Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2018-5406 - 4/26/2018
RESOLUTION NO. 2018-5406 WHEREAS, on the 15th day of December 2016, the Round Rock Transportation and Economic Development Corporation ("TEDCO") entered into an Economic Development Program Agreement (the "Agreement") with the City of Round Rock ("City"), KR Acquisitions, and KR CC, Inc., to provide, among other things, for the construction of a Convention Center; and WHEREAS, TEDCO desires to enter into an agreement with Hensel Phelps for the construction of the Round Rock Convention Center; Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE ROUND ROCK TRANSPORTATION AND ECONOMIC DEVELOPMENT CORPORATION, That the President is hereby authorized and directed to execute on behalf of the Round Rock Transportation and Economic Development Corporation a Construction Agreement with Hensel Phelps for the Round Rock Convention Center, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The Board of Directors hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of April, 2018. By: WILL PECKHAM, Vice President Round Rock Transportation and Economic Development Corporation ATTEST: ' JQX SLOAI\f,Secretary Ol' .1804;00399458 EXHIBIT 1',Ts 4 AIA TM Document Al33 - 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price AGREEMENT made as of the day of in the year 2018 ADDITIONS AND DELETIONS: (In words, indicate day, month and year.) The author of this document has added information needed for its BETWEEN the Owner: completion.The author may also have revised the text of the original (Name, legal status and address) AIA standard form.An Additions and I Round Rock Transportation and Economic Development Corporation("TEDCO") Deletions Report that notes added information as well as revisions to (for address for notice purposes see Exhibit A) the standard form text is available from the author and should be reviewed.A vertical line in the left and the Construction Manager: margin of this document indicates (Name, legal status and address) where the author has added necessary information and where Hensel Phelps the author has added to or deleted (for address for notice purposes see Exhibit A) from the original AIA text. This document has important legal for the following Project: consequences.Consultation with an (Name and address or location) attorney is encouraged with respect IRound Rock Convention Center to its completion or modification. (See Project description below for additional detail) AIA Document A201 TM-2007, General Conditions of the Contract The Architect: for Construction,is adopted in this (Name, legal status and address) document by reference.Do not use with other general conditions unless HKS,Inc. this document is modified. (Paragraphs Deleted) The Owner and Construction Manager agree as follows: Init. AIA Document A133 TM-2009(formerly A121 TMCMc-2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES 3 OWNER'S RESPONSIBILITIES 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES 6 COST OF THE WORK FOR CONSTRUCTION PHASE 7 PAYMENTS FOR CONSTRUCTION PHASE SERVICES 8 INSURANCE AND BONDS 9 DISPUTE RESOLUTION 10 TERMINATION OR SUSPENSION 11 MISCELLANEOUS PROVISIONS 12 SCOPE OF THE AGREEMENT Init. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIAO Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 2 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) i ARTICLE 1 GENERAL PROVISIONS §1.1 PROJECT The Project is for the construction of a 200,000 square foot Convention Center is owned by the City of Round, Rock,Texas(the"City"). In conjunction with the construction of the Project herein,is a new resort including approximate 1000-key hotel,200,000 square foot Indoor Water Park,150,000 square foot Indoor Theme Park,Lobby,retail,multiple food and beverage locations,4,000 parking spaces,all related and requisite back-house support,facilities,and infrastructure to operate the facilities,and certain onsite public improvements("Kalahari Project"),included as part of the larger project is a and constructed under a separate contract(all together the scopes of Work for the Project and the Kalahari Project make up the master project("Master Project"). This is one of two agreements,which together,cover the Master Project. §1.2 RELATIONSHIP OF THE PARTIES The Construction Manager accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Construction Manager's industry respected skill and judgment in furthering the interests of the Owner consistent with the terms of the Contract as defined in the General Conditions.The Construction Manager shall furnish construction administration,management services and supervision;furnish at all times an adequate supply of workers and materials;and perform the Work in an expeditious and economical manner consistent with the Owner's interests and with the terms of the Contract. The Owner shall endeavor to promote harmony and cooperation among the Owner,the City,the Architect,Construction Manager,and other persons or entities employed by Owner for the Project. For notice purposes attached hereto is Exhibit A-List of Designated Representatives and Contact Persons. §1.2.1 Owner.The Owner is a Type-B corporation created under the authority of Chapter 505 of the Texas Local Government Code. § 1.2.1.1 Owner Related Parties. The term"Owner Related Parties"refer to the following identified parties,together with their owners,members,managers,affiliates,general or limited partners,joint venture partners,and each of their respective directors,officers,employees,or successors: City of Round Rock,Texas,a Texas home-rule municipality Note: Construction Manager acknowledges and agrees that,notwithstanding the rights and benefits of the Owner Related Parties arising under this Contract,Construction Manager is not contracting with such Owner Related Parties other than the Owner(or its assigns as provided herein)and that Construction Manager shall have no contractual cause of action against such Owner Related Parties arising from this Contract,except as may otherwise be expressly agreed in writing between the Construction Manager and such Owner Related Party. §1.2.1.2 Owner's Designated Representative.Owner has designated a city employee and a third-party to act as its Owner's Designated Representative("Owner's Designated Representative")for the Project as designated in Exhibit A.Except as otherwise directed in writing by Owner,Construction Manager shall furnish to Owner's Designated Representative copies of all notices and written communications by or through Construction Manager to Owner or the Architect,contemporaneously with such notice to Owner and/or Architect. Construction Manager shall cooperate fully with the Owner's Designated Representative and shall provide Owner's Designated Representative full access to the Project,to the same extent as required for the Owner and/or Architect. Notices to Owner's Designated Representative shall be sent as set forth in Exhibit A. Construction Manager shall be entitled to rely upon direction and decisions made by Owner's Designated Representative except to the extent that Owner has expressly provided written direction to the contrary. Init. AIA Document A133TM—2009(formerly A121 TMMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 3 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) § 1.2.2 The City of Round Rock,Texas. The City of Round Rock,Texas(the"City")is the vested and legal owner of the real property on which the Project will be located in Round Rock,Texas(the"Land")more particularly described in Exhibit B—Legal Description,which is attached hereto. Notice is hereby given that the fee interest in the Land shall not be subject to liens for improvements made by the Owner. Liens against the City's fee interest in the Land are prohibited. Neither the Construction Manager nor any subcontractor of any tier("Subcontractor"or" Subcontractors"as defined herein)shall have any lien rights(constitutional or statutory)against the City's fee interest in the Land.Construction Manager,and each Subcontractor,must include a clause substantially the same as the foregoing clause in each contract that Construction Manager,or that Subcontractor,enters into with persons providing labor,services,or materials so that such persons are put on notice that they are prohibited from filing liens against the Land with respect to their work for Construction Manager or any subcontractor,as applicable. Construction Manager,and each Subcontractor,must require that such persons acknowledge receipt of such notice and agree that they are prohibited from filing liens against the City's fee interest in the land with respect to their work for the Construction Manager or that Subcontractor,as applicable. §1.2.2.1 Third-Party Beneficiary. Construction Manager acknowledges and agrees that the scope of Work included in this Agreement is part of a larger Master Project,and that the scopes of Work together between the Convention Center Project and the Kalahari Project make up the Master Project. Construction Manager agrees that KR Acquisitions LLC and KR CC,Inc.are intended third-party beneficiaries of the Master Project,including but not limited to the agreement between Construction Manager and the City for the Convention Center scope of Work. § 1.2.3 Construction Manager. Construction Manager is engaged as an independent business,and agrees to perform the Work as an independent construction manager and not as the agent,employee,or servant of Owner. Subject to approvals from the Owner,Construction Manager has and hereby retains the right to exercise full control and supervision of the Work. Construction Manager agrees to be responsible for all such matters. Construction Manager agrees to be responsible for its own acts and those of its subordinates,employees,and Subcontractors during the term of this Agreement. Nothing contained herein or inferable herefrom shall be construed to make Construction Manager the agent,servant or employee of Owner,or create any partnership,joint venture,or other association between Construction Manager and Owner,or any of the Owner Related Parties.Any direction or instruction by Owner of any of its authorized representatives with respect to the Work shall relate to the results the Owner desires to obtain from the Work and shall in no way affect Contractor's independent contractor status. §1.2.4 Key Persons. Construction Manager's key personnel("Key Personnel")are named on Exhibit C—Key Personnel and Rate Schedule,which is attached hereto,and are those persons who have been assigned to the Project and who will devote a substantial amount of time in performing the obligations and responsibilities of the Construction Manager under the Construction Documents,along with Construction Manager's fixed wage and salary rates for respective classifications of personnel performing services for the Project. During the term of this Agreement,Construction Manager shall not substitute or change Key Personnel or the rates quoted therein without the Owner's prior written approval. §1.3 GENERAL CONDITIONS The General Conditions of the Contract are incorporated herein by reference as if fully set forth herein.The term "Contractor"as used in the General Conditions shall mean the Construction Manager. §1.4 STANDARD OF CARE IN PERFORMING THE WORK. Construction Manager represents and warrants to the Owner the following: (a) Construction Manager,Key Personnel,and Subcontractors are knowledgeable and experienced in providing services comparable to those necessary to complete the Work and with the needs and requirements for this type of Project; (b) Construction Manager,Key Personnel,and Subcontractors performing Work under this Agreement shall perform every part of the Work hereunder in accordance with this Agreement and Applicable Laws.It is not Construction Manager's responsibility to ascertain that the Specifications,Plans,and Drawings are in accordance with Applicable Law,but the Construction Manager shall promptly inform the Architect Init. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 4 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (369ADA11) and Owner if Construction Manager has knowledge,recognizes,or discovers that the Specifications,Plans, Drawings or other Contract Documents,are not in accordance with Applicable Laws; (d) For purposes of this Agreement,the term"Standard of Care"shall mean the exercise of a degree of care in performing the Work in a manner consistent with the same level of care and skill exercised by knowledgeable and experienced professional construction managers competent in the construction of facilities of a similar nature and complexity in accordance with customarily accepted good and sound professional practices and procedures;and (e) Construction Manager, Key Personnel, and Subcontractors possess the skills and experience to coordinate, allocate, and manage the Work of the various trade contractors to ensure that Work as completed is fit for its intended use,frilly operational,free of latent defects,and frilly warranted. §1.5 CONSTRUCTION MANAGER SHALL BE RESPONSIBLE FOR THE PROPER PERFORMANCE OF THE WORK. Construction Manager has visited the site and examined the conditions affecting the Work and agrees that it is sufficiently familiar with the site and all observable conditions affecting the same and with the Specifications,Plans, and Drawings that Construction Manager has been able to make a sound determination of each in order for Construction Manager to bind itself to this Agreement.Construction Manager shall be responsible for the construction of the Project andthe Work based on the Specifications,Plans,and Drawings,determining the scope of all subcontracts and for all the bidding of all Work necessary for Construction Manager to complete the Work and fully perform hereunder. Construction Manager remains responsible for the complete and integrated operations of the Work notwithstanding the allocations of scopes of the Work among different trade contractors. Notwithstanding the foregoing,Construction Manager is not responsible for any unforeseen and concealed conditions that the Construction Manager did not discover or have notice prior to the start of construction without the use of physically intrusive methods provided that Construction Manager complies with the applicable General Conditions and other provisions of the Contract Documents. ARTICLE 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES The Construction Manager shall perform the services described in this Article,the General Conditions,and elsewhere in the Contract Documents. At the Owner's option,the Construction Phase may commence before the Preconstruction Phase is completed,in which case both phases shall proceed concurrently. §2.1 PRECONSTRUCTION PHASE §2.1.1 The Construction Manager's preconstruction phase responsibilities(if any)are set forth in a separate agreement concerning same. §2.1.2 LONG-LEAD TIME ITEMS. The Construction Manager shall prepare,for the Architect's review and the Owner's acceptance,a procurement schedule for items that must be ordered well in advance of construction,or in advance of reaching a final Guaranteed Maximum Price as provided herein.The Construction Manager shall expedite and coordinate the ordering and delivery of materials that must be ordered well in advance of construction. If the Owner agrees to procure any items prior to the establishment of the Guaranteed Maximum Price,the Owner shall procure the items on terms and conditions acceptable to the Construction Manager,and Owner will,to a reasonable level coordinate delivery of such items,and store such items as to be protected from theft,damage,or destruction.Upon the establishment of the Guaranteed Maximum Price,the Owner shall assign all contracts for these items to the Construction Manager and the Construction Manager shall thereafter accept responsibility for them. §2.1.3 CONSTRUCTION MANAGER'S REPRESENTATIONS In addition to other representations and warranties contained in the Contract Documents,and without limiting same,the Construction Manager represents and warrants the following to the Owner as an inducement to the Owner to execute this Agreement and the GMP Amendment(at the time the GMP Amendment is agreed to by the parties): Init. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 5 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) I (a) it will perform all Work called for hereunder in a good and workmanlike manner and in accordance with all legal requirements and the Contract Documents; I (b) that it shall strictly comply with and satisfy all legal requirements applicable to the Construction Manager's means and methods of the Work; I (c) that it is financially solvent,able to pay its debts as they come due and possesses sufficient working capital to complete the Work and perform its obligations hereunder; (d) that it possesses the requisite level of experience and expertise in the business administration, construction,construction management,and superintendence of the projects of this size, complexity,and nature of the Project,and it will perform the Work in accordance with its Standard of Care as set forth herein; I (e) that it is able to furnish the tools,materials,supplies,equipment,and labor required to complete the Work and perform its obligations hereunder; (f) that it is authorized to do business in the municipality in which the Project is located and properly licensed by all necessary governmental and public and quasi-public authorities having jurisdiction over the Project; I (g) that its execution of the Agreement(and the GMP Amendment)and its performance hereunder are within its duly authorized powers; (h) that it understand the restrictions imposed on the handling of construction payments received by the Owner pursuant to any Applicable Law and that it will fully comply with those provisions and the provisions of any applicable subcontract or purchase order in the handling of all payments made by the Owner to the Construction Manager pursuant to this Agreement; and (i) it is aware of the critical time restrictions for performance of the Work. The foregoing representations and warranties are in addition to,and not in lieu of,any and all other responsibilities and liabilities imposed upon the Construction Manager by law with respect to the Construction Manager's duties, obligations,and performance of the Work. All representations and warranties,including this section,shall survive the Final Completion of the Work or the earlier termination of this Agreement. §2.1.4 COMPLIANCE WITH LAWS The Construction Manager shall comply with Applicable Laws,as defined herein(including Prevailing Wage laws, if applicable),regulations,and special requirements of the Contract Documents regarding equal opportunity and affirmative action programs. §2.2 GUARANTEED MAXIMUM PRICE PROPOSAL AND AMENDMENTS §2.2.1 The Guaranteed Maximum Price will be established in a multiple step process. When the Construction Documents are thirty percent(30%)complete,the Construction Manager will propose a GMP Proposal("GMP Proposal No.1")in a form reasonably required by the Owner.GMP Proposal No. 1 will include the following: (a) a statement of the Guaranteed Maximum Price,which shall include the Cost of the Work(organized by trade categories or systems or other method as may be requested by Owner),the Construction Manager's Fee,the Construction Manager's lump sum general conditions costs,the Construction Manager's Contingency(as defined in Section 2.2.10 below),and a deductive amount for any savings incurred for bought-out,completed,or partially completed Work included in any duly executed Work Authorization Amendments approved prior to establishing the Guaranteed Maximum Price; (b) a list of any clarifications and assumptions upon which the Guaranteed Maximum Price is predicated; and Init. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright m 1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 6 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) I (c) the date for Critical Milestones,Substantial Completion of the entire Work,and Final Completion of the entire Work. Upon presentation of GMP Proposal No. 1,the Owner shall,with reasonable promptness,exercise one of the following three options:(1)accept the GMP Proposal by executing an amendment("GMP Amendment No. V);(2) reject the GMP Proposal—in which case the Owner shall only be responsible for payment for the Construction Manager's preconstruction services(through separate agreement)and any work performed in accordance with any duly approved and authorized Work Authorization Amendment;or(3)enter into negotiations with the Construction Manager and ultimately either accept or reject a revised GMP Proposal. §2.2.2 To the extent that the Drawings and Specifications are anticipated to require further development by the Architect,the Construction Manager shall provide in the Guaranteed Maximum Price for such further development consistent with the Contract Documents and reasonably inferable therefrom. Such further development does not include such things as changes in scope,systems,kinds and quality of materials,finishes or equipment,all of which, if required,shall be incorporated by Change Order. In any GMP Proposals,the Construction Manager shall also identify which Drawings and Specifications the Construction Manager contends will require revision in order to reflect the Construction Manager's proposed assumptions and clarifications. §2.2.3 When the Construction Documents are 100%complete,the Construction Manager shall carefully study and evaluate for the purpose of establishing the GMP the design and documents and with reasonable promptness,but not more than 90 days,shall conduct a final scope review and buy-out of each of the major trade Subcontractors.The Owner shall participate in the scope review and buy-out process and may also direct the Architect to participate as well.Based on the final buy-out prices,the Construction Manager shall submit a GMP Proposal("GMP Proposal No.2").The GMP Proposal No.2 will include items listed in Section 2.2.1 and 2.2.2,but shall also include a list of allowances or unit prices;and a list of the documents and their revision dates upon which the GMP Proposal No.2 is based. Upon presentation of GMP Proposal No.2,the Owner shall,with reasonable promptness,exercise one of the following three options: (1)accept the GMP Proposal No.2 by executing an amendment regarding same;(2)reject the GMP Proposal No.2;or(3)enter into negotiations with the Construction Manager and ultimately either accept or reject a revised GMP Proposal No.2. §2.2.4 Upon acceptance of a GMP Amendment No. 1,the Owner may,in writing,direct the Construction Manager to begin specified portions or phases of the Work.Construction Manager shall not incur Costs of the Work without the Owner's prior written approval. In the time between GMP Proposal No. 1 and GMP Proposal No.2, In the event that the Owner rejects the GMP Proposal No.2 and no amendment is entered into regarding same,the Owner shall either:(1)pay the Construction Manager the Cost of the Work incurred to date and Fee thereon incurred with the Owner's prior approval,but the Owner shall have no further liability to the Construction Manager;or(2)elect in writing to proceed with the Project under the GMP Amendment No. 1. §2.2.5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum Price Proposal(s).In the event that the Owner and Architect discover any inconsistencies or inaccuracies in the information presented,they shall promptly notify the Construction Manager,who shall make appropriate adjustments to the Guaranteed Maximum Price Proposal,its basis,or both. §2.2.6 Owner shall be entitled to full access to all details of the process of developing the GMP Proposals. It is the intent of this Agreement that allowances,assumptions,clarifications,and other loose elements that could lead to change orders after any Guaranteed Maximum Price is determined to be held to a minimum. §2.2.7 The Construction Manager shall not incur any cost to be reimbursed as part of the Cost of the Work prior to the commencement of the Construction Phase,unless the Owner provides prior written authorization for such costs. §2.2.8 The Owner shall authorize the Architect to provide the revisions to the Drawings and Specifications to incorporate the agreed-upon assumptions and clarifications contained in any Guaranteed Maximum Price Amendment.The Owner shall promptly furnish those revised Drawings and Specifications to the Construction Init. