Loading...
R-12-08-23-F8 - 8/23/2012 RESOLUTION NO. R-12-08-23-F8 WHEREAS, the U.S. Department of Interior — Bureau of Reclamation had previously made grant funds in the amount of $858,000.00 available to the City of Round Rock through approval of City's application under the 2012 Title XVI Water Reclamation and Reuse Program for the purpose of completing the Williamson County Water Reclamation and Reuse Project; and WHEREAS, the U.S. Department of Interior — Bureau of Reclamation now wishes, by approval of a modification document, to make additional grant funds in the amount of $954,083.00 available to the City of Round Rock under the same application approval, for a total amount of grant funds of$1,812,083.00, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the modification document numbered MOD NUMBER 004 entitled "United States Department of the Interior Bureau of Reclamation Assistance Agreement" be approved, a copy of said document being attached hereto as Exhibit "A" and incorporated herein for all purposes, thereby increasing the original funding amount of$858,000.00 by an additional $954,083.00 for a total amount of $1,812,083.00 which the Bureau of Reclamation is obligated to fund to City relative to the Williamson County Water Reclamation and Reuse Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. O:\wdox\SCClnts\0112\1204\MUNICIPAL\00256304.DOC/jkg RESOLVED this 23rd day of August, 2012. City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 2 EXHIBIT „A„ 7 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ASSISTANCE AGREEMENT 1A. AGREEMENT NUMBER 1B.MOD NUMBER 2. TYPE OF AGREEMENT 3. CLASS OF RECIPIENT R08AC60018 004 [ ] GRANT Local Government x COOPERATIVE AGREEMENT 4. ISSUING OFFICE (NAME,ADDRESS) S. RECIPIENT(NAME,ADDRESS) Bureau of Reclamation City of Round Rock P.O.Box 36900 221 East Main Street Billings,MT 59107-6900 Round Rock,TX 87664 EIN#: 74-6017485 County: Williamson DUNS#: 10-274-0792 Congress.Dist: 131 6. ADMINISTRATIVE POINT OF CONTACT (NAME,ADDRESS) 7. RECIPIENT PROJECT MANAGER(NAME,ADDRESS) Lindsey Nafts Alan McGraw Grants Officer Mayor Bureau of Reclamation City of Round Rock Great Plains Regional Office 221 East Main Street P.O.Box 36900 Round Rock,TX 87664 Billings,MT 59107-6900 Ph. (512)218-3236 Ph. (406)247-7684 Email: Inafts usbr. ov 8. GRANTS OFFICER TECHNICAL REPRESENTATIVE(NAME,ADDRESS) 9A. INITIAL AGREEMENT 91B. MODIFICATION Collins K.Balcombe EFFECTIVE DATE: EFFECTIVE DATE: Bureau of Reclamation Oklahoma Texas Area Office 09-29-2008 See Block 17a 5316 Hwy 290 West Ste.510 Austin,TX 78745 10. COMPLETION DATE Ph. (512)899-4162 Email: cbalcombe usbr. ov 09-30-2018 11. PROGRAM STATUTORY AUTHORITY CFDA Section 1636 of Public Law 108-316 15.504 12. FUNDING RECIPIENT/OTHER RECLAMATION 13. REQUISITION NUMBER INFORMATION 12641000044 Total Estimated $5,682,609.00 $2,248,146.01 14. ACCOUNTING AND APPROPRIATION DATA Amount of Agreement This Obligation $5,365,301.84 $ 954,083.00 AIA-1979-4999-001-00-0-0-411C-6H50000 Previous Obligation $317.307.75 $ 858,000.00 Total Obligation $5,682,609.59 $1,812,083.00 Cost-Share% 76% 24% 15. PROJECT TITLE AND BRIEF SUMMARY OF PURPOSE AND OBJECTIVES OF PROJECT Project Title: Williamson County Water Reclamation and Reuse Project Description of Chances: See attached 16a. Acceptance of this Assistance Agreement in accordance with 17a. Award of this Assistance Agreement in accordance with the ' the terms and conditions contained herein is hereby made on terns and conditions contained herein is hereby made on behalf of the above-named recipient behalf of the United States of America,Bureau of Reclamation BY: DATE: BY: DATE: `s 16b. NAME,TITLE,AND TELEPHONE NUMBER OF SIGNER 17b. NAME OF GRANTS OFFICER j Lindsey Nafts Grants Officer ❑ Additional signatures are attached s r i Cooperative Agreement No. R08AC60018 Modification No. 004 Attachment Notice of Reduction in Scope of Work: the modification removes Phase I of the Williamson County Water Reclamation and Reuse Project from the Scope of Work. Phase I was completed under a separate agreement between the City of Round Rock and the Bureau of Reclamation, Cooperative Agreement No. R10AC60R43. Notice of Reduction in Total Estimated Amounts of Funding: the modification reduces the Total Estimated Amount of Funding for both the City of Round Rock and the Bureau of Reclamation. The City of Round Rock's Total Estimated Amount of Funding is changed from $14,330,495.00 to $5,682,609.59 (see Block 12 of United States Department of the Interior, Bureau of Reclamation, Assistance Agreement signature page). The Bureau of Reclamation's Total Estimated Amount of Funding is changed from $4,776,832.00 to $2;248,146.01 (see Block 12 of United States Department of the Interior, Bureau of Reclamation, Assistance Agreement signature page). These changes are a result of the removal of Phase I of the scope of work and updated z budget numbers (see Attachment II for detailed budget). 