R-12-06-28-G8 - 6/28/2012 P 4 { A } 1 RESOLUTION NO. R-12-06-28-G8 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project, and F WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and t WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said a Contract in accordance with the attached Quantity Adjustment/Change Order No. 2,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of June, 2012. � l AL N MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk O:\wdox\SCClnts\0112\1204\MUNIC IP AL\00252537.DOC/rmc i EXHIBIT „A„ E Page i of 4 Contract Quantity Adjustment/Change Order n✓�.osnx Department Transportation Date: 5/16/2012 Project Kenney Fort Blvd.(Arterial A) Name City Project TX02ARTA Change Order/Quantity Adjustment 2 ID Number No. Justification r 1. ONCOR redesign of traffic signal power. 2. Add sheer key at bent cap. 3. Revise tapping sleeve. 4. Install French drain at shoofly to relieve ground water. 5. Revise grading and storm sewer system at abutment#8 on south side of project. 6. Not used. 7. Less material provided to UPRR at line over to shoofly. 8. Sleeving in roadway requested by CORR. SUMMARY Amount %Change Original Contract Price: $17,095,753.80 , Previous Quantity Adjustment(s): $10,518.00 This quantity Adjustment: ($254,695.50)1 Total Quantity Adjustment(s): ($244,177.50)1 Total Contract Price with Quantity Adjustment(s): $16,851,576.30 p Previous Change Order(s): $1.00 0.00% This Change Order: $288,703.20 1.71% Total Change Order(s)To Date: $288,704.20 1.71% Adjusted Contract Price (Original Contract Price Plus Quantity $17,140,280.50 Adjustment(s)Pius Change Order(s)j: Difference between Original and Adjusted Contract Prices: $44,526.70 Original Contract Time: 730 Icalendar Days Time Adjustment by previous Quan.Adj./Change Order: Icalendar Days Time Adjustment by this Quart.Adj./Change Order: 0 Calendar Days New Contract Time: 730 Calendar Days Sutimittfed for Appit" Prepared By I TS I Bil ablein City of Round Rock,Project Manager Date Approvials' Chasco Constructors Signature Charles Glace Jar".,President //Date Engineer r--�t�i � _ �Vic1 M 1�r1)�Ytrl t Dt.MAr• 4/7- Signature Name&Title Date City of Round Rock Signature Steve Norwood,Round Rock City Manager Date S Page 2 of 4 Contract Quantity Adjustment/Change Order rev.OS/12 i Department Transportation Date: 5/16/2012 Project Kenney Fort Blvd.(Arterial A) Name City Project TX02ARTA Change Order/Quantity Adjustment 2 ID Number No. Gliahge drder Data Contract Item# Item Description Unit Qty. Unit Price Amount Time Adjustment 1 Revise traffic signal eower IRSTA= B STA $660.00 * ONLY EA 2.00 $330.00 * INSTALL ELECTRICALPAD INSTALL ONLY) EA 1.00 $660.00 $660.00 620-2007 ELEC CONDR(NO.4)BARE LF 2225.00 $2.40 5 340,00 620-2008 ELEC CONDR(NO.4)INSULATED LF 7680.00 $2.75 