Loading...
CM-2018-1680 - 4/6/2018STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: CP&Y, INC. ("Engineer") ADDRESS: 13809 Research Boulevard Suite 300 Austin TX 78750 PROJECT: Southeast GST Pump Improvements & S81 Elevated Tank Pump Station This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and CP&Y, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 12th day of November, 2015 for the Southeast GST Pump Improvements & S81 Elevated Tank Pump Station Project in the amount of $149,833.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on August 11. 2016 to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $332,629.00 to a total of $482,462.00; and WHEREAS, it has become necessary to amend the Contract to increase the compensation by $24,248.20 to a total of $506,710.20; NOW THEREFORE, premises considered, the City and the i_ngineer agree that said Contract is amended as follows: Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $24,248.20 the maximum amount payable under the Contract for a total of $506,710.20, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [slgnalure pages fallow] eyf-1&,r0 SupplementaTontract 0199 1552,00398198 kev.06 16 8427x Date I zI LW Supplemental Contract Rcv.06116 0199 1552.00398198 84275 CITY OF i I ROCK 5/ I. Supplemental Contract 0199 1552, 00398198 APP VED AS TO FORM: S tepha L. Sheets, City Attorney c1 Rev.06/16 84275 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Wage Exhibit b Fee Schedule T and South 91 EST Pump Station Improvements of Round Rock Task Description Total Labor Hours Total Loaded Labor Cost A SIFECAL SERV? C 7 PUMP IMPROVEMENTS BY SMITH PUMP CO 2, ENGINEER COORDINATION WITH SMITH PUMP CO 15 B82 0e 8,386 2l) SUBTOTAL SPECIAL SERVICES S 24,24820 TOTAL. BASIC & SPECIAL SERVICES & EXPENSES) S 24,246.20 SUB -TOTAL ADDITIONAL SERVICES GRAND TOTAL (BASIC, SPECIAL A ADDITIONAL SERVICES, EXPENSES) $ 24,248.20 4.0 EXHIBIT D Southeast and South 81 Pump Stations Page 1 of 5 ume: iwzarzuia N SOUTH 81 TANK PUMP STATION W*E & SOUTHEAST GST PUMP 5 IMPROVEMENT PROJECTS aauNo--Tri- City of Round Rock ROUND ROCK E Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with CP&Y, Inc. for the Southeast GST Pump Improvements & S81 Elevated Tank Pump Station Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/6/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $24,248.20 Indexes: Self -Financed Water Construction Attachments: LAF - SC#2 w- CP Y, Inc. - Southeast GST Pump Improvements S81 Elevated Tank Pump Station (00398253xA08F8).pdf, SC#2 w- CP Y - SE GST Pump Improvements S81 Elevated Tank Pump Station (00398213xA08F8).pdf, Map S81 —tan kPumpStation_SE_GSTProject.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1680 Consider executing Supplemental Contract No. 2 with CP&Y, Inc. for the Southeast GST Pump Improvements & S81 Elevated Tank Pump Station Project. This Supplemental Agreement No. 2 is for the Southeast Ground Storage Tank (SE GST) Pump Station & South 81 Pump Station Improvements project. The SE GST Pump Station was built in the mid -1980's. This potable water pump station pumps water from the City's 890 Pressure Plane to the 924 Pressure Plane. The pumps and electrical motor control center are antiquated and need repair or replacement. This project was initiated to rehabilitate the SE GST Pump Station and construct a new pump station at the South 81 Elevated Storage Tank. In November of 2015, the City contracted CP&Y, Inc. to deliver a Preliminary Engineering Report. In August of 2016, the City approved Supplemental Agreement No. 1 for CP&Y to perform Final Design Services. Supplemental Agreement No. 1 included $68,000 for immediate pump repairs at the SE GST pump station. After analysis by the pump manufacturer, more extensive repairs were required and an additional $24,248.20 is needed to complete the repairs. The Utility Staff requests the City Manager to approve City of Round Rock Page f Printed on 4/0/2048 Agenda Item Summary Continued (CM4018-1880) Supplemental Agreement No. 2 for $24,248.20. This modifies the total contract amount to $506,710.20. Cost: $24,248.20 Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 Pdnted on 41WO18