3 Notice of Additional Reservation of Funds: the modification reserves additional funds in the amount of$954,083.00. Total amount of obligated funding is now changed g from $858,000.00 to $1,812,083.00. It is to be expressly understood the Government s has no obligation to provide funds in addition to those in writing. Notice of Budget Revisions: the modification revises the project budget numbers. See Attachment II for updated budget. Notice of Updated Reporting Requirements: the modification updates the frequency of required reports under the award. e Performance reports are hereby required on a semi-annual basis. The Bureau of Reclamation has received the June of 2012 performance report. The City of Round t' Rock's subsequent performance report is due October 30, 2012 for the reporting period ending September 30, 2012. Financial reports are hereby required on a semi-annual basis. The Bureau of Reclamation has received the June 2012 Financial Report. The City of Round Rock's subsequent performance report is due October 30, 2012 for the reporting period ending September 30, 2012. 2 Notice of Cost Share Information: Public Law 108-316 states the Federal Cost Share of this project will not exceed 25% of the total project costs. Under Cooperative Agreement No. R08AC60018, project expenditures associated with pre-construction activities totaled $423,077.00. Reclamation's share of project costs was $105,769.25 (25 percent), and Round Rock's share was $317,307.75 (75 percent). Under Cooperative Agreement No. R10AC60R43, project expenditures associated with Phase I construction are projected to total $6,185,108.29 as of August 7, 2012. Reclamation's share of project costs is $1,228,575.00 (19.86 percent), and Round Rock's share is $4,956,533.29 (80.14 percent). As of August 7, 2012, a balance of $357,702.07 remains in Federal funds owed to Round Rock in order to bring the Phase I Federal cost-share to 25 percent. Under this modification, this remaining $357,702.07 balance is hereby added to the $1,876,797.93 Federal share (25 percent) of project costs associated with Phases II-V. Reclamation withheld $123,000 in funding for administration of the award. This is considered a project cost and must be cost shared by the City of Round Rock. Round Rock's share is $92,250 and under this modification, this funding is hereby added to the Round Rock's obligation amount bringing the total Federal cost-share to $2,142,376.76. Therefore, the non-Federal cost-share is hereby changed to $5,365,321.99. I A final accounting of project costs will be completed upon project close out. The table provided below reflects total project accounting as of August 7, 2012. Plase y �, tRR Cost Share%#,` Reclamation o X 'y Notal. Reclamation administrative $0.00 0.00 $123,000.00 100.00 $123,000.00 Pre-Engineering/NEPA $317,307.75 75.00 $105,769.25 25.00 $423,077.00 i ARRA Phase 1 $4,996,533.29 80.78 $1,188,575.00 19.22 $6,185,108.29 Subtotal $5,313,841.04 ` $1,417,344.25 Phase II-V $5,365,301.84 71.46 $2,142,376.76 28.54 $7,507,698.75 TOTAL $10,679,163.03 75.00 $3,559,721.01 25.00 $14,238,884.04 F 4 3 Cooperative Agreement No. R08AC60018 Modification No. 004 Attachment I Budget BUDGET RECIPIENT RECLAMATION ITEM FUNDING FUNDING TOTAL DESCRIPTION UNIT COST UNIT 71.46% 28.54% COST SALARIES AND WAGES Position title x hogrly wage/salary x est hours for assi§ted activity: Descnbi this information for each ,tion Titlei Gost/Hour: Hours � Director of Utility& $4,947 Environmental $57.69 120 $1,975 $6,923 Services Utility Inspector $30.97 720 $15,935 $6,363 $22,298 Finance Director $57.69 60 $2,474 $988 ,461 Grant Coordinator $22.83 460 $7,505 $2,997 $$3$3,502 cou Susig $30.57 160 $3,495 $1,396 $4,891 Utility Accountant $22.82 360 $5,871 $2,344 $8,215 GIS Technician $17.15 140 $1,716 $685 $2,401 Admin.Tech III $20.75 120 $1,779 $711 $2,490 Accounting Tech Il $19.98 134 $1,913 $764 $2,677 Subtotal $45,636 $18,223 $63,859 FRINGFI.BENEFITS' Explain the type;of fringe'beneits and how applied to venous categones ofpersonnel r (Med.Ins.,TMRS, 29.22% FICLongevity) $13,335 $5,325 $18,660 g ty) r a Subtotal $13,335 $5,325 $18,660 .TRAVEL=dates,µlocation.oftiavel,'method of travel,)C esti m8ted cost,who-will travel ' t N/A $0.