase 1) the scope of work, 2) the work schedule, and 3) the lump-sum fee included in the original contract dated July 14, 2011. 1)The additional scope of work includes re-designing the signal improvements for A.W. Grimes Blvd. at Creek Ridge Blvd. to reduce utility conflicts and construction costs. The additional scope concerning new tasks adds Flashing Yellow Arrow left-turn displays to the three new signals and retrofits three existing signals along University Blvd. In addition, this task also includes planning and designing for Flashing Yellow Arrow upgrades to several signals along Gattis School Rd. and Old Settlers Blvd. The final new scope item tasks the engineer with traffic analysis and plan development for coordinated signal timings along University Blvd. from the IH-35 frontage roads to A.W. Grimes Blvd. (FM 1460). 2) The work schedule will be increased to allow for the traffic study and timing plan development, which cannot begin until after the new signals have been constructed and are operational. 3) The additional fee of $65,838.63 is comprised of $16,940.33 for increases to previous tasks and $48,898.30 for new tasks. Of the $48,898.30 fee for new tasks, $6,355.00 is allocated for sub-consultant work on the signal coordination study. Cost: $65,838.63 Source of Funds: Type B Corporation Date of Public Hearing(if required): N/A Recommended Action: Approval i f t F S E A e r E i 2. yLy 6 P k f 3 F. i i t y t. . t STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: KIMLEY-HORN AND ASSOCIATES INC. ("Engineer") ADDRESS: 10415 Morado Circle Bldg. 1Ste.300 Austin TX 78759 PROJECT: Signal Improvements on University at Teravista Club Dr.,Sandy Brook Dr., and College Park Dr.,and on A W Grimes at Creek Ridge Blvd. This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Kimley-Horn and Associates, Inc.,hereinafter called the`Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 14th day of July, 2011 for the Signal Improvements on University at Teravista Chub Dr., Sandy Brook Dr., and College Park Dr., and on A.W. Grimes at Creek Ridge Blvd. Project in the amount of$79,097.71; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$65,838.63 to a total of$144,936.34; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. f Article 2 Ening_eering_Services and Exhibit B EngineeringServices shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C Work Schedule shall be amended as i set forth in the attached Addendum To Exhibit C. IL r Article 4 Compensation and Exhibit D, Fee _Schedule shall be amended by increasing by r $65,838.63 the lump sum amount payable under the Contract for a total of $144,936.34, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Rev.12/01/08 Supplemcntal Contract 84275 0199.7175;00249567 1 KIMLEY—HORN AND ASSOCIATES,INC. By. sw 5` Date CITY OF ROUND ROCK APP +D AS TO RM: B y' Stephan . Sheets,City Attorney Alan McGraw,Mayor Date ' s j ry 1 3 Rev.12/01/08 Supplemental Contract 84275 0199.7175;00249567 2 t ADDENDUM TO EXHIBIT B Services to be Provided by the Engineer City: Round Rock, Texas Location(s): Multiple University Boulevard @ Teravista Club Drive University Boulevard @ Sandy Brook Drive University Boulevard @ College Park Drive A.W. Grimes Boulevard @ Creek Ridge Boulevard Signal Improvements at existing signals - FM 3406-Old Settlers Blvd — Chisolm Trail to Sunrise Road Signal Improvements at existing signals - Gattis School Road— S Mays St to Redbud Lane University Blvd—IH-35 to A. W. Grimes Blvd Project: Signal Improvements and Corridor Traffic Signal Synchronization SCOPE OF WORK OVERVIEW Kimley-Horn and Associates, Inc. ("KHA") will provide the following additional services to the Signal Improvements project on University at Teravista Club Dr., Sandy Brook Dr., and College Park Dr., and on A. W. Grimes at Creek Ridge Blvd. project as described below. TASK 1.0 PROJECT ADMINISTRATION Project management spans the entire duration of the project and involves monitoring and coordination of services provided to the City to assure timely and efficient completion of the project. Included in this task are project control and scheduling, documentation, reporting requirements, staff forums, meetings, and quality control. Subtask 1A. Documentation Reports, technical memoranda, status reports, invoices, and other correspondence relevant to the project will be summarized and turned over to the City at the conclusion of the project. f Subtask 1B. Reporting Requirements Monthly email status reports will be prepared and submitted to the City. The emails will contain a general report of project progress and contract fulfillment. r Subtask 1C. Meetings Project review and project specific technical meetings will be conducted under this subtask. Unless otherwise stated herein, it is assumed that all Project review meetings will be held at the City's Public Works Department offices. It is agreed for budgeting purposes that one kickoff meeting, one field review meeting, one timing plan review meeting, and one implementation / field fine tuning meeting will be held relative to the project. 