Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
R-12-08-23-F11 - 8/23/2012
1 r RESOLUTION NO. R-12-08-23411 3 f i WHEREAS, the City of Round Rock has duly advertised for bids for the Harrell Parkway Electrical Improvement Project, and WHEREAS, BE, Inc. dba BJ Electric has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of BJI, Inc. dba BJ Electric, Now i Therefore i BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, ? That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with BJI, Inc. dba BJ Electric for the Harrell Parkway Electrical Improvement Project. k The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Y Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of August, 2012. Y is C City of Round Rock, Texas A/� Jutz Ppo -T.-em ATTEST: i F SARA L. WHITE, City Clerk i 0iwdox\SCC1nts\01 12\1204\MUNICIPAL\00256316.DOC F t F t a t THE CITY OF ROUND ROCK PARKS& RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED 301 West Bagdad BY: DMB Round Rock, Texas. 78664 DATE: 8/10/2012 (512)218-5540 BID TABULATION SHEET OF 1 OF 1 CONTRACT: Harrell Parkway Electrical Improvements LOCATION:PARD Conference Room BJI,Inc dba BJ Electric TAG Electric of Austin DATE: 8/10/2012 Bid Bond? Bid Bond? Bid Bond? Bid Bond? APPROX. UNIT UNIT UNIT UNIT ITEM UNIT QTY. PRICE COST PRICE COST PRICE COST PRICE COST reaElectrical mprovements reaElectrical Improvements Area'C'E lectrical improvemeiTt-s AreaElectrical Improvements reaElectrical Improvements TOTAL BASE BID: $155,545.00 $202,023.00 $0.00 $0.00 bidtab/bidtab ROUNDROCK,TEXAS City Council Agenda Summary Sheet PURPOSE.PASSION.PROSPERITY. r Agenda Item No. 1711. Consider a resolution authorizing the Mayor to execute a construction contract with BJI, Agenda Caption: Inc.for the Harrell Parkway Electrical Improvement Project. Meeting Date: August 23, 2012 Department: Parks and Recreation Staff Person making presentation: Rick Atkins Parks and Recreation Director f is Item Summary: This item will allow the City to enter into a construction contract with BJI, Inc. (dba BJ Electric Company) to install } electrical improvements along Harrell Parkway. The project will include installing wiring and electric panels with receptacles along Harrell Parkway from the Tennis Complex to the Soccer Complex. The electrical improvements are being installed to facilitate the Rock'N Lights drive-thru light show in Old Settlers Park. The electrical will eliminate the need for the vast majority of generators and diesel fuel that would have been required to put on the light show. x Additionally,the electrical improvements are being set up to provide power availability for other events that happen within Old Settlers Park. Cost: $155,545.00 Source of Funds: General Self-Financed Construction Date of Public Hearing(if required): N/A s; Recommended Action: Approval { z I° r S k. EXECUTED ORIGINAL DOCUMENT FOLLOW City of Round Rock, Texas Contract Forms Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor AGREEMENT made as of they (oday of in the year 201. BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor BJI,Incorporated dba BJ Electric Company ("Contractor") 1509 Three Points Road Pflugerville,Texas 78660 The Project is described as: Harrell Parkway Electrical Improvements Project, including installation of electrical wiring,panels,and receptacles along Harrell Parkway in Old Settlers Park The Engineer is: Hendrix Consulting Engineers 115 East Main Street Round Rock,Texas 78664 For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications,appears in Article 8. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 7-2012 Pagel of 5 Standard Form of Agreement 00196575 ARTICLE 3 DATE OF COMMENCEMENT;DATE OF SUBSTANTIAL COMPLETION;DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within ten ( 10 ) calendar days from the date delineated in the Notice to Proceed. 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this Agreement no later than forty-five ( 45 )calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than forty-five ( 45 )calendar days from issuance by Owner of Notice to Proceed, subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof) on or before the date(s) specified for Substantial Completion in the Agreement, Contractor shall pay to Owner, as liquidated damages,the sum of two hundred fifty and No/100 Dollars($ 250.00 )for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s) specified for Substantial Completion in the Agreement. It is agreed that the harm that would be caused by such failure, which includes loss of expected use of the Project areas, provision of alternative storage facilities and rescheduling of moving and occupancy dates, is one that is incapable or very difficult of accurate estimation.It is hereby agreed that if Substantial Completion of the Work(or any portion thereof) is not achieved on or before thirty(30)days after the date(s) specified for Substantial Completion in the Agreement, the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation, the recovery of actual damages. The date(s) specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than