$55 0 $Q $0 , . $0 SubtotalF $0 $0 $0 EQUIPMENT Leased Equipment use rate+hourly wage/salaryx est hoars for assisted activity=Describe equipment to be,purchased, Y uliif nce of uaits:fo�"all. ui ment to be archased or`leased':for assisted'activi Do not list contractoi su lied equipment heie.. Furnish&install solar-electric $35 732 ? ModiconPLC/RTU $50,000.00 0 $14,268 $50,000 (IVB) Subtotal $35,732 $14,268 $50,000 SUPPLIES/MATERUIL S Describe all major types of supplies/materials;unit price,#;of units,etc.;to be used on this assisted activity. £` N/A $-00 0 $0 $p $0 Subtotal $0 $0 $0 CONTRACTUAL/CONSTRUCTION . lam an contracts or sub A Exp y greements that will be awarded,why needed Explam;contractor i _gualificaUons and how the contractor wall be selected._ _ ' i 4 4 Construction Contractor Phase II- TBD after Request for Bids Includes ,949 purchase of $2,727,265 1 $1,949,013 $778,252 $2,727,265 easements and engineering consultant fees Construction Contractor Phases IVA&IVB-TBD after Request for Bids 1 $2,527,074 $1,009,076 $3,536,150 Includes purchase of $3,536,150.00 easements and engineering consultant fees Construction Contractor Phase V- TBD after Request for Bids $529,595.00 1 $378,470 $151,125 $529,595 Includes purchase of easements and engineering consultant fees Subtotal $4,854,557 $1,938,453 $6,793,010 OTHERS Lust any other cost elements necessary for your project,such as extra repomng or coritm ncies m a cons truchon contract Phase II Construction $239,110.00 ' ` =: r fi &Easements $170,877.57 $68,232.43 $239,110.00 Phase IVA&IVB Construction& $295,700.00 $211,319.05 $84,380.95 $295,700.00 Easements Phase II Construction &Easements $47,360.00 $33,845.35 $13,514.65 $47,360.00 Subtotal $416,041.97 $166,128.03 $582,170.00 TOTAL DIRECT COSTS $5,365,302 $2,142,397 $7,507,699 INDIItECT.;COSTS "10%of wa es as Erin a benefits TOTAL MIRECT COSTS 10% $0.00 $0.00 � -,VN r = f $7,50M. 9 There is a $20.00 difference in numbers due to rounding. i s i i i x 5 F Cooperative Agreement No. R08AC60018 Modification No. 004 Attachment II Scope of Work/Milestones Williamson County Water Reclamation and Reuse Project City of Round Rock,Texas Phase II-V Agreement Number 08FC602334/R08AC60018 Scope of Work for Reuse Water Phase II Design and construction of a 24-inch reuse water transmission main beginning at the north end of phase I—24-inch Old Settlers Park reuse water transmission main; the pipeline will follow northerly up the future"Arterial A"right-of-way through"Avery Centre east"to CR 112,then, the pipeline will head west along CR 112 crossing under FM 1460 (with a 42"bore) and connecting to an existing 16-inch reuse water line in the Avery-Nelson right-of-way. The total length of pipe is about 11,000 linear feet of 24-inch reuse water transmission main. Scope of Work for Reuse Water Phases IVA& IVB Design and construction of a 16-inch reuse water transmission main beginning at the north end of the existing reuse water transmission main in college park drive; then, the pipeline will follow northerly up College Park Drive right-of-way for approx. 2,400 linear feet; then, it will follow west in tract 1, a 30-foot wide tract, for approx. 900 linear feet and then continue onto tract 2 and connect to a 1.25 million gallon elevated reuse water tank. In addition, 3.0 mgd pumping capacity will be added to the pump station at the reuse water treatment facility. i Scope of Work for Reuse Water Phase V F This Phase will extend the existing reuse waterline from the west end of an existing 24-inch reuse water line and extend west for approx. 4,220 linear feet as an 8-inch reuse water line. The Phase V reuse water line will run under FM 1460 and continue west until its termination at the Round Rock School District Stony Point High School. This reuse line will have the capacity to deliver 1.0 million gallons per day(mgd). Scope of Work by Semi-Annual Period for Reuse Water Phase II FY 12 Semiannual Reporting Period No 2• April 1 2012—September 30 2012 1. Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase-IVA) Enter into Contract with Design Engineer to complete reuse water Phase 4 IV-A 3. (Phase-IVA) City Staff review of 30% construction Plans and Specifications complete 4. (Phase-IVA and IVB) conduct miscellaneous Recipient Administration Activities 5. (Phase-IVB) Enter into contract with Design Engineer to complete reuse water Phase 6 IV-B 6. (Phase-IVB) City Staff review of 30% construction Plans and Specifications complete 7. (Phase-IVB) Elevated reuse water tank tract and easement acquisition 8. (Phase-IVB) Pre-acquisition bore at center of tank site 9. Various re-vegetation, landscaping, fencing, and gating FY 13 Semiannual Reporting Period No 1. October 1 2012 March 31 2013 1- Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase II) Enter into contract with Design Engineer 3. (Phase II) City staff review of construction Plans and Specifications 4. (Phase II) Continue Reuse Water Line Easement Acquisition 5. (Phase-IVA) City staff review of construction Plans and Specifications 6. (Phase-IVB) City staff review of construction Plans and Specifications 7. (Phase-IVB Drill bore holes for Geotech analysis for tank foundation design 8. (Phase-IVB) Complete design 9. (Phase-IVA and IVB) continue miscellaneous Recipient Administration Activities 10. (Phase-IVB) Advertise for bid 11. (Phase-IVB) Receive bids for construction 12. (Phase-IVB) Review bids and recommend award to lowest and best bidder 13. (Phase-IVB) City Council award of Construction Contract 14. (Phase-IVB) City Staff review and approval of bid and construction documents 15. Various re-vegetation, landscaping, fencing, and gating FY 13 Semiannual Reporting Period No 2• April 1 2013 -September 30 2013 1. Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase II) City staff review of construction Plans and Specifications 3. (Phase II) City staff review of and approval of bid construction documentation 4. (Phase-IVB) Install temporary fencing, erosion, and sedimentation controls 5. (Phase-IVA) Advertise for bid 6. (Phase-IVB) Contractor to mobilize and begin construction activities 7. (Phase-IVB) Prepare and clear construction site t 8. (Phase-IVA) Receive bids for construction 9. (Phase-IVB) Excavate and construct reuse water elevated storage tank foundation 10. (Phase-IVB) Furnish and construct reuse water elevated storage tank 11. (Phase-IVB) Furnish and install 16"reuse water line, including valves and fittings 12. (Phase-IVA) Receive bids for Construction 13. (Phase-IVA) Review bids and recommend award to lowest and best bidder 14. (Phase-IVA) City Council award of Construction Contract 15. (Phase-IVB) Furnish and install internal reuse water lines in tank, including valves and t' fittings 16. (Phase-IVB) Furnish and install 16"reuse water line, including valves and fittings 17. (Phase-IVB) Furnish and construct tank concrete pedestal 18. (Phase-IVA) Pre-Construction conference and Notice to Proceed 19. (Phase V) Enter into contract with Design Engineer 20. (Phase V) City staff review of construction Plans and Specifications 21. (Phase V) Continue Reuse Water Line Easement Acquisition 7 22. Various re-vegetation, landscaping, fencing, and gating FY 14 Semiannual Reporting Period No 1 October 1 2013 March 31 2014 1. (Phase II) Advertise for bid 2. (Phase II) Receive bids for construction 3. (Phase II) Review bids and recommend award to lowest and best bidder 4. (Phase II) City Council awards construction contract Phase II 5. (Phase II) Pre-construction conference and notice to proceed 6. (Phase -IVA) Contractor to mobilize and begin construction activities 7. (Phase -IVA) In-Situ verification of existing utilities 8. (Phase -IVA) Install temporary fencing, erosion, and sedimentation controls 9. (Phase -IVB) Furnish and construct tank 1.25 MG steel bowl 10. (Phase -IVA) Furnish and install 16" reuse water line bore, including valves and fittings 11. (Phase -IVB) Furnish and apply coating system to 1.25 MG steel tank bowl 12. (Phase V) City staff review and approval of Plans and Specifications 13. (Phase V) Advertise for bid 14. (Phase V) Receive bids for construction 15. (Phase V) Review bids and recommend award to lowest and best bidder 16. (Phase V) City Council awards construction contract Phase V 17. Various re-vegetation, landscaping, fencing, and gating FY 14 Semiannual Reporting Period No 2• April 1 2014 September 30 2014 E 1. Conduct miscellaneous Recipient Administration Activities s 2. (Phase II) Contractor to mobilize and begin construction activities 3. (Phase II) In-Situ verification of existing utilities 4. (Phase II) Install temporary fencing, erosion, and sedimentation controls 5. (Phase II) Furnish and construct 42" bore steel casing pipe 6. (Phase II) Furnish and install 24" reuse water line bore, including valves and fittings 7. (Phase II) Disinfect and pressure test 24" reuse water line. 8. (Phase II) Final grading and top soil replacement 9. (Phase-IVB) Furnish and apply coating system to 1.25 MG steel tank bowl 10. (Phase-IVA) Disinfect and pressure test 16"reuse water line 11. (Phase-IVB) Furnish and install solar electric PLC/RTU 12. (Phase-IVB) Disinfect 1.25 MG reuse water steel bowl 13. (Phase-IVB) Disinfect and pressure test 16"reuse water line 14. (Phase V) Pre-construction conference and notice to proceed 15. (Phase V) Contractor to mobilize and begin construction activities 16. (Phase V) In-Situ verification of existing utilities 17. (Phase V) Install temporary fencing, erosion, and sedimentation controls 18. (Phase V) Furnish and install Eight (8)" reuse water line, including valves and fittings 19. (Phase V) Furnish and install 24" reuse water line bore, including 24" steel casing pipe 20. (Phase V) Disinfect and pressure test Eight(8) inch reuse water line. 21. (Phase V) Final grading and top soil replacement 22. Various re-vegetation, landscaping, fencing, and gating 23. (Phase -IVA) Project Inspections and Closeout 8 FY 15 Semiannual Reporting Period No 1. October 1 2014 March 31 2015 1. Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase II) Project Inspection and close out 1. (Phase-IVB) Project Inspections and Closeout 3. (Phase V) Project inspection and closeout r } ti l Y f. 3 9 '"�ROUNDROCK,TEXAS Ci Council A enda Summar Sheet PURPOSE PASSION.PROSPERITY. Agenda Item No. F8. Consider a resolution approving modification (MOD Number 004) to the U.S. Department of the Interior Bureau of Reclamation Assistance Agreement relative to Title XVI Water Agenda Caption: Reclamation and Reuse Program. Meeting Date: August 23, 2012 Department: Utilities and Environmental Service Staff Person making presentation: Michael Thane, P.E. Utilities and Environmental Services Director Item Summary: The City of Round Rock is in the process of constructing a reuse water system in the northeast area of the City. This reuse water system will help accelerate the conversion of effluent reuse water at locations now using potable drinking water for irrigation purposes and will free up current and future sources of raw and potable drinking water. The U.S. Department of Interior — Bureau of Reclamation had previously made grant funds in the amount of $858,000 available through Assistance Agreement Number R08AC60018 to the City of Round Rock under the 2008 s Title XVI Water Reclamation and Reuse Program for the purpose of continuing to expand the City's Water Reclamation and Reuse Project. The Bureau of Reclamation now wishes to make additional grant funds in the amount of $954,083 available to the City of Round Rock through a Modification of the Agreement, for a total amount of grant funds of$1,812,083. The modification document numbered MOD NUMBER 004 entitled "United States Department of the Interior Bureau of Reclamation Assistance Agreement" must be approved by the City g Council, a copy of which is attached. The Bureau of Reclamation is obligated to fund to City relative to the City's Water Reclamation and Reuse Project. These funds represent a 25% cost reimbursement to the City for the design and construction of the reuse water system. k Cost: Source of Funds: Self-Financed Water Construction Date of Public Hearing(if required): N/A Recommended Action: Approval F4 i 3 EXECUTED ORIGINAL DOCUMENT FOLL OW UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ASSISTANCE AGREEMENT 1A. AGREEMENT NU M8 ER tB .MOD NUMBER RO8AC60018 2. TYPE OF AGREEMENT 3. CLASS OF RECIPIENT 004• _ ( GRANT } x COOPERATIVE AGREEMENT Local Government 4. ISSUING OFFICE (NAME,ADDRESS) 5. RECIPIENT(NAME,ADDRESS) Bureau of Reclamation P.O.Box 36900 City of Round Rock 221 East Main Street Billings,MT 59107-6800 Round Rock TX 87664 74-6017485 County: "Plamson DUNS#: 10.274 0792 Congress.Dist 31 6. ADMINISTRATIVE POtl4t OF CONTACT Lindsey Nafts T (NAME.ADDRESS) 7. RECIPIENT PROJECT MANAGER(NAME,ADDRESS) Grants Officer Alan McGraw Bureau of Reclamation Mayor Great Plains R City of Round Rock Regional 221 East Main Street x' P.O.Box 36900 Round Rock,TX 87664 'a Ph. (s, )2 7-768 6900 Ph. (512)218-3236 Ph. (406)247 7684 Email: Inalls(lbusbir-clov 8. GRANTS OFFICER TECHNICAL REPRESENTATIVE(NAME,ADDRESS) 9A. INITIAL AGREEMENT 9B. MODIFICATION Collins IG Balcombe EFFECTIVE DATE: EFFECTIVE DATE: Bureau of Reclamation � - Oklahoma Texas Area Office 09-28-2008 53116 Hwy 290 West Ste.510 See Block 17a Austin,TX 78745 10. COMPLETION DATE Ph. (511)899-4162 Email: cb bad usb. ov 09-30-2018 11. PROGRAM STATUTORY AUTHORITY Section 1636 of Public Law 108-316 CFDA 712. FUNDINGREC1PfENT/ THER RECLAMATION 13. REQUISITION NUMBER 15.504 INFORMATION 12641000044 Total EsthnWed $5,682,609.00 $2,248,146.01 14. ACCOUNTING AND APPROPRIATION DATA Amount of A moment This Obif atton $5,366.301.84 $ 954 083.00 AIA-1979-4999.001-00-0-0.411C-SH50000 Previous Obil on $317.307.75 $ 858,000.00 Total Obi ation $5,882,609.59 $1,812,083.00 Cost-Share% 76% 240/6 15: PROJECT TITLE AND BRIEF SUMMARY OF PURPOSE AND OBJECTIVES OF PROJECT Protect TIHe: Williamson County Water Reclamation and Reuse Project ` Docriotion of Changes:_ See attached 16a. Acceptance o this Assistance Agreement in accordance with 'f 7a. Awar f this Assistance Agreement in accord ce with the the terms 410 cond tions contained herein Is.hereby made on tI nd conditions c ntained herein Is h beh If of abov named p nt of the United S es of a, au of Real ma on ion BY DATE: '(.��tZ~ BY DATE: I 16b. NAME,TITLE AND LEPHONE NUMBER OF SIGNER 17b. NAME OF GRANTS OFFICER his W -e t.