05/01/12 Traffic Signal Designs Supplemental I 1 City of Round Rock TASK 4.0 FINAL PLANS, SPECIFICATIONS & ESTIMATES Based on City review comments, substantial re-design of multiple intersections will be performed as described below: 1. Re-design the proposed signal at A. W. Grimes at Creek Ridge Blvd. at 90 percent plan submittal stage. The re-design will include the following changes: a. Update "Proposed Signal Layout" sheet to change single mast-arm pole assemblies to dual mast-arm pole assemblies. b. To counter sight distance and visibility issues, add an advanced flashing beacon assembly to inform motorists of a possible stop at the new signal ahead. c. Update "Conduit and Cable Chart" sheet based on updated signal pole locations. d. Update "Wiring and Phasing" sheet. e. Update "Signal Elevation" sheet. f. Update "Quantities" sheet. f r 2. Update signal design plans to include flashing yellow arrow signal head displays for all left- turn movements at University Blvd. at Teravista Club Dr., Sandy Brook Dr., and College Park Dr. The following modifications will be made at each intersection: a. Update "Wiring and Phasing" sheet. b. Update "Signal Elevation" sheet. c. Update "Quantities" sheet. d. Using SignCAD design a new 24"00" plaque sign to be installed next to a flashing yellow arrow signal head display. 3. Add three new sheets to the planset to include the upgrade of existing signals at University Blvd. at University Oaks Blvd., Oakmont Dr., and Sunrise Rd. installing flashing yellow arrow displays for left-turn movements. 4. Estimate quantities to upgrade existing signals along FM 3406/Old Settlers Blvd. and Gattis School Rd to include flashing yellow arrow displays for all left-turn movements. The signals will include six (6) existing signals along FM 3406/Old Settlers Blvd. and 12 existing signals along Gattis School Road. In addition to the above services, KHA will provide coordinated signal timing plans for AM Peak, PM Peak, Off-Peak, and Weekend-Peak periods for six (6) existing signals and three (3) proposed future ' signals along University Blvd. The detailed scope of services is as below: TASK 8.0 DATA COLLECTION KHA will collect turning movement counts at the intersections listed below along University Blvd. Corridor. The counts will be collected on a Tuesday or Wednesday from 7-9 AM (morning peak), and 4-6 PM (afternoon peak). 05/01/12 Traffic Signal Designs Supplemental 1 2 City of Round Rock 1. IH 35 Southbound Frontage Road 6. Teravista Club Dr. (Future) 2. 11135 Northbound Frontage Road 7. Sandy Brook Dr. (Future) 3. University Oaks Blvd. 8. College Park Dr. (Future) 4. Oakmont Dr. 9. Seton Parkway 5. Sunrise Rd. 10. A. W. Grimes Blvd. Subtask 8A. Field Observations KHA will monitor operations at critical signals which will be determined in consultation with the City staff. KHA will identify and note any operational challenges and improvement potentials at these intersections. Subtask 8B. Intersection Data KHA will collect existing lane geometries, traffic control, speed limits, and signal phasing information for each corridor and intersection listed above. Subtask 8C. Photo Log 4 KHA will photograph the approaches to each intersection for verification of field data. These photographs will be provided as an appendix to the final report. Subtask 8D. Daily Traffic Volumes KHA will collect directional 24-hour tube counts at up to two locations to determine daily and weekend traffic peaking patterns along the project corridor. E Subtask 8E. Travel Time Runs KHA will collect existing travel times from one end of the project corridor to the other end during AM Peak, PM Peak, Off-Peak, and Weekend Peak periods. KHA will use this data to compute delay savings after implementing proposed optimized signal timings along the corridor. TASK 9.0 DEVELOP SYNCHRONIZED SIGNAL TIMING PLANS KHA will perform the following tasks to develop synchronized signal timing plans for the corridors listed in Task 8.0: Subtask 9A. Base Models KHA will develop base models using traffic simulation software Synchro 7.0 with existing signal timings, lane geometries, and roadway speeds. Models will be created for each of AM Peak, PM Peak, Off-Peak, and Weekend-Peak periods. 