CM-2018-1666 - 3/23/2018Page I of } r Contract Quantft Adjustntent/Change Order mr, 01/16 Department: Planning and Development Services Project Name: Stagecoach Inn Restoration Date: 3.15.2018 City Project Change Order/Quantity ID Number SGINN _ Adjustment No. 1 Vendor Phoenix 1 Restoration and Construction, L 14032 Distribution_ Way, Fanners Branch, TX 75234 214 902 0111 Company Name Address Phone No. Ing demolition around the Stagecoach Inn, conditions have been uncovered which have required adjustments to the design. Stone walls w A to be reconstructed which were initially dmguht to be in good condition, non -original stone wails are being demolished, and the roof will adjusted to the original roof slope. Also, the base wall construction Is being relined to allow for a more stable condition. At the new site, ing grade beam excavation on March 15th, 2018, it was discovered that the "bed rock" sits at a lower average depth than what was cribed In the geotechnical report provided. This change order Includes the cost of additional concrete necessary to fill the adjusted depth. SUMMARY Original Contract Prim: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantlty Adjusurent(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change order- Total rder Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Ails Quantity Adjustment(s) Plus Change OnWs)]: Difference between Original and Adjusted Contract Prices: Amount % Change Original Contract lime: 120 Time Adjustment by previous Quan. Adj./Change Order: 0 Time Adjusbuent by this Quan. Adj.JChan9e Order: 10 New Contract Time, 130 $0.00 0% $26,281.02 4% $26,281.02 4% #824,281.02 $26,281.02 mayoryCaty r Wj , q Manager d I .AAO syb4 Laurie Hadley, City Manager _ / l Signa re Printed Name, Title Date 0Y+ 2 0 / Ar- &W � �, Contract Quantity Adjustment/Change Order '' wmepoappe re., di, A Project Name: Stagecoach Inn Restoration Quan. Adj./Change Order No.: Chanma inrddmr Efate Page 2 ora Item # Item NwAMPtlon link Qty. unit Price Amount Contract Time Adjustment 1 2 P 93: omit portion of slab area for demolition P #4: Use CMU in feu a stone at Int. lease wall perimeter sr Lf 402 153 $1.90 $34.75 -$904.72 -$5,316.04 3 COP mortar testing uirement from project Test 1 $2,311.93 -;2,311.93 4 COP #6-1tem 1: Demolish non -origins stone sf 49.49 $78.55 $3,887.53 5 COP # Item 2: Reconstruct Stone at Southwest Corner sf 29.686 $202.94 $6,024.37 6 COP #6 -Item 3: Lower Bdsllng Roof sf 370 $23.65 $8,748.72 5 7 COP #7: Credit to omit cement board siding and framing from west wall sf 70 -$63.29 -$4,430.03 A COP #8: Added Foundation wall depth due to deviation between geoticniml report and actuail conditions CY 1 53 $520.44 $27,583.12 5 9 Owner's 8ettemment Allowance shall be reduced from $5,000.00 to $0 $ 45,000.00 $0.0 $0.00 .00 0.001 0.00 .00 0.00 0.001 0,00 $0.00 0.00 $0.00 0. 0.00 0. Page 3 of 3 Contract Quantity Adjustment/Change order n., 01116 Project Name: Stagecoach Inn Restoration Quan. Adj./Change Order No_: 1 norm lh . AANief.__Fn..&_ Contract Time 1Adjustment _-- 1 1 I _-- 1 11 I 1 k City of Round Rock RountnROC c Agenda Item Summary TEMS Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Phoenix I Restoration and Construction, Ltd. for the Stagecoach Inn Relocation Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 3/23/2018 Dept Director: Brad Wiseman Cost: $28,281.02 Indexes: Hotel Occupancy Tax Fund Attachments: Department: Planning and Development Services Department Text of Legislative File CM -2018-1666 Consider executing Quantity Adjustment/Change Order No. 1 with Phoenix 1 Restoration and Construction, Ltd. for the Stagecoach Inn Relocation Project. During demolition around the Stagecoach Inn, conditions were uncovered which have required adjustment to the design. Stone walls will need to be reconstructed which were initially thought to be in good condition; non -original stone walls are being demolished; and the roof will be adjusted to the original roof slope. In addition, the base wall construction is being refined to allow for a more stable condition. Most significantly, during grade beam excavation on March 15, 2018, it was discovered that the "bed rock" sits at a lower average depth than what was described in the geotechnical report for the site. This change order includes the cost of additional concrete necessary to fill the adjusted depth. Cost: $28,281.02 Source of Funds: Hotel Occupancy Tax Fund City of hound Rock page 1 Printed on 7/27!2048