-b 0Zi C ►'�) it). SNaft eto) Lindsey r Chandler P. Worley,Jr. o Additional s' natures are attached l Cooperative Agreement No. R08AC60018 Modification No. 004 Attachment I Notice of Reduction in Scope of Work: the modification removes Phase I of the Williamson County Water Reclamation and Reuse Project from the Scope of Work. Phase I was completed under a separate agreement between the City of Round Rock and the Bureau of Reclamation, Cooperative Agreement No. R10AC60R43. Notice of Reduction in Total Estimated Amounts of Funding: the modification reduces the Total Estimated Amount of Funding for both the City of Round Rock and the Bureau of Reclamation. The City of Round Rock's Total Estimated Amount of Funding is changed from $14,330,495.00 to $5,682,609.59 (see Block 12 of United States Department of the Interior, Bureau of Reclamation, Assistance Agreement signature page). The Bureau of Reclamation's Total Estimated Amount of Funding is changed from $4,776,832.00 to $2,248,146.01 (see Block 12 of United States Department of the Interior, Bureau of Reclamation, Assistance Agreement signature page). These changes are a result of the removal of Phase I of the scope of work and updated budget numbers (see Attachment II for detailed budget). Notice of Additional Reservation of Funds: the modification reserves additional funds in the amount of$954,083.00. Total amount of obligated funding is now changed from $858,000.00 to $1,812,083.00. It is to be expressly understood the Government has no obligation to provide funds in addition to those in writing. Notice of Budget Revisions: the modification revises the project budget numbers. See Attachment II for updated budget. Notice of Updated Reporting Requirements: the modification updates the frequency of required reports under the award. Performance reports are hereby required on a semi-annual basis. The Bureau of Reclamation has received the June of 2012 performance report. The City of Round Rock's subsequent performance report is due October 30, 2012 for the reporting period ending September 30, 2012. Financial reports are hereby required on a semi-annual basis. The Bureau of Reclamation has received the June 2012 Financial Report. The City of Round Rock's subsequent performance report is due October 30, 2012 for the reporting period ending September 30, 2012. 2 i i Notice of Cost Share Information: Public Law 108-316 states the Federal Cost Share of this project will not exceed 25% of the total project costs. Under Cooperative Agreement No. R08AC60018, project expenditures associated with pre-construction activities totaled $423,077.00. Reclamation's share of project costs was $105,769.25 (25 percent), and Round Rock's share was $317,307.75 (75 percent). Under Cooperative Agreement No. R10AC60R43, project expenditures associated with Phase I construction are projected to total $6,185,108.29 as of August 7, 2012. Reclamation's share of project costs is $1,228,575.00 (19.86 percent), and Round Rock's share is $4,956,533.29 (80.14 percent). As of August 7, 2012, a balance of $357,702.07 remains in Federal funds owed to Round Rock in order to bring the Phase I Federal cost-share to 25 percent. Under this modification, this remaining $357,702.07 balance is hereby added to the $1,876,797.93 Federal share (25 percent) of project costs associated with Phases II-V. Reclamation withheld $123,000 in funding for administration of the award. This is considered a project cost and must be cost shared by the City of Round Rock. Round Rock's share is $92,250 and under this modification, this funding is hereby added to the Round Rock's obligation amount bringing the total Federal cost-share to $2,142,376.76. Therefore, the non-Federal cost-share is hereby changed to $5,365,321.99. A final accounting of project costs will be completed upon project close out. The table provided below reflects total project accounting as of August 7, 2012. Reclamation administrative $0.00 0.00 $123,000.00 100.00 $123,000.00 Pre-Engineering/NEPA $317,307.75 75.00 $105,769.25 25.00 $423,077.00 ARRA Phase 1 $4,996,533.29 80.78 $1,188,575.00 19.22 $6,185,108.29 Subtotal $5,313,841.04 $1,417,344.25 Phase II-V $5,365,301.84 71.46 $2,142,376.76 28.54 $7,507,698.75 TOW $10,679,163.03 75.00 $3,559,721.01 25.00 $14,238,884.04 3 Cooperative Agreement No. R08AC60018 Modification No. 004 Attachment I Budget BUDGET RECIPIENT RECLAMATION ITEM FUNDING FUNDING TOTAL DESCRIPTION UNIT COST UNIT 71.46% 28.54% COST Director of Utility& $57.69 120 $4,947 $1,975 Environmental $6,923 Services Utility Inspector $30.97 720 $15,935 $6,363 $22,298 Finance Director $57.69 60 $2,474 $988 $3,461 Grant Coordinator $22.83 460 $7,505 $2,997 $10,502 AccountinSupervisor $30.57 160 $3,495 $1,396 $4,891 Utility Accountant $22.82 360 $5,871 $2,344 $8,215 GIS Technician $17.15 140 $1,716 $685 $2,401 Admin.Tech III $20.75 120 $1,779 $711 $2,490 Accounting Tech II $19.98 134 $1,913 $764 $2,677 Subtotal $45,636 $18,223 $63,859 (Med.Ins.,TMRS, 29,22% FICA,Medicare, $13,335 $5,325 $18,660 Longevity) Subtotal $13,335 $5,325 $18,660 ii N/A $0.555 