05/01/12 Traffic Signal Designs Supplemental 1 3 City of Round Rock Subtask 913. Cycle Length Analysis After setting up the base models, different cycle lengths will be analyzed using Synchro 7 to identify the optimum system cycle lengths and lead/lag sequences for the corridor. The optimum cycle length for the diamond interchange at IH-35 and University Blvd. will be determined using PASSER III software. Subtask 9C. Optimized Models Optimized splits, offsets and phase sequences will be developed for the corridor to maximize green bands for the AM, PM, Off Peak, and Weekend Peak period. The off peak period will be modeled by factoring down the afternoon model using data from the 24 hour counts along the corridor. The green band splits will be based on peak period traffic demand, with larger green bands favoring predominant traffic flows. The new timing plans will be discussed with City staff for their review and approval. Modifications will be made to the timing plans based on the City's comments and a set of timing plans and time- space diagrams will be presented to the City. TASK 10.0 SIGNAL TIMING IMPLEMENTATION AND FINE TUNING KHA will assist in the implementation of the signal timing plans as follows: Subtask 10A. Lab Test Each individual timing plan will be downloaded to a test controller at the City's traffic shop for testing prior to implementation to prevent any glitches upon implementation in the field. Subtask 10B. Input New Timings KHA will input the proposed signal timing plans at each signal using new `pattern' numbers preventing the need to overwrite existing coordination pattern. The initial implementation of the timing plans will be done remotely via the City's ACTRA/TACTICS system to increase efficiency of programming the controllers. k Subtask 10C. Fine Tuning After the proposed signal timing plans have been implemented, KHA will drive through the corridor during each peak period (AM, Off-Peak, PM, and Weekend peak) to identify any modifications that need to be made to the splits and or the offsets. Attention will be paid to vehicular delays and queuing on minor streets. Upon completion of the fine tuning, KHA will update the City's ACTRA/TACTICS database and deliver final timing plan sheets to the City. 05/01/12 Traffic Signal Designs Supplemental 1 4 City of Round Rock TASK 11.0 FINAL REPORT AND MODEL SUBMITTALS 3 KHA will prepare a technical report detailing the methodology adopted, assumptions, and the results of the study. The report will include a `Before' and `After' analysis measuring the overall improvement to each corridor in terms of travel time savings and reduction in pollutants with the deployment of new signal timing plans. Additionally, numerous appendices providing details of the data collection efforts, signalized intersection reports using the Highway Capacity Manual (HCM) reporting feature of Synchro 7,time-space diagrams, and timing sheets will be included as part of the report. KHA will submit three (3) draft copies of the report to the City for review. Within ten (10) working days of receiving review comments, KHA will finalize the report and provide three (3) copies to the City. All reports will be signed and sealed by a Texas registered professional engineer. All Synchro 7 models will be submitted to the City at the completion of the project. t 5 F` i r } i x i 05/01/12 Traffic Signal Designs Supplemental 1 5 City of Round Rock EXHIBIT C UPDATED WORK SCHEDULE Kimley-Hom and Associates,Inc. PS&E for Traffic Signal Imrovements: University Boulevard @ Terravista Club Drive University Boulevard @ Sandy Brook Drive University Boulevard Q College Park Drive A.W.Grimes Boulevard @ Creek Ridge Boulevard Develop&Implement Optimized Signal Timing Plans: University Btvd-IH-35 to A.W.Grimes Blvd Month Task Time July-'11 Aug-'11 Sept-'11 Oct-'11 Nov-'11 Dec-'11 Jan-'12 Feb-'12 Mar-'12 April-'12 May-'12 June-Nov'12 Dec-'12 Jan-'13 Feb-'13 Mar-'13 April-'13 Base Maps/Field Recon 3 WKS Project Scoping 1 Day Preliminary Layouts 1 WK Site Review 1 Day Utility Coordination Monthly Preliminary PS&E-30%Submittal 3 WKS Final PS&E 90%Plans 1 MO 95%Plans 1 MO Final Paper Copy 3 WKS Signed&Sealed Planset 2 WKS City Review 1 MO City's Coordination with WILCO Bidding Phase Advertisement Bid Opening/Tabulations City Council Notice to Proceed Construction Phase 6M0 Drawing of Record Turning Movement Counts/24-HR Tube Counts 1.5 WK Develop Synchronized Signal Timing Plans 1 MO City Reviewof Timing Plans 0.5 WK Signal Timing Implementation&Fine Tuning 1 WK Draft Report 2 WKS City Review of Draft Report 1 WK Final Report 1 WK City of Round Rock,Texas Exhibit C-Work Schedule Page 1 of 1 5/1/2012 Kimley-Horn and Associates,Inc. 3 E I ADDENDUM TO EXHIBIT D: FEE SCHEDULE BY TASKS Project Name: Signal Improvements on University at Teravista Club Dr., Sandy Brook Dr., and College Park Dr., and A. W. Grimes } at Creek Ridge Blvd - Supplemental No. 1 R Consultant: Kimley-Horn and Associates, Inc. Budgets Increases to Task Existing New Task Tasks I. PROJECT ADMINISTRATION' $5,443.91 — II. BASE MAPS AND SPECIFICATIONS ASSEMBLY i III. PRELIMINARY PLANS & SPECIFICATIONS IV. FINAL PLANS, SPECIFICATIONS, & ESTIMATES $11,496.42 — R V. BID DOCUMENTS VI. CONSTRUCTION BIDDING ASSISTANCE VII. CONSTRUCTION PHASE SERVICES VIII. DATA COLLECTION* $5,735.73 } IX. DEVELOP SYNCHRONIZED SIGNAL TIMING PLANS* $14,205.76 X. SIGNAL TIMING IMPLEMENTATION & FINE TUNING" $7,769.96 XI. FINAL REPORT& MODEL SUBMITTALS" $10,629.60 TASKS SUBTOTAL $16,940.33 $38,341.05 ' KHA EXPENSES $4,202.25 KHA TOTAL $59,483.63 SUB-CONSULTANTS GRAM $2,500.00 ITERIS $3,855.00 SUPPLEMENTAL TOTAL $65,838.63 s *- For University Blvd Signal Timing Tasks- See Man-Hours Estimate 1-