Loading...
R-12-08-23-F4 - 8/23/2012 RESOLUTION NO. R-12-08-23-F4 WHEREAS, the Round Rock Transportation and Economic Development Corporation ("RRTEDC") has previously adopted a Transportation Capital Improvement Plan ("Plan"), and WHEREAS, the RRTEDC wishes to amend said Plan, and WHEREAS, the bylaws of the RRTEDC require that said amendments to the Plan be approved by the City Council, and WHEREAS, the City Council wishes to approve said amendments to the Plan, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the amendment to the Transportation Capital Improvement Plan approved by the Round r Rock Transportation and Economic Development Corporation, which is attached hereto as Exhibit "A", is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of August, 2012. 3' City of Round Rock, Texas ; Mt4 rem ATTEST: SARA L. WHITE, City Clerk O:\wdox\SCC Int s\0112\1204\MLJNICIPAL\00256292.DOC t F Amendment#29 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION JAW", [KenneyFon Boulevard Arterial A Fro t Joe DlMegplo Bouiev rd to 1000 feat soum ar Pranmatery m7YMning to pbbRM.N;g; naw summa 2011EXHIBIT ( ) Us79 ROW requirements,RSAE Co structionM 576,818,000 $8,000,000 d 524,818,000 -$5,000,000Ir�WIntx2006 312,898,314 51,135,895 b 514,034,209Settlers BNd./Kiphen Road(CR 11 J) Fran FM 1480 to CR 122 Deelgn.Waoease rigor-or-vrey and construct sena dMded arterial $1,000,000 d $1,000,000 5212,352 a 5212,352 Sprig 2009 $2,565,105 38,949,872 a 511,514,977 53,432,344 FM 1460/AW Grimes Un Awu4a ROW la mip e, ralecatbn ane rrdocate Nxanl'Bwlavard to 900'Naln or U579 CNy&E.C.Pranmorry nn9lnaarng aw renal 52,741,000 b P.S.aE.Construction of MAD 4, 5562,500 d RM 620510,000,000 f At Union PeGlk Railroad Carotruct raatpdFtl12017 praes saparatlen 512,000,000 512,000,000 59,500,000 Traffic Signals verwus bcetkms Design and wrearvot tnmc signal.,knplarnent Or.poNg abnal tithing plans 55,900,000 55,900,000 5500,000 5250,000 Transportation Consulting Miscellanemm on^anun9 work n wppat of Onyokg $7%,293 trnn ard on $796,293 -$110,058 Wyoming Springs Drive Fran RM 620 b Brighteater B-Iward Calalruct heti or a 4 mdNtsw seamy Canpblw $4,057,552 $1,553,565 d $5,611,117 Design intersection lmpwameMalndudkgturm Sprkg2ot2 $1,344,072 $1,344,972 Sotto Mays at Gattis School Road 11N1p fM n an stenions of IMereectlen Imes,-peal Impro emnas aw p.eeatmn $782,344 aceorrcdetbns FM 34% Sears—Row to IN Deep and construct Marseplon Impnovemem,et spring 2012 !2,410,000 rhos Intersections from San Base Road to IH $2,410,000 $1,500,000 35. Sp 2010 $5,160,000 Main Street Project 2,3 and 7 Main street,San Seen to Blak street wpm storm Oetpr ad CO1"hi"Mdn strM m roach„rw $5,160,000 en Blair street le s WDT.Ixlude,mem sews on Blw sett!Ban M•N SkM to Flaeve SVM FM1460 North to University W Design a MAD 4 roadway,incwdng plam. Weds,2012 $356,500 $143,500 esnrgnwss Row to unlwa.ny Bwlevara spedflatkme and awmetaa rlpMor-vny $356,500 $500,000 aetxmllunlon its very coordination. Chisholm Trail 3 1900 feel none or wale!aro to won.Lane IbipiWcwuVuq Cai lro Tren Roe e•MAD 4,spring 2012 $3,300,000 $3,300,000 .nd vena.pant rttd to sPttid Evan case P.apeny Major Maintenance Program various wuBons MJa naimem.ae„rv.dam.nedw tlevughau du Ongang $11,011,584 511,011,584 510,000,000 5466,743 City FY I2-17 Arterial Improvement Program various kcatlma Ongoing $2,100,000 $2,100,000 5600,000 31,000,000 inda.ynen, Railroad Quiet Zones UPRR.bet—CR 172 and at.W11N . C.