Loading...
CM-2018-1636 - 2/16/2018ROUND ROCKTEXA5 PAM AM 11IMEATM December 13, 2017 AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES AND SUBMITTAL OF EXHIBITS "A -1" FOR RAILROAD APPROVAL Crossing #1: Pedestrian Underpass -- Heritage Trail West — North Path MP 1.07, Georgetown Industrial Lead State: Texas City: Round Rock County: Williamson County Crossing #2: Pedestrian Underpass— Heritage Trail West— South Path MP 1.05, Georgetown Industrial Lead State: Texas City: Round Rock County: Williamson County Andrew Hudanish Manager, Industry & Public Projects Union Pacific Railroad Company 24125 Old Aldine Westfield Rd Spring, Texas 77373 Dear Mr. Hudanish: Plans are being prepared to the Heritage Trail Project at the locations referenced above. The proposed work includes construction of a pedestrian hike and bike trail and grade separated pedestrian underpass at both locations. In connection with the projects, the Agency considers it necessary for the successful advancement of the project for your company to collaborate in the development of the project by performing the following: • preliminary engineering and other related services • development of cost estimates • review of the projects' preliminary layouts • submit current train and switching moves The Agency authorizes and agrees to reimburse the Railroad for its expenses and actual costs that are incurred for collaborating in the development of the projects' preliminary engineering and other preliminary activities. The Railroad has estimated that these preliminary engineering and other preliminary costs will be up to $20,000. Payment will be made within thirty (30) days from the Agency's receipt and approval of the Railroad's request for reimbursement. Railroad will refer to Agency's Project Number WHERT and forward Invoices to Finance Department, 221 E. Main Street, Round Rock, Texas 78664. Additionally, attached for your company's review and approval is one (1) set of prints of the concept plans for the proposed pedestrian underpass located at MP 1.07, Georgetown Industrial Lead. These prints are marked Exhibit A -C, which are the 30 % complete plans and show the basic features of the proposed trail project at the location referenced above. Please review and provide comment on the basic features of the Exhibit A -C as soon as possible. Also enclosed is one (1) set of photos of each project area. Also attached for your company's review and approval is one (1) set of prints of the concept plans for the proposed pedestrian underpass located at MP 1.05, Georgetown Industrial Lead. These prints are marked Exhibit D -F, which are the 30 % complete plans and show the basic features of the proposed trail project at the location referenced above. Please review and provide comment on the basic features of the Exhibit D -F as soon as possible. Also enclosed is one (1) set of photos of each project area. The project may require the Railroad to incur costs for force account activities. Please prepare the railroad force account cost estimate for work activities to be provided by your company, as identified in Exhibit A -F and submit them as your earliest convenience so that they may be attached to the railroad generated Construction & Maintenance (C&M) agreement. For the crossing at MP 1.07 and MP 1.05, Georgetown Industrial Lead, please verify the number of current regular train (10 trains per day) and two (2) switching movements with a Maximum Speed of 10 MPH as currently shown in our inventory records. This information will be used by the Agency's Contractor to obtain Railroad Protective Liability Insurance. This agreement is intended to address Preliminary Engineering. It is understood by both parties that railroad may withhold its approval for any reason directly or indirectly related to safety or its operations, property issues or effect to its facilities. If the Project is approved, Union Pacific will continue to work with the Agency to develop Final Plans, Specifications and prepare