forty five ( 45 )calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's performance of the Contract.The Contract Sum shall be one hundred fifty five thousand five hundred forty-five and 00/100 dollars ($ 155,545.00 ),subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates which are described in the Contract Documents and are hereby accepted by Owner: Base Bid One-Area'A' Base Bid Five-Area'E' Base Bid Two-Area'B' Base Bid Three-Area'C' Base Bid Four-Area'D' Page 2 of 5 ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor,and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender, Owner shall make progress payments on account of the Contract Sum to Contractor as provided below, in Article 14 of the City of Round Rock General Conditions,and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.1.3 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth (10th) day of a month, Owner shall make payment to Contractor not later than the tenth(10th)day of the next month. If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require. This schedule, unless objected to by Engineer or Owner,shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as provided in Article 14 of the City of Round Rock General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work,and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed. Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment, and shall not be treated as warranty items. ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the City of Round Rock General Conditions. Page 3 of 5 6.2 The Work may be suspended by Owner as provided in Article 15 of the City of Round Rock General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary, Special, and other Conditions of the Contract are those contained in the Project Manual dated_August 2012 7.1.4 The Specifications are those contained in the Project Manual dated August 2012 7.1.5 The Drawings,if any,are those contained in the Project Manual dated July 30,2012 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated August 2012 7.1.7 The Notice to Bidders,Instructions to Bidders,Bid Form,and Addenda,if any,are those contained in the Project Manual dated August 2012 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents, if any,forming part of the Contract Documents are as follows: ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: David Buzzell,Park Development Manager City of Round Rock 301 W.Bagdad, Suite 250 Round Rock,Texas 78664 8.3 Contractor's representative is: Jack Payne,President BJI,Incorporated dba BJ Electric Company 1509 Three Points Road Pflugerville,Texas 78660 8.4 Neither Owner's nor Contractor's representative shall be changed without ten (10) days' written notice to the other party. 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. Page 4 of 5 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor,subject to proper additions and deductions,all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner, both parties hereto expressly agree and assert that, in the event of any dispute over its meaning or application, this Agreement shall be interpreted reasonably and fairly, and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock,Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding, including without limitation, any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least three(3) original copies, of which one is to be delivered to Contractor, one to Engineer for use in the administration of the Contract,and the remainder to Owner. OWNER CONTRACTOR CIT TMDR K,TEXAS BJI,Incorporated dba BJ Electric Company Printed Name: �NNV Printed Name: ` a-L Title 0"" Title: Date Signed: L�' Date Signed: ATTEST: City Clerk :F;OR:QIY,APP OVE AS TO FORM: CityAtt ey Page 5 of 5 _� 1 BJIO-E1 OP ID:AW A41`4 o CERTIFICATE OF LIABILITY INSURANCE DAT 08130D/YYYY) 08/30/12 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT PRODUCER 512-835-7633 NAME: Ann Hyatt Hertel Insurors Group,LLP512-835-0800 PHONE 512-835-7633 AX :5I2-835-0800 8500 Bluffstone Cove,Ste.B201 A/c No Ext No Austin,TX 78759 E-MAIL Mitch Elengold ADDRESS:ahyatt@hertelinsuro .com INSURER(S) AFFORDING COVERAGE NAIC# INSURER A:America First Lloyds Ins Co INSURED BJI,Inc.DBA B.J.Electric Co INSURER B:Texas Mutual Insurance Company 22945 1509 Three Points Road INSURER C:America First Insurance Pflugerville,TX 78660 INSURER D: INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRADDL SUOR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE JUSE wyn POLICY NUMBER MM/DD//YYYY MMIDD/YYYY LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1,000,00 A X COMMERCIAL GENERAL LIABILITY CBP8705896 08/16/12 08/16/13 PREMISES Ea occurrence $ 100,00 CLAIMS-MADE I OCCUR MED EXP(Any one person) $ 10,00 PERSONAL&ADV INJURY $ 1,000,00 GENERAL AGGREGATE $ 2,000,00 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 2,000,00 POLICY X PRO- LOC Emp Ben. $ 1,000,00 AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,00 Ea accident A X ANY AUTO BA8714802 08/16/12 08/16/13 BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS AUTOS X HIRED AUTOS FX NON-OWNED PROPERTY DAMAGE $ AUTOS Per accident X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 5,000,00 C EXCESS LIAB CLAIMS-MADE CU8705966 08/16/12 08/16/13 AGGREGATE $ 5,000,00 DED I X I RETENTION$ 10,000 $ WORKERS COMPENSATION X I WC STATU- OTH- AND EMPLOYERS'LIABILITY TDRY LIMITS B ANY PROPRIETOR/PARTNER/EXECUTNE Y/N SF1090653 08/16/12 08/16/13 E.L.EACH ACCIDENT $ 1,000,00 OFFICER/MEMBER EXCLUDED? � N/A (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,00 If yes,describe under .L. DESCRIPTION OF OPERATIONS below EDISEASE-POLICY LIMIT $ 1,000,00 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Addidonel Remarks Schedule,It more space is required) PROJECT:HARRELL PARKWAY ELECTRICAL IMPROVEMENTS SEE ATTACHED HOLDER NOTES CERTIFICATE HOLDER CANCELLATION CITYROU SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN CITY MANAGER ACCORDANCE WITH THE POLICY PROVISIONS. CITY OF ROUND ROCK AUTHORED REPRESENTATIVE MAIN ST. ROUND ROUNN D ROCK,TX 78664 ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010/05) The ACORD name and logo are registered marks of ACORD Bond#4383647 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That BJI, Inc., dba BJ Electric Company of the City of Pflugerville County of Travis , and State of Texas , as Principal, and surerec Insurance Company authorized under the law of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto THE CITY OF ROUND ROCK,TEXAS,(Owner), in the penal sum of One Hundred Fifty Five Thousand,Five Hundred Forty Five and no/1o0-- Dollars ($ 155,545.00 ) for the payment whereof, well and truly to be made the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally, by these presents: WHEREL-2. the Principal has entered into a certain written Agreement with the Owner dated the -224 r -".&-- day of "Ow , 2012 to which the Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of. Harrell Parkway Electrical Improvements Project I (Name of the Project) j NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants. conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of, the Principal in performing the Work covered by said Agreement and occurring within a period of twelve (12)months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Pians and Specifications hereto annexed, then this obligation shall be void; otherwise to remain in full force and effect; i PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. ` Page 1 00610 7-2009 Performance Bond 00090656 i l i I I I I i PERFORMANCE BOND(continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or i addition to the term of the Agreement, or to the Work performed thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument i this 27th day of August ,20 12 . I BJI., Inc. dba BJ Electric Company SureTec Insurance Company Principal Suret -S,;4L K d\Name Printed a Janis Winkler Attorney-in-Fact By: CJ '` By: Janis Winkler Title: d'p Title: Attorney-in-Fact Address: 1509 Three Points Rd Address: c A Schutte A gency Pflugerville,Texas 78660 PO Box 3547,Austin,Tx 78764 i Resident Agent of Surety: Signature Steve Schutze Printed Name 1101 S Congress Street Address Austin,Texas 78704 City, State&Zip Code i Page 2 00610 7-2009 Performance Bond 00090656 Bond#4383647 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § That BJI Inc.,dba BJ Electric Company of the City of Pflugerville County of Travis , and State of Texas as Principal, andsuretec Insurance Company authorized under the laws of the State of Texas to act as Surety on Bonds for Principals, are held and firmly bound unto THE CITY OF ROUND ROCK, (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of One Hundred Fifty Five Thousand, Five Hundred Forty Five and nol100 Dollars ($ 155,545.00 ) for the payment whereof, well and truly be made the said Principal and Surety bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner, dated the -24th I S4- day of t , 2012 , to which Agreement is hereby referred to and made a part hereof as fulll and to the same extent as if copied at length herein consisting Of: Harrell Parkway Electrical Improvements Project (Name of the Project) NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall well and truly pay all subcontractors,workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts, work, labor, equipment, supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 2 00620 7-2009 Payment Bond 00090656 PAYMENT BOND(continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect it's obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this 27th day Of August , 20120 BJI, Inc.,dba BJ Electric Company SureTec Insurance Company Principal Sur ty r, ^S,Q c VL { Printed Name Printed Itime Janis Winkler Attorney-in-Fact By: By: Janis Winkler Title: P-,e s;o Title: Attorney-in-Fact Address: 1509 Three Points Rd Address: C A Schutze Agency Pflugerville,Texas 78660 PO Box 3547,Austin,Tx 78764 Resident Agent of Surety: Signature Steve Schutze Printed Name 1101 S Congress Street Address Austin,Texas 78704 City, State&Zip Code Page 2 00620 7-2009 Payment Bond 00090656