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 7 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) Manager as they are revised.The Construction Manager shall notify the Owner and Architect of any inconsistencies between the Guaranteed Maximum Price Amendment and the revised Drawings and Specifications. I §2.2.9 To the extent any sales,rental,or use of labor,equipment or materials for the Project are subject to sales or use tax under Applicable Law,the Construction Manager shall include in the Guaranteed Maximum Price all sales, consumer,use and similar taxes for the Work provided by the Construction Manager that are legally enacted, whether or not yet effective,at the time the Guaranteed Maximum Price Amendment is executed. Construction Manager acknowledges that the Work is tax exempt. Construction Manager shall perform the Work and administer the Contract in a manner in which maintains the tax exempt status of the Work.Owner shall provide tax exempt certificates and specify the Work which is tax exempt. §2.2.10 CONSTRUCTION MANAGER'S CONTINGENCY. Any GMP Proposal shall contain the Construction Manager's Contingency as part of the Guaranteed Maximum Price(the"Construction Manager's Contingency"). The Construction Manager's Contingency shall be made available by Owner,only upon prior written approval by Owner,for use by the Construction Manager to cover increases in the cost of the Work incurred by Construction Manager for unforeseen causes or details not reasonably anticipated by the Construction Manager at the time of the execution of this Agreement,such as increases in bid or negotiated contracts.Construction Manager's Contingency is not intended for changes in the scope of the Work or for reimbursement of expenses and costs not otherwise recoverable as Cost of the Work under Article 6 of this Agreement,such as originating from further development of the Construction Documents after GMP Proposal No.2(as defined herein)and such corresponding Amendment, increased Costs of the Work that do not result from an Owner-change order,cost overrun,any additional costs due to Unexcused Delays,or to employ Corrective Measures as may be required of Owner pursuant to Section 8.2.4 of the General Conditions,or costs caused by defaults by Subcontractors that are not recoverable from the Subcontractor or its insurer or surety,including costs of correcting defective work or the warranty work.The Construction Manager's Contingency shall not be available for Owner-initiated changes to the Construction Documents unless mutually agreed upon by Owner and Construction Manager.The Construction Manager shall not earn a Fee on unused Contingency.The Construction Manager shall not be entitled to additional General Conditions Costs,unless mutually agreed upon by Owner and Construction Manager. The Construction Manager shall maintain records detailing the use of the Construction Manager's Contingency after Owner's approval and shall make those available for the Owner's review upon request and shall submit the records with the monthly payment application. The Owner shall have the right to approve or reject any expenditure from the Construction Manager's Contingency in its sole reasonable discretion,subject only to the Construction Manager's rights under the disputes resolution provisions of this Agreement. Construction Manager's Contingency:three percent(3%)of the estimated Cost of the Work component of the Guaranteed Maximum Price(without such Contingency)as initially established and set forth in the GMP Amendment(s). Sums may be charged to the Construction Manager's Contingency only to the extent that the same have been paid or are to be actually paid by Construction Manager. Notwithstanding anything in the Contract Documents to the contrary,no charge shall be made against the Construction Manager's Contingency without the prior written approval of the Owner. §2.2.11 After execution of the GMP Amendment No.2,the GMP will be modified only for Owner-initiated changes or other circumstances specifically authorized by this Agreement. §2.2.12 Some phases of the Work may be ready for construction before it is appropriate to arrive at an overall Guaranteed Maximum Price for the entire Project.If the Owner elects to proceed with any packages of the Work before the parties arrive at an overall Guaranteed Maximum Price,the Construction Manager shall develop proposals for any phases of the Work identified by the Owner. §2.2.13 Until a Guaranteed Maximum Price for the entire Project has been established and accepted by the Owner through a duly executed GMP Amendment,the Construction Manager and Owner agree to use a work authorization amendment("Work Authorization Amendment")in a mutually acceptable format to authorize work to begin AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 8 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3B9ADA11) based on a specified scope and a specified"not to exceed"price.The price and the scope of Work identified with each previously approved Work Authorization Amendment will be included in the Guaranteed Maximum Price at the time the Contract Documents are sufficiently complete to establish the Guaranteed Maximum Price.Prior to the Owner's acceptance of the Guaranteed Maximum Price for the entire Work,Construction Manager shall not incur any cost to be reimbursed as part of the Cost of the Work for Construction Phase services,except as the Owner may specifically authorize in an executed Work Authorization Amendment as required herein. §2.2.14 Except as otherwise agreed by Owner and Construction Manager,when a GMP Proposal for any portion of the Work is agreed upon by the parties pursuant to a Work Authorization Amendment,the Guaranteed Maximum Price amounts for those portions which have been previously approved by the Owner shall be combined and shall be used in pricing those portions of the Work covered by such Guaranteed Maximum Price proposals,and all separate Guaranteed Maximum Price proposals previously agreed to by the parties shall be of no further force and effect. § 2.2.15 In submitting the GMP Proposal,the Construction Manager represents that it will provide every item,system,or element of Work that is identified,shown or specified in the GMP Proposal or the supporting documents,along with all necessary or ancillary materials and equipment for their complete operating installation,unless specifically excepted by the Owner. Upon Owner's acceptance of the GMP Proposal,the Construction Manager shall not be entitled to any increase in the Guaranteed Maximum Price due to the continued refinement of the Construction Documents or the absence or addition of any detail or specification that may be required in order to complete the construction of the Project or applicable Work package,except as expressly qualified in the GMP Amendment. §2.2.16 As GMP Amendment and Guaranteed Maximum Price are referenced herein,GMP Amendment shall mean the GMP Amendment with the latest date which was duly executed by the parties and made a modification of this Agreement,and Guaranteed Maximum Price shall mean the not to exceed value in the GMP Amendment. §2.3 CONSTRUCTION PHASE §2.3.1 GENERAL. The Construction Phase shall commence on the Owner's issuance of a Notice to Proceed. If the Owner directs the Construction Manager to commence only some portion(s)of the construction,the Construction Manager shall only enter into those subcontracts and purchase orders necessary for the directed work and shall proceed with the limited portion of construction. §2.3.2 ADMINISTRATION §2.3.2.1 It is the intent of this Agreement that as many as possible of the elements of the Project be subject to vigorous competition. Except as otherwise approved by Owner in advance in writing,all Subcontracts(including purchase orders)shall be awarded pursuant to competitive bids. (a) If the Construction Manager intends to bid Work by its own forces("Self-Perform Work"),other than supervision of the Work,or through an affiliated or related party(as defined herein),Construction Manager shall notify Owner in writing of such intent and how the bid pricing shall be obtained. Construction Manager must obtain Owner's prior written approval prior to the solicitation of bids. If approved,Construction Manager must competitively bid against no less than three(3)trade contractors (when feasible). All bids,including Construction Manager's bid,shall be submitted directly to Owner and shall be opened by Owner.Construction Manager must submit its bid to Owner no less than 24 hours in advance of when other bids are due. (b) The Construction Manager shall not subcontract out general conditions,supervision of the entire Work,or project management of the entire Work. (c) The Construction Manager shall obtain bids from Subcontractors and from suppliers of materials or equipment fabricated especially for the Work and shall deliver such bids to the the Owner,along with its recommendations concerning such bids. The Owner may designate specific persons from whom,or entities from which,the Construction Manager shall obtain bids;however the Construction Manager shall be entitled to obtain bids from other qualified bidders.The Construction Manager shall endeavor to obtain at least three(3)bids for each subcontract(except for purchase orders aggregating less than$50,000.00 in connection with the Project)and in no case less than two(2)from parties not affiliated with or related to the Construction Manager. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright m 1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 9 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) (d) For the purpose of this subparagraph,"affiliate"or"related party"is any entity controlling, controlled by,or under common control with Construction Manager,or any entity in which any officer, director,member,employee,partner,or shareholder of the Construction Manager,or any member of such person's immediate family has a direct or indirect interest.The Construction Manager shall not accept any bid without the Owner's prior written approval.The Construction Manager shall not be required to contract with anyone to whom the Construction Manager has reasonable objection. (e) If a specific bidder among those whose bids are delivered by the Construction Manager to the Owner and Architect(1)is recommended to the Owner by the Construction Manager,(2)is qualified to perform that portion of the Work,and(3)has submitted a bid that conforms to the requirements of the Contract Documents without reservations or exceptions,but the Owner requires that another bid be accepted,then the Construction Manager may require that a Change Order be issued to adjust the Contract Time and the Guaranteed Maximum Price by the difference between the bid of the person or entity recommended to the Owner by the Construction Manager and the amount and time requirement of the subcontract or other agreement actually signed with the person or entity designated by the Owner. (f) Subcontracts and agreements with suppliers at all tiers shall conform generally to the payment provisions in Sections 7.1.8 and 7.1.9 of this Agreement and the terms regarding payments contained in the General Conditions, and shall not be awarded on the basis of cost plus a fee without the prior consent of the Owner.If upon Owner approval,the Subcontract is awarded on a cost plus fee basis,the Construction Manager shall provide in the Subcontract for the Owner to receive the same audit rights with regard to the Subcontractor as the Owner receives with regard to the Construction Manager in Section 6.11 below. (g) If the Construction Manager recommends a specific bidder that may be considered a"related party"or "affiliate"according to this Section,then the Construction Manager shall promptly notify the Owner in writing of such relationship and notify the Owner of the specific nature of the contemplated transaction. §2.3.2.2 The Construction Manager shall schedule and conduct weekly meetings or at a frequency reasonably specified by the Owner,at which the Owner,Architect,Construction Manager,and appropriate Subcontractors can discuss the status of the Work..The Construction Manager shall prepare and distribute meeting minutes to the Owner and Architect within five(5)days of the meeting,which shall be subject to the Owner's and Architect's review and comment. §2.3.2.3 As part of the GMP Proposals the Construction Manager shall prepare and submit to the Owner and Architect a construction schedule for the Work consistent with the requirements of the Contract Documents,and submittal schedule in accordance with Sections 2.3.2 and 3.10 of the General Conditions. §2.3.2.4 The Construction Manager shall record the progress of the Project. On a monthly basis,or otherwise as agreed to by the Owner,the Construction Manager shall submit written progress reports to the Owner and Architect, showing percentages of completion and other information required by the Owner as set forth in this Agreement.The monthly reports shall include,but not be limited to,the following: (a) Daily Log. The Construction Manager shall maintain,and make available to the Owner and Architect upon request,a daily log containing a record for each day of weather,portions of the Work in progress, Subcontractors working on site,number of workers on site,identification of equipment on site,problems that might affect progress of the work,accidents,injuries,and other relevant information that Owner may reasonably require. (b) Shop Drawing Schedule. The Construction Manager shall develop a schedule for submittal and review of Submittals and Shop Drawings,product data,and samples,with input from Owner and Architect.The schedule shall show dates for submission and subsequent review by all necessary parties and shall be coordinated with the Schedule and Critical Milestones.The Construction Manager shall update the Submittal/Shop Drawing schedule weekly and submit to Owner for its review. (c) Change Order/Change Order Request Log. The Construction Manager shall maintain a Change Order and Change Order Request log for the purpose of tracking and recording all Change Orders and Change AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright m 1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 10 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) Order Requests(Owner requested changes,Design requested changes,the Construction Manager requested changes,field requested changes,etc.)whether they have a cost/schedule impact or not.At a minimum,this log shall contain: (i) Change Order Number; (ii) Description of Change; (iii) Nature of Change; (iv) Date Requested; (v) Initiator; (vi) Subcontractor impact report; (vii) Date Review by the Architect; (viii) Date reviewed by Construction Manager; (ix) Cost Implication of the Change; (x) Schedule Implication of the Change; (xi) Description of Other Potential Impact to Project;and (xi) Date Approved or Disapproved by Owner. As part of the requirements for Final Completion,the Change Order Log shall be delivered to the Owner. (d) Request for Information("RFI")Log. The Construction Manager shall maintain an RFI Log for the purpose of tracking and recording all RFIs. At a minimum,this log shall contain: (i) RFI number; (ii) Description; (iii) Date Requested; (iv) Initiator; (v) Specification,Drawing(Sheet No.or Detail)Referenced; (vi) Schedule and/or Cost Impacts; (vii) Subcontractor Impacts; (viii) Date Answered;and (ix) Priority. (e)Material and Equipment Procurement Log. The Construction Manager shall maintain and regularly update a schedule for the purchase and delivery of materials and equipment requiring long-lead time procurement. The Construction Manager shall expedite and coordinate delivery of these purchases. The Construction Manager shall include in its weekly progress reports a status log of long-lead time items. (1)Safety Report. The Construction Manager shall develop,implement,and maintain jobsite safety,training and protocol programs.At all times during the course of the Project and the Work,the Construction Manager shall be responsible for the overall safety of the site. Accordingly,the Construction Manager shall maintain records of meetings,inspections,and incidents.The Construction Manager shall maintain an accurate record of all accidents and incidents relating to work performed under this Agreement resulting in death,injury,occupational disease,or damage to property,materials,supplies,or equipment.The Construction Manager shall provide Owner copies of all accident reports filed with federal,state,and local governmental agencies and such additional data as may be requested by Owner. The Construction Manager shall maintain accurate records related to safety at the site,and provide a monthly report regarding same to Owner,including but not limited to the following: (i) Man-hours for reporting period; (ii) Total man-hours worked for the Project to date; (iii) Recordable injuries and lost work days;and (iv) Identify any hazards or discrepancies. §2.3.2.5 The Construction Manager shall develop a system of cost control for the Work,including regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes.The Construction Manager shall identify variances between actual and estimated costs and report the variances to the Owner and Architect and shall provide this information in its monthly reports to the Owner and Architect. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA° 11 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) §2.4 CONSTRUCTION MANAGER SHALL REMEDY DEFECTIVE WORK §2.4.1 The Construction Manager represents and warrants that the Work shall be(1)free from all defects;(2) conform to the requirements as set forth in the Specifications,Plans,and Drawings;and(3)comply with Applicable Law with regard to the means and methods of construction and Construction Manager's scope of Work. Work not conforming to these requirements,including substitutions not properly approved and authorized,may be considered defective Work at Owner's sole and reasonable discretion. §2.4.2 All defective Work shall be taken down,removed,and replaced with work of a quality required by the Contract Documents,without an increase in the Guaranteed Maximum Price or Construction Manager's Fee, whether observed before Substantial Completion of the Work and whether or not fabricated,installed,or completed. The Construction Manager shall bear all costs of correcting defective work,including but not limited to additional testing and inspections,compensation for the Architect's services or another design professional's services,and costs and expenses made necessary by the defective work. If the defective Work has not been cured within a reasonable time period to be mutually determined by the parties,Owner shall have the right,on five(5)days written notice to the Construction Manager,to remove or cause to be removed all defective Work or materials,and to have the Work or material corrected and the Construction Manager shall be obliged to pay to Owner all expenses so incurred.If Owner removes the unsatisfactory Work,Owner may deduct from any future payments to the Construction Manager due under this Agreement the amounts so expended by Owner.If Owner does not deduct such amounts and the Construction Manager fails to pay all unpaid amounts on Owner demand,recourse may be made immediately to any applicable bonds. Construction Manager shall not use its Contingency to pay for such costs under this Section 2.4 unless expressly approved by Owner in writing. Costs incurred due to defective work are not otherwise reimbursable. §2.5 CONSTRUCTION MANAGER SHALL REACH SUBSTANTIAL COMPLETION TIMELY. §2.5.1. Time is of the essence. At all times during this Project,time is of the essence for Construction Manager's performance of the Work. §2.5.2. Liquidated Damages. The parties acknowledge that if the Construction Manager is not able to achieve the Critical Milestones,if any,or Substantial Completion(as defined in General Conditions Section 9.8)by the dates set forth in the GMP Amendment,as said dates may be modified from time to time in strict accordance with the provisions of the Contract Documents,then the Owner will suffer damages as a result.The parties further acknowledge that it is difficult at this time to determine with precision those damages and that the parties desire to provide for liquidated damages as the sole and exclusive remedy in lieu of actual,or any other type of,damages in the event that the Construction Manager is not able to achieve the Critical Milestones or Substantial Completion by the date required("Liquidated Damages").Construction Manager agrees to pay to Owner,as liquidated damages and not as a penalty,the sum set forth in the table included in Exhibit D—Liquidated Damages Schedule,which is attached hereto,per calendar day for each calendar day after the date for the Critical Milestone or Substantial Completion until such time as the Construction Manager achieves the Critical Milestone or Substantial Completion. Notwithstanding this provision,the Construction Manager shall meet the Critical Milestone or the date of Substantial Completion and cannot choose merely to accept liquidated damages even if such damages will be less than the cost of acceleration to meet the respective date(s). The Liquidated Damages for the Critical Milestones and Substantial Completion are cumulative. Nonetheless,in the event that the Construction Manager is responsible for Liquidated Damages for failing to meet one or more Critical Milestones,but nonetheless achieves Substantial Completion by the required date and the Construction Manager is not otherwise in default of its obligations under the Contract Documents,the Owner may,in its discretion,waive liquidated damages for the Critical Milestones. §2.6 BUILDING INFORMATION MODELING. The Construction Manager(including all of its Subcontractors)shall utilize state of the art technology in all phases of the Work as part of the Guaranteed Maximum Price.This includes, without limitation,building information modeling for real time dynamic building modeling in 3D for all components of the Work("BIM").The Construction Manager shall cooperate with the Architect in the preparation and completion of the models. §2.7 Construction Manager shall instruct Owner and its operating personnel in the proper use,maintenance,and emergency repair of all systems and equipment at the time of Substantial Completion and before final acceptance of AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 12 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) the Work by the Owner. Contractor shall call particular attention to safety measures that should be followed during operation of any such systems or equipment. ARTICLE 3 OWNER'S RESPONSIBILITIES §3.1 INFORMATION AND SERVICES REQUIRED OF THE OWNER §3.1.1 The Owner and Construction Manager shall discuss and address the Owner's requirements and expectations for the Project,including Owner's objectives,constraints,and criteria,including schedule,space requirements and relationships,flexibility and expandability,special equipment,systems,sustainability and site requirements. §3.1.2 Owner's Evidence of Financial Arrangements. The Construction Manager may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner's obligations under the Contract in accordance with Chapter 56 of the Texas Business and Commerce Code. Thereafter,the Construction Manager may only request such evidence if the Owner fails to make payments to the Construction Manager as the Contract Documents require.Construction Manager shall keep any information provided by Owner under this provision confidential,whether or not such information is specifically marked "Confidential"and prevent disclosure to any third-party. To the extent that the information provided by Owner pursuant to this provision is permitted to be provided to any Subcontractor on the Project,Construction Manager shall(1)require the Subcontractor to comply with Exhibit I of this Agreement in the Subcontract and attachment of Exhibit I to its Subcontract,and(2)require Subcontractor to sign a Non-disclosure Agreement in a form acceptable to the Owner. Notwithstanding the foregoing,any and all information provided under this clause is subject to the provisions of Exhibit I,it being the intent of this Agreement that whichever provisions are more strict shall control. §3.1.3 The Owner shall establish and periodically update the Owner's budget for the Project based upon consultation with the Construction Manager and Architect. §3.1.4 Structural and Environmental Tests,Surveys and Reports.Upon reasonable and specific request by the Construction Manager,the Owner shall furnish information or services under the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness so as not to delay the progress of the Work after receiving the Construction Manager's written request for such information or services and details as to the time by which Owner's response is required.The Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work §3.1.4.1 The Owner shall furnish tests,inspections and reports required by law and as otherwise agreed to by the parties,such as structural,mechanical,and chemical tests,tests for air and water pollution,and tests for hazardous materials. §3.1.4.2 The Owner shall furnish surveys describing physical characteristics,legal limitations and utility locations for the site of the Project,and a legal description of the site.The surveys and legal information shall include,as applicable,grades and lines of streets,alleys,pavements and adjoining property and structures;designated wetlands; adjacent drainage;rights-of-way,restrictions,easements,encroachments,zoning,deed restrictions,boundaries and contours of the site;locations,dimensions and necessary data with respect to existing buildings,other improvements and trees;and information concerning available utility services and lines,both public and private,above and below grade,including inverts and depths.All the information on the survey shall be referenced to a Project benchmark. §3.1.4.3 The Owner,when such services are requested,shall furnish services of geotechnical engineers,which may include but are not limited to test borings,test pits,determinations of soil bearing values,percolation tests, evaluations of hazardous materials,seismic evaluation,ground corrosion tests and resistivity tests,including necessary operations for anticipating subsoil conditions,with written reports and appropriate recommendations. §3.1.4.4 During the Construction Phase,the Owner shall furnish information or services required of the Owner by the Contract Documents with reasonable promptness.The Owner shall also furnish any other information or services under the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness so as not to cause delay in the progress of the Work after receiving the Construction Manager's written request for such information or services and details as to the time by which Owner's response is required. The AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 13 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. §3.2 OWNER'S DESIGNATED REPRESENTATIVE The Owner shall identify a representative authorized to act on behalf of the Owner with respect to the Project.The Owner's Designated Representative shall render decisions promptly and furnish information expeditiously,so as to avoid unreasonable delay in the services or Work of the Construction Manager.Except as otherwise provided in Section 4.2.1 of the General Conditions,the Architect does not have such authority.The term"Owner"means the Owner or the Owner's authorized representative. §3.3 ARCHITECT The Owner has retained an Architect to provide services,duties and responsibilities with regard to the design of the Project..Upon request of the Construction Manager,Owner shall provide the Construction Manager a copy of the executed agreement between the Owner and the Architect,and any further modifications to the agreement. ARTICLE 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES §4.1 Compensation §4.1.1 Compensation for the Construction Manager's preconstruction phase services,if any,is set forth in a separate agreement" ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES The Owner shall pay the Construction Manager for the Construction Phase Services as follows: §5.1 COMPENSATION For the Construction Manager's proper performance of the Work as described in the Contract Documents,the Owner shall pay the Construction Manager in current funds,and amount which shall not exceed the Guaranteed Maximum Price,as set forth herein. The Contract Sum is the Cost of the Work as defined in Section 6.1.1 plus the Construction Manager's Fee. §5.1.1 The Construction Manager's Fee,except as limited by the Guaranteed Maximum Price,shall be 2.75%of the Cost of the Work(as defined herein below)actually incurred by the Construction Manager in the performance of the Work. Notwithstanding the provisions set forth in Section 5.1.3 below,Construction Manager shall be entitled to earn its Fee on approved Change Orders. §5.1.2 For authorized changes in the Work that result in an increase or decrease in the Guaranteed Maximum Price, the Construction Manager's Fee shall be increased or decreased accordingly. The Construction Manager's Fee shall be the Construction Manager's complete fee compensation(which includes Construction Manager's profit and indirect overhead)and,together with the payment for the Cost of the Work for those costs which are expressly set forth in Sections 6.1 through 6.7 of this Agreement,shall constitute Construction Manager's sole reimbursement for indirect and direct costs and expenses,general conditions,and profit arising from or attributable to the performance of the Work as described herein. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 14 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (369ADA11) §5.1.3 Limitations,if any,on a Subcontractors'reimbursable costs,as well as overhead and profit for changes in the cost of its portion of the Work are,except as otherwise expressly approved in writing by Owner,as provided in Exhibit E-"Change Order Pricing",and as follows: Subcontractor's combined markup for overhead and profit on additive Work shall not exceed twelve percent(12%) of the actual direct cost of the additional Work that such Subcontractor self performs. If any lower-tier subcontractor performs part or all of the additional Work,then such lower-tier subcontractor shall only be entitled overhead and profit not to exceed twelve percent(12%)of the actual direct cost of the additional Work. Subcontractor shall be entitled to a maximum of five(5%)percent mark-up on lower-tier subcontractor Work. The total combined mark-up for Subcontractor and lower-tier subcontractor shall not exceed seventeen (17%)percent. For any deductive adjustment to the Guaranteed Maximum Price for a change in the Work, Subcontractor's Overhead and Profit will be marked-down at the same percentage and on the same basis as mark-ups for increases as provided above. §5.2. GUARANTEED MAXIMUM PRICE §5.2.1 The sum of the Cost of the Work,Construction Manager's lump sum general conditions costs as set forth in Exhibit F—General Conditions Costs,which is attached hereto,and the Construction Manager's Fee(as set forth in Section 5.1.1 above)is guaranteed by the Construction Manager not to exceed the amount set forth in the GMP Amendment subject only to additions and deductions by Change Order properly approved and executed as provided in the Contract Documents. Costs that would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Construction Manager without reimbursement by the Owner. Such maximum"not to exceed"value as adjusted by approved changes in the Work is referred to in the Contract Documents as the"Guaranteed Maximum Price"or "GMP." §5.2.2 Savings Treatment.Savings,which shall be defined herein as when the sum of the total,reimbursable Cost of the Work incurred by the Construction Manager and the total Construction Manager's Fee is less than the Guaranteed Maximum Price, will be shared 75%to Owner 25%to Construction Manager payable to Construction Manager upon completion of the Work. The Owner shall pay the Construction Manager its share of the Savings as part of the Construction Manager's final Application for Payment following Final Completion;however,Owner shall not be obligated to pay such share of any Savings to the extent(1)this Contract is not delivered in accordance with the Contract Time,(2)is terminated prior to Substantial Completion for the non-performance of Construction Manager;(3)if Construction Manager is in material breach of any provision of this Agreement;or(4)any fraud or negligence by Construction Manager. Notwithstanding the foregoing,for the purposes of determining Shared Savings,any unused allowances shall not be part of the Shared Savings and the final Guaranteed Maximum Price shall be reduced accordingly. §5.3 CHANGES IMPACTING GUARANTEED MAXIMUM PRICE §5.3.1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work may be determined by any of the methods listed in Subparagraph 7.1.3 and 7.1.4 of the General Conditions. §5.3 Changes in the Work §5.3.1 The Owner may,without invalidating the Contract,order changes in the Work within the general scope of the Contract consisting of additions,deletions or other revisions.The Owner shall issue such changes in writing in accordance with Article 7 of the General Conditions.The Construction Manager shall be entitled to an equitable adjustment in the Contract Time as a result of changes in the Work only as provided in the Contract Documents and subject to the requirements thereof,including the timely notice requirements applicable portions of Section 4.3. