Loading...
CM-2018-1659 - 3/16/2018Page t of 3 Contract Quantity Adjustment/Change Order WWNU HOW TV, 01116 Department: Transportation Project Name: Creek Bend and Western Gateway Date: 2/28/18 City Project Change Order/Quantity ID Number LDSCP-600-CSVC Adjustment No. 2 Vendor DeNucci Constructors, LLC 8310-1 Capitol of Texas, Austin, Texas 78731 Company Name Address Phone No. 3ustification Quantity adjustment/Change Order #2 is required to add concrete pavers around the Gateway project; Blocks repositioned at round -a -bout along with damaged Irrigation lines (first time); Added Mulch area at Western Gateway near water tower; added limestone edging at same area (4" and 6"); Repair concrete benches from vandalized skatestoppers; furnish and Install alternate skatestoppers; added outlet at sign for lighting; Reposition and dowel together limestone blocks at round -a -bout (2nd time). + Amount % Change Original Contract Price: $805,726.50 Previous Quantity Adjustment(s): This Quantity Adjustment: $44,133.00 Total Quantity Adjustment(s): $44,133.00, Total Contract Price with Quantity Adjustment(s): $849,859.50 Previous Change Order(s): $16,608.56 2% This Change Order: $5,031.93 1% Total Change Order(s) To Date: $21,640.49 3% Adjusted Contract Price (Original Contract Price Pius Quantity Adjustment(s) Plus Change Order(s)]: $871,499.99 Difference between Original and Adjusted Contract Prices: $65,773.49 Original Contract Time: 120 Time Adjustment by previous Quan. Adj./Change Order: 0 Time Adjustment by this Quan. Adj./Change Order: 10 New Contract Time: 130 S.ubtnlited for Approval Prepay By: Todd Kel en Operations Manager 2/28/18 ,gnature Printed Name, Tide, Company _ ARpravals >4L.Cu LDAAn)!�r- Date / Contractor: Signa � Printed ame, Title, Company Date City Project �„� Manager: = Todd Kel en Operations Man er 2/28/18 gn re PrintedNWIV, Tide Date Mayor/City ! AA 16 11 � / 3 I C�' �I Manager/ 2-4 w✓ Signature -i Printed !Name, dle C L/ Date 614,2-011`14-6-9 Contract Quantity Adjustment/ Change Order IRWIHP PPO[ =1 si Project Name: Creek Bend and Western Gateway Quan. Adj./Change Order No.: Chance Order Data Page 2of3 Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount Re -install Landscape stones 2 times and 2a adding outlet to Round -a -bout sign LS 1 $5,031.93 $5,031.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 r Pqc 3 of 3 _ Contract Quantity Adjustment/Change Order pO1tNd Nd[Jl i S ..x• +ea �Ul6 Project Name: Creek Bend and Western Gateway Quan. Adj./Change Order No.: City of Round Rock ROUND ROCK TEXAS Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with DeNucci Constructors, LLC for the Creek Bend Extension and Western Gateway Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/16/2018 Dept Director: Gary D. Hudder, Transporatation Director Cost: $49,164.93 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: CO -QA #2 - partically executed Department: Transportation Department Text of Legislative File CM -2018-1659 Consider executing Quantity Adjustment/Change Order No. 2 with DeNucci Constructors, LLC for the Creek Bend Extension and Western Gateway Project. On July 27, 2017 City Council awarded a construction contract for the Creek Bend Extension & Western Gateway project to DeNucci Constructors. The project is in the setting of Southwest Downtown Infrastructure Improvements 5A project and the Creek Bend Extension project. The project includes provisions for landscaping, hard scape, irrigation and a Gateway Entrance sign in accordance to the proposed program scope items as directed by the City of Round Rock. The project will also incorporate the former wellhead and gazebo to accompany landscape plantings and associated improvements. The item up for consideration is for Change Order/Quantity Adjustment #2 and is for several items that were identified as necessary which were not included in the original bid and/or were included but require quantity adjustments. The items included in Change Order/Quantity Adjustment #2 include: add concrete pavers around the Gateway project; Gateway blocks repositioned at round -a -bout along with damaged irrigation lines (first time); Added Mulch area at Western Gateway near water tower; added limestone edging at same area (4" and 6"); Repair concrete benches from vandalized skate -stoppers; furnish and install alternate skate -stoppers; added outlet at sign for lighting; Reposition and dowel together limestone City of Round Rock Page 1 Printed on 9115/2018 Agenda Item Summa Continued CM•2o18.1858 blocks at round -a -bout (2nd time). The original contract approved by City Council totaled $805,726.50, The item up for consideration in Change Order/Quantity Adjustment #2 totals $49,164.93. With the approval of this item, the adjusted total will be $871,499.99. This change results in a 3% increase in the original approved contract amount. Cost: $49,164.93 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Pape 2 Printed an V1512018