—Reilr,ad Q.M2nx between CR 173 end St Su-2013 $13,567 $452,270 a $465,837 William S- 11135 VenIHJ5 ramp reversals and frontage roads coo stations Baxay.ra to Us 79 "bin•"'°°b r•nw..ne•ee•Iaa re the 8asagc $8,500,000 $8,500,000 $8,500,000 roade.!eludes pNe•Vim.ccwadatiauent Deign adcammna MAD4ru.awryfh.bridge Fa112014 $4,000,000 $5,130,% % 7 a $9.130, 7 $4,000,000 Creek Bend Boulevard Creek Band Circle to Wyoming springs Drive va Bnany Crttk and Hairy Man Road halude all r;gmbr.y.cyaiaiuw.mvvorxa,vl wwk,ac. Chisholm Trail Road FM 3/08m sem Bess Road Doo"l—i�founie.MAD4rwew.y,kaweing Wed.2012 $5,100,000 $6,111,605 c $11,211,605 $5,100,000 D-i®,,,,J ea,tmmn adewalk and P,&-aHm Fa 22013 $2,000,000 $2,000,000 52,000,000 Mays Sheet Brushy Creek bilge to Me UPRR/Lake Creek '"'pfO4C"""r""d'dd'mn'°n•I wvamem to allmv Brdge um lav within Nee Ionia.W«k.I,o ialudn Iiglding m Ne UPRR bridge ad gaeway tenure.I Ne anruvc w dnwniawn Southwest Downtown vwws bcetion in eodmveet aoemtam Design and construct street act appecad idan Fit tot 3 $12,000,000 provemenls on the remaiMrN $72,000,0$$3 sounavast d"ItIoer,IMoudee San Saba,Uberty, Bear.arta Bagdad. La Frontes Streets Varian streets In u Frorthea Dein andcawtun mad aP.ief w.mwn Wla Summar2012 $2,966,74; $2,%6,74 $ in V Fraden $466,743 La Frontera Streets Phase 2 various Waste,in La Frontere Deign road rep.in tie paverva f.d._o"Finaw.TBD $400,000 $400,00400,DD0 Arterial Sidewalk Program varbue kcatlenn 13eupi ud caawn ddew,lw mvariwu steal, TBD $300,000 $300,00 Nmaghwr ea city $300,000 Major Bridge Maintenance vwa,alacetlate MJa bridge nuinuwas m an aid bridge TBD $500,000 $500,00 u—sh ,Ne city. $500,000 University Boulevard IH-36 frontage toed to sonriea Row 1�efien. iviam asrinm wiN.idew,Iw ad. TBD $550,000 $550,00550,000 US 79 IH-15 frcntape road to AW.Grlmw Bwlevard ,,de r mvimm 1 ao,,a aid da,p m Plan• TBD $500,000 $500,0000,000 widen C5 79 M rix luau with•caeca tan I.nc. Seton Parkway,Phase Froaselt AW,urrW and wsatdsaron Hospital sarin and Dein ad cammn n,Iror.4 lea d.v&d ateri.l. TBD $2,000,000 $2,000,00 .Ito A.w.Gnmse eaulev.ra 00,000Cypress Boulevard realignment Rea ess BoulmxdlEegbn Neataw sunme, Deign aw caaow.+da redilpa,ad arcypre..a 57,000,000 31,000,00B-1—vd with Eagle NM 00,000ER�.Ifivd o imniry,aee,ad monde for Winter lou 5350,000 2350,0050,000 Traffic Management Center Clry wide. cgmam vam:Pmvieeb=gf.flic algal rwie nawmk. Total Curets Pr $120 898 630 458500 6 153 445 156 50.300.000 53 6 N (see Gaga 3)TaW CanpMw Proisds 1207 2712 261 172 6 $381,9351369 1 383 849 523RVE 7 284 aw t Amendment#29 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM * - r a ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION {� ►.1"`s �r�x "�` "'� � - tirm�ray xz�,�+a���x r,.� z�!"1 - ,m ca,p.tea Prol.ns ,�, ., s:��"�.-�^-�",.tt �>�a��' a "4i,... �sr`��L is T,�,1!'"