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 15 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (369ADA11) §5.3.2 Adjustments to the Guaranteed Maximum Price on account of changes in the Work subsequent to the execution of the GMP Amendment may be determined by any of the methods listed in Section 7.3.3 of the General Conditions of the Contract for Construction. §5.3.3 In calculating adjustments to subcontracts(except those awarded with the Owner's prior written consent on the basis of cost plus a fee),the terms"cost"and"fee"and"mark-up"as used in Section 7.3.3.3 of the General Conditions and the term"costs"and a reasonable allowance for overhead and profit,which all combined shall be no more than the agreed upon percentage set forth in Section 5.1.3,as used in Section 7.3.7 of the General Conditions shall have the meanings assigned to them in General Conditions.Adjustments to subcontracts awarded with the Owner's prior consent on the basis of cost plus a fee shall be calculated in accordance with the terms of this Agreement,unless the Owner has furnished the Construction Manager with prior written approval of the form and substance of a subcontract,in which case such adjustments shall be calculated in accordance with the terms and conditions of that subcontract. §5.3.4 In calculating adjustments to the Guaranteed Maximum Price,the terms"cost"and"costs"as used in the above-referenced provisions of General Conditions shall mean the Cost of the Work as defined in Sections 6.1 to 6.7 of this Agreement and the term"fee"shall mean the Construction Manager's Fee as defined in Section 5.1 of this Agreement. §5.3.5 Notwithstanding the foregoing in this Section 5.3,no change in the Construction Manager's Fee or overhead will be allowed for any additive or deductive change orders except as specifically provided for in this Agreement. §5.3.6 Except as otherwise expressly provided herein or in the GMP Amendment,in calculating an adjustment to the Guaranteed Maximum Price for a change in the Work resulting in a change to the Construction Manager's onsite overhead and administrative expense,including Construction Manager's General Conditions Costs,such adjustment shall be based upon the actual estimated increase or reduction of such costs rather than a percentage or otherwise pre-determined mark-up or mark-down. ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE §6.1 COSTS TO BE REIMBURSED §6.1.1 The term"Cost of the Work"shall mean costs necessarily incurred by the Construction Manager in the proper performance of the Work. Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior written consent of the Owner.The Cost of the Work shall include only the items expressly permitted in Article 6. §6.1.2 Where any cost is subject to the Owner's prior approval,the Construction Manager shall obtain this approval in writing prior to incurring the cost.The parties shall endeavor to identify any such costs prior to executing Guaranteed Maximum Price Amendment. §6.2 Labor Costs §6.2.1 Wages and salaries of construction workers directly employed by the Construction Manager to perform the construction of the Work at the site(for such Work that Construction Manager is authorized to perform through its personnel,other than Self-Perform Work)or,with the Owner's prior written approval,at off-site workshops,and only to the extent such workers are actually performing Work directly related to the Project. §6.2.2 Wages and salaries of the Construction Manager's supervisory and administrative personnel when stationed at the site with the Owner's prior approval. Such rates shall not exceed those set forth on Exhibit C,unless approved in in advance in writing by Owner. §6.2.3 Wages and salaries of the Construction Manager's supervisory or administrative personnel engaged at factories,workshops or on the road,in expediting the production or transportation of materials or equipment required for the Work,but only for that portion of their time required for the Work. Such rates shall not exceed those set forth on Exhibit C,unless approved in advance in writing by Owner. §6.2.4 Costs paid or incurred by the Construction Manager for taxes,insurance,contributions,assessments and benefits required by law or collective bargaining agreements and,for personnel not covered by such agreements,and AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright®1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 16 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (369ADA11) all other employee benefits such as sick leave,medical and health benefits,holidays,vacations and pensions,for such employees based upon wages or salaries reimbursable as Cost of the Work pursuant to Sections 6.2.1 through 6.2.3 above shall be included in the fixed wage or salary rates as set forth in Exhibit C attached hereto. Such wage or salary rates(including markups for benefits)for the respective classification of personnel performing Work or services hereunder are agreed upon and fixed as set forth in Exhibit C and such rates are not subject to audit. However,the time chargeable to the Project hereunder for such employees or that portion of the wages allocable to the Cost of the Work are subject to audit. §6.2.5 Bonuses,profit sharing,incentive compensation and any other discretionary payments paid to anyone hired by the Construction Manager or paid to any Subcontractor or vendor,with the Owner's prior written approval. §6.3 Subcontract Costs Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts properly entered into in accordance with the requirements of the Contract Documents. §6.4 Costs of Materials and Equipment Incorporated in the Completed Construction §6.4.1 Costs,including transportation and storage,of materials and equipment incorporated or to be incorporated in I the completed construction;provided,that such materials and equipment are obtained pursuant to the terms of the Contract Documents. §6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed but required to provide reasonable allowance for waste and spoilage.Unused excess materials,if any,shall be properly stored and protected during performance of the Work and handed over to the Owner at the completion of the Work or,at the Owner's option,shall be sold by the Construction Manager.Any amounts realized from such sales shall be credited to the Owner as a deduction from the Cost of the Work. §6.5 Costs of Other Materials and Equipment,Temporary Facilities and Related Items §6.5.1 Costs of transportation,storage,installation,maintenance,dismantling and removal of materials,supplies, temporary facilities,machinery,equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work.Costs of materials,supplies,temporary facilities,machinery,equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site.Costs for items not fully consumed by the Construction Manager shall mean fair market value. Notwithstanding the foregoing,any items used but not consumed,which are paid for by the Owner shall,at the Owner's option,become the property of the Owner and shall be delivered to the Owner upon completion of the Work in accordance with instructions furnished by the Owner. §6.5.2 Rental charges for Construction Manager-owned or leased vehicles assigned to those personnel defined in Section 6.2.1 and 6.2.2 above,temporary facilities,machinery,equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation,minor repairs,dismantling and removal thereof..Rates of Construction Manager-owned equipment and quantities of equipment shall be in keeping with industry standards In no event shall the Construction Manager be entitled to reimbursement for any cumulative total of rental charges in connection with any single piece of machinery or equipment in excess of eighty percent(80%)of its fair market value as of the date that such machinery or equipment is first put into service in connection with the Work. The Construction Manager shall pay,without reimbursement,any such excess rental charges. §6.5.3 Costs of removal of debris from the site of the Work. §6.5.4 Costs of document reproductions,facsimile transmissions and long-distance telephone calls,postage and parcel delivery charges,telephone service at the site and reasonable petty cash expenses of the site office. §6.5.5 That portion of the reasonable expenses of the Construction Manager's supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work.Provided,however,that daily travel to and from the Project site is not considered reimbursable travel. The amount included in the Cost of Work with respect to automobile travel expenses shall be based on the mileage allowance permitted for ordinary and necessary business deduction under Section 162 of the Internal Revenue Code of 1986,as amended. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright m 1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 17 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) §6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location,subject to the Owner's prior approval and requirements of Lender,if any,and Owner,including but not limited to providing Owner with photographs of all materials received and stored,copies of bills of sale,insurance coverage in place for materials stored offsite,and protecting materials from theft or damage. §6.6 Miscellaneous Costs §6.6.1 The actual cost of premiums for that portion of insurance and bonds that can be directly attributed to this Contract,based upon such minimum limits for coverage as required by Exhibit H(Insurance Requirements) attached hereto,which rates shall be final for the duration of the Project(and only subject to adjustment for changes in the scope or duration of the Project). If Owner requests,Construction Manager shall purchase Subcontractor Default insurance to cover the default of its Subcontractors,such Subcontractor Default insurance cost shall be reimbursable as Cost of the Work at the rate of one point three five percent (1.35%)of the value of the subcontracts,including the purchase orders,covered by such Subcontractor Default insurance,and Construction Manager shall not be entitled to a markup for general conditions or Fee on Subcontractor Default Insurance. §6.6.2 Subject to Section 13.6 of the General Conditions,sales,use or similar taxes imposed by a governmental authority that are related to the Work and for which the Construction Manager is liable. §6.6.3 Fees and assessments for the building permit and for other permits,licenses and inspections for which the Construction Manager is required by the Contract Documents to pay. §6.6.4 Fees of laboratories for tests required by the Contract Documents,except those related to defective or nonconforming Work. §6.6.5 Royalties and license fees paid for the use of a particular design,process or product required by the Contract Documents;the cost of defending suits or claims for infringement of patent rights arising from such requirement of the Contract Documents;and payments made in accordance with legal judgments against the Construction Manager resulting from such suits or claims and payments of settlements made with the Owner's consent.However,such costs of legal defenses,judgments and settlements shall not be included in the calculation of the Construction Manager's Fee or subject to the Guaranteed Maximum Price. §6.6.6 Costs for electronic equipment and software,directly related to the Work with the Owner's prior approval. §6.6.7 Deposits lost for causes other than the Construction Manager's negligence or failure to fulfill a specific responsibility in the Contract Documents. §6.6.8 Expenses incurred in accordance with the Construction Manager's standard written personnel policy for relocation and temporary living allowances of the Construction Manager's personnel required for the Work. §6.6.9 Reasonable travel expenses for travel outside of Texas pursuant to specific request by Owner,and only as approved in advance by Owner. §6.7 Emergencies and Repairs to Damaged or Nonconforming Work §6.7.1 Costs incurred in taking action to prevent threatened damage,injury,or loss in case of an emergency not caused by the Construction Manager,its Subcontractors, Suppliers,or anyone over whom Construction Manager has control or whom Construction Manager is responsible,affecting the safety of persons and property,as provided in Section 10.3.3 of the General Conditions. §6.8 COSTS NOT TO BE REIMBURSED §6.8.1 The Cost of the Work shall NOT include the items listed below: AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 18 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) .1 Salaries and other compensation of the Construction Manager's personnel stationed at the Construction Manager's principal office or offices other than the site office,except as specifically provided in Section 6.2 herein; .2 Expenses of the Construction Manager's principal office and offices other than the site office,except as specifically provided for in Section 6.6; .3 Overhead and general expenses,except as may be expressly included in Section 6.1 herein; .4 The Construction Manager's capital expenses,including interest on the Construction Manager's capital employed for the Work; .5 Costs due to the negligence or failure of the Construction Manager,Subcontractors and suppliers or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable to fulfill a specific responsibility to the Owner as set forth in this Agreement or required by Applicable Law,including but not limited to costs for the correction of damaged,defective,or non-conforming Work,indemnity obligations,and similar costs excluded from reimbursement .6 Any cost not specifically and expressly described in Sections 6.1 to 6.7; .7 Costs,other than costs included in properly approved and executed Change Orders approved by the Owner,that would cause the Guaranteed Maximum Price to be exceeded; .8 Costs for services incurred during the Preconstruction Phase;and .9 Costs reimbursed under one category of 6.1 through 6.7 shall not be reimbursed under another category. §6.9 Discounts,Rebates and Refunds §6.9.1 Cash discounts obtained on payments made by the Construction Manager shall accrue to the Owner if(1) before making the payment,the Construction Manager included them in an Application for Payment and received payment from the Owner,or(2)the Owner has deposited funds with the Construction Manager with which to make payments;otherwise,cash discounts shall accrue to the Construction Manager.Trade discounts,rebates,refunds and amounts received from sales of surplus materials and equipment shall accrue to the Owner,and the Construction Manager shall make provisions so that they can be secured. §6.9.2 Amounts that accrue to the Owner in accordance with the provisions of Section 6.9.1 shall be credited to the Owner as a deduction from the Cost of the Work. §6.10 General Conditions Costs §6.10.1 Construction Manager's General Conditions expenses as identified in the General Conditions Costs shall be a lump sum amount,which is set forth in Exhibit F attached hereto. These expenses include rented or purchased materials and equipment used by the Contractor at the Project site office in connection with the Work,and items as set forth in Exhibit F. Costs which are reimbursable but not included as"Cost of the Work"in Section 6.1 shall be included by Construction Manager in its lump sum General Conditions Costs. §6.11 Accounting Records The Construction Manager shall keep full and detailed records and accounts related to the cost of the Work and exercise such controls as may be necessary for proper financial accounting practices and management under this Contract and as evidence of all costs incurred.The accounting and control systems shall be subject to the approval of the Owner.The Owner and the Owner's auditors shall,during regular business hours and upon twenty-four(24) hours' notice,be afforded access to,and shall be permitted to audit and copy,the Construction Manager's records and accounts,including complete documentation supporting accounting entries,books,correspondence,instructions, drawings,receipts,subcontracts,Subcontractor's proposals,purchase orders,vouchers,memoranda and other data I relating to this Contract.The Construction Manager shall preserve these records for a period of no less than six(6) years after Final Payment,or for such longer period as may be required by Applicable Law. §6.12 Records subject to audit,examination,and copying include,without limitation,accounting records(hard copy as well as electronic versions),written policies and procedures,bid documents,schedule analyses,Subcontract files,certified payrolls(if any),original estimates,correspondence,Change Order files,back charge logs and supporting documents,general ledger entries detailing cash and trade discounts earned,insurance rebates and dividends,agreements,purchase orders,contracts,commitments,memoranda,and any and all other sources of information and matters that may have any bearing on or pertain to any matters,rights,duties,or obligations under or covered by any Contract Document(all the foregoing as"Records"). Records shall include all forms of materials, including hard copy,electronic,computerized,and digitized.If the final audit by Owner of the Construction AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 19 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) Manager's Records(and any other relevant data including correspondence,emails,and this Agreement)reveals an overcharge,including,without limitation,any untimely request for payment,the Construction Manager shall pay the Owner upon demand an amount equal to one hundred percent of such overcharge and the administrative expense incurred in determining the overcharge. Notwithstanding anything herein,if the final audit reveals an overcharge for payment in excess of one hundred thousand($100,000)then the Construction Manager shall,in addition to repayment of such overcharge,reimburse Owner either ten thousand dollars($10,000)or fifty percent(50%)of the actual cost of the audit,whichever is greater. ARTICLE 7 PAYMENTS FOR CONSTRUCTION PHASE SERVICES §7.1 PROGRESS PAYMENTS §7.1.1 Based upon Applications for Payment submitted to the Owner and Architect by the Construction Manager, including,without limitation,all required supporting documentation,and Certificates for Payment issued by the Architect and approved by the Owner,the Owner shall make progress payments on account of the Contract Sum to the Construction Manager as provided below and elsewhere in the Contract Documents. §7.1.2 The period covered by each Application for Payment shall be from the first(1St)of each month through and including the last day of such month("Payment Period"). §7.1.3 Construction Manager shall comply with the terms and conditions set forth in Section 9.3 of the General Conditions,including by way of example,submitting to Owner the pencil draw Draft Application for Payment on or before the twenty-fifth(25th)day of the current Payment Period,with the final and complete Application for Payment due on the fifth(5th)day of the month immediately following such Payment Period. §7.1.4 Provided an Application for Payment properly submitted pursuant to Section 9.3 of the General Conditions and this Agreement,is received by the Architect and the Owner not later than the fifth(5th)day following the Payment Period(the"Submission Date")and Architect issues a Certificate of Payment with respect to such Application of Payment pursuant to Section 9.4 of the General Conditions,the Owner shall make payments under the Certificate of Payment,as required by the Contract Documents,to the Construction Manager not later than thirty five(35)days following the Submission Date.The Owner,if the Application for Payment is not acted upon by the Architect within five(5)days of submission and the Application for Payment was timely submitted and complete and in full compliance with the provisions of the General Conditions and Construction Manager is not otherwise the cause of such delay,shall make an independent determination of the amounts due and shall proceed with making any payment which may then be due. §7.1.5 With each Application for Payment,the Construction Manager shall submit payrolls,petty cash accounts, receipted invoices or invoices with check vouchers attached,and any other evidence reasonably required by the Owner,Architect,or Lender to demonstrate that cash disbursements already made by the Construction Manager on account of the Cost of the Work equal or exceed(1)progress payments already received by the Construction Manager plus any retainage applicable to previous progress payments,less(2)that portion of those payments attributable to the Construction Manager's Fee,plus(3)payrolls for the period covered by the present Application for Payment. §7.1.6 Each Application for Payment shall be based on the most recent schedule of values submitted by the Construction Manager in accordance with the Contract Documents.The schedule of values shall allocate the entire Guaranteed Maximum Price among the various portions of the Work,except that the Construction Manager's Fee shall be shown as a single separate item.The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as is customary in the industry,with such changes as the Architect or the Owner may reasonably require.This schedule,unless objected to by the Architect or the Owner,shall be used as a basis for reviewing the Construction Manager's Applications for Payment. I §7.1.7 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.The percentage of completion shall be the lesser of(1)the percentage of that portion of the Work which has actually been completed,or(2)the percentage obtained by dividing(a)the expense that has actually been incurred by the Construction Manager on account of that portion of the Work for which the Construction Manager has made or intends to make actual payment prior to the next AIA Document A133 TM—2009(formerly A121 T""CMc—2003).Copyright®1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 20 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3B9ADA11) Application for Payment by(b)the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values. §7.1.8 In addition to the other items required by the Contract Documents,each Application for Payment shall be accompanied by the following,all in form and substance reasonably satisfactory to the Owner: (a) A certification from Construction Manager certifying that: (i) The Application for Payment represents the actual costs then due Construction Manager under the terms of this Agreement. (ii) The Application for Payment does not include a request for payment for Work previously paid for or included in a previous Application for Payment. (iii) All Work covered by the Application for Payment has been completed in accordance with this Agreement,the Specifications,Plans and Drawings,and properly approved Change Orders. (iv) There are no known Mechanics'Liens outstanding at the date of the Application for Payment. (v) All due and payable bills(except for amounts in dispute with Subcontractors)with respect to the Work have been paid to date or are included in the amount requested in the Application for Payment. (vi) There is no known basis for the filing of any Mechanics'Liens for or relating to the Work, except for(a)unpaid bills included in the Application for Payment,all of which shall be paid from the amount due to Construction Manager with respect to the Application for Payment,or(b)amounts in dispute with Subcontractors. (vii) Subject to receipt of payment,Construction Manager waives any Mechanics'Lien rights to the extent of such payment. (viii) To the best of Construction Manager's knowledge,there is no default,or event,which with the passage of time or giving of notice,or both,would constitute default under this Agreement. (ix) The remaining balance of the GMP is,in Construction Manager's reasonable estimation sufficient to complete construction of the remaining portion of the Work. (x) Construction Manager warrants that title to all Work and materials covered by an Application for Payment shall pass to Owner upon the receipt of payment by Construction Manager,free and clear of all Mechanics'Liens,claims,security interest or encumbrances. (b) A duly executed and acknowledged Construction Manager's Statement showing all Subcontractors and suppliers with whom the Construction Manager has entered into trade contracts or purchase orders,the amount of each such trade contract or purchase order,and the amount requested for any Subcontractor or supplier in the Application for Payment; (c) Duly executed conditional waivers and releases of liens from the Construction Manager and all Subcontractors and Suppliers,as found in Exhibit G—Lien Waivers,which are attached hereto,or as required by Applicable Law for all Work performed,for the Payment Period covered by the applicable Application of Payment contingent only upon receipt of payment for such Work. After Pay Application Number 1 and as a condition to receipt of payment for the next Pay Application,Construction Manager will provide Owner with Unconditional Waivers and Releases of Lien(in accordance with the forms attached as Exhibit G or in compliance with Applicable Law)from Construction Manager and all Subcontractors for the Work performed in the preceding month and for which Construction Manager received payment;and (d) Such other customary information,documentation and materials as the Owner or the Architect may reasonably request,including but not limited to evidence of payment sufficient to show payment to Subcontractors of any tier and suppliers. §7.1.9 Subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: .1 Take that portion of the Guaranteed Maximum Price properly allocable to completed Work as determined by multiplying the percentage of completion of each portion of the Work by the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values. Pending final determination of cost to the Owner of changes in the Work,amounts not in dispute shall be included as provided in Section 7.3.9 of the General Conditions; AIA Document A133TM—2009(formerly Al 21 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 21 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (369ADA11) .2 Add that portion of the Guaranteed Maximum Price properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work,or if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing; .3 Add the Construction Manager's Fee,less retainage of ten percent( 10%).The Construction Manager's Fee shall be computed upon the Cost of the Work at the rate stated in Section 5.1 or,if the Construction Manager's Fee is stated as a fixed sum in that Section,shall be an amount that bears the same ratio to that fixed-sum fee as the Cost of the Work bears to a reasonable estimate of the probable Cost of the Work upon its completion; .4 Subtract retainage often percent(10%)from that portion of the Work that the Construction Manager self-performs; .5 Subtract the aggregate of previous payments made by the Owner; .6 Subtract the shortfall,if any,indicated by the Construction Manager in the documentation required by Section 7.1.4 to substantiate prior Applications for Payment,or resulting from errors subsequently discovered by the Owner's auditors in such documentation;and .7 Subtract amounts,if any,for which the Architect or Owner has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. All retainage hereunder may be reduced or otherwise limited at Owner's discretion,subject to any requirements of Owner's lender and the submission of lien waivers and documentation as required by Owner. Approximately every ninety(90)days,Contractor shall submit to Owner a summary of that portion of the Work that has been completed as of the submission date and Owner may,but shall not be required to,release retainage for all or some of the work. Notwithstanding the foregoing,Owner shall not pay retainage without a fully executed final