CM-2018-1637 - 2/16/2018ROUND ROCKTEX S
PAHO AMa M090M
December 13, 2017
AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES
AND SUBMITTAL OF EXHIBITS "A 4' FOR RAILROAD APPROVAL
Crossing #1: Pedestrian Underpass —Lake Creek Trail
MP 161.82, Austin Subdivision
State: Texas City: Round Rock
County: Williamson County
Andrew Hudanish
Manager, Industry & Public Projects
Union Pacific Railroad Company
24125 Old Aldine Westfield Rd
Spring, Texas 77373
Dear Mr. Hudanish:
Plans are being prepared to the Lake Creek Trail Project at the locations referenced above. The
proposed work includes construction of a pedestrian hike and bike trail and grade separated
pedestrian underpass at this location. In connection with the project, the Agency considers it
necessary for the successful advancement of the project for your company to collaborate in the
development of the project by performing the following:
• preliminary engineering and other related services
• development of cost estimates
• review of the projects' preliminary layouts
• submit current train and switching moves
The Agency authorizes and agrees to reimburse the Railroad for its expenses and actual costs
that are incurred for collaborating in the development of the project's preliminary engineering
and other preliminary activities. The Railroad has estimated that these preliminary engineering
and other preliminary costs will be up to $10,000. Payment will be made within thirty (30) days
from the Agency's receipt and approval of the Railroad's request for reimbursement. Railroad
will refer to Agency's Project Number and forward Invoices to Finance Department, 221 E. Main
Street, Round Rock, Texas 78664.
-2b/R67
Additionally, attached for your company's review and approval is one (1) set of prints of the
concept plans for the proposed pedestrian underpass located at MP 161.82, Austin Subdivision.
These prints are marked Exhibit G-1, which are the 30 % complete plans and show the basic
features of the proposed trail project at the location referenced above. Please review and
provide comment on the basic features of the Exhibit G-1 as soon as possible. Also enclosed is
one (1) set of photos of each project area.
The project may require the Railroad to incur costs for force account activities. Please prepare
the railroad force account cost estimate for work activities to be provided by your company, as
identified in Exhibit G-1 and submit them as your earliest convenience so that they may be
attached to the railroad generated Construction & Maintenance (C&M) agreement.
For the crossing at MP 161.82, Austin Subdivision, please verify the number of current regular
train (29 trains per day) and two (2) switching movements with a Maximum Speed of 79 MPH
as currently shown in our inventory records. This information will be used by the Agency's
Contractor to obtain Railroad Protective Liability Insurance.
This agreement is intended to address Preliminary Engineering. It is understood by both parties
that railroad may withhold its approval for any reason directly or indirectly related to safety or
its operations, property issues or effect to its facilities. If the Project is approved, Union Pacific
will continue to work with the Agency to develop Final Plans, Specifications and prepare
Material and Cost Estimates for Railroad Construction Work associated with the project. It is
also understood that if the project is constructed, if at all, at no cost to the railroad.
The Agency and the Railroad will enter into separate License, Right of Entry, Construction and
Maintenance Agreements associated with the actual construction of the project if the project is
accepted and approved by the railroad. The Agreements will be drafted by Union Pacific and
forwarded to the Agency after the Exhibit G-1 and cost estimates have been approved.
Please contact Katie Baker, Park Development Manager at telephone number (512) 341— 3355
or via email at kbaker roundrocktexas. ov if you have any questions. Your assistance in this
matter is appreciated.
i c rely,
Laurie Hadley, City Manager
City of Round Rock Texas`
UNION PACIFIC RIILROAD COMPANY
Date �.& Za
Name andTitlekb-,t&r1 a%7AsA,J)So4 I L/ Ac--xe-411JOW6*4 A�4
Attachment(s)
Exhibit 'G— — MP 161.82, Austin Subdivision: Location Map
Exhibit'H' — MP 161.82, Austin Subdivision: Site Plan
Exhibit'I' — MP 161.82, Austin Subdivision: Proposed Improvements
I� u_¢
.. � ti 1'� '/ -a-
d.
���5 M�i�i `�. �, T
�.1
w
R
' r <
F +.S
aW. i . .t'�,�T
�`
�!
_��
to
i ei 4
i _
"ti:.
� �..
r, !
���. k, � Mi; L
� �
�`
_ _
Ili
�
� �
�* +}
'fir`_
4
1
�
�+J,s.
�1
_ �
� -
�
4
��
- -
t
�„� '
�� rz �
� .;��.
- _ eL
�
� �
-
, ' - ti.
-
-
..
:, ..
�_
=u�.
.
� �
r
1
� [+. 'J. �"fir'
..
r �.M.� ','
}.
..
_ � �..
.l M
�
� i.
-.
e 1 e .
rt
� .I
ale '.i
�-�
v l
� _
�
��
�
� R.
�
. 'x
s
;.
'5 ' S
-
',
�
. _ _ _.
�
-
S'
� r
~.
}
_ ;1
sk�f
.
R��_
y
a
�ws•r
�nlll
�I�fl
omannndnnnn
�nlll
�I�fl
omannndnnnn
:;
9
� a
■ .
a ■
• ■
a ■
• w
• w
a s
• •
■ t
f
�a�eaeaaeaaaaaaeaeaaa
a a
•
. •
a s
a .
• .
e .