� G��a�q�,�✓,�� -''���`� �, -4 r r ��') § Faast Croak From Double Crash DrM to 800'Wast of FaM CanpNiW $2,805,]12 Rdps Suwivlebn 51,326,573 b 54,132,225 558,081 a 559,081 AW Grimes BNd(Arterial B) From US 79d Louis Hams BNd Canplelatl 524.099,542 $1,982,701 b (26,082,243 $149,999 c $149,999 G—b— 4 lens divided adxlel $1,313,217 a $1,313,217 From Louis Hams BW to IH 35 Frontpe Road Construct ,� 588 531 D $3,720,401 IH 35 Twneraxds Construct montage road Mnawntls 5547,119• $547,139 FM 1325/Lcuia HsenxHastKS Crossing Completed 53.533.582 $3.175.O00 58,708,582 Faass,ay Study IH-35 d RM 620 and 11-136 8 US 79 AlterwBves to alleviate wdl ngeon WA $328.000c $328,000 Oabrwht ArlxlS Drive h'' x.203 ( ) From TxaNsta to Chandler Road Construc144ftadl ded roatlxey Completed $1.6m,169 $92.203 $1,660,169 Fran IM-35W Oaknnrd Drive Construct 44—tlkvlded roatlway Carybtad ArterialTFromUniversity $1,249,590 $1,249,590 Univera$y Blvd M CR 112 Construct had •4-yM divided rwAvsy Canpbtatl (1,191,392 $1,191,192 Prima Strategies Assisi C$yylntaspamycoardkwlkm la SH 45 Com plelatl Rad Bud Lara(CR 122,Phases 1 d 2) Fran Gag.Schad Road to CR 723 Coradructxw 24divde0 roadway $52.326 $52,326 Can WetM $1,1 62,071 $1,162,077 Ratl Bud Lew(CR 122,Phaw 3) F—CR 12110 US 79 PS8 E Reston i rom Caminlct Syne saclbn, Canpletatl Bridoe,ROarwderossg $61 7.363 f0 $877,383 $2,591,178 $140,264 $2.731.442 South Mays Shast Impravemany Southat Maya Shasa/DollBo Way,Gsttis othod Road Malign Walla.when Weab,orient Weeta CanplelM 6,tsesbn 8 Dagway/Boartlwalk Convection $4,720,270 $21,4 a y/,741.735 TwBd Sgnel Courtlhwtion FM 1325/Lars Henna MCNHVIH 35MM 620 US 79 Cofthuct and Impbnwnt coordinated trat6c signet Comp.w 396,888 598.686 US 79 Fran CR 195 to CR 110 Reconstruct highway to 4loft divided highway Conplalad $2,285,892 $3,500.000 a 55,]85,892 SH 45 Rw d Rack East CRY Umb to Round Rock West Ac4uka ROW la SH 45 5300,CCC 1e 5300000 CZ Limb Completed 5274$,322 $215200.00D a 5242,635,322 US 79 Fran FM 1480 to CR 195 Construct 44aw divided hlgtsvayCanpblad (28,000,000 d $26.000,000 $8.654,867 $3,000,000 a 511.854.887 11135 Arse Im no nmrsree from Westinghouse Road to FM 1431 RNocayramps'widen frontage road,and Completed constructfrontage road turne—nd $9,563.980 $4,042,766 a 513,606,746 11135 Frontage Rd C-D and Hester,Crowing Construct Frontage road cdlecW-tlytdgdor xq C Bridge Repynnynt IH 35 @ Healers Crowing Completed $16,171,294 repyca Resters Cressirp Bridge 518,171,294 US 79,1 North Mays 1 DOO fast In NI directions of Pdxaachon Intersection Imprwertwnts mckding dual Completed $88,858 leR turns for all aPproachaa,agftl knprovemants $88.850 and acwmodat" Adxyl M(M-5) University Batlevxd b Chandler Creek hlbutary Design MAD 4 Reprbrk¢ed 50 50 Ad"M(M4) Chandb Crwk Idbdaryto Cyprew Cow(imhidw Design MAD a MaPrtailimd $2,500 Arterial M( From Arterial M to the north IH-35 frontage red Design MAD 4 ReprbrlttzW f0 $2.5$0 Arterial M Cypress Cow ad.ftdn to Pabma Dssgn MAD 4 Repror tae, $9,706$9,706 $9,706 70 CYPrees Cove Estenebn resw Cyps Boulewrd d Arterial M Design MAD 4 Raprbryzed so AW Gdmes Soulwatl50 From Louis Hseft to the sadharn ETJ Design MAD 4 Raprbrllizad $0 f0 Mad Sheol Projecll ion rrtmwmo Mein Sura ova eC to Rsprlor5@atl Main ShM edanston,IH 3510 San Saw Wr IH-3 fiasaer wwd:imdvd,dos purtwx of $111,480 $111,480 rw�rwarvd br v 41,088,520 Design 0re rwlignment o/RR Aversra dib Liwrty Reprlor4lzad Round Rack Avenue/Llberly Avenue realignment Main Sheet,Star to Mew Sir"and Ubm y Awn.,Avenue'mckain Ble daai9c of a signet st tlw $668,671 $668,671 mom Round Rock Avco.to Maya Sheol. Lmertyrt4ays intaraactbn all Me design of Mab -$295,329 