lien waiver conditioned upon payment that complies with Texas law,and Construction Manager shall provide to the Owner fully executed unconditional lien waivers as provided herein. I §7.1.10 Except with the Owner's prior approval,the Construction Manager shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. §7.1.11 Notwithstanding any of the other terms of this Section 7.1 to the contrary,if at any time during the progress of the Work or before the Final Payment is made,any Lien or claim of Lien is filed,or notification to withhold money for labor or material furnished by the Construction Manager under the Construction Documents is served on the Owner relating to any Work for which the Construction Manager has received payment under the Construction Documents,Owner shall have the right to withhold from any further payments due the Construction Manager,an amount sufficient to discharge any or all such Liens or claims to the extent the lien or claim is not secured by a bond sufficient to discharge the lien or claim.Any release or receipted voucher in settlement of such Liens or claims in form and content satisfactory to Owner,must be furnished to Owner by the Construction Manager before any money withheld may be paid to the Construction Manager.If following Owner's notice any such Lien or claim of Lien against the Project is not discharged,released or otherwise settled in a manner satisfactory to the Owner promptly following Owner's notice thereof,Owner shall have the right,but not obligation,to satisfy any and all such liens or claims from the withheld money. §7.2 FINAL PAYMENT §7.2.1 Final payment shall be made by the Owner to the Construction Manager when: (1) the Contract has been fully performed(including,without limitation,completion of punch list items and the satisfaction of the requirements set forth in Subparagraphs 9.8.1 and 9.8.2 of the General Conditions)by the Construction Manager,except for the Construction Manager's responsibility to correct nonconforming Work,if any,that has not yet been discovered and to satisfy other requirements,if any,which necessarily survive final payment; (2) a final Application for Payment and a final accounting of the Cost of the Work have been submitted by the Construction Manager and reviewed by the Owner's accountants and approved by the Owner as in accordance with the requirements of the Contract Documents; AIA Document Al33TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 22 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) (3) final Certificate of Payment has been issued by the Architect and approved by the Owner,as in accordance with the requirements of the Contract Documents; (4) operations manuals,manufacturer's warranties of materials or equipment incorporated into the Project and a duly executed assignment of such warranties,in a form and substance acceptable to Owner,have been delivered to Owner; and (5) the Construction Manager has delivered to Owner conditional final releases of liens from the Contractor and all Subcontractors and suppliers of any tier,in the form attached as Exhibit G or in conformance with the requirements of Applicable Law for effective releases of lien claims regarding the Project,along with the all bills paid affidavit as set forth in the General Conditions. Owner and its accountants shall act promptly in reviewing the foregoing information delivered by Construction Manager and Owner shall make final payment not more than thirty-one(3 1)days after the date the Construction Manager has met the requirements of the Contract Documents for final payment as determined by the Owner. §7.2.2 The amount of the final payment shall be calculated as follows: (a) Take the sum of the Cost of the Work substantiated by the Owner's final accounting and the Construction Manager's Fee;but in no event more than the Guaranteed Maximum Price. (b) Subtract amounts,if any,for which the Owner or Architect withholds,in whole or in part,payment or final Certificate of Payment as provided in the Contract Documents; and (c) Subtract the aggregate of previous payments made by the Owner. If the aggregate of previous payments made by the Owner exceeds the amount due the Construction Manager,the Construction Manager shall reimburse the difference to the Owner upon demand. The Owner's accountants will review and report in writing on the Construction Manager's final accounting within 30 days after delivery of the final accounting to the Owner and the Architect by the Construction Manager.Based upon such Cost of the Work as the Owner's auditors report to be substantiated by the Construction Manager's final accounting,and provided the other conditions of Subparagraph 7.2.1 have been met,the Architect will,within seven days after receipt of the written report of the Owner's auditors,either issue to the Owner a final Certificate for Payment with a copy to the Construction Manager,or notify the Construction Manager and Owner in writing of the Architect's reasons for withholding a certificate as provided in Section 9.5 of the General Conditions. §7.2.3 If the Owner's accountants report the Cost of the Work as substantiated by the Construction Manager's final accounting to be less than claimed by the Construction Manager,the Construction Manager shall be entitled to proceed in accordance with Section 4.3 of the General Conditions.Unless otherwise agreed by the parties,a claims proceeding with respect to a disputed final payment amount shall be brought by the Construction Manager no later than 30 days after the Construction Manager's receipt of a copy of the Architect's final Certificate for Payment. Failure to initiate such proceedings within this 30-day period shall result in the substantiated amount reported by the Owner's auditors becoming binding on the Construction Manager.Pending a final resolution of the disputed amount,the Owner shall pay the Construction Manager undisputed amounts. In the event of a disputed Claim by Owner against Construction Manager with respect to any amount or circumstance covered by any final Application for Payment,Owner may withhold from the Final Payment an amount not to exceed one- hundred(100%)percent of the disputed Claim. §7.2.4 No interest shall be payable to the Construction Manager on overdue amounts under any provision of the Contract Documents,except as may be required under Applicable(state)Law. Notwithstanding the foregoing,Construction Manager shall be paid interest at a rate of prime plus one percent(1%)per annum for payments made beyond the final Application for Payment due date and which were not being rightfully withheld in accordance with the Contract Documents. §7.2.5 Owner may engage a title company of Owner's choice to issue an endorsement,on or before the forty- fifth(45th)day after the day on which a Notice of Completion pertaining to the Work was filed,stating that no AIA Document A133TM—2009(formerly A121 T"MCMc—2003).Copyright m 1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 23 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) I mechanics or materialmen's liens appear of record as a result of labor performed on or materials delivered to the Work. §7.2.6 Acceptance by Construction Manager of each payment provided for in this Agreement shall be a representation by Construction Manger to Owner that all Work required by this Agreement to be performed before such payment became due has been completed by Construction Manager in accordance with the terms and conditions of this Agreement and in accordance with the Drawings and Specifications. Acceptance of Final Payment by Construction Manager,any Subcontractor,Sub-subcontractor or material supplier shall constitute a waiver of all claims by that payee,except for those claims previously made in writing and identified by that payee as unsettled at the time of Construction Manager's final Application for Payment. §7.2.7 Construction Manager will,within 10 days of receipt of Final Payment,provide Owner with Unconditional Waivers and Releases of Lien(in accordance with the forms attached as Exhibit G or in compliance with Applicable Law) from Construction Manager and all Subcontractors. ARTICLE 8 INSURANCE AND BONDS §8.1 INSURANCE For all phases of the Project,the Construction Manager and the Owner shall purchase and maintain insurance as set forth in Exhibit H—Insurance Requirements attached hereto. I §8.2 PERFORMANCE AND PAYMENT BONDS If requested by Owner,and prior to the commencement of the Work by the Construction Manager, the Construction Manager shall provide payment and performance bonds in the penal sum of 100%of the Guaranteed Maximum Price from a surety or sureties acceptable to the Owner for the Work.The Owner shall reimburse the Construction Manager for the cost of the premiums for the bonds upon presentation to the Owner of the actual invoice for the premium for the bonds as set forth in 6.6.1.The bond forms shall be AIA A312,or as otherwise required by Owner. The surety or sureties shall appear on Treasury Department Circular 570 with approval to issue bonds in the amount required hereunder.The Owner's receipt of the fully executed bonds is a condition precedent to the Owner's obligation to make any payments otherwise due hereunder.Any decrease in the Guaranteed Maximum Price shall not reduce the penal amount of the bond unless specifically provided for in said Change Order and Owner shall be entitled a pro rata refund of premiums paid for the bond in that event.If the surety thereon becomes insolvent or if its right to do business or license to issue bonds in the state in which the project is located is revoked,the Construction Manager shall immediately notify Owner of such event and within three(3)days following notification furnish alternative bonds in conformance with this Paragraph.If the Construction Manager fails to post replacement bonds,the Owner shall have the right,at its option,to terminate the Construction Manager for default and the Contractor and its surety shall remain liable for all obligations hereunder. ARTICLE 9 DISPUTE RESOLUTION § 9.1 Any Claim between the Owner and Construction Manager shall be resolved in accordance with the provisions set forth in Section 4.3 of the General Conditions,and then if not resolved therein,through the method of dispute resolution selected in Article 15. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 24 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) i ARTICLE 10 TERMINATION OR SUSPENSION §10.1 TERMINATION PRIOR TO ESTABLISHMENT OF THE GUARANTEED MAXIMUM PRICE §10.1.1 Prior to the execution of the Guaranteed Maximum Price Amendment,the Owner may terminate this Agreement upon not less than seven(7)days'written notice to the Construction Manager for the Owner's convenience and without cause. §10.1.2 If the Owner terminates the Contract pursuant to Section 10.1.1 after the commencement of the Construction Phase but prior to the execution of the Guaranteed Maximum Price Amendment,the Owner shall pay to the Construction Manager an amount calculated as follows: I .1 Take the Cost of the Work incurred by the Construction Manager to the date of termination; .2 Add the Construction Manager's Fee computed upon the Cost of the Work to the date of termination at the rate stated in Section 5.1;and .3 Subtract the aggregate of previous payments made by the Owner for Construction Phase services. The Owner shall also pay the Construction Manager fair compensation,either by purchase or rental at the election of the Owner,for any equipment owned by the Construction Manager which the Owner elects to retain and which is not otherwise included in the Cost of the Work under Section 10.1.3.1. Construction Manager's recovery as expressly authorized in this Section 10.1.2 shall be Construction Manager's sole and exclusive remedy in the event of the Owner's termination of the Contract pursuant to Section 10.1.1 above. §10.1.3 To the extent that the Owner elects to take legal assignment of subcontracts and purchase orders(including rental agreements),the Construction Manager shall,as a condition of receiving the payments referred to in this Article 10,execute and deliver all such papers and take all such steps,including the legal assignment of such subcontracts and other contractual rights of the Construction Manager,as the Owner may require for the purpose of fully vesting in the Owner the rights and benefits of the Construction Manager under such subcontracts or purchase orders.All Subcontracts,purchase orders and rental agreements entered into by the Construction Manager will I contain provisions allowing for assignment to the Owner as described above. If the Owner accepts assignment of subcontracts,purchase orders or rental agreements as described above,the Owner will reimburse or indemnify the Construction Manager for all costs arising under the subcontract,purchase order or rental agreement,if those costs would have been reimbursable as Cost of the Work if the contract had not been terminated.If the Owner chooses not to accept assignment of any subcontract,purchase order or rental agreement that would have constituted a Cost of the Work had this agreement not been terminated,the Construction Manager will terminate the subcontract,purchase order or rental agreement and the Owner will pay the Construction Manager the costs necessarily incurred by the Construction Manager because of such termination. §10.2 TERMINATION SUBSEQUENT TO ESTABLISHING GUARANTEED MAXIMUM PRICE Following execution of the Guaranteed Maximum Price Amendment and subject to the provisions of Section 10.2.1 and 10.2.2 below,the Contract may be terminated as provided in Article 14 of the General Conditions. §10.2.1 If the Owner terminates the Contract after execution of the Guaranteed Maximum Price Amendment,the amount payable to the Construction Manager pursuant to Sections 14.2 and 14.4 of the General Conditions shall not exceed the amount the Construction Manager would otherwise have received pursuant to Section 10.1.2 of this Agreement. Init. AIA Document All 33 TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 25 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) i §10.3 SUSPENSION The Work may be suspended by the Owner as provided in Article 14 of the General Conditions.In such case,the Guaranteed Maximum Price and Contract Time shall be increased as provided in Section 14.3.2 of the General Conditions,except that the term"profit"shall be understood to mean the Construction Manager's Fee as described in Sections 5.1 and 5.3.5 of this Agreement. §10.4 LIMITATION OF DAMAGES UPON TERMINATION Construction Manager agrees that,upon Construction Manager's termination for cause(or Owner's termination for convenience),Construction Manager's recovery for damages and lost profits,if any,for Owner's breach(or early termination),shall be limited as set forth in this Article 10 of the Agreement and Article 14 of the General Conditions. ARTICLE 11 MISCELLANEOUS PROVISIONS §11.1 Terms in this Agreement shall have the same meaning as those in the General Conditions. §11.2 OWNERSHIP AND USE OF DOCUMENTS Section 1.5 of the General Conditions shall apply to both the Preconstruction and Construction Phases. §11.3 GOVERNING LAW Section 13.1 of the General Conditions shall apply to both the Preconstruction and Construction Phases. §11.4 ASSIGNMENT The Owner and Construction Manager,respectively,bind themselves,their agents,successors,assigns and legal representatives to this Agreement.The Construction Manager shall not assign this Agreement without the written consent of the Owner. Owner may,upon written notice to the Construction Manager and without the consent of the Construction Manager assign this Contract and Owner's rights thereunder as provided in the General Conditions. In addition to,and without limiting its rights hereunder,Owner may upon written notice to the Construction Manager and without the consent of the Construction Manager,also assign this Contract to a parent,subsidiary,or affiliated entity of the Owner,and in addition that the Owner may assign this Agreement to a lender providing financing for the Project.Except as provided in Section 13.2.2 of the General Conditions,neither party to the Contract shall assign the Contract as a whole without written consent of the other.If either party attempts to make such an assignment without such consent,that party shall nevertheless remain legally responsible for all obligations under the Contract. §11.5 CONFIDENTIALITY Construction Manager recognizes that many facts of Owner's operations are valuable business secrets. Accordingly,Construction Manager will treat all of Owner's data and information that become known or are made available to Construction Manager in a confidential manner. Without limiting the foregoing, Construction Manager agrees to comply with the confidentiality and non-disclosure requirements attached hereto as Exhibit I-Non-Disclosure and Confidentiality Requirements. The provisions of this Section shall survive the termination of this Contract. Further,the provisions of this Section shall be expressly incorporate into all agreements with Subcontractors entered into by Construction Manager in connection with the Project. §11.6 ATTORNEYS'FEES In any dispute by the parties hereto arising out of or related to this Agreement,the party or parties whose position is selected,awarded,or successful(regardless of whether damages are awarded)will be awarded its attorneys'fees, costs,and expenses incurred in connection with the dispute. The fact finder will determine the prevailing party and award to such prevailing party,in addition to any other relief to which such party is entitled to recover,its attorneys' fees,costs,and expenses incurred in connection with the dispute. §11.7 AUTHORITY OF ARCHITECT Notwithstanding any contrary provision contained herein,no consent,decision,determination,approval or certification to be made by Architect shall be binding upon Owner unless and to the extent agreed to in writing by Owner. AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright m 1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 26 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. / This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) §11.8 LENDER'S REQUIREMENTS The Construction Manager acknowledges that the Owner is financing the Work,or any portion thereof,with a loan from Owner's lender("Lender"). Construction Manager shall provide to the lender(or lenders)furnishing financing for the development and construction of the Project any Project information that such lender(s)or its (their)designated representatives require or any such certification that Construction Manager is obligated to provide to the Owner under the Contract Documents.The Construction Manager further agrees to execute such documents as may be reasonably required by the lender or lenders furnishing financing for the development and construction of the Project and which are consistent with commercial practices for the financing of a project of the size and scope of the Project,including but not limited to the following examples:(a)a subordination of Construction Manager's lien rights(including a lien on removables or fixtures)to any liens of the lender(s)securing any obligations arising from the Project; (b)an agreement by Construction Manager to provide notice prior to suspension of the Work or termination of the Contract by Construction Manager and providing such lender(s)with an opportunity to cure Owner's default;(c)contingent assignment of this Agreement to the lender(s)in the event of a default by Owner under this Contract or under the documents creating the loan(s)provided that Construction Manager shall not be required to perform additional work for lender unless lender has assumed responsibility for payment of such additional work;(d)an agreement by Construction Manager to certify its compliance with the Contract Documents; and(e)acknowledgment that no Change Order or Construction Change Directive resulting in a material increase to the Contract Time or Cost of the Work will be effective without the consent of such lender(s). Construction Manager shall also agree to such modifications to this Agreement as such lender(s)may reasonably require, provided the Construction Manager's costs or time of performance are not increased unless this Agreement is equitably adjusted. §11.9 OTHER PROVISIONS §11.9.1 Multiple Original Counterparts. This Agreement may be executed in multiple original counterparts,each of which shall be of equal dignity.Faxed or electronically scanned signatures shall be sufficient for the execution and delivery of this Agreement. §11.9.2 Partial Invalidity Does Not Invalidate the Agreement. The invalidity of any part,clause,or portion of the Contract Documents shall not impair or affect in any manner whatsoever the validity,enforceability or effect of the remainder of the Contract Documents. §11.9.3 Survival. All provisions of the Contract which by their nature survive termination of this Agreement or final completion of the Work,including without limitation,all warranties,indemnities,indemnity obligations, confidentiality obligations,and insurance requirements that extend past completion of the Work,shall remain in force and effect after final completion or any termination. §11.9.4 Section References. The section headings and cross references contained in the Contract Documents are for reference purposes only and shall not affect the meaning or interpretation of the Contract. §11.9.5 Owner and Construction Manager both acknowledge and agree that each has reviewed the terms of this Agreement and has had an opportunity to consult an attorney. The parties further agree that the rule of contract construction that any ambiguities are resolved against the drafting party will be subordinated to the principle that the terms and provisions of this Contract will be construed fairly as to all parties and not in favor of or against any party. §11.9.6 Unless as otherwise specifically stated herein,Owner's rights under this Agreement and elsewhere in the Contract Documents,are cumulative and not in limitation of any rights of the Owner(i)granted in the Contract Documents;or(ii)at law or in equity. ARTICLE 12 SCOPE OF THE AGREEMENT §12.1 This Agreement,along with the all Exhibits attached hereto which are incorporated by reference as if fully set forth herein,and the General Conditions,and any Modifications to this Agreement represent the entire and integrated agreement between the Owner and the Construction Manager and supersedes all prior negotiations, representations or agreements,either written or oral.This Agreement may be amended only by written instrument signed by both Owner and Construction Manager. AIA Document A133T"'—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Init. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 27 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) §12.2 The following documents comprise the Agreement: .1 AIA Document A133-2009,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price,as modified by the Parties; .2 AIA Document A201-2007,General Conditions of the Contract for Construction,as modified by the Parties. .3 Exhibits,attached hereto and incorporated by reference as if fully set forth herein as follows: Exhibit A—List of Designated Representatives and Contact Persons Exhibit B-Legal Description of Land Exhibit C-Key Personnel Exhibit D—Liquidated Damages and Critical Milestones Exhibit E—Change Order Pricing Exhibit F—General Conditions Costs Exhibit G—Lien Waiver Forms Exhibit H—Insurance Requirements Exhibit I—Non-Disclosure and Confidentiality Exhibit J—Prevailing Wage Rates(Round Rock,TX) Exhibit K—Reserved Exhibit L—City/TEDCO Contribution Cap Exhibit M—Construction Manager's Design-Build Scope of Work Exhibit N-General Description of Project Scope and List of Plans I .4 Any amendments or modifications duly approved and executed and made part of this Agreement. This Agreement is entered into as of the day and year first written above. [*END OF DOCUMENT*] AIA Document A133TM—2009(formerly A121 TMCMc—2003).Copyright©1991,2003 and 2009 by The American Institute of Architects.All rights reserved. Inst. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA® 28 Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 20:53:17 on 04/11/2018 under Order No.2212032907 which expires on 03/05/2019,and is not for resale. User Notes: (3139ADA11) EXHIBITS TO AGREEMENT AIA / A133 - 2009 BETWEEN Round Rock Transportation and Economic Development Corporation AND Hensel Phelps PROJECT: The City of Round Rock Convention Center Round Rock, TX TABLE OF CONTENTS Exhibit A LIST OF DESIGNATED REPRESENTATIVES AND CONTACT PERSONS Exhibit B PROJECT SITE DESCRIPTION Exhibit C CONSTRUCTION MANAGER'S KEY PERSONNEL AND RATES SCHEDULE Exhibit D CRITICAL MILESTONES AND LIQUIDATED DAMAGES Exhibit E CHANGE ORDER PRICING Exhibit F GENERAL CONDITIONS COSTS Exhibit G LIEN WAIVER FORMS Exhibit H INSURANCE REQUIREMENTS Exhibit I NON-DISCLOSURE AND CONFIDENTIALITY REQUIREMENTS Exhibit J PREVAILING WAGE RATES Exhibit K [Reserved]. Exhibit L THE CITY OF ROUND ROCK/TEDCO'S MAXIMUM FINANCIAL RESPONSIBILITY PURSUANT TO AGREEMENT Exhibit M CONSTRUCTION MANAGER DESIGNED WORK i EXHIBIT A LIST OF DESIGNATED REPRESENTATIVES AND CONTACT PERSONS OWNER'S DESIGNATED REPRESENTATIVES: Travis Wilkes Dale Hensen (KR Acquisitions/Kalahari) An additional Owner's Designated Representative may be added and the Owner's Designated Representative may be changed, effective only upon written notice to the Construction Manager executed by the then-current Designated Representative or an officer of the Owner. Without limiting any other provisions of the Contract Documents, all notices of claims for changes to the Contract Time or the Contract Sum, notices of all other claims by Construction Manager or its subcontractors (of any tier) against the Owner, notices of default on the part of the Owner, notices demanding action or requiring cure by the Owner, or notices of termination or required as a condition of termination shall not be effective until and unless received by Owner's Designated Representative, with a copy contemporaneously sent to and received by the following: Laurie Hadley 221 E. Main Street Round Rock, Texas 78664 Stephan Sheets 309 E. Main Street Round Rock, Texas 78664 The parties further acknowledge that Owner may retain the services of one or more additional consultants to assist the Owner in connection with the Project and that, upon Owner's written direction, Construction Manager shall copy such consultants with regard to such notices or communications as directed by Owner and shall cooperate fully with such consultants and provide access to the Project as reasonably required by such consultants. No waiver, consent or modification of the terms of the Contract or Construction Manager's obligations to perform thereunder or any other approval shall be effective or enforceable against Owner except to the extent such waiver, consent, modification or approval is in writing and duly executed by Owner's Designated Representative. Without limiting the foregoing, all Change Orders, Change Directives, and Modifications must be executed by Owner's Designated Representative. Consistent with the foregoing, no consultant retained by Owner, including but not limited to Owner's Project Manager, shall have authority to waive, excuse, or release Construction Manager with regard to any obligation arising under the Contract or to bind Owner with regard to any matter arising under the Contract or related to the Project, except to the extent expressly authorized in writing by the Owner's Designated Representative. Exhibit A-1 Architect's Designated Representative: Richard Johnston Steve Valenta HKS Architects, Inc. 350 N Saint Paul Street Suite 100 Dallas, TX 75201 All notices and other written communications to be provided by the Construction Manager to the Architect under the terms of the Contract shall be sent to the Architect's Designated Representative noted above. Construction Manager's Designated Representative: Michael Orlowski Erik LaRue Hensel Phelps 8326 Cross Park Dr. Austin, TX 78754 All notices to be provided to the Construction Manager under the terms of the Contract, including but not limited to all preliminary notices for claims for changes in the Contract Time or Contract Sum, all notices of claim, or other written communications that affect the Contract Time or the Contract Sum or that assert any claim by the Owner against the Construction Manager shall be sent to the Construction Manager's Designated Representative noted above. Upon written notice signed by the current Construction Manager's Designated Representative or a duly authorized corporate