0 $0 $0 $0 j Subtotal $0 $0 $0 WEi Furnish&install � = F solanelectric $35,732 $14,268 $50,000 Modicon PLC/RTU $50,000.00 0 IVB) Subtotal $35,732 $14,268 $50,000 N/A $-00 0 $0 $0 $00 Subtotal $0 $0 $0 t s d' 4 Construction Contractor Phase I1- TBD after Request for Bids Includes $2 727 2 purchase of 65 1 $1,949,013 $778,252 $2,727,265 easements and engineering consultant fees Construction Contractor Phases IVA&IVB-TBD after Request for Bids 1 $2,527,074 $1,009,076 $3,536,150 Includes purchase of $3,536,150.00 easements and engineering consultant fees Construction Contractor Phase V- TBD after Request for Bids $529,595.00 1 $378,470 $151,125 $529,595 Includes purchase of easements and engineering consultant fees Subtotal $4,854,557 $1,938,453 $6,793,010 is MMINW, Phase II Construction $239 &Easements ,110.00 $170,877.57 $68,232.43 $239,110.00 Phase IVA&IVB Easements Construction& $295,700.00 $211,319.05 $84,380.95 $295,700.00 Phase II Construction &Easements $47,360.00 $33,845.35 $13,514.65 $47,360.00 Subtotal $416,041.97 $166,128.03 $582,170.00 TOTAL DIRECT COSTS $5,365,302 $2,142,397 $7,507,699 I gi TOTAL INDIRECT COSTS 10% $0.00 $0.00 i r t x t There is a $20.00 difference in numbers due to rounding. i l 5 Cooperative Agreement No. R08AC60018 Modification No. 004 Attachment II Scope of Work/Milestones Williamson County Water Reclamation and Reuse Project City of Round Rock, Texas Phase II-V Agreement Number 08FC602334/R08AC60018 Scope of Work for Reuse Water Phase II Design and construction of a 24-inch reuse water transmission main beginning at the north end of phase 1 A—24-inch Old Settlers Park reuse water transmission main; the pipeline will follow northerly up the future "Arterial A"right-of-way through"Avery Centre east"to CR 112, then, the pipeline will head west along CR 112 crossing under FM 1460 (with a 42"bore) and connecting to an existing 16-inch reuse water line in the Avery-Nelson right-of-way. The total length of pipe is about 11,000 linear feet of 24-inch reuse water transmission main. Scope of Work for Reuse Water Phases IVA & IVB Design and construction of a 16-inch reuse water transmission main beginning at the north end of the existing reuse water transmission main in college park drive; then,the pipeline will follow northerly up College Park Drive right-of-way for approx. 2,400 linear feet; then, it will follow west in tract 1, a 30-foot wide tract, for approx. 900 linear feet and then continue onto tract 2 and connect to a 1.25 million gallon elevated reuse water tank. In addition, 3.0 mgd pumping capacity will be added to the pump station at the reuse water treatment facility. Scope of Work for Reuse Water Phase V This Phase will extend the existing reuse waterline from the west end of an existing 24-inch reuse water line and extend west for approx. 4,220 linear feet as an 8-inch reuse water line. The Phase V reuse water line will run under FM 1460 and continue west until its termination at the w Round Rock School District Stony Point High School. This reuse line will have the capacity to deliver 1.0 million gallons per day(mgd). Scope of Work by Semi-Annual Period for Reuse Water Phase II FY 12 Semiannual Reporting Period No. 2• April 1 2012— September 30 2012 1. Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase-IVA) Enter into Contract with Design Engineer to complete reuse water Phase ` IV-A 3. (Phase-IVA) City Staff review of 30% construction Plans and Specifications complete 4. (Phase-IVA and IVB) conduct miscellaneous Recipient Administration Activities 5. (Phase-IVB) Enter into contract with Design Engineer to complete reuse water Phase i i 6 x r IV-B 6. (Phase-IVB) City Staff review of 30% construction Plans and Specifications complete 7. (Phase-IVB) Elevated reuse water tank tract and easement acquisition 8. (Phase-IVB) Pre-acquisition bore at center of tank site 9. Various re-vegetation, landscaping, fencing, and gating FY 13 Semiannual Reporting Period No 1. October 1 2012-March 31 2013 1. Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase II) Enter into contract with Design Engineer 3. (Phase II) City staff review of construction Plans and Specifications 4. (Phase II) Continue Reuse Water Line Easement Acquisition 5. (Phase-IVA) City staff review of construction Plans and Specifications 6. (Phase-IVB) City staff review of construction Plans and Specifications 7. (Phase-IVB Drill bore holes for Geotech analysis for tank foundation design 8. (Phase-IVB) Complete design 9. (Phase-IVA and IVB) continue miscellaneous Recipient Administration Activities 10. (Phase-IVB) Advertise for bid 11. (Phase-IVB) Receive bids for construction 12. (Phase-IVB) Review bids and recommend award to lowest and best bidder 13. (Phase-IVB) City Council award of Construction Contract 14. (Phase-IVB) City Staff review and approval of bid and construction documents 15. Various re-vegetation, landscaping, fencing, and gating FY 13 Semiannual Reporting Period No 2• April 1 2013 -September 30 2013 1. Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase II) City staff review of construction Plans and Specifications f 3. (Phase 11) City staff review of and approval of bid construction documentation 4. (Phase-IVB) Install temporary fencing, erosion, and sedimentation controls 5. (Phase-IVA) Advertise for bid 1 6. (Phase-IVB) Contractor to mobilize and begin construction activities 7. (Phase-IVB) Prepare and clear construction site 8. (Phase-IVA) Receive bids for construction 9. (Phase-IVB) Excavate and construct reuse water elevated storage tank foundation 10. (Phase-IVB) Furnish and construct reuse water elevated storage tank 11. (Phase-IVB) Furnish and install 16" reuse water line, including valves and fittings 12. (Phase-IVA) Receive bids for Construction 13. (Phase-IVA) Review bids and recommend award to lowest and best bidder i 14. (Phase-IVA) City Council award of Construction Contract 1 15. (Phase-IVB) Furnish and install internal reuse water lines in tank, including valves and fittings 16. (Phase-IVB) Furnish and install 16" reuse water line, including valves and fittings 17. (Phase-IVB) Furnish and construct tank concrete pedestal 18. (Phase-IVA) Pre-Construction conference and Notice to Proceed l 19. (Phase V) Enter into contract with Design Engineer 20. (Phase V) City staff review of construction Plans and Specifications 21. (Phase V) Continue Reuse Water Line Easement Acquisition 7 h i 22. Various re-vegetation, landscaping, fencing, and gating FY 14 Semiannual Renortina Period No 1. October 1 2013 March 31 2014 1. (Phase II) Advertise for bid 2. (Phase II) Receive bids for construction 3. (Phase II) Review bids and recommend award to lowest and best bidder 4. (Phase I1) City Council awards construction contract Phase II 5. (Phase II) Pre-construction conference and notice to proceed 6. (Phase -IVA) Contractor to mobilize and begin construction activities 7. (Phase -IVA) In-Situ verification of existing utilities 8. (Phase -IVA) Install temporary fencing, erosion, and sedimentation controls 9. (Phase -IVB) Furnish and construct tank 1.25 MG steel bowl 10. (Phase -IVA) Furnish and install 16" reuse water line bore, including valves and fittings 11. (Phase -IVB) Furnish and apply coating system to 1.25 MG steel tank bowl 12. (Phase V) City staff review and approval of Plans and Specifications 13. (Phase V) Advertise for bid 14. (Phase V) Receive bids for construction 15. (Phase V) Review bids and recommend award to lowest and best bidder 16. (Phase V) City Council awards construction contract Phase V ' 17. Various re-vegetation, landscaping, fencing, and gating FY 14 Semiannual Reporting Period No 2• April 1 2014- September 30 2014 1. Conduct miscellaneous Recipient Administration Activities 2. (Phase I1) Contractor to mobilize and begin construction activities 3. (Phase II) In-Situ verification of existing utilities 4. (Phase II) Install temporary fencing, erosion, and sedimentation controls 5. (Phase 11) Furnish and construct 42" bore steel casing pipe 6. (Phase II) Furnish and install 24" reuse water line bore, including valves and fittings 7. (Phase 1I) Disinfect and pressure test 24'* reuse water line. 8. (Phase II) Final grading and top soil replacement 9. (Phase-IVB) Furnish and apply coating system to 1.25 MG steel tank bowl 10. (Phase-IVA) Disinfect and pressure test 16" reuse water line ". 11. (Phase-IVB) Furnish and install solar electric PLC/RTU 12. (Phase-IVB) Disinfect 1.25 MG reuse water steel bowl 13. (Phase-IVB) Disinfect and pressure test 16" reuse water line 4 14. (Phase V) Pre-construction conference and notice to proceed 15. (Phase V) Contractor to mobilize and begin construction activities l 16. (Phase V) In-Situ verification of existing utilities 17. (Phase V) Install temporary fencing, erosion, and sedimentation controls 18. (Phase V) Furnish and install Eight (8)" reuse water line, including valves and fittings 19. (Phase V) Furnish and install 24" reuse water line bore, including 24" steel casing pipe 1` 20. (Phase V) Disinfect and pressure test Eight(8) inch reuse water line. 21. (Phase V) Final grading and top soil replacement It 22. Various re-vegetation, landscaping, fencing, and gating ` 23. (Phase -IVA) Project Inspections and Closeout ` i f, 8 x FY 15 Semiannual Reporting Period No 1. October 1 2014 March 31 2015 1. Continue miscellaneous Recipient Administration Activities all Phases 2. (Phase II) Project Inspection and close out 1. (Phase-IVB) Project Inspections and Closeout 3. (Phase V) Project inspection and closeout a i E i i k 4 3 }} k F d b gg 4 T 4 6 5' L F K; 9 F