Sheet bobvI en Bak and Mays Shwle Conduct prelmysry arp W ng,damic,right o/ Comp,,,Amami C Fran RM 620 to Sam Bess Rd -Y nap and acquka ROW for Ammal C al dos $376'749 $378,749 Intersection of RM 620 and Deepw od Drive North Mays Eden— From Old Seinen 8ouyved to spproxk a," Design,Pachew rightaf-way and construct 4-Is s Completed rey JemaWay divided amenia $3,504,389 Re53,504,389 X67,284 Red Bud Loft Phase, From CR 12310 Wondynd Loop Design and construct MAD 4 Complew : ; Y51,257,000 $7,25,000 PP6CNFy;,a -$170,000 LEGEND �_' ,5381♦17IIrl66 'S3Otr836y� ,_," $ •�StHeFedenl Fund a-CIN UHlky Fund 0•Privda f-Amiben Recown end RNmestmanl Act c-Williamson d Cs TCountvtatbn a Genial SO Flnencad Construction Am rdmeM 029 d•WIIGamson CcunN ulddad De-xilz 2 ROUNDROCK,TEXAS City Council Agenda Summary Sheet PURPOSE.PASSION.PROSPERITY. Agenda Item No. F4. Consider a resolution approving the action of the Transportation and Economic ADevelopment Corporation in amending the Transportation Capital Improvement Program genda Caption: (TCIP). Meeting Date: August 23, 2012 Department: Transportation Staff Person making presentation: Gary Hudder i Transportation Director ( Item Summary: This amendment to the Transportation Capital Improvement Program includes the following: x A. Reduce funding for the FM 1460 project between University Boulevard and Old Settlers Boulevard, ($3,432,344) B. Reduce the Road Consulting project budget, ($110,058.00) C. Close-out of North Mays Extension project, ($67,283.64) D. Reduce funding for the 2012-16 Street Maintenance, ($466,742.71) E. Close-out of Red Bud Phase 4 project, ($170,000.00) F. Reduction in funding to reflect actual contract costs for FM 1460 north of University, ($143,500.00) G. Provide funding for final engineering of South Mays at Gattis School Road intersection improvements,$782,344.00 H. Provide additional funding for the construction of La Frontera Streets Reconstruction, Phase 1, $466,742.71 I. Provide additional funding for the Arterial Improvement Program-Bottlenecks-$1,000,000. J. Provide construction funding for turn lane improvements on FM 3406 between Chisholm Trail Road and N. Mays Street,$1,500,000. K. Provide funding for Traffic Signals,$250,000. L. Provide funding for the design of La Frontera Streets Reconstruction, Phase 2,$400,000. M. Provide funding to construct a city wide radio network for traffic signal operations,$250,000. N. Provide funding to construct sidewalks along arterial roadways,$300,000. 0. Provide funding to maintain bridges on arterial roadways, Major Bridge Maintenance,$500,000. P. Provide funding to design University Boulevard as a six-lane divided section between IH-35 and Sunrise Road, $550,000. Q. Provide funding for environmental and engineering for the reconfiguration of US 79 to a six lane facility between IH 35 and A.W. Grimes Boulevard,$500,000. f R. Provide funding to design and construct Seton Parkway between its current termination and A.W. Grimes Boulevard, $2,000,000. S. Provide funding to design and construct the realignment of Cypress Boulevard with Eagles Nest,$1,000,000. This amendment will result in a total net increase to the TOP budget of$5,109,158.36. Cost: $5,109,158.36 Source of Funds: Type B Corporation Date of Public Hearing(if required): N/A Recommended Action: Approval