officer of the Construction Manager and delivered to Owner, additional persons may be added as Designated Representatives of the Construction Manager, subject to such restrictions on their authority as specified in the written notice. Exhibit A-2 EXHIBIT B PROJECT SITE DESCRIPTION Lot 2, 9.476 Acres, Block C of the Final Plat of Kalahari Resort and Replat of Bertil Telander Subdivision Exhibit B-1 EXHIBIT C CONSTRUCTION MANAGER'S KEY PERSONNEL AND RATES SCHEDULE Construction Manager shall have the following Key Personnel dedicated to the Project: Michael Orlowski (Multiple Projects) William Higgins (Multiple Projects) Erik LaRue Cody Adams Scott Sansom Ed Kowalski Pursuant to Sections 6.2.2 and 6.2.3 of the Agreement, wages or salaries of Construction Manager's personnel, to the extent reimbursable as Cost of the Work under the Contract Documents, shall be reimbursed based upon the following rates, subject to such Labor Burden as authorized herein: Position Hourly Date. Operations Manager $109,38 Project Manager $98n17 Design Manager $98 17 General Supe-intendent $119.94 Project Superintendent $98.67 Mep Superintendent $98,67 Area Superintendent, $86.38 Project Engineer $70-14 Vdc Engineer $82.24 Project Scheduler $8.2 24 Safety Manager $83.23 QC Manager $90-92 CSC Engineer $79.22 Office Engineer $58— 6 Chiof Estimator $109.38 Senior Estimator $98-17 Estimator $74 67 The foregoing Wage and/or Salary rates and Labor Burden for the respective personnel or classifications of personnel performing Work or services hereunder are agreed upon and fixed, and such rates are not subject to audit. However, the time chargeable to the Project hereunder for such employees or that portion of the wages allocable to the Cost of the Work are subject to audit. Further, the proper classification of employees charged to the Cost of the Work (when rates are based upon classification) is subject to verification as reasonably required by the Owner. Exhibit C-1 EXHIBIT D CRITICAL MILESTONES AND LIQUIDATED DAMAGES LIQUIDATED DAMAGES SCHEDULE Construction Manager acknowledges the date required by the Contract Documents for the Substantial Completion of the entire Work of the Master Project(including both Convention Center Contract and Kalahari Hotel, Waterpark, and Onsite Improvements Contract) are essential to the Owner's beneficial use of the improvements to be constructed hereunder and, therefore, time is of the essence in meeting each of those dates. Accordingly, the parties hereto expressly agree that, if the Construction Manager fails to meet such Contract Time requirements, subject to adjustments as provided in the Contract Documents, the Owner shall, as its sole remedy for delay damages arising out of the failure to meet such Contract Time requirements, be entitled to retain and/or recover from the Construction Manager, as Liquidated Damages and not as a penalty, the respective amounts set forth below, which are hereby agreed to be a reasonable estimate of damages the Owner will incur as a result of Construction Manager's failure to meet the applicable Contract Time requirements. Liquidated Damages for the entire Work: If the Construction Manager shall neglect, fail, or refuse to achieve Substantial Completion of the entire Work of the Master Project(including both Convention Center Contract and Kalahari Hotel,Waterpark, and Onsite Improvements Contract) by the date required below for Substantial Completion of the entire Work, subject to adjustments in the Contract Time as provided in the Contract Documents, then the Construction Manager (and the Construction Manager's Surety, if any, in the case of default) agrees to pay to the Owner as Liquidated Damages, and not as a penalty or forfeiture, the sum or sums for each day of such delay as set for the below: Substantial Completion Date Amount of Liquidated Damages per Calendar Day November 1, 2020 $50,000 per day Notwithstanding the foregoing, Liquidated Damages shall begin on November 23, 2020, and the time between November 1, 2020 and November 22, 2020 shall be referenced as the grace period ("Grace Period"). The foregoing Liquidated Damages apply to the delivery by Construction Manager of the entire Master Project by the Substantial Completion Date listed above, taking into account the Grace Period. The parties acknowledge that the Liquidated Damages amount is a singular amount applicable to the Master Project and not to be aggregated between the Convention Center Project and Kalahari Project. Exhibit D-1 EXHIBIT E CHANGE ORDER PRICING 1. Change Order Pricing Methods. Whenever Change Order proposals to adjust the Guaranteed Maximum Price become necessary, the Owner will have the right to select the method of pricing to be used by the Construction Manager in accordance with the pricing provisions found in this Section. The options for the pricing of the Subcontractors'Work will be (1) Lump Sum Change Order Proposal or (2) Cost of the Work plus Fee Change Order Proposal as defined in the following provisions: Lump Sum Change Order Proposals. The Construction Manager (through any lower tier subcontractor)will submit a properly itemized Lump Sum Change Order Proposal covering the additional work and/or the work to be deleted. This proposal will be itemized for the various components of work and segregated by labor, material, and equipment in a reasonably detailed format reasonably satisfactory to the Owner. Consistent with the foregoing, the Owner will require itemized Change Order proposals from the Construction Manager, Subcontractors, and Sub-subcontractors regardless of tier(Downstream Subcontractors). Details to be submitted will include estimates showing materials quantity take-offs, material prices by item, and related labor hour pricing information in such detail as reasonably required by Owner in order to determine how the proposed pricing was computed. Except as otherwise provided herein, such lump sum proposals shall be based upon costs reimbursable as Cost of the Work and subject to the limitations and conditions set forth in Articles 6 and 7 of the Agreement. Notwithstanding the foregoing, agreed reimbursement rates set out in the Agreement are only applicable to the Construction Manager, and agreed reimbursement rates set out in the respective Subcontract Agreements may be used for pricing for that Subcontractor's Change Order work. Estimated labor costs shall be based on the actual cost per hour paid by the Construction Manager (for Self-Performed Work) and the respective Subcontractors and Downstream Subcontractors for those workers who are reasonably anticipated to perform the Change Order work. Estimated labor hours shall include hours only for those workmen and supervisory personnel directly involved in performing the Change Order work. Labor burden allowable in Change Orders for Construction Manager's Self Perform Work shall be as set forth in Article 6 of the Agreement. Labor burden allowable in Change Orders for Subcontractors and Downstream Subcontractors shall be defined as employer's net actual cost of payroll taxes (FICA, Medicare, SUTA, FUTA), net actual cost for employer's cost of union benefits (or other usual and customary fringe benefits actually paid, if the employees are not union employees), and net actual cost to employer for worker's compensation insurance. Cost of the Work Plus Fee Change Order Proposals. As an alternative to Lump Sum Change Order Proposals, the Owner may elect to have any Change Order work performed on a time and material plus a fee basis. Upon written notice to proceed, the Construction Manager shall perform such authorized extra Work (for Construction Manager's Self Perform Work) or shall cause its Subcontractors (and their Downstream Subcontractors) to perform such authorized extra Work at actual cost for direct labor (working foremen, journeymen, apprentices, helpers, etc.), actual cost of labor burden (allowable as provided above), actual cost of material used to perform the extra work, and actual cost of rental of major equipment (without any separate charge for administration, clerical expense, general supervision or superintendent of any nature whatsoever, including general foremen, or the cost or rental of small tools, minor equipment, or plant plus the approved markup for fee or profit and general conditions costs in an amount not to exceed the percentages as set forth in Section 5.1.3 of the Agreement. Owner and Construction Manager may agree in advance in writing on a maximum price for this work and Owner shall not be liable for any charge in excess of the maximum. Exhibit E-1 2. Computing Subcontractor Costs. Any adjustments to Subcontracts shall, except as otherwise agreed in writing by Owner and Construction Manager, be subject to the Change Order Pricing requirements as provided herein or as may be set forth in the respective Subcontract Agreement(which, in the event of a conflict, the terms of the respective Subcontract Agreement shall control provided that Owner has approved such conflicting terms). Except as otherwise expressly agreed by the Owner, any adjustment to Subcontracts with regard to mark-ups for overhead and profit shall be subject to the limits as set forth in Section 5.1.3 of the Agreement. It is understood that the Subcontractor Change Order Pricing Requirements apply to all types of contracts and/or subcontracts specifically including lump sum (or fixed price contracts), unit price contracts, and/or cost of the work plus fee contracts with or without a guaranteed maximum price. It is further understood that these Change Order Pricing Requirements will apply to all methods of change order pricing specifically including Lump Sum Change Order Proposals, unit price Change Order Proposals (to the extent the parties agree on unit pricing), and Cost of the Work Plus Fee Change Order Proposals. 3. Accurate Change Order Pricing Information. Construction Manager agrees to submit accurate documentation to support any Change Order Proposals or other contract price adjustments in accordance with the terms of the Contract with respect to pricing of Change Orders. 4. Right to Verify Change Order Pricinq Information. Construction Manager agrees that any designated Owner's representative will have the right to examine the records of the Construction Manager to verify the accuracy and appropriateness of the documentation used to price Change Order Proposals. Construction Manager shall furnish Owner with copies of all Change Orders issued to Subcontractors. 5. Deductive Change Orders and Net Deductive Changes. The application of the markup percentages as set forth in Section 5.1.3. of the Agreement will apply to both additive and deductive Change Orders. In those instances where a change involves both additive and deductive work,the additions and deductions will be netted and the markup percentage adjustments will be applied to the net additive or deductive amount. 6. Chanqe Order Proposal Time and Construction Change Directive. The Construction Manager's proposals for changes in the Guaranteed Maximum Price or the Contract Time shall be submitted promptly but within twenty one (21) calendar days of the Owner's request unless the Owner extends such period of time due to the circumstances involved or Construction Manager, by exercising reasonable diligence, is not able to finalize such proposal within fourteen calendar days. Construction Manager shall contractually require all Subcontractors to respond to requests for pricing in conformance with the pricing requirements herein and time impact information in an accurate, diligent and prompt manner to allow for Construction Managers' compliance with the twenty one day proposal submission requirement. If such proposals are not received in a timely manner, if the proposals are not acceptable to Owner, or if the changed work should be started immediately to avoid damage to the Project or costly delay, the Owner may issue a Construction Change Directive to the Construction Manager to proceed with the changes without waiting for the Construction Manager's proposal or for the formal Change Order. The cost or credit and/or time extensions will be determined by negotiations as soon as practical thereafter and incorporated in a Change Order to the Contract. In the event that the parties are unable to agree on the amount of the cost or credit of the changed work, the provisions of Section 7.3 of the General Conditions shall apply. Exhibit E-2 EXHIBIT F GENERAL CONDITIONS COSTS Convention Center Project lump sum General Conditions Costs are as follows: Supervision- $135743205 Plans and Printing- $25930 Job Site Office Complex- $1763337 Total Lump Sum General Conditions: $157539472 Exhibit F-1 EXHIBIT G LIEN WAIVER FORMS Construction Manager shall use the following forms of lien waivers, or any form as may be required by Applicable Law, as required by the terms of the Agreement. [See forms on following page.] Exhibit G-1 CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT Proj ect Job No. On receipt by the signer of this document of a check from (maker of check) in the sum of$ payable to (payee or payees of check) and when the check has been properly endorsed and has been paid by the bank on which it is drawn, this document becomes effective to release any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position that the signer has on the property of (owner) located at (location) to the following extent: (job description). This release covers a progress payment for all labor, services, equipment, or materials furnished to the property or to (person with whom signer contracted) as indicated in the attached statement(s) or progress payment request(s), except for unpaid retention, pending modifications and changes, or other items furnished. Before any recipient of this document relies on this document, the recipient should verify evidence of payment to the signer. The signer warrants that the signer has already paid or will use the funds received from this progress payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project in regard to the attached statement(s) or progress payment request(s). Date (Company name) By (Signature) (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job title) of (company name), known to me to be the person whose name was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which, witness my hand and official seal on this the day of NOTARY PUBLIC—STATE OF TEXAS Exhibit G-2 CONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT Proj ect: Job No.: On receipt by the signer of this document of a check from (maker of check) in the sum of $ payable to (payee or payees of check) and when the check has been properly endorsed and has been paid by the bank on which it is drawn, this document becomes effective to release any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position that the signer has on the property of (owner) located at (location) to the following extent: (job description). This release covers the final payment to the signer for all labor, services, equipment, or materials furnished to the property or to (person with whom signer contracted). Before any recipient of this document relies on this document, the recipient should verify evidence of payment to the signer. The signer warrants that the signer has already paid or will use the funds received from this final payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project up to the date of this waiver and release. Date: (Company name) By (Signature) (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job title) of (company name), known to me to be the person whose name was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which, witness my hand and official seal on this the day of NOTARY PUBLIC—STATE OF TEXAS Exhibit G-3 NOTICE: This document waives rights unconditionally and states that you have been paid for giving up those rights. It is prohibited for a person to require you to sign this document if you have not been paid the payment amount set forth below. If you have not been paid, use a conditional release form. UNCONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT Proj ect Job No. The signer of this document has been paid and has received a progress payment in the sum of $ for all labor, services, equipment, or materials furnished to the property or to (person with whom signer contracted) on the property of (owner) located at (location) to the following extent: (job description). The signer therefore waives and releases any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position that the signer has on the above referenced project to the following extent: This release covers a progress payment for all labor, services, equipment, or materials furnished to the property or to (or person with whom signer contracted) as indicated in the attached statement(s) or progress payment request(s), except for unpaid retention, pending modifications and changes, or other items furnished. The signer warrants that the signer has already paid or will use the funds received from this progress payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project in regard to the attached statement(s) or progress payment request(s). Date: (Company name) By: (Signature) Its: (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job title) of (company name), known to me to be the person whose name was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which, witness my hand and official seal on this the day of , NOTARY PUBLIC—STATE OF TEXAS Exhibit G-4 NOTICE: This document waives rights unconditionally and states that you have been paid for giving up those rights. It is prohibited for a person to require you to sign this document if you have not been paid the payment amount set forth below. If you have not been paid, use a conditional release form. UNCONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT Proj ect: Job No. The signer of this document has been paid in full for all labor, services, equipment, or materials furnished to the property on the property of (owner) located at (location)to the following extent: (job description). The signer therefore waives and releases any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position. The signer warrants that the signer has already paid or will use the funds received from this final payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project up to the date of this waiver and release. Date: (Company) By: (Signature) (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job title) of (company name), known to me to be the person whose name was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which, witness my hand and official seal on this the day of , NOTARY PUBLIC—STATE OF TEXAS Exhibit G-5 EXHIBIT H INSURANCE REQUIREMENTS The following insurance requirements shall apply to the Master Project (as defined in the Agreement), which includes the Convention Center, Hotel and Indoor Waterpark, and certain onsite public improvements, and all insurance shall be in place prior to commencement of construction of the Work on any part of the Master Project, unless specified otherwise by Owner. For purposes of these insurance requirements the term "Owner" whether singular or plural shall include KR Acquisitions LLC; the City of Round Rock, Texas and Round Rock Transportation and Economic Development Corporation ("TEDCO"). A. CONSTRUCTION MANAGER INSURANCE Construction Manager shall procure and maintain at its own expense policies of insurance of the types and in the minimum amounts as follows: All policies above must be provided through insurers authorized to do business in the state in which the Project is located. These insurers must have an A. M. Best rating of no less than A and a financial size of VIII or more. If other contract documents require more stringent financial security criteria, the more stringent requirements shall control. 1. COMMERCIAL GENERAL LIABILITY("CGL") Construction Manager shall provide and maintain during the term of the Work and for a period not less than ten (10) years after completion of the entire Work of the Master Project (as defined in the Agreement), including any warranty periods the following commercial general liability insurance. Commercial General Liability written on an ISO Occurrence Coverage Form CG 00 01 (or a substitute form providing equivalent coverage): Each Occurrence—Bodily Injury/ Property $2,000,000 Personal Injury $2,000,000 General Aggregate $4,000,000 Products/Completed Operations Aggregate $4,000,000 If any of the insurance required to be maintained pursuant to this Agreement contains aggregate limits which apply to the operations of the Construction Manager other than those operations which are the subject of this Agreement, and such limits are diminished or reduced below the limits required hereunder after one or more incidents, occurrences, claims, settlements or judgments against such insurance or for any other reason, then Construction Manager shall take immediate steps to restore aggregate limits or shall maintain other insurance protection for such aggregate limits. CGL Policy must include: • Coverage for; premises and operations; products and completed operations; contractual liability of a type that provides coverage for the indemnification clause in this Contract; personal injury liability; employees as insureds; independent contractor protective liability; incidental medical malpractice; explosion, collapse and underground damage and must include, severability of interest language. It must also include coverage for cross liability claims between Insureds. • General Aggregate on a"per project" basis. • Additional Insured status using forms CG 20 10 (10 01) for ongoing operations and CG 20 37 (10 01)for completed operations or their equivalent to apply for: Exhibit H-1 KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round, Rock, Texas; TEDCO; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). Additional Insured status shall be provided during construction and for the duration of any applicable statute of limitations and statute of repose after Substantial Completion of the Project. Coverage to apply on a primary and non-contributory basis. • Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock, Texas; and TEDCO (as defined herein above); and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). • Policy must not exclude coverage for Exterior Insulation and Finish Systems(EIFS). Construction Manager must agree to provide completed operations coverage under this policy during the construction phase and for the duration of the applicable statute of limitations and statute of repose (not less than 10 years)after substantial completion of the Project. 2. AUTOMOBILE LIABILITY Construction Manager shall provide and maintain business automobile liability insurance coverage during the term of the Work, including any warranty periods, on a standard form (approved by the Texas Department of Insurance) written to cover all owned, hired, non-owned automobiles, and motor vehicles, subject to the following minimum limits: Combined Single Limit $1,000,000 Including bodily injury/property damage arising out of the use, ownership and / or maintenance of owned, non-owned and hired vehicles. The Automobile Liability policy shall include an endorsement (form TE 0202A for Projects located in Texas or substantial equivalent for projects located in other jurisdictions) providing thirty (30) days' notice of cancellation to Owner. Policy must include: • Additional Insured status for: KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock, Texas; and TEDCO; and each of their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). • Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock, Texas; and TEDCO; and each of their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). • Contractual liability • Where transportation of any hazardous materials or pollutants may be required, the Automobile Liability insurance required by this Section shall include upset and overturn coverage and a broadened pollution endorsement. MCS 90 Endorsement should be included, where applicable. 3. WORKERS COMPENSATION/EMPLOYER LIABILITY Construction Manager shall provide and maintain during the term of the Work, including any warranty periods, Workers' Compensation Insurance Coverage [as defined in Sec. 401.011(44) of the Texas Labor Code for Projects located in the State of Texas] for all Construction Manager's workers at the site of the Project with Employer's Liability Coverage with limits of: Each Accident $1,000,000 Disease Policy Limit $1,000,000 Disease Each Employee $1,000,000 Limits can be achieved via a combination of primary and excess policies. Exhibit H-2 In case any work is sublet, the Construction Manager shall require all subcontractors similarly to provide Workers Compensation insurance for all of the subcontractors' employees unless such employees are covered by the protection afforded by Construction Manager. Policy must include: • Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock,Texas; and TEDCO; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). 4. UMBRELLA/EXCESS LIABILITY(OCCURRENCE POLICY FORM) - MINIMUM LIMITS OF LIABILITY Construction Manager shall provide and maintain during the terms of the Work, including any warranty periods, excess liability coverage on a policy form acceptable to Owner, providing coverage in excess of the limits specified above. Such policy shall have the same inception and expiration dates as the underlying liability policies and coverage no less broad than those in the primary policies or program: Each Occurrence $150,000,000 Aggregate $150,000,000 Umbrella/Excess policies must schedule as underlying policies on a"follow form" basis: General Liability/ Auto Liability/ Employer's Liability. Policy must include: • Additional Insured status must apply as shown in the underlying General Liability and Automobile policy sections of this exhibit with respect to parties and coverage. Coverage to apply on a primary/non-contributory basis. • Waiver of Subrogation must apply to the fullest extent allowable by law in favor of those identified in the underlying General Liability, Auto and Workers' Compensation policy sections within this exhibit. • This policy must provide that if the underlying coverage is exhausted, the excess coverage will drop down as primary insurance. • Umbrella / Excess Liability must be maintained and must include completed operations coverage during the construction phase and for the duration of any applicable statute of limitations and statute of repose (but in no event less than 10 years) after Substantial Completion of the Project. 5. PROFESSIONAL LIABILITY Construction Manager shall provide and maintain on an annual basis, at its expense, professional liability coverage for claims or damages arising from professional services required by or through Construction Manager for the Project. Professional liability shall be required for anyone or any entity providing Professional Services. Minimum limits of liability are: Each Occurrence $25,000,000 Annual Aggregate $25,000,000 Policy must: • Cover all professional services performed on behalf of Project. • As respects any retroactive date or prior acts exclusion to which such coverage is subject, said retroactive date must pre-date both the date upon which any services hereunder are commenced and the date of this Agreement. Exhibit H-3 • Include Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock, Texas; and TEDCO; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). Professional Liability Coverage must be maintained while actual work is being performed and for the duration of the applicable statute of limitations and statute of repose (but in no event less than 10 years) after substantial completion of the project. 