Material and Cost Estimates for Railroad Construction Work associated with the project. It is also understood that if the project is constructed, if at all, at no cost to the railroad. The Agency and the Railroad will enter into separate License, Right of Entry, Construction and Maintenance Agreements associated with the actual construction of the project if the project is accepted and approved by the railroad. The Agreements will be drafted by Union Pacific and forwarded to the Agency after the Exhibit A -F and cost estimates have been approved. Please contact Katie Baker, Park Development Manager at telephone number (512) 341— 3355 or via email at kbaker@roundrocktexas.jzov if you have any questions. Your assistance in this matter is appreciated. Iely, Laurie Hadley, City Manager City of Round Rock, Texas ice` UNION P CIFIC RAI ROAD COMPANY By A�Fi+ Date p xrt 2 ?e1"�. Name and Title EA OF l�NDeSTR't a Fr,�.rG� Attachment(s) Exhibit 'A' — MP 1.07, Georgetown Industrial Lead: Location Map Exhibit 'B' — MP 1.07, Georgetown Industrial Lead: Site Plan Exhibit 'C' — MP 1.07, Georgetown Industrial Lead: Proposed Improvements Exhibit'D' — MP 1.05, Georgetown Industrial Lead: Location Map Exhibit 'E' — MP 1.05, Georgetown Industrial Lead: Site Plan Exhibit 'F' — MP 1.05, Georgetown Industrial Lead: Proposed Improvements k: r 0 0 z M 91 e ralm HAL HERITAGE TRAIL -WEST CITY OF ROUND ROCK ROUND ROCK TX li ................ -r� f 19 HALFF .o -e 1 , I , PH m a HERITAGE TRAIL -WEST C ROUNDROCNUSOCK JI- � z iP, r7 a -pq 1 + z jig I � FOR! -- a �Eg C 7- zp ■ n p 0 S g t m iD t 1 HIM Z � ■ fil - ' �t�et HERITAGE TRAIL -WEST CFrY F40LADwacROCK TX co rgr HALFF HERITAGE TRAIL -WEST pa+w. �„• CITY OF ROUND ROCK tib, • ROUNOR=.TX [i ,f4:=! j�° � = HALFF HERITAGE TRAIL -WEST 3 *,, e,,,,, r,, CITY OF ROUND ROCK gg 4 I ' ' Y� ° I .'� aouro ROOK. TX i I o m 0 m 0 m O a CmC i�m - - .J Y rn a HAI I HERITAGE TRAIL -WEST CRY OF ROUND ROCK uj gww.ROUND ROCK TX _J �. uu Y Rn,nan gig �7O W W LU a } P E t 1 RAILROAD UNOERPEN CANOPY SECTION 2 RAILROAD UNOERPEN CANOPY CONCRETE ANCHOR M II L LL _ r; su Tie? d 3 r nur _ wa ww,r Purl V a... aY 1� Y+.IN MALS PROPOSED AIPROVEMENTS S305 E:XHIBIT'F City of Round Rock 11ROEUND X ROCK Agenda Item Summary Agenda Number: Title: Consider executing an Agreement for Preliminary Engineering Services and Submittal of Exhibits "A" through "F" for Railroad Approval with Union Pacific Railroad Company for a pedestrian underpass at Heritage Trail. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 2/16/2018 Dept Director: Rick Atkins, Director Cost: $20,000.00 Indexes: 2014 General Obligation Bonds Attachments: t.AF - Agrmt for Preliminary Engineering Services and Submittal of Exhibits 'A' through 'F' for approval by UPRR - Heritage Trail (00395371xA08F8).pdf, UPRR Exhibit A-F.PDF, UP PE Agreement - Updated Dec 2017.docx Department: Parks and Recreation Department Text of Legislative File CM -2018-1636 Consider executing an Agreement for Preliminary Engineering Services and Submittal of Exhibits "A" through "F" for Railroad Approval with Union Pacific Railroad Company for a pedestrian underpass at Heritage Trail. This item authorizes the City and Union Pacific to enter into an agreement for engineering review of pedestrian underpasses for Heritage Trail West. The pedestrian underpasses are required for the trail to pass under the railroad. The Heritage Trail project includes a 10' wide trail detailing the history of Round Rock as a timeline. The project spans from Bathing Beach at Chisholm Trail Road to Mays St and include improvements at Bathing Beach Park, Chisholm Trail Crossing Park, and Memorial Park. The programmatic elements of the project will include historical elements, educational elements, arts & cultural elements, general park elements and elements that encourage community events and development revitalization along the corridor. Cost: $20,000.00 Source of Funds: 2014 General Obligation Bonds City of Round Rock Page 1 Printed on 205MIS