t21,120.00 213-525 40'SINGLE LUMINAIRE EA 6.00 $3,600.00 521.600,00 618-2026 CONDT PVC)(SCHD 40 6" LF 1200.00 $24.00 $28,800.00 6182012 CONDT PVC)(SCHD 40 1" LF 1650.00 $5A5 ($8,497.50) Subtotal $69,682.50 2 Add shear key&dowels at BCS * Add shear key EA 1 $3,700.00 $3,700.00 * Revise Dier steel EA 1 $8,766.50 $8,766.50 Subtotal $12,466.50 3 Revise to tapping sleeve&valve * Add 18"x 16"tapping sleeve&valve EA 1 $19,425.00 Subtotal $19,425.00 4 Add French drain at Shoofly * 4"perforated PVC french drain LF 300 $30.0 $910 0.00 * Tie into existing culvert EA 1 $500.00 $500.00 Subtotal $9,500-00 5 Abut.#8 grading&storm revision 400 2001 STRUCTURAL EXCAVATION CY 185.00 $25.00 $4,625.00 605 SOIL RETENTION BLANKETS(CL SY 2379.00 $1.80 $4,282.20 1 C 110 ABUTMENT 8 GRADING CY 1641.00 $18.00 $29,538.00 510 HDPE WT IB PIPE(ASTM F2648)(301N) LF 261.00 $85.00 $22,185.00 INCLUDING EXCAVATION 508 SET TY 11 30 IN RCP 3:1 EA 1.00 $1.750.00 $1,750.00 432 2021 RIPRAP(STONE PROTECTION)(18 IN) CY 591.00 $115.00 $67,965.00 432'"" RIPRAP(STONE PROTECTION)(36 IN) CY 66.00 $115.00 $7,590.00 (Df,o=18") 110 ADDITIONAL EXCAVATION IDENTIFIED CY 826.00 $22.00 $18,172.00 AT THE 1.5:1 SLOPE LOCATION, Subtotal 156107.20 S_ Agid elec.&Irrigation sleeves * 4ea-4"Shed.80 emoty conduits LF 306 $61.00 $18,666.00 * lea-4"Sched 40 empty conduits LF 204 $14.00 $2,856.00 Subtotal $21,522.00 s^_ a TOTALS: $288,703.20 �0 r e Page 3 of 4 i Contract Quantity Adjustment/Change Order rev.05112 Department Transportation Date: 5/16/2012 ' Project Kenney Fort Blvd.(Arterial A) Name City Project TX02ARTA Change Order/Quantity Adjustment 2 ID Number No. Quarility�AdJustment�_�ata __ , Contract Bid Item# Item Description Unit Qty. Unit Price Amount Time Adjustment 1 Revise traffic signal power 213-120 GROUND BOX TY A)(ONCOR EA 4.00 $255.00 $1.020.00 213-3301341 DRILL SHAFT 24 IN RDWY ILL POLE)(0 LF 22.00 $103.00 $2,266.00 4162032 DRILL SHAFT Trf Sig Pole 36 IN LF 10.00 $195.00 $1.950.001 416 2005 DRILL SHAFT 42 IN) LF 328.001 $148.00 ($48,544,00) 4162006 URit,t-SHAFT 48 IN LF 40.00 $191.00 (t7,640.001 6182018 CONDT PVC)(SCHD 40 2" LF 2623.00 $6.20 $16.262.60 618 2019 CONDT(PVC)(SCHD 401(2" EQRE LF 215.00 $18.55 $4,20325 6202009 ELEC CONDR(NO.6)BARE LF 1187.00 $0.85 ($1,127.65) 6202010 ELEC CONDR(NO.6)INSULATED LF 3452.00 $1.05 ($3,624,60) 6202011 ELEC CONDR(NO.8)BARE LF 432.00 $0.75 $324.00 6202012 ELEC CONDR(NO.8)INSULATED LF 1,329.00 $0.85 41.129.65 6202014 ELEC CONDR NO.10 INSULATED LF 600.00 $0.60 $360.00 6242012 GRND BOX TY C(1629111 WIAPRON EA (1.001 $320.00 320.00 6242014 GRND BOX TY D 162922 W/APRON EA 1.00 $360.00 5360.00 Subtotal ($40,260.05) 3 Revise to tappina sleeve&valve 511 Wet Connection 18"x 16"tee FA -1 1 $5,300.00 ($5,300.00) 510 Valves,Iron Body Resilient Seated,16" EA .1 $6,000.00 ($6,000.00) Gate Valve Non-geared Subtotal 511300.00 5 Abut 48 qradinti&storm rev. 1322005 EMBANKMENT(FINAL)(ORD COMP)(TY CY 552.00 $3.25 $1,794.00 605 SO�AETENTION BLANKETS(CL SY (2973.00) $0.70 ($2,081.10) 605 SOIL RETENTION BLANKETS(CL 2)(TY SY (361.00) $4.35 ($1,570.35) 4002005 CEM STABIL BKFL CY 135.00 $100.00 $13,500.00 506 MANH(COMPL)(TYA)INCLUDING EA 5.00 $2,250.00 $11,250.00 EXCAVATION AND BACKFILL MANH(COMPL)(JUNCT BOX)(TY M) 506 INCLUDING EXCAVATION AND EA (4.00) $8,650.00 ($34,600.00) BACKFILL INLET(COMPL)(CURB)(TY 11)(10') 508 INCLUDING EXCAVATION AND EA (3.00) $2,950.00 ($8,850.00) BACKFILL INLET(COMPL)(CURB)(TY 11)(15') 508 INCLUDING EXCAVATION AND EA 3.00 $4,875.00 $14,625.00 BACKFILL 509 TRENCH EXCAVATION PROTECTION LF (112.00) $2.00 ($224.00) 510 RC PIPE(CL 111)(18 IN)INCLUDING LF 89.00 $32.00 $2,848.00 EXCAVATION AND BACKFILL 510 RC PIPE(CL 111)(30 IN)INCLUDING LF (155.00) $51.00 ($7,905.00) EXCAVATION AND BACKFILL Subtotal ($11.213.45 4 ' z r Page 4 of 4 Contract Quantity Adjustment/Change Order #, rev.05/12 Department Transportation Date: 5/16/2012 Project Kenney Fort Blvd.(Arterial A) Name f City Project TX02ARTA Change Order/Quantity Adjustment 2 ID Number No. 7 Rev.aty of material only to UPRR 4282 2001 TRACK 136#CWR W/WOOD TIES AND TF (1,066.23) $180.00 ($191,922.00) BALLAST MATERIAL ONLY Subtotal $191922.00 TOTALS; ($254,695.50)1 0 4 4 ROUND ROCK,TEXAS City Council Agenda Summary Sheet PURPOSE.PASSION.PROSPERITY. Agenda Item No. G8. Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Agenda Caption: Order No. 2 with Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project. Meeting Date: June 28, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: The original contract for construction services was approved by the City Council on June 23, 2011 for the amount of $17,095,753.80. Quantity Adjustment/Change Order No. 1 with Chasco Constructors added John Harris and Susan Hickox as additional insured to be covered for any and all claims. In addition, at the request of Union Pacific Railroad, the proposed 36 inch reinforced concrete pipe was replaced with the 36 inch corrugated concrete pipe for culvert crossing and two additional headwalls to be constructed at the cost of$10,519. Quantity Adjustment/Change Order No. 2 is for quantity adjustments in railroad-related work and field-related quantity changes. The cost of QA/CO#2 is$34,007.70 which brings the new total of this construction contract to$17,140,280.50. Cost: $34,007.70 Source of Funds: Type B Corporation Date of Public Hearing(if required): N/A Recommended Action: Approval s z t t i t a Page 1 of 4 Contract Quantity Adjustment/Change Order E rev.05/12 Department Transportation Date: 5/16/2012 x Project Kenney Fort Blvd.