6. POLLUTION LEGAL LIABILITY Construction Manager shall provide and maintain during the term of the Work and a thirty(30)day extended reporting period, pollution liability insurance coverage, including mold coverage, with the following minimum limits: Each Accident $25,000,000 Policy must: • As respects any retroactive date or prior acts exclusion to which such coverage is subject, said retroactive date must pre-date both the date upon which any services hereunder are commenced and the date of this Agreement. • Include coverage for pollution legal liability, mold, third-party claims for bodily injury and property damage; remediation costs(clean-up); and first party discovery and third party claims. • Include Additional Insured status for KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock, Texas; and TEDCO; ; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). Coverage to apply on a primary and non- contributory basis. • Be maintained while actual work is being performed and for the duration of the applicable statute of limitations and statute of repose after substantial completion of the project. B. SUBCONTRACTOR'S INSURANCE REQUIREMENTS All Subcontractors shall obtain and maintain the insurance policies shown above (Sections 1 through 4)with the same coverage, terms and conditions and having the same or higher limits, with the exception of the additional insured coverage form which may be provided on the current ISO form or equivalent, and the Professional Liability, Pollution Liability and Umbrella/Excess Liability Limits which are shown in the exhibit immediately below titled: SUBCONTRACTOR'S INSURANCE REQUIREMENTS EXHIBIT. It is only with the Owner's written permission that policy limits may be lower than stated. The term "subcontractor(s)" shall include subcontractor(s) of any tier. It is the responsibility of Construction Manager to make certain their subs are aware of and in compliance with these requirements including the provision of Additional Insured and Waiver of Subrogation status to KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; City of Round Rock, Texas; and TEDCO; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). Exhibit H-4 SUBCONTRACTOR'S INSURANCE REQUIREMENTS EXHIBIT TYPE UMBRELLA/EXCESS PROFESSIONAL POLLUTION LIABILITY LIABILITY LIABILITY Plumbing, Process Piping, HVAC, $8,000,000 Each Occurrence/ Fire Protection, Electrical $8,000,000 Aggregate Contractors, Tower Crane (Subs in this category must have a minimum combined limit between their General Liability and Umbrella/Excess Liability policies of no less than $10,000,000 Each Occurrence/$10,000,000 Aggregate) Foundation, Exterior Wall Panels, $3,000,000 Each Occurrence/ Dependent on Concrete, Masonry, Steel &Misc. $3,000,000 Aggregate Services to be Iron, Drywall, Elevator, Preformed— Windows/Curtainwall, Roofing, (Subs in this category must Required for anyone Indoor Fire Places, Resort Pools, have a minimum combined limit performing work that Low Voltage, Utilities, Earthwork, between their General Liability Dependent on Services to be could have an Flooring and Umbrella/Excess Liability environmental policies of no less than Performed impact, including but $5,000,000 Each not limited to: Occurrence/$5,000,000 Environmental Aggregate) Testing, Drilling or Excavation Low Hazard, e.g., Painting, Doors, $1,000,000 Each Occurrence/ Appliances, Millwork, Outdoor $1,000,000 Aggregate Fireplace, Window Treatments, Final Cleaning, Signage, Trash Control, (Subs in this category must Landscaping have a minimum combined limit between their General Liability and Umbrella/Excess Liability policies of no less than $3,000,000 Each Occurrence/$3,000,000 Aggregate) C. CERTIFICATES OF INSURANCE Construction Manager shall submit to Owner a Certificate of Insurance prior to commencement of construction. Owner will have the right, but not the obligation, to prohibit entry to the Project or Project Site until such certificates or other evidence that insurance has been placed in complete compliance with these requirements is received and approved by Owner. The Certificate must show details of the coverage required (i.e., waivers, additional insureds, primary/ non-contributory and, forms when specified). All policies must include and, the Certificate must show that these policies will not be materially changed, cancelled or non-renewed without thirty(30) days' prior written notice to Owner, except for ten-days advance notice for non-payment. As Construction Manager's policies renew new certificates of insurance evidencing the agreed upon coverage, terms and conditions must be provided to Owner, prior to the renewal date. At the request of the Owner, copies of full policies must be provided to the Owner. Construction Manager shall be responsible for verifying that all subcontractor's insurance is in compliance with the insurance requirements included within this Agreement and Construction Manager is responsible Exhibit H-5 for securing Certificates of Insurance from all Subs. The Certificate must show details of the coverage required (i.e.,waivers, additional insureds, primary/non-contributory and,forms when specified). All policies must include and, the Certificate must show that these policies will not be materially changed, cancelled or non-renewed without thirty (30) days' prior written notice to Owner. As subcontractor's policies renew new certificates of insurance evidencing the agreed upon coverage, terms and conditions must be provided to Owner, prior to the renewal date. At the request of the Owner, copies of full policies must be provided to the Owner. Construction Manager shall deliver to the Owner a copy of such Certificates of Insurance for their subcontractors prior to commencing the Work and, a copy of all renewal certificates prior to the renewal date. The insurance requirements set forth in this Section are not intended and shall not be construed to modify, limit or reduce any of the Construction Manager's duties of indemnity under the Contract. If Construction Manager or its subcontractors fail to obtain or maintain the required insurance, Owner shall have the right to treat such a failure as a breach of the Contract and to exercise all appropriate rights and remedies, including contract termination. The acceptance of delivery by Owner of any certificate of insurance evidencing the required coverages and limits does not constitute approval or agreement by Owner that the insurance requirements have been met or that the insurance policies shown in the certificates of insurance are in compliance with the requirements of this Agreement. For any of the coverages that are required to remain in force after final payment, an additional certificate evidencing continuation of such coverage will be provided to the Owner at each policy renewal for at least ten years. D. BUILDER'S RISK COVERAGE Owner shall purchase and maintain, property insurance written on a builder's risk "all-risk" or equivalent policy form in the amount of at least the initial Guaranteed Maximum Price, plus value of subsequent contract modifications and cost of materials supplied or installed by others, plus the value of the contents of the Project during construction for the entire Project at the site on a replacement cost basis, including costs to cover professional fees, without deductibles greater than $50,000 per occurrence, except that the deductible for the Cost of Correction or Making Good Amended Endorsement (U-ZBR-0307-A) can be $100,000. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until the project has reached Substantial Completion or until no person or entity other than the Owner has an insurable interest in the property, whichever is later. This insurance shall protect the interests of the Owner(s), Construction Manager, Subcontractors of every tier in the Project. The Construction Manager and Subcontractors of every tier shall be Additional Insureds under such policies and a Waiver of Subrogation shall apply. This property insurance shall cover portions of the Work stored off the site and also portions of the Work in Transit. Losses or claims not paid by insurance because such losses or claims fall within the deductible shall be borne by the Construction Manager to the extent Construction Manager's or its Subcontractors' negligence caused or are responsible for the loss. Likewise, deductibles paid for losses or claims shall be paid by Construction Manager to the extent Construction Manager or its Subcontractors' negligence caused or was responsible for the loss or claim. Construction Manager's or its Subcontractors' liability for any deductible will be the lesser of$25,000 with the exception of water damage claims which trigger the Cost of Correction or Making Good Amended Endorsement(U-ZBR-0307-A). If the Cost of Correction or Making Good Amended Endorsement is triggered for any claim relating to water damage, Construction Manager or its Subcontractors, where their negligence caused or is responsible for the loss,will be subject to a$50,000 deductible. Partial occupancy or use shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. Exhibit H-6 Loss of Use Insurance - The Owner, at the Owner's option, may purchase and maintain such insurance as will insure the Owner against loss of use of the Owner's property due to fire or other hazards, however caused. NOTE: It is not the responsibility of the Owner to insure machinery, tools, and any equipment that will not become a permanent part of the project. Such items are not insured under the Builder's Risk Policy. E. OTHER TERMS AND CONDITIONS APPLICABLE TO INSURANCE 1. Policies where Additional Insured and/or where Waiver of Subrogation status is required as a part of this Agreement shall extend to the full limits of liability maintained by the Construction Manager, even if those limits of liability are in excess of those required by this Agreement. 2. Insurance effected or procured by Construction Manager will not reduce or limit Construction Manager's contractual obligation to indemnify and defend Indemnitees for claims or suits which result from or are connected with the performance of this Contract. 3. All liability policies required to be furnished and maintained by Construction Manager shall be primary insurance to any other insurance that may be available to Owner and the other Indemnitees identified in the Contract. It is the intent of the parties to this Contract that all insurance coverage required herein shall be primary to and shall seek no contribution from all insurance available to Owner and such other Indemnitees, with Owner's and such other Indemnified Parties' insurance being excess, secondary, and non-contributing. 4. Requirements by lenders for this project and/or, the land owner may cause the insurance requirements within this document to be revised. However, any changes would be usual and customary to their interests and are unlikely to impact the cost of Construction Manager's insurance. 5. Except as noted otherwise, all deductibles and self-insured retention amounts in the above-described liability insurance policies shall be assumed by, for the account of, and at the sole risk of the Construction Manager or Subcontractor. F. SURETY REQUIREMENTS 1. Construction Manager's Bonds Construction Manager will be required to furnish a statutory payment bond and a performance bond that complies with Texas law for the Convention Center Scope of Work. Owner, at its discretion, may require Construction Manager to furnish a statutory payment bond and a performance bond that complies with Texas law for all other scopes of Work. 2. Subcontractors' Bonds To the extent that premium costs for payment and performance bonds furnished by Construction Manager's subcontractors are expressly reimbursable under Article 6 of the Agreement as Cost of the Work, such bonds shall be in form and substance satisfactory to the Owner and furnished prior to the commencement of construction of the Work of the respective subcontract under the Contract Documents. a. For each subcontractor bond, Construction Manager shall obtain from each such subcontractor and the subcontractor's surety a Dual or Multiple Obligee Rider, on a form acceptable to the Owner, naming as additional obligees the Owner's Lender, and such other persons or entities as reasonably required for Owner's financing. b. Each such surety bond must be executed by a responsible corporate surety acceptable to the Owner, holding a current certificate of authority from the United States Exhibit H-7 Department of Treasury to issue bonds to the federal government ("Treasury Listed"), and duly licensed and authorized to issue surety bonds in the jurisdiction in which the Project is located. C. If approved by Owner in writing, Construction Manager may instead provide Subcontractor Default Insurance as recognized in Section 6.6.1 of the Agreement. All deductibles or losses that are attributable to subcontractor default but that fall below the deductibles shall be borne by the Construction Manager. Exhibit H-8 EXHIBIT I NON-DISCLOSURE AND CONFIDENTIALITY REQUIREMENTS 1. Construction Manager recognizes and agrees that certain financial information furnished by Owner to Construction Manager regarding the financing of the Project and the Drawings and Specifications and other Contract Documents contain and comprise proprietary information and trade secrets of the Owner, its affiliates and third parties, and that the Drawings and Specifications and other Contract Documents and such other materials and information whether or not marked or specifically identified as CONFIDENTIAL (whether provided by the Owner or its affiliates or drawn or prepared by Construction Manager or any Subcontractor [of any tier] during performance of the Work) contain and comprise proprietary information and trade secrets of the Owner, its affiliates or third parties. Such trade secrets and proprietary information shall be regarded by Construction Manager as secret and confidential and Construction Manager, except for the purpose of the Contract, shall not publish or disclose to any third party or make use of such information without prior written consent transmitted by the Owner. 2. Construction Manager will obtain written agreements from its Subcontractors (or include provisions in its subcontract agreements) providing that such Subcontractors will hold secret and confidential all information which Construction Manager is required to regard as secret and confidential under this Contract for the purpose of their work for and on behalf of Construction Manager. Construction Manager will not disclose any information which it is required to regard as secret and confidential under this Contract to any Subcontractor or other third party who has not signed a written agreement that such party will hold secret and confidential all information which Construction Manager is required to regard as secret and confidential. 3. Neither Construction Manager nor any of its Subcontractors shall publish or release any publicity or public relations materials of any kind concerning or relating to this Contract, any Work to be performed pursuant thereto, any respective Project or proposed Project of the Owner, or any other activities of the Owner, unless such materials have first been reviewed and approved in writing by the Owner. Any request by a Subcontractor for consent in this respect shall not be acceded to unless such materials have first been reviewed and approved in writing by the Owner. This includes publication to social media, the internet, or any other public forum. This provision shall not apply to mandatory reports which Construction Manager or its Subcontractors are required by law to file with governmental authorities, or as may be ordered by a Court or legally required to provide by Applicable Law. Upon any such Court order or legal requirement, Construction Manager shall promptly notify Owner so that Owner may prevent such disclosure or seek applicable legal remedies. 4. The obligations of nonpublication, nondisclosure and nonuse imposed upon the parties shall apply(irrespective of any termination of the Contract)to all information except: (a) Information which at the time of supply or thereafter is in the public domain (otherwise than by any fault or omission on the part of the recipient); (b) Information which at the time of supply was in the possession of the recipient and was not acquired directly or indirectly from the other party or its affiliates; and (c) Information which is at any time received from a third party having a bona fide right to supply it and which (and to the extent to which) the recipient is or becomes free from all or any obligations to such third party not to disclose or use the same. 5. Upon completion or earlier termination of this Contract, Construction Manager shall promptly deliver to Owner all drawings, specifications, and other information relating to the Work with regard to all such completed or terminated Projects, and all copies thereof in Construction Manager's possession; provided however, Construction Manager may retain one complete copy of all drawings, specifications and other information. 6. Construction Manager shall not use photographs of any respective Project or the existence of this Contract for the purposes of trade advertisement, publicity material, or other publication to third parties without Owner's prior written approval thereof. Exhibit 1-1 EXHIBIT J PREVAILING WAGE RATES [See attached.] Exhibit J-1 RESOLUTION NO. R-2016-3760 WHEREAS, Texas Government Code Chapter 2258.022 requires a City to determine the general local prevailing rate of per diem wages for each craft or type of worker in the locality in.which public work is to be performed; and WHEREAS, a City is required to: (1) conduct a survey of wages received by classes of workers employed on projects of character similar to public works contracts awarded by a City; or (2) use the prevailing wages rate as determined by the United States Department of Labor (DOL) in accordance with the Davis-Bacon Act (40 U.S.C. Section 276a et seq.), and its subsequent amendments; and WHEREAS, the City of Round Rock ("City") has previously used the prevailing wage rate as determined by the DOL in accordance with the Davis-Bacon Act for its public works contracts; and WHEREAS, City staff recently conducted a survey of wages received by classes of local workers employed on projects of character similar to the City's public works projects and determined that wages received by workers employed on similar projects are consistent with wage rates published by the Texas Workforce Commission for the Austin-Round Rock Area; and WHEREAS, the 2015 Texas Workforce Commission Wage Rates are attached hereto as Exhibit"A"; and WHEREAS,the City finds that based upon the results of the survey conducted, it is in the best interest to adopt the wage rates set forth by the Texas Workforce Commission for the Austin-Round Rock Area as the general prevailing wage rate for the City's public works contracts;Now therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That in accordance with Texas Government Code Chapter 2258.022(a)(1), City staff conducted a survey to determine the general prevailing rate of per diem wages and has determined that the Austin-Round Rock Area wage rates published by the Texas Workforce Commission accurately reflect the general prevailing wage rates for the locality. 011J1604;0036I234Iss2 Exhibit J-2 The City Council hereby adopts the wage rates published by the Texas Workforce Commission for the Austin-Round Rock Area, which establish the minimum rates that shall be used by all contractors or subcontractors on public works projects awarded by the City. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 8"' day of September,2016. 7 ALAN MCGRAW, Mayor City of Round Rock,Texas ATTEST: SARA L. WHITE, City Clerk Exhibit J-3 2 EXHIBIT"A" 2015 ANNUAL TEXAS WORFORCE COMMISSION WAGE RATES Construction and Extraction Occupations Hourly wage $11.92 First-Line Supervisors of Construction Trades and Extraction Workers Hourly wage $20.16 Brickmasons and Blockmasons Hourly wage $20,24 Carpenters Hourly wage $12.42 Floor Layers,Except Carpet,Wood,and Hard Tiles Hourly wage $12.74 Tile and Marble Setters Hourly wage $11.79 Cement Masons and Concrete Finishers Hourly wage $1.2.18 Construction Laborers ,Hourly wage $10.08 Paving,Surfacing,&Tamping Equipment Operators Hourly wage $11.28 Operating Engineers and Other Construction Equipment Hourly wage $13.52 Drywall and Ceiling Tile Installers Hourly wage $12.72 Electricians Hourly wage $16.03 Glazlers Hourly wage $12.51 Insulation Workers,Floor,Ceiling,and Wall Hourly wage $12.67 Insulation Workers,Mechanical Hourly wage $14.21 Painters,Construction and Maintenance Hourly wage $11.67 Pipelayers Hourly wage $12.77 Plumbers,Pipefitters,and Steamfitters Hourly wage $14.39 Reinforcing Iron and Rebar Workers Hourly wage $12.58 Roofers Hourly wage $11.31 Sheet Metal Workers Hourly wage $12.76 Structural Iron and Steel Workers Hourly wage $13.50 Helpers—Brickmasons,Blockmasons,Stonemasons,and Tile and Hourly wage $10.79 Marble Setters Helpers—Carpenters Hourly wage $11.29 1 Exhibit J-3 Helpers—Electricians Hourly wage $11.24 Helpers--Painters,Paperhangers,Plasterers,and Stucco Masons Hourly wage $10.68 Helpers—Pipelayers,Plumbers,Pipefitters,and Steamfitters Hourly wage $10.57 Helpers,Construction Trades,All Other Hourly wage $9.87 Construction and Building Inspectors Hourly wage $20.15 Elevator installers and Repairers Hourly wage $22.36 Hazardous Materials Removal Workers Hourly wage $14.15 Highway Maintenance Workers Hourly wage $12.70 Septic Tank Servicers and Sewer Pipe Cleaners Hourly wage $11.93 Construction and Related Workers,All Other Hourly wage $13.13 Service Unit Operators,Oil,Gas,and Mining Hourly wage $12.81 Earth Drillers,Except Oil and Gas Hourly wage $16.02 Rock Splitters,Quarry Hourly wage $10.84 Roustabouts,Oil and Gas Hourly wage $11.17 Installation,Maintenance,and Repair Occupations Hourly wage $12.31 First-Line Supervisors of Mechanics,Installers,and Repairers Hourly wage $19.84 Computer,Automated Teller&Office Machinery Repairers Hourly wage $10.44 Radio Mechanics Hourly wage $11.48 Telecommunications Equipment Installers and Repair Houriywage $15.50 Avionics Technicians Hourly wage $34.54 Electric,Motor,Power Tool,and Related Repairers Hourly wage $13.59 Electrical and Electronic Installers and Repairers Hourly wage $19.25 Electrical and Electronics Repairers,Commercial and Residential Hourly wage $13.82 Electrical and Electronic Repairers,Powerhouse,Substation and RelayHourly wage $20.84 Electronic Equipment Installers and Repairers,Motor Vehicles Hourly wage $12.95 Electronic Home Entertainment Equipment Installers Hourly wage $10.93 2 Exhibit J-4 Security and Fire Alarm Systems Installers Hourly wage $15.47 Aircraft Mechanics and Service Technicians Hourly wage $21u0 Automotive Body and Related Repairs Hourly wage $14.86 Automotive Glass Installers and Repairers Hourly wage $13J4 Automotive Service Technicians and Mechanics Hour(vvxame $12.6* Bus&Truck Mechanics&Diesel Engine Specialists Hourly wage $14.75 Farm Equipment Mechanics Hourly wage $10.66 Mobile Heavy Equipment Mechanics,Except Engineers Hourly wage $15.35 Motorcycle Mechanics Hourly wage $11.07 Outdoor Power Equipment&Other Small Engine Mechanics Hourly wage $11.95 Bicycle Repairs Hourly wage $12.75 Tire Repairers and Changers Hourly wage $10.26 Mechanical Door Repairers Hourly wage $13.34 Control and Valve Installers and Repairers,Except Mechanical Door Hourly wage $14.60 Heating,Air Conditioning and Refrigeration Mechanics and Installers Hnudywoge $14.*1 Home Appliance Hourly wage $13.32 Industrial Machinery Mechanics Hourly wage $17.70 Maintenance Workers,Machinery Hourly wage . $14.54 Millwrights Hourly wage $13.77 Electrical Power-Line Installers and Repairers Hourly wage $17,74 Telecommunications Line Installers and Repairers Hourly wage $1*.32 Medical Equipment Repairers Hourly wage $17.44 Precision Instrument&Equipment Repairers,Other Hourly wage $14'27 ' Maintenance and Repair Workers,General Hourly wage $11.61 Coin,Vending and Amusement Machine Servicers and Repairers Hourly wage $10.73 Locksmiths and Safe Repairers Hourly wage $12.69 3 Exhibit J-5 Helpers--Installation,Maintenance and Repair Workers Hourly wage $8.30 Installation,Maintenance&Repair Workers,Other Hourly wage $10.50 Production Occupations Hourly wage $9.92 First-Line Supervisor of Production and Operating Workers Hourly wage $17.00 Coil Winders,Tapers,and Finishers Hourly wage $11.69 Electrical and Electronic Equipment Assemblers Hourly wage $11.78 Electrochemical Equipment Assemblers Hourly wage $14.71 Structural Metal Fabricators and Fitters Hourly wage $13.06 Team Assemblers Hourly wage $9.95 Timing Device Assemblers,Adjuster&Calibrators Hourly wage $15.98 Assemblers and Fabricators,All Other Hourly wage $10.13 Computer-Controlled Machine Tool Operators,Metal and Plastic Hourly wage $12.44 Numeric Tool and Process Control Programmers Hourly wage $18.89 Extruding and Drawing Machine Setters,Operators Hourly wage $10.93 Cutting,Punching,and Press Machine Setters,Operators Hourly wage $10.29 Grinding,Lapping,Polishing,and Buffing Machine Hourly wage $10.33 Lathe and Turning Machine Tool Setters,Operators Hourly wage $14.17 4 Exhibit J-6 EXHIBIT K [RESERVED]. Exhibit K-1 EXHIBIT L THE CITY OF ROUND ROCK/TEDCO'S MAXIMUM FINANCIAL RESPONSIBILITY PURSUANT TO AGREEMENT Construction Manager acknowledges that the Convention Center scope of Work is part of a larger Master Project, which includes the Convention Center, Hotel, Indoor Water Park, and Onsite Public Infrastructure. The Convention Center is owned by the City of Round Rock (the "City"), and the Master Project is being developed by KR Acquisitions LLC ("KRA") pursuant to a Master Development Agreement ("Master Development Agreement") between the City, TEDCO, and KRA. In accordance with the Master Development Agreement, the City/TEDCO has a maximum amount of funding to contribute to the design and construction of the Convention Center. Construction Manager acknowledges that the City/TEDCO's total contribution to the Convention Center portion of the Master Project shall not exceed Forty Million and No/100 Dollars ($40,000,000.00), which includes payments to HKS, Inc. ("HKS") for architectural services. The estimated total amount to be paid by the City to HKS is$2,953,744.00. TEDCO shall pay to Construction Manager for Work under this Agreement, the difference between $40,000,000 and the total amount due to HKS (the "City Contribution"). To the extent that the Contract Sum for the Convention Center pursuant to this Agreement exceeds the City Contribution, the amounts in excess of the City Contribution due and owing under the terms of the Agreement to Construction Manager shall be paid by KR CC, Inc. (the "KRCC Amount"). Under no circumstances shall the combined total amount of the City Contribution and KRCC Amount exceed the Guaranteed Maximum Price for the Convention Center. Notwithstanding anything to the contrary in the Agreement, Construction Manager agrees that the City/TEDCO's obligations for payment for construction of the Convention Center under the Agreement is limited to the City Contribution. TEDCO acknowledges and agrees that any right to Liquidated Damages pursuant to this Agreement, if any, is hereby assigned to KR Acquisitions LLC and KR CC, Inc. [SIGNATURES ON NEXT PAGE] Exhibit L-1 AGREED: ROUND ROCK TRANSPORTATION AND ECONOMIC DEVELOPMENT CORPORATION By: Craig Morgan Its: President CITY OF ROUND ROCK, TEXAS By: Craig Morgan, Mayor KR CC, Inc., a Delaware Corporation By: Todd R. Nelson Its: President HENSEL PHELPS a Delaware General Partnership By: Its: Exhibit L-2 EXHIBIT M CONSTRUCTION MANAGER DESIGNED WORK Construction Manager agrees that portions of the Work may be required by the Contract to be designed and constructed by Construction Manager (the "Construction Manager Designed Work"). Construction Manager will cause the design of all Construction Manager Designed Work to be performed by one or more Subcontractors retained by Construction Manager(Design-Build Subcontractors). Standard of Care. These Design-Build Subcontractors shall perform all professional design services required by the Contract consistent with the professional skill and care ordinarily provided by architects or engineers practicing in the same or similar locality under the same or similar circumstances, and with regard to projects of this nature, size, and complexity. Owner-Supplied Information. 1. Owner or Architect, HKS, Inc., will provide Construction Manager with complete Project criteria, programming requirements, bridging documents, if any, and all other information reasonably necessary for Construction Manager to meet the Project requirements ("Owner-Supplied Information") in accordance with Contractor's schedule. 