. a
■ •
a ■
. ,
■
�nlll
�I�fl
omannndnnnn
I+bR\Rf10M[NI�+IYf111Nf IMN�.I M INfIn V [.w
^tee—a■ 4�rnr>m
g SLON 7Rl3![39
—"r--0i•••• VMd?L�hD� lMdl OION1Na 9LNOYd I'IOINPI 7N111L711f1{5 ,+
SI33Eg1 3M
a'a � 8�8 C� Pp !i � !� ' a e• ai! a! � � R it �a" a
Ig''�a�i��3aA ! i�Z�.
Bl�: �����
Ili r$ 1 � !' =r# �d`�, a g3' fill-
0;
ill-
R g g g g# eaE s
■'►g.agg }9 f� e�Yli E$ 7 ES`�
rttl�t �•t a a ■ `• a/■a g■ s a a e r ■, ar i t ij ■
bra a ' p ■ E �a t � r !
5 ai' Hill
,ip:_ # _ 9 � I I
a �
i �j 1
gli��tra,• �r ]It33t,' !ar lei: 1ft#i
H -M.111 41 11.101 a Sr�11 i . ■ � l rl � [ i� � �s! �aw." � a
r g
} � �� i � ° as i ' 6! ' } ar ■ � � E r■ 9 � E ■ y=' a
j �� iy ■ } �.!! Yta� :�Bg � t� i� a ,$� ��� � a � ���I`�#� E,�� a
ag� r �� 1� � t �' � � w ! ! ��• �i ��' =!!E� � j =� ! � #a! � r � �p�qi � "�A � � � a� c�
i #i� 9 ■t i'a # a��!El�eir }�iaa ; g a
����� i � � �!! � �� ■� � � as � } a� [ �i a. � r ■ }�
■ g i ' e R ! _ r r
111!1!11i 9 � ,� ! ! �• a �� ■ � d = f��E� !�. � � i�
IM loll
igNil
�!! a!�si��iri -�it 8i�.� a
"IN I II � # �aalIt la
a'� a �■ R ■ }'a� ��� � � r, Kar � 1� �L � '� �r i '� i ! ' @a����s ,��!
���;�������`. �� ,�� ��I � s�l�� • !� � t�� is $,�E���g��ii� ����.�� �!' ��� ���� � ��
��r��!ll��=�� �. ����� #r� � ��� � E9� 4 �j��� Y����� � �� � Adt�l��� �� ����'�� �r�g■`t7'�
t a �� �r ■� F , Ct■ 1 1 if M11
� 1�r�
��111�`_ ■� E It s■FrF ' ! c � a�ta� � �a'+�t l�, g ! # �a' III W,
1fill �k1 g !r a I �i g��f�j 1} r€1i r r ■t■� !1
,
g
� p! Ngiii ���; ga;
t Ilk
all
g■ is#t�Ey' !
SYJM ')CION GNiIOH
S31ON TVfl3 S
aa310 assn
i,ti @ r @ t BxtIL
I _ _�@`IAl
Iii IMP
fall
,a
!lit
Its
IN I It 111011, 11,1
€tiIN
p@ �
�t
tri.if
id
MIN
p f �
11
r1i I !`!1 @ irr fill Y
- e*w
rw�rnrw�
MI AOIM IO now
N'I1dpNldFll�w E
-45
offirm
ws�w�nnaw+w�
r�{
-�_...�..—' ^'�------' art_.--� �... ✓ r/=✓ / '� � nr _.-..�R � _----�, .—..JSR'
vwa
aNrW
s
U=lMlu
i Nall � Oilovd NoMn
w
)m Oww
MOIL73S
+aw 'ifVN!
y
mm Vft OYOMYIRI DUIiXd ial%m
I mm
\` I
1
IMP
I l
4.
_
11
if
IL
u- LE
i
I I
Chi ��
a
I I
I I
t3
'
�!
i
t4 i�
City of Round Rock
ROUND ROCK
{
TEXAS Agenda Item Summary
Agenda Number:
Title: Consider executing an Agreement for Preliminary Engineering Services and
Submittal of Exhibits "G" through "I" for Railroad Approval with Union Pacific
Railroad Company for a pedestrian underpass at Lake Creek Trail.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 2/16/2018
Dept Director: Rick Atkins, Director
Cost: $10,000.00
Indexes: 2014 General Obligation Bonds
Attachments: LAF - Agrmt for Preliminary Engineering Services and Submittal of Exhibits
'G' through 'I' for approval by UPRR for Lake Creek T
(00395375xA08F8),pdf, 2017-08-01 UPRR Lake Creek Trail G-I.PDF, UP
PE Agreement Updated December 2017 Lake Cree Trail.docx
Department: Parks and Recreation Department
Text of Legislative File CM -2018-1637
Consider executing an Agreement for Preliminary Engineering Services and Submittal of
Exhibits "G" through "I" for Railroad Approval with Union Pacific Railroad Company for a
pedestrian underpass at Lake Creek Trail.
This item authorizes the City and Union Pacific to enter into an agreement for engineering
review of a pedestrian underpass for Lake Creek Trail. The pedestrian underpass is
required for the trail to pass under the railroad.
The Lake Creek Trail project includes a 10' wide trail spanning from Round Rock West
Drive to Centennial Plaza. It will include pedestrian underpasses under the Railroad,
I1-1-35, and a bridge spanning Lake Creek near Centennial Plaza. It will also include site
amenities and general park elements along the trail.
Cost: $10,000.00
Source of Funds: 2014 General Obligation Bonds
Citycf Round Rock Page i Printed on 211512018