(Arterial A) Name i City Proms TXOZARTA Change Order/Quantity Adjustment 2 6 ID Number No. i Justification 1. ONCOR redesign of traffic signal power. 2. Add sheer key at bent cap. 3. Revise tapping sleeve. 4. Install French drain at shoofly to relieve ground water. 5. Revise grading and storm sewer system at abutment#8 on south side of project. 6. Not used. 7. Less material provided to LIPRR at line over to shoofly. 8. Sleeving in roadway requested by CORR. i SUMMARY Amount %Change Original Contract Price: $17,095,753.80 Previous Quantity Adjustmen4s): $10,518.00 This Quantly Adjustment: (;254,695.50) ' Total Quantity Adjustment(s): ($244,177.50) Total Contract Price with Quantity Adjustment(s): $16,851,57630 ;„ Previous Change Order(s): C $1.001 0.00% This Change Order: $288,703.20 1.71% Total Change Order(s)To Date: $288,704.20 1.710/o Adjusted Contract Price (Original Contract Price Plus Quantity $17,140,280 50 Adjustments)Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: $44,526.70 Original Contract Time: 730 Calendar Days Time Adjustment by previous Quart.AdJ4Change Order: FCalendar Days Time Adjustment by this Quan.Adj./Change Order: 0 Calendar Days New Contract Time: 730 Calendar Days Prepared By t ll s IyL Bii blein City of Round Rock,Project Manager Date NO Chasco {'a W Constructors Signature Charles Glace Jr.,President �p cDate Engineer ic� triG�'iflliMh t 1 M T f/2 Signature Name&Title Date City of Round afkRock AG� �vi -&I-(ryt Y� S nature r Date 001V Com$ S E L t `z F Page 2 of 4 Contract Quantity Adjustment/Change Order tN.V)12 DeparUnent Transportation Date: 5/16/2012 i- Project Kenney Fort Blvd.(Arterial A) Name ( Change Order/Quantity Adjustment City Protect TX02ARTA 2 ID Number No'_--- k I contract g Item# Item Description Unit Qty. 7Un1tPr1= Amount Time Adjustment t 1 Re bW& I gower * ONLY EA 2.00 330.00 $660.00 * INSTALL ELECTRICALPAD INSTALL ONLY) EA 1.00 $661.00 $660.00 620-2007 ELEC CONDR(NO.4)BARE LF 2225.00 $2.40 .00 620.2008 ELEC CONDR(NO.4)INSULATED 7680.00 $2.L5 21120.00 213-525 4rMGLE LUMINAIRE EA 6.00 $3,6W.00 t2l.600.00 618- 40 6" LF 1200.00 24.00 $23,800.00 6182012 CONDT PVC SCHD 40 1" LF 165 .00 $5.16 8 7.50 Subtotal $69.682.50 shear7- Add key&dowels at RC8 : q r EA 1 $3,700.00 $3,700.00 * RwIse r steel EA 1 766.50 S8,766.50 Subtotal S12.466-50 valve * Add 18"x 16"taocing sleeve 0 valve EA 1 $19,425.00 $19,425. Subtotal $19,425.00 * " drain pedp PVC french drain i LF 300 $9,000.00 * Tie Into existsna culvert EA 1 $500.00 500.00 Subtotal $9,500-00 5 Abut.#8 grading&storm revision 400 2001 STRUCTURAL EXCAVATION CY 185.00 $25.00 $4,625.00 605 SOIL RETENTION BLANKETS(CL SY 2:379.00 $1.80 $4,282.20 1)(TYC 110 ABUTMENT 8 GRADING CY 1641.00 $29.538.00 510 HDPE WT IB PIPE(ASTM F2648)(301N) LF 261.00 $85.00 $22,185.00 INCWDING EXCAVATION 508 SET 11)(30 INCP 3:1 EA 1.00 S1 750.00 S1.750.00 4322021 RIPRAP(STONE PROTECTION)(18 IN) CY 591.00 $115.00 $67,965.00 (D50=9") 432"" RIPRAP(STONE PROTECTIONX36 IN) CY 66.00 $115.00 $7,590.00 (Dw=18.) 