2. Unless expressly stated to the contrary in the Contract Documents, Owner shall provide, at its own cost and expense, for Contactor's information and use the following, and which shall also be considered Owner-Supplied Information: L Surveys describing the property, boundaries, topography and reference points for use during construction, including existing service and utility lines; ii. Geotechnical studies describing subsurface conditions, and other surveys describing other latent or concealed physical conditions at the Site; iii. Temporary and permanent easements, zoning and other requirements and encumbrances affecting land use, or necessary to permit the proper design and construction of the Project and enable Construction Manager to perform the Work; iv. A legal description of the Site, as set forth in Exhibit B to the Agreement; and V. To the extent available, environmental studies, reports and impact statements describing the environmental conditions, including Hazardous Substances, in existence at the Site. 3. Construction Manager shall be entitled to reasonably rely on the accuracy of the information represented in the Owner-Supplied Information or any design specifications contained in the Owner-Supplied Information, but to the extent that Construction Manager recognizes inaccuracies or defects in such Owner-Supplied information, Construction Manager will notify Owner of same. Construction Manager shall be entitled to an adjustment in the Contract Sum, to the extent that Construction Manager incurs actual additional costs subject to the terms of the Agreement, and Contract Time to the extent Contractor's cost or time of performance have been adversely impacted by inaccurate Owner-Supplied Information, but only to the extent that the critical path is adversely impacted. Exhibit M-1 Work Product.All drawings, specifications, and other documents and electronic data furnished by Construction Manager to Owner("Work Product")are deemed to be instruments of service and Owner shall be considered the owner of the instruments of service and shall have property interests therein consistent with the terms of the Agreement, including but not limited to any intellectual property rights, copyrights, and patents, subject to the Owner's payment for the instruments. Construction Manager Performance. Subject to the Standard of Care, Construction Manager Designed work will be performed in accordance with the following requirements: Construction Manager shall cause the respective Design-Build Subcontractor to prepare and submit to the Construction Manager and Owner and Architect for review and approval, drawings and specifications for the installation of the Construction Manager Designed Work (the"Construction Manager Designed Drawings") in accordance with the Owner-Supplied Information. The Construction Manager Designed Drawings shall be prepared and submitted in accordance with a submittal schedule established by the Contractor. The appropriate Subcontractor shall revise the Construction Manager Designed Drawings for the Construction Manager Designed Work as may be required by the Architect to conform to the Owner-Supplied Information and the Contract Documents. Construction Manager shall cause the design of the Construction Manager Designed Work, the Construction Manager Designed Drawings, and the installation of the Construction Manager Designed Work to comply with (i) the requirements of the Contract Documents; and (ii) Applicable Law. Construction Manager shall obtain, or cause the appropriate Subcontractor to obtain all required approvals prior to the commencement of installation of the Construction Manager Designed Work. Construction Manager and/or the Design-Build Subcontractors shall work with the Architect to coordinate the Construction Manager Designed Work with the Contract Documents; provided that, the Architect shall have overall responsibility to ensure that the Project Construction Documents, including the Construction Manager Designed Drawings are complete, fully coordinated and that the Construction Manager Designed Work interfaces properly with the other Construction Documents prepared by the Architect and the other consultants engaged by the Owner. Neither the review nor approval by the Architect or the other consultants of the Owner with respect to the working drawings or other documents prepared by the Design-Build Subcontractor(s) hereunder shall relieve Construction Manager or the respective Design-Build Subcontractor of its obligations hereunder. The design and engineering services required for any Construction Manager Designed Work shall be performed by person(s) or entity(ies) lawfully licensed to practice architecture or professional engineering in the state in which the Project is located and all Construction Manager Designed Drawings shall be properly sealed as required. Except the extent cause by a Construction Manager or Design-Build Subcontractor(s)failure to comply with the Standard of Care in the performance of its professional services, the Contract Sum or Contract Time or GMP shall be adjusted to compensate Construction Manager for any changes to the Construction Manager Designed Work, including revisions to the Construction Manager Designed Drawings necessitated by the directives of the Architect or the Owner, changes to or errors in the Owner- Supplied Information or Construction Documents or the effects of any changes in the legal requirements enacted after the date of the Contract affecting the performance of the Work. 20448215v.3 Exhibit M-2 AIA Document Al 33" - 2009 Standard Form of Agreement Between Owner and Construction Manager as Constmctor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price120- {Aqy AGREEMENT made as of the day of� in�e'yADDITIONS AND DELETIONS: ear 2018 The author of mcum (in words, indica!,day,month andyear.) df has added information nestled for IN BETWEEN the Owner. completion.The author may also have revised the lent of the original (Name, legal status and address) AIA standard form.An Atlde/ons and Deletions Repo tthat notes added Round Rock Transportation and Economic Development Corporation("TEDCO") information as well as revisions to (for address for notice purposes see Exhibit A) the standard form tent is available from the author and should be reviewed.A vertical line In the left and the Construction Manages margin ofthis document Indicates (Name, legal slams and address) whem the author has added necessary information and where Hensel Phelps the author has added to or deleted (for address for notice purposes see Exhibit A) Both the original AIA tent. for the following Project: This document has important legal consequences.Consultation van,an athe and address or location) attorney is encouraged with respect to its completion or modification. Round Rock Convention Center (See Project description below for additional detail) AIA Document A201 m-2007, General Conditions of the Contract The Architect: for Construction,Is adopted in this (Name, legal status and address) document by reference.Do not use with other general conditions unless HKS,Inc. this document is modified. (Paragraphs Deleted) The Owner and Construction Manager agree as follows: AIA Occurrent A133m-Was pomudy A121"CMc-Most.Copyraht®1991,2003 and 2009 by The Amnra en Inedtute rc of Ahitects.All Militiareenvad. InIL WARNING:TM1Ia AIA-Document is protected by U.S.Copyright Law and Internallonal Triallae.Unsumorlmd reproduction or distribution state AIA, Document orany portion of it may resua In severe civil and criminal p metal,and will be preeocuted to"maximum extent possible under Me Ise. t TisdmumenlwaspMumtlby AlAe am H2D.53:17on04/11201aunder Order Na.2212032907whichaxpiman WN512019,and'mnotformsaN. TABLE OF ARTICLES 1 GENERAL PROVISIONS 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES 3 OWNER'S RESPONSIBILITIES 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES 6 COST OF THE WORK FOR CONSTRUCTION PHASE 7 PAYMENTS FOR CONSTRUCTION PHASE SERVICES 6 INSURANCE AND BONDS 9 DISPUTE RESOLUTION 16 TERMINATION OR SUSPENSION 11 MISCELLANEOUS PROVISIONS 12 SCOPE OF THE AGREEMENT AIA Gocum MA133^'-2009 Qamxtly A121^CMn-2003).CopyrghtO 1991,2003 and 2M9 by The Amenwn Imbrue,of Architects.All deliver,reurved. ION' WARNING:%W AIA-Documem is prolechd by U.S.CopyrlOht U. ad lnbmallonal Treaties.Unauthorized reproducUon or distribute.of this AM- 2 10mumem,or any potion of R,may resuit In seven civil and criminal penslUes,and will be prosecuted to the maximum eaten possible under Me law. T mdmumentwaspmduced Oy AIASW areat20:33:17m OQfl@O10uMer ONer No.U12032907whicnexpim on03IOW2019,and is mtbrmaW Uen Nobs: 13119ADAI1) ARTICLE 1 GENERAL PROVISIONS §1.1 PROJECT The Project is for the construction of a 200,000 square foot Convention Center is owned by the City of Round, Rock,Texas(the"City"). In conjunction with the construction of the Project herein,is a new resort including approximate 1000-key hotel,200,000 square foot Indoor Water Park,150,000 square foot Indoor Theme Park,Lobby,retail,multiple food and beverage locations,4,000 parking spaces,all related and requisite back-house support,facilities,and infrastructure to operate the facilities,and certain onsite public improvements("Kalahari Project"),included as part of the larger project is a and constructed under a separate contract(all together the scopes of Work for the Project and the Kalahari Project make up the master project("Master Project"). This is one of two agreements,which together,cover the Master Project. §1.2 RELATIONSHIP OF THE PARTIES The Construction Manager accepts the relationship of trust and confidence established by this Agreement and covenants with the Owner to cooperate with the Architect and exercise the Construction Manager's industry respected skill and judgment in furthering the interests of the Owner consistent with the terms of the Contract as defined in the General Conditions.The Construction Manager shall furnish construction administration,management Services and supervision;furnish at all times an adequate supply of workers and materials;and perform the Work in an expeditious and economical manner consistent with the Owner's interests and with the terms of the Contract. The Owner shall endeavor to promote harmony and cooperation among the Owner,the City,the Architect,Construction Manager,and other persons or entities employed by Owner for the Project. For notice purposes attached hereto is Exhibit A-List of Designated Representatives and Contact Persons. §1.2.1 Owner.The Owner is a Type-B corporation created under the authority of Chapter 505 of the Texas Local Government Code. §1.2.1.1 Owner Related Parties. The tern"Owner Related Parties"refer to the following identified parties,together with their owners,members,managers,affiliates,general or limited partners,joint venture partners,and each of their respective directors,officers,employees,or successors: City of Round Rock,Texas,a Texas home-role municipality Note: Construction Manager acknowledges and agrees that,notwithstanding the rights and benefits of the Owner Related Parties arising under this Contract,Construction Manager is not contracting with such Owner Related Parties other than the Owner(or its assigns as provided herein)and that Construction Manager shall have no contractual cause of action against such Owner Related Parties arising from this Contract,except as may otherwise be expressly agreed in writing between the Construction Manager and such Owner Related Party. §12.1.2 Owner's Designated Representative.Owner has designated a city employee and a third-party to act as its Owner's Designated Representative("Owner's Designated Representative")for the Project as designated in Exhibit A.Except as otherwise directed in writing by Owner,Construction Manager shall famish to Owner's Designated Representative copies of all notices and written communications by or through Construction Manager to Owner or the Architect,contemporaneously with such notice to Owner and/or Architect. Construction Manager shall cooperate fully with the Owner's Designated Representative and shall provide Owner's Designated Representative full access to the Project,to the same extent as required for the Owner and/or Architect. Notices to Owner's Designated Representative shall be sent as set forth in Exhibit A. Construction Manager shall be entitled to rely upon direction and decisions made by Owner's Designated Representative except to the extent that Owner has expressly provided written direction to the contrary. InIt. AU10ocumeal A133^ -2009(bmeny AI21CW-M3).CoWdght01991,200]and 2009 by The Amencan Institute d Archib .All hats reserved. WARNING:This AIA*cacumen Is protected by U.S.Copyright Lawand lmematlonlTuanee.Unautbotlxed reproducflon ordisMbuUon ofible AIM 3 This nbntany ponlucof ymayresultineewareclue endcdminalpenaales,antl 2211beprosecuted torhemaximum extantdi.ratfi antlers. tew. This Motes: was produced Oy AlA acaware at 20'.331)on Wl11/201a antler ONer No.22120]29W wsiM expires cn 03lO5M019,antl in nMlareeele. Uex Notes: (389AGA11) §1.2.2 The City of Round Rock,Texas. The City of Round Rock,Texas(the`City")is the vested and legal owner of the real property on which the Project will be located in Round Rack,Texas(the"Land")more particularly described in Exhibit B—Legal Description,which is attached hereto. Notice is hereby given that the fee interest in the Land shall not be subject to liens for improvements made by the Owner. Liens against the City's fee interest in the Land are prohibited. Neither the Construction Manager nor any subcontractor of any tier("Subcontractor"or Subcontractors"as defined herein)shall have any lien rights(constitutional or statutory)against the City's fee interest in the Land.Construction Manager,and each Subcontractor,must include a clause substantially the same as the foregoing clause in each contract that Construction Manager,or that Subcontractor,enters into with persons providing labor,services,or materials so that such persons are put on notice that they Inc prohibited from filing liens against the Land with respect to their work for Construction Manager or any subcontractor,as applicable. Construction Manager,and each Subcontractor,must require that such persons acknowledge receipt of such notice and agree that they are prohibited from filing liens against the City's fee interest in the land with respect to their work for the Construction Manager or that Subcontractor,as applicable. §1.2.2.1 Third-Party Beneficiary. Construction Manager acknowledges and agrees that the scope of Work included in this Agreement is part of a larger Master Project,and that the scopes of Work together between the Convention Center Project and the Kalahari Project make up the Master Project. Construction Manager agrees that KR Acquisitions LLC and KR CC,Inc.are intended third-party beneficiaries of the Matter Project,including but not limited to the agreement between Construction Manager and the City for the Convention Center scope of Work. §1.2.3 Construction Manager. Construction Manager is engaged as an independent business,and agrees to perform the Work as an independent construction manager and not as the agent,employee,or servant of Owner.Subject to approvals from the Owner,Construction Manager has and hereby retains the right to exercise full control and supervision of the Work. Construction Manager agrees to be responsible for all such matters. Construction Manager agrees to be responsible for its own acts and those of its subordinates,employees,and Subcontractors during the term of this Agreement. Nothing contained herein or inferable herefrom shall be construed to make Construction Manager the agent,servant or employee of Owner,or create any partnership,joint venture,or other association between Construction Manager and Owner,or any of the Owner Related Parties.Any direction or instruction by Owner of any of its authorized representatives with respect to the Work shall relate to the results the Owner desires to obtain from the Work and shall in no way affect Contractor's independent contractor stains. §1.2.4 Key Persons. Construction Manager's key personnel("Key Personnel")are named on Exhibit C—Key Personnel and Rate Schedule,which is attached hereto,and am those persons who have been assigned to the Project and who will devote a substantial amount of time in performing the obligations and responsibilities of the Construction Manager under the Construction Documents,along with Construction Manager's fixed wage and salary rates for respective classifications of personnel performing services for the Project. During the term of this Agreement,Construction Manager shall not substitute or change Key Personnel or the rates quoted therein without the Owner's prior written approval. §1.3 GENERAL CONDITIONS The General Conditions of the Contract are incorporated herein by reference as if fully set forth herein.The term "Contractor"as used in the General Conditions shall mean the Construction Manager. §1.4 STANDARD OF CARE IN PERFORMING THE WORK. Construction Manager represents and warrants to the Owner the following: (a) Construction Manager,Key Personnel,and Subcontractors are knowledgeable and experienced in providing services comparable to those necessary to complete the Work and with the needs and requirements for this type of Project; (b) Construction Manager,Key Personnel,and Subcontractors performing Work under this Agreement shall perform every part of the Work hereunder in accordance with this Agreement and Applicable Laws.It is not Construction Manager's responsibility to ascertain that the Specifications,Plans,and Drawings are in accordance with Applicable Law,but the Construction Manager shall promptly inform the Architect AIA Documnn A133's-2009 tiam,sdY Aflli sCnc-2003),Copyright O 1991.2003 and 2009 by The American InstituteMPochibots.All rime marva0. Inst. WARNING:This AIA-Document ie probcfed by U.S.Cppyd9ht Use and International Tissues.UnaWM1orlad!nprodminam or distribution c Nis AIA- 4 Document or any porton orifi may mauN In seven civil and criminal penalties,and will be prosecuted b Ne maximum axbnt pocsble undsrts.law. I This document was produced try ALA soawem 02053:17 nn 01 under Oder No,2212032907 which expms on 03101 and is not for mass User Nabs (399ADA1I) and Owner if Construction Manager has knowledge,recognizes,or discovers that the Specifications,Plans, Drawings or other Contract Documents,are not in accordance with Applicable Laws; (d) For purposes of this Agreement,the term"Standard of Care"shall mean the exercise of a degree of was in performing the Work in a manner consistent with the same level of care and skill exercised by knowledgeable and experienced professional construction managers competent in the construction of facilities of a similar nature and complexity in accordance with customarily accepted good and sound professional practices and procedures;and (e) Construction Manager, Key Personnel, and Subcontractors possess the skills and experience to coordinate, allocate, and manage the Work of the various trade contractors In ensure that Work as completed is fit for its intended use,fully operational,free of latent defects,and fully warranted. §1.5 CONSTRUCTION MANAGER SHALL BE RESPONSIBLE FOR THE PROPER PERFORMANCE OF THE WORK. Construction Manager has visited the site and examined the conditions affecting the Work and agrees that it is sufficiently familiar with the site and all observable conditions affecting the same and with the Specifications,Plans, and Drawings that Construction Manager has been able to make a sound determination of each in order for Construction Manager to bind itself to this Agreement.Construction Manager shall be responsible for the construction ofthe Project andthe Work based on the Specifications,Plans,and Drawings,determining the scope of all subcontracts and for all the bidding of all Work necessary for Construction Manager to complete the Work and fully perform hereunder. Construction Manager remains responsible for the complete and integrated operations of the Work notwithstanding the allocations of scopes ofthe Work among different trade contractors. Notwithstanding the foregoing,Construmion Manager is not responsible for any unforeseen and concealed conditions that the Construction Manager did not discover or have notice prior to the start of construction without the use of physically intrusive methods provided that Construction Manager complies with the applicable General Conditions and other provisions ofthe Contract Documents. ARTICLE 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES The Construction Manager shall perform the services described in this Article,the General Conditions,and elsewhere in the Contract Documents. At the Owner's option,the Construction Phase may commence before the Preconstruction Phase is completed,in which case both phases shall proceed concurrently. §2.1 PRECONSTRUCTION PHASE §2.1.1 The Construction Manager's preconstruction phase responsibilities(if any)are set forth in a separate agreement concerning same. §2.1.2 LONG-LEAD TIME ITEMS. The Construction Manager shall prepare,for the Architect's review and the Owner's acceptance,a procurement schedule for items that must be ordered well in advance of construction,or in advance of reaching a final Guaranteed Maximum Price as provided herein.The Construction Manager shall expedite and coordinate the ordering and delivery of materials that must he ordered well in advance of construction. If the Owner agrees to procure any items prior to the establishment ofthe Guaranteed Maximum Price,the Owner hall procure the items on terms and conditions acceptable to the Construction Manager,and Owner will,to a reasonable level coordinate delivery of such items,and store such items as to be protected from theft,damage,or estruction.Upon the establishment of the Guaranteed Maximum Price,the Owner shall assign all contracts for these items to the Construction Manager and the Construction Manager shall thereafter accept responsibility for them. §2.13 CONSTRUCTION MANAGER'S REPRESENTATIONS In addition to other representations and warranties contained in the Contract Documents,and without limiting same,the Construction Manager represents and warrants the following to the Owner as an inducement to the Owner to execute this Agreement and the GMP Amendment(at the time the GMP Amendment is agreed to by the parties): Init AIA Dxomant A133^-2009(romunly A121-CM.-3003).C.,,ht 01991,2003 aM 2009 by The Amencen Imune of Aulnects.All rine has arnit. WARNING:This AIA*nocumeM is protect"by U.S.CopydOM Law and International Trail Unamo"ud reproduction or distribution of We AlM B Document,or any pmlen of It.may reault In a w..clAl and cdminal penaaea,and will be prosecuted W NO maximum extent poaalble under the law. This document was produced by AM totems at 20:53'.1)on Out 12010 under Order No 2212032907 which eVnes on 0300512019.and is not for teat. Uaer Noir: (369ADA11) (a) it will perform all Work called for hereunder in a good and workmanlike manner and in accordance with all legal requirements and the Contract Documents; (b) that it shall strictly comply with and satisfy all legal requirements applicable to the Construction Manager's means and methods of the Work; (c) that it is financially Solvent,able to pay its debts as they come due and possesses sufficient working capital to complete the Work and perform its obligations hereunder; (d) that it possesses the requisite level of experience and expertise in the business administration, construction,construction management,and superintendence of the projects of this size, complexity,and nature of the Project,and it will perform the Work in accordance with its Standard of Care as set forth herein; (e) that it is able to famish the tools,materials,supplies,equipment,and labor required to complete the Work and perform its obligations hereunder; (f) that it is authorized to do business in the municipality in which the Project is located and properly licensed by all necessary governmental and public and quasi-public authorities having jurisdiction over the Project; (g) that its execution of the Agreement(and the GMP Amendment)and its performance hereunder are within its duly authorized powers; (h) that it understand the restrictions imposed on the handling of construction payments received by the Owner pursuant to any Applicable Law and that it will fully comply with those provisions and the provisions of any applicable subcontract or purchase order in the handling of all payments made by the Owner to the Construction Manager pursuant to this Agreement;and (i) it is aware of the critical time restrictions for performance of the Work. The foregoing representations and warranties are in addition to,and not in lieu of,any and all other responsibilities and liabilities imposed upon the Construction Manager by law with respect W the Construction Manager's duties, obligations,and performance of the Work. All representations and warranties,including this section,shall survive the Final Completion of the Work or the earlier termination of this Agreement. §2.1.4 COMPLIANCE WITH LAWS The Construction Manager shall comply with Applicable Laws,Its defined herein(including Prevailing Wage laws, if applicable),regulations,and special requirements of the Contract Documents regarding equal opportunity and affirmative action programs. §2.2 GUARANTEED MAXIMUM PRICE PROPOSAL AND AMENDMENTS §2.2.1 The Guaranteed Maximum Price will be established in a multiple step process. When the Construction Documents are thirty percent(30%)complete,the Construction Manager will propose a GMP Proposal("GMP Proposal No.1")in a form reasonably required by the Owner.GMP Proposal No. 1 will include the following: (a) a statement of the Guaranteed Maximum Price,which shall include the Cost of the Work(organized by trade categories or systems or other method as may be requested by Owner),the Construction Manager's Fee,the Construction Manager's lump sum general conditions costs,the Construction Manager's Contingency(as defined in Section 2.2.10 below),and a deductive amount for any savings incurred for bought-out,completed,or partially completed Work included in any duly executed Work Authorization Amendments approved prior to establishing the Guaranteed Maximum Price; (b) a list of any clarifications and assumptions upon which the Guaranteed Maximum Price is predicated; and AIA DocumentA133^'-2009(fomwdy A121auCN1c-200.1).CopyriYhtO 1991.2003 and 2009 by The Amenran Indiana,a ArMltecte.All rights m an ed. InIL WARNING:This AIAe Document Is protecbld by U.S.Copyright Law and international Treaties.Unauthorized reproduction or distribution of this Am* 6 Document,or any portion of k,may man In severe chill and criminal penalties,and as be prosecuted W Ne maximum extant possible under Me law. ( Th'w documentwas pWuced by AM wnware at M:531Tm W11=18 urder ONer No.2212032901 whk minis on 03ro52019,and is notformade. near Noor. (3BRADA11) (c) the date for Critical Milestones,Substantial Completion of the entire Work,and Final Completion of the entire Work. Upon presentation of GMP Proposal No. 1,the Owner shall,with reasonable promptness,exercise one of the following three options:(1)accept the GMP Proposal by executing an amendment("GMP Amendment No.1");(2) reject the GMP Proposal—in which case the Owner shall only be responsible for payment for the Construction Manager's preconstmction services(through separate agreement)and any work performed in accordance with any duly approved and authorized Work Authorization Amendment;or(3)enter into negotiations with the Construction Manager and ultimately either accept or reject a revised GMP Proposal. §2.2.2 To the extent that the Drawings and Specifications are anticipated to require further development by the Architect,the Construction Manager shall provide in the Guaranteed Maximum Price for such further development consistent with the Contract Documents and reasonably inferable therefrom.Such further development does not include such things as changes in scope,systems,kinds and quality of materials,finishes or equipment,all of which, if required,shall be incorporated by Change Order. In any GMP Proposals,the Construction Manager shall also identify which Drawings and Specifications the Construction Manager contends will require revision in order to reflect the Construction Manager's proposed assumptions and clarifications. §2.2.3 When the Construction Documents are 100%complete,the Construction Manager shall carefully study and evaluate for the purpose of establishing the GMP the design and documents and with reasonable promptness,but not more than 90 days,shall conduct a final scope review and buy-out of each of the major trade Subcontractors.The Owner shall participate in the scope review and buy-out process and may also direct the Architect to participate as well.Based on the final buy-ora prices,the Construction Manager shall submit a GMP Proposal("GMP Proposal No.2").The GMP Proposal No.2 will include items listed in Section 2.2.1 and 2.2.2,but shall also include a list of allowances or unit prices;and a list of the documents and their revision dates upon which the GMP Proposal No.2 is based. Upon presentation of GMP Proposal No.2,the Owner shall,with reasonable promptness,exercise one of the following three options: (1)accept the GMP Proposal No.2 by executing an amendment regarding same;(2)reject the GMP Proposal No.2;or(3)enter into