110 ADDITIONAL EXCAVATION IDENTIFIED CY 826.00 $22.00 $18,172.00 AT THE 1.5:1 SLOPE LOCATION. Subtotal 156 07.20 * LF 306 $61.00 $18,666.00 * Sea-4"Sched 40 empty conduits LF 204 $14.00 $2,856.00 Subtotal 21522.00 TOTALS:11 $288,703.201O b e Page 3 of 4 Contract Quantity Adjustment/Change Order M/.OSIIl k. Department Transportation Date: 5/16/2012 x Project Kenney Fort Blvd.(Arterial A) Name City Project Change Order/Quantity Adjustment TX02ARTA 2 ID Number �'�- t Contract Bid Item# Item Description Unit Qty, Unit Price Amount Time Adjustment 1 Ravin traffic skmall Dower 20-= GKOUND BOX(TY A ONCOR EA 4.00 $255.00 1 213-330/341 DRILL 24 N RDWY ILL POLEO LF 22.00 $103-00 2,266.001 4162032 S e 0. S1 .00 11950-00)1 4`16 2005 DRILL S 421N DO 148.00 100)1 06 2006 i S 481N 40.00 1 7 6182018 T C (SC 40 2" LF 2623.00 620 $16,252.60 6182019 CONDT (SCHO 40)(2")(BORE) LF 215.00 $19.55 $4,203.25 6202009 C ND N .5 L 1187.00 .95 ($1,127.65) 6202010 ELEC CON D N0.6)INSUOM LF (3452.00111 $1.0533,624,50) 2011 ELEC CONO.B BARE LF 432. 75 24.00 6202012 ELEC CONDR O.B INSULATED LF (1,329.00) 0.85 ($1,12919) 6202014 ELEC CONOR(NO.10)INSULATED LF 600.00 $0.60 12 $320.00 .00 6242014 GRND BOX TY D 162922 WfAPRON EA 1.00 00 Subtotal 260.05 511 Wet Connection "1 x Wise EA -1 5 300.00 510 Valves,Iron Body Resilient Seated,16' EA -1 $6,000.00 ($6,000.00) Gate Valve Non eared Subtotal 11300.00 1322005 EMBANKMENT(FINALHORD COMP)(TY CY 552.00 $3.25 $1,794.00 605 SOIL RETENTION BLANKETS(CL SY (2973.00) $0.70 ($2,081.10) 605 SOIL RETENTION BLANKETS(CL 2XTY SY (361.00) $4.35 ($1,570.35) H 4002005 CEM STABIL BKFL CY 135.00 $100.00 $13,500-00 506 MANH(COMPL)(TYA)INCLUDING EA 5.00 $2,250.00 $11,250.00 EXCAVATION AND BACKFILL MANH(COMPL)(JUNCT BOX)(TY M) 506 INCLUDING EXCAVATION AND EA (4.00) $8,650.00 ($34,600.00) BACKFILL INLET(COMPLXCURBXTY II)(1(Y) 508 INCLUDING EXCAVATION AND EA (3.00) $2,950.00 ($8,850.00) BACKFILL INLET(COMPLXCURBXTY 11)(1 S-) 508 INCLUDING EXCAVATION AND EA 3.00 $4,875.00 $14,625.00 BACKFILL 509 TRENCH EXCAVATION PROTECTION LF (112.00) $2.00 ($224.00) 510 RC PIPE(CL 111)(18 IN)INCLUDING LF 89.00 $32.00 $2,848.00 EXCAVATION D BACKFILL 510 RC PIPE(CL 111)(30 IN)INCLUDING LF (155.00) $51.00 ($7,905.00) EXCAVATION AND BACKFILL Subtotal 11213.45 s Page 4 of 4 Contract Quantity Adjustment/Change Order MrrM..rrw, Y Department Transportation Date: 5/16/2012 Protect Kenney Fort Blvd.(Arterial A) Name City Project TX02ARTA Change Order/Quantity Adjustment 2 ID Number No R 4282 2001 TRACK 136#CWR W/WOOD TIES AND TF (1,086.23) $180.00 BALLAST MATERIAL ONLY ($191,922.00) Sui;totsl 191922.00 TOTAM-11 4254,695.50H0 x t C Y 4