negotiations with the Construction Manager and ultimately either accept or reject a revised GMP Proposal No.2. §2.2.4 Upon acceptance of a GMP Amendment No. 1,the Owner may,in writing,direct the Construction Manager to begin specified portions or phases of the Work.Construction Manager shall not incur Costs of the Work without the Owner's prior written approval. In the time between GMP Proposal No. 1 and GMP Proposal No.2, In the event that the Owner rejects the GMP Proposal No.2 and no amendment is entered into regarding same,the Owner shall either:(1)pay the Construction Manager the Cost of the Work incurred to date and Fee thercon incurred with the Owner's prior approval,but the Owner shall have no further liability to the Construction Manager;or(2)elect in writing to proceed with the Project under the GMP Amendment No. 1. §2.2.5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum Price Proposal(s).In the event that the Owner and Architect discover any inconsistencies or inaccuracies in the information presented,they shall promptly notify the Construction Manager,who shall make appropriate adjustments to the Guaranteed Maximum Price Proposal,its basis,or both. §2.2.6 Owner shall be entitled to full access to all details of the process of developing the GMP Proposals. It is the intent of this Agreement that allowances,assumptions,clarifications,and other loose elements that could lead to change orders after any Guaranteed Maximum Price is determined to be held W a minimum. §2.2.7 The Construction Manager shall not incur any cost to be mimbursed as part of the Cost of the Work prior an the commencement of the Construction Phase,unless the Owner provides prior written authorization for such costs. §2.2.8 The Owner shall authorize the Architect to provide the revisions to the Drawings and Specifications to incorporate the agreed-upon assumptions and clarifications contained in any Guaranteed Maximum Price Amendment.The Owner shall promptly furnish those revised Drawings and Specifications to the Construction AW cument A1un 33'e-2009 no ary A121^'CMc-20031.Commight O 1991,2003 and 2009 by The And inn Institute of Architects.All rights moved. Inst Do WARNING:Tan AIA*nbcument Is protected by U.S.Copyrlghttswand Internal Umulhodred reprand. aon orUlNrlibunon a Mla AM- 7 Document or any potion Ora,may result In tewre civil and criminal penalties,and will be pmacutad to the maximum extsm p0ulble uneartlN tew. ( This documentwaf produced by AM voMaro at 20:5317 on 0411112010 under Omer No 2212032907 wM1iM expires an OWDWO19,and is not for mass. User Nobs: (389ADA11) Manager as they are revised.The Construction Manager shall notify the Owner and Architect of any inconsistencies between the Guaranteed Maximum Price Amendment and the revised Drawings and Specifications. §2.2.9 To the extent any sales,rental,or use of labor,equipment or materials for the Project are subject to sales or use tax under Applicable Law,the Construction Manager shall include in the Guaranteed Maximum Price all sales, consumer,use and similar taxes for the Work provided by the Construction Manager that are legally enacted, whether or not yet effective,at the time the Guaranteed Maximum Price Amendment is executed. Construction Manager acknowledges that the Work is tax exempt. Construction Manager shall perform the Work and administer the Contract in a manner in which maintains the tax exempt status of the Work.Owner shall provide tax exempt certificates and specify the Work which is tax exempt. §2.2.10 CONSTRUCTION MANAGER'S CONTINGENCY. Any GMP Proposal shall contain the Construction Manager's Contingency as part of the Guaranteed Maximum Price(the"Construction Manager's Contingency"). The Construction Manager's Contingency shall be made available by Owner,only upon prior written approval by Owner,for use by the Construction Manager to cover increases in the cost of the Work incurred by Construction Manager for unforeseen causes or details not reasonably anticipated by the Construction Manager at the time of the execution of this Agreement,such as increases in bid or negotiated contracts.Construction Manager's Contingency is not intended for changes in the scope of the Work or for reimbursement of expenses and costs not otherwise recoverable as Cost of the Work under Article 6 of this Agreement,such as originating from further development of the Construction Documents after GMP Proposal No.2(as defined herein)and such corresponding Amendment, increased Costs of the Work that do not result from an Owner-change order,cost overrun,any additional costs due to Unexcused Delays,or to employ Corrective Measures as may be required of Owner pursuant to Section 8.2.4 of the General Conditions,or costs caused by defaults by Subcontractors that are not recoverable from the Subcontractor or its insurer or surety,including costs of correcting defective work or the warranty work.The Construction Manager's Contingency shall not be available for Owner-initiated changes to the Construction Documents unless mutually agreed upon by Owner and Construction Manager.The Construction Manager shall not earn a Fee on unused Contingency.The Construction Manager shall not be entitled to additional General Conditions Costs,unless mutually agreed upon by Owner and Construction Manager. The Construction Manager shall maintain records derailing the use of the Construction Manager's Contingency after Owner's approval and shall make those available for the Owner's review upon request and shall submit the records with the monthly payment application. The Owner shall have the right to approve or reject any expenditure from the Construction Manager's Contingency in its sole reasonable discretion,subject only to the Construction Manager's rights under the disputes resolution provisions of this Agreement. Construction Manager's Contingency:three percent(3%)of the estimated Cost of the Work component of the Guaranteed Maximum Price(without such Contingency)as initially established and set forth in the GMP Amendment(s). Sums may be charged to the Construction Manager's Contingency only to the extent that the same have been paid or are to be actually paid by Construction Manager. Notwithstanding anything in the Contract Documents to the contrary,no charge shall be made against the Construction Manager's Contingency without the prior written approval of the Owner. §2.2.11 After execution of the GMP Amendment No.2,the GMP will be modified only for Owner-initiated changes or other circumstances specifically authorized by this Agreement. §2.2.12 Some phases of the Work may be ready for construction before it is appropriate to arrive at an overall Guaranteed Maximum Price for the entire Project.If the Owner elects to proceed with any packages of the Work before the parties arrive at an overall Guaranteed Maximum Price,the Construction Manager shall develop proposals for any phases of the Work identified by the Owner. §2.2.13 Until a Guaranteed Maximum Price for the entire Project has been established and accepted by the Owner through a duly executed GMP Amendment,the Construction Manager and Owner agree to use a work authorization amendment("Work Authorization Amendment")in a mutually acceptable format to authorize work to begin AIA limmusm A133m-2009 Normally Al 21 reClAc-2003).Copyright 01991.2003 and 2009 by The Ameman Inertias of AroNbcls.All rights summer. him. AM This AIA-nocumast is pratsctsd by U.S.copyright Lew and International Thanes.Unauthorized reproduction or elimination of this Arks 8 Document,aa"human of it may man In sawn civil and cmmiml pentl0es,and will as prosecuted to Ne maximum meant possible under Me law. This document was produced by ALA losses at 20'.53'.1]on OHO 2018 under Omer No.2212032907 which eepiree on 03/052019,and is nor for mule. U.Nobs: (3B9ADA11) based on a specified scope and a specified"not to exceed"price.The price and the scope of Work identified with each previously approved Work Authorization Amendment will be included in the Guaranteed Maximum Price at the time the Contract Documents are sufficiently complete to establish the Guaranteed Maximum Price.Prior to the Owner's acceptance of the Guaranteed Maximum Price for the entire Work Construction Manager shall not incur any cost to be reimbursed a;part of the Cost of the Work for Construction Phase services,except as the Owner may specifically authorize in an executed Work Authorization Amendment as required herein. §23.14 Except as otherwise agreed by Owner and Construction Manager,when a GMP Proposal for any portion of the Work is agreed upon by the parties pursuant to a Work Authorization Amendment,the Guaranteed Maximum Price amounts for those portions which have been previously approved by the Owner shall be combined and shall be used in pricing those portions of the Work covered by such Guaranteed Maximum Price proposals,and all separate Guaranteed Maximum Price proposals previously agreed to by the parties shall be of no further force and effect. § 2.2.15 In submitting the GMP Proposal,the Construction Manager represents that it will provide every item,system,or element of Work that is identified,shown or specified in the GMP Proposal or the Supporting documents,along with all necessary or ancillary materials and equipment for their complete operating installation,unless specifically excepted by the Owner. Upon Owner's acceptance of the GMP Proposal,the Construction Manager shall not be entitled to any increase in the Guaranteed Maximum Price due to the continued refinement of the Construction Documents or the absence or addition of any detail or specification that may be required in order to complete the construction of the Project or applicable Work package,except as expressly qualified in the GMP Amendment §23.16 As GMP Amendment and Guaranteed Maximum Price are referenced herein,GMP Amendment shall mean the GMP Amendment with the latest date which was duly executed by the parties and made a modification of this Agreement,and Guaranteed Maximum Price shall mean the not to exceed value in the GMP Amendment. §2.3 CONSTRUCTION PHASE §2.3.1 GENERAL. The Construction Phase shall commence on the Owner's issuance of Notice to Proceed. If the Owner directs the Construction Manager to commence only some portion(s)of the construction,the Construction Manager shall only enter into those subcontracts and purchase orders necessary for the directed work and shall proceed with the limited portion of construction. §2.3.2 ADMINISTRATION §2.3.2.1 It is the intent of this Agreement that as many as possible of the elements of the Project be subject to vigorous competition. Except as otherwise approved by Owner in advance in writing,all Subcontracts(including purchase orders)shall be awarded pursuant to competitive bids. (a) If the Construction Manager intends in bid Work by its own fomes("Self-Perform Work"),other than supervision of the Work,or through an affiliated or related party(as defined herein),Construction Manager shall notify Owner in writing of such intent and how the bid pricing shall be obtained. Construction Manager must obtain Owner's prior written approval prior to the solicitation of bids. If approved,Construction Manager must competitively bid against no less than three(3)trade contractors (when feasible). All bids,including Construction Manager's bid,shall be submitted directly to Owner and shall be opened by Owner.Construction Manager must submit its bid to Owner no less than 24 hours in advance of when other bids are due. (b) The Construction Manager shall not subcontract out general conditions,supervision of the entire Work,or project management of the entire Work. (c) The Construction Manager shall obtain bids from Subcontractors and from suppliers of materials or equipment fabricated especially for the Work and shall deliver such bids to the the Owner,along with its recommendations concerning such bids. The Owner may designate specific persons from whom,or entities from which,the Construction Manager shall obtain bids;however the Construction Manager shall be entitled m obtain bids from other qualified bidders.The Construction Manager shall endeavor to obtain al least three(3)bids for each subcontract(except for purchase orders aggregating less than$50,000.00 in connection with the Project)and in no case less than two(2)from parties not affiliated with or related to the Construction Manager. Init AWGohumeMA133`-m09(bm1aM Al2P`GM[-2003).Copplant01991,2003 and 2009 by The American InetlWrc Indiana of hibtla.All rightsmerwn. WARNING:%I$AIADDocument npmbcbd by U.S.Copyn9ht Lmamd trimmed...I Tsui Unauthorized reprpluctlon or distribution of Me AlAe 9 Goodnal ar actportion of ft.may/Molt In Nva.civil and minimal panalNas and will be unsecured ft Ne maximum extent possible under ma law. This dccumant was preducM by AIA salMare at 20:53.1]an 00112010 under Oder No.2212032907 which eapires on 0105@019,and is not or mule. UOr Notes: (389ADA11) (d) For the purpose of this subparagraph,"affiliate"or`related party"is any entity controlling, controlled by,or under common control with Construction Manager,or any entity in which any officer, director,member,employee,partner,or shareholder of the Construction Manager,or any member of such person's immediate family has a direct or indirect interest.The Construction Manager shall not accept any bid without the Owner's prior written approval.The Construction Manager shall not be required to contract with anyone to whom the Construction Manager has reasonable objection. (e) If a specific bidder among those whose bids are delivered by the Construction Manager to the Owner and Architect(1)is recommended to the Owner by the Construction Manager,(2)is qualified to perform that portion of the Work,and(3)has submitted a bid that conforms to the requirements of the Contract Documents without reservations or exceptions,but the Owner requires that another bid be accepted,then the Construction Manager may require that a Change Order be issued to adjust the Contract Time and the Guaranteed Maximum Price by the difference between the bid of the person or entity recommended to the Owner by the Construction Manager and the amount and time requirement of the subcontract or other agreement actually signed with the person or entity designated by the Owner. (Q Subcontracts and agreements with suppliers at all tiers shall conform generally to the payment provisions in Sections 7.1.8 and 7.1.9 of this Agreement and the terms regarding payments contained in the General Conditions, and shall not be awarded on the basis of cost plus a fee without the prior consent of the Owner.If upon Owner approval,the Subcontract is awarded on a cost plus fee basis,the Construction Manager shall provide in the Subcontract for the Owner to receive the same audit rights with regard to the Subcontractor as the Owner receives with regard to the Construction Manager in Section 6.11 below. (g) If the Construction Manager recommends a specific bidder that may be considered a'related party"or "affiliate"according to this Section,then the Construction Manager shall promptly notify the Owner in writing of such relationship and notify the Owner of the specific nature of the contemplated transaction. §2.3.2.2 The Construction Manager shall schedule and conduct weekly meetings or at a frequency reasonably specified by the Owner,at which the Owner,Architect,Construction Manager,and appropriate Subcontractors can discuss the status of the Work..The Construction Manager shall prepare and distribute meeting minutes to the Owner and Architect within five(5)days of the meeting,which shall be subject to the Owner's and Architect's review and comment. §2.3.2.3 As part of the GMP Proposals the Construction Manager shall prepare and submit to the Owner and Architect a construction schedule for the Work consistent with the requirements of the Contract Documents,and submittal schedule in accordance with Sections 2.3.2 and 3.10 of the General Conditions. §2.3.2A The Construction Manager shall record the progress of the Project.On a monthly basis,or otherwise as agreed to by the Owner,the Construction Manager shall submit written progress reports to the Owner and Architect, showing percentages of completion and other information required by the Owner as set forth in this Agreement.The monthly reports shall include,but not be limited to,the following: (a) Daily Log. The Construction Manager shall maintain,and make available to the Owner and Architect upon request,a daily log containing a record for each day of weather,portions of the Work in progress, Subcontractors working on site,number of workers on site,identification of equipment on site,problems that might affect progress of the work,accidents,injuries,and other relevant information that Owner may reasonably require. (b) Shop Drawing Schedule. The Construction Manager shall develop a schedule for submittal and review of Submittals and Shop Drawings,product data,and samples,with input from Owner and Architect.The schedule shall show dates for submission and subsequent review by all necessary parties and shall be coordinated with the Schedule and Critical Milestones.The Construction Manager shall update the Submittal/Shop Drawing schedule weekly and submit to Owner for its review. (c) Change Order/Change Order Request Log. The Construction Manager shall maintain a Change Order and Change Order Request log for the purpose of tracking and recording all Change Orders and Change laft AIADocumnNA1U^'-2009(yom,srly A121mCM-200J).Dopyb9WO1991,2003 eno2009 by The AmenonlnoNub MArtl,ilec4.All title lxarved. WARNING;Will AIA-General la marmot by U.S.Copyri,ht Law antl aberrational Trusses.Unauthorized apro luclbn ordistrlb,Non cattle AlA0 10 Document,or any potion oak may result In seven civil and criminal penamx,and will be prosec ted to are maximum axtem poaalble un llatM law. / Un wmars: twos pmtlucetl by AIA aahwem a12aaJay on OII11R010 antler Ober No.22120J2901 whct expires on 0a�0a/2019,andun01ror89AD Dear Nplac (3B9ADA11) Order Requests(Owner requested changes,Design requested changes,the Construction Manager requested changes,field requested changes,etc.)whether they have a cost/schedule impact or not.At a minimum,this log shall contain: (i) Change Order Number; (ii) Description of Change; (iii) Nature of Change; (iv) Date Requested; (v) Initiator; (vi) Subcontractor impact report; (vii) Date Review by the Architect; (viii) Date reviewed by Construction Manager; (ix) Cost Implication of the Change; (x) Schedule Implication of the Change; (xi) Description of Other Potential Impact to Project;and (xi) Date Approved or Disapproved by Owner. As part of the requirements for Final Completion,the Change Order Log shall be delivered to the Owner. (d) Request for Information("RFP')Log. The Construction Manager shall maintain an RFI Log for the purpose of tracking and recording all RFIs. At a minimum,this log shall contain: (i) RFI number; (ii) Description; (iii) Date Requested; (iv) Initiator; (v) Specification,Drawing(Sheet No.or Detail)Referenced; (vi) Schedule and/or Cost Impacts; (vii) Subcontractor Impacts; (viii) Date Answered;and (ix) Priority. (e)Maledal and Equipment Procurement log. The Construction Manager shall maintain and regularly update a schedule for the purchase and delivery of materials and equipment requiring long-lead time procurement. The Construction Manager shall expedite and coordinate delivery of these purchases. The Construction Manager shall include in its weekly progress reports a status log of long-lead time items. (Q Safety Report The Construction Manager shall develop,implement,and maintainjobsite safety,training and protocol programs.At all times during the course of the Project and the Work,the Construction Manager shall be responsible for the overall safety of the site. Accordingly,the Construction Manager shall maintain records of meetings,inspections,and incidents.The Construction Manager shall maintain an accurate record of all accidents and incidents relating to work performed under this Agreement resulting in death,injury,occupational disease,or damage to property,materials,supplies,or equipment.The Construction Manager shall provide Owner copies of all accident reports filed with federal,state,and local governmental agencies and such additional data as may be requested by Owner. The Construction Manager shall maintain accurate records related to safety at the site,and provide a monthly report regarding same to Owner,including but not limited to the following: (i) Man-hours for reporting period; (ii) Total man-hours worked for the Project to date; (iii) Recordable injuries and lost work days;and (iv) Identify any hazards or discrepancies. §2.3.2.5 The Construction Manager shall develop a system of cost control for the Work,including regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes.The Construction Manager shall identify variances between actual and estimated costs and report the variances to the Owner and Architect and shall provide this information in its monthly reports to the Owner and Architect. InIL AMD.uirent A133^-20N(M..Hy AI21raCMc-NO3).C.,H,htm1991,2003 and 2009 by The America lnulXule MArUill All XaNb reserved. WAnNING:TIIIU AIA Document°Oouumone prOtKbO by U.S.CppytlBat 4wand International TreaU>aM .Unauorhetl reproduction or distributed alAIAe .�.� assistant,or any pardon of 14 may Houk In sewn clNl antl criminal pennies,and will be pmssoufed to the maximum extant possible moderato law. The document was pMucad by AIA wNxare M20 5317 on 0011141010 under Oder No.2212032907whic-i expires on 03/051201$and is nMbr seats. Uur Nobc (3B9ADA11) §2.4 CONSTRUCTION MANAGER SHALL REMEDY DEFECTIVE WORK §2.4.1 The Construction Manager represents and warrants that the Work shall be(1)free from all defects;(2) conform to the requirements as set forth in the Specifications,Plans,and Drawings;and(3)comply with Applicable Law with regard to the means and methods of construction and Construction Manager's scope of Work. Work not conforming to these requirements,including substitutions not properly approved and authorized,may be considered defective Work at Owner's sole and reasonable discretion. §2.4.2 All defective Work shall be taken down,removed,and replaced with work of a quality required by the Contract Documents,without an increase in the Guaranteed Maximum Price or Construction Manager's Fee, whether observed before Substantial Completion of the Work and whether or not fabricated,installed,or completed. The Construction Manager shall bear all costs of correcting defective work,including but not limited to additional testing and inspections,compensation for the Architect's services or another design professional's services,and cosh and expenses made necessary by the defective work. If the defective Work has not been cured within a reasonable time period to be mutually determined by the parties,Owner shall have the right,on five(5)days written notice to the Construction Manager,to remove or cause to be removed all defective Work or materials,and to have the Work or material corrected and the Construction Manager shall be obliged to pay to Owner all expenses so incurred.If Owner removes the unsatisfactory Work,Owner may deduct from any future payments to the Construction Manager due under this Agreement the amounts so expended by Owner.If Owner dues not deduct such amounts and the Construction Manager fails to pay all unpaid amounts on Owner demand, recourse may be made immediately to any applicable bonds. Construction Manager shall not use its Contingency to pay for such costs under this Section 2.4 unless expressly approved by Owner in writing. Costs incurred due to defective work are not otherwise reimbursable. §2.5 CONSTRUCTION MANAGER SHALL REACH SUBSTANTIAL COMPLETION TIMELY. §2.5.1. Time is of the essence. At all times during this Project,time is of the essence for Construction Manager's performance of the Work. §2.5.2. Liquidated Damages. The parties acknowledge that if the Construction Manager is not able to achieve the Critical Milestones,if any,or Substantial Completion(as defined in General Conditions Section 9.8)by the dates set forth in the GMP Amendment,as said dates may be modified from time to time in strict accordance with the provisions of the Contract Documents,then the Owner will suffer damages as a result.The parties further acknowledge that it is difficult at this time to determine with precision those damages and that the parties desire to provide for liquidated damages as the sole and exclusive remedy in lieu of actual,or any other type of,damages in the event that the Construction Manager is not able to achieve the Critical Milestones or Substantial Completion by the date required("Liquidated Damages").Construction Manager agrees to pay to Owner,as liquidated damages and not as a penalty,the sum set forth in the table included in Exhibit D—Liquidated Damages Schedule,which is attached hereto,per calendar day for each calendar day after the date for the Critical Milestone or Substantial Completion until such time as the Construction Manager achieves the Critical Milestone or Substantial Completion. Notwithstanding this provision,the Construction Manager shall meet the Critical Milestone or the date of Substantial Completion and cannot choose merely to accept liquidated damages even if such damages will be less than the cost of acceleration to meet the respective lately). The Liquidated Damages for the Critical Milestones and Substantial Completion are cumulative. Nonetheless,in the event that the Construction Manager is responsible for Liquidated Damages for failing to meet one or more Critical Milestones,but nonetheless achieves Substantial Completion by the required date and the Construction Manager is not otherwise in default of its obligations under the Contract Documents,the Owner may,in its discretion,waive liquidated damages for the Critical Milestones. §2.6 BUILDING INFORMATION MODELING. The Construction Manager(including all of its Subcontractors)shall utilize state of the art technology in all phases of the Work as part of the Guaranteed Maximum Price.This includes, without limitation,building information modeling for real time dynamic building modeling in 3D for all components of the Work('BIT').The Construction Manager shall cooperate with the Architect in the preparation and completion of the models. §2.7 Construction Manager shall instruct Owner and its operating personnel in the proper use,maintenance,and emergency repair of all systems and equipment at the time of Substantial Completion and before final acceptance of Ink AIADmuma A133"-2009(ta odyM21^ W-2003).Copybabt01991,2003 aM 2009 by The American Institute MArcbilMa.All Him,merveE. WAIMIN0:"is AIAa Document is lsrote:C%d by U.S.Copyright rawand International Torathes.Unauthorized reproduction or distribution of this AlA' 12 DUument,roes.period ono,may eased In sever,civil and criminal penalties,and will be prosecuted W the maximum ezmM possible underlies law. / This document was produced by AIA soTva a a120'.53:17 on 04/112010 underOder No.2212032907 which expim on 03/058019,and is not for inside. Uur Notes (3B9ADA11) the Work by the Owner. Contractor shall call particular attention to safety measures that should be followed during operation of any such systems or equipment. ARTICLE OWNER'S RESPONSIBILITIES §3.1 INFORMATION AND SERVICES REQUIRED OF THE OWNER §3.1.1 The Owner and Construction Manager shall discuss and address the Owner's requirements and expectations for the Project,including Owner's objectives,constraints,and criteria,including schedule,space requirements and relationships,flexibility and expandability,special equipment,systems,sustainability and site requirements. §3.1.2 Owner's Evidence of Financial Arrangements. The Construction Manager may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements in fulfill the Owner's obligations under the Contract in accordance with Chapter 56 of the Texas Business and Commerce Code. Thereafter,the Construction Manager may only request such evidence if the Owner fails to make payments to the Construction Manager as the Contract Documents require.Construction Manager shall keep any information provided by Owner under this provision confidential,whether or not such information is specifically marked "Confidential"and prevent disclosure to any third-party. To the extent that the information provided by Owner pursuant to this provision is permitted to be provided to any Subcontractor on the Project,Construction Manager shall(1)require the Subcontractor to comply with Exhibit t of this Agreement in the Subcontract and attachment of Exhibit t to its Subcontract,and(2)require Subcontractor to sign a Non-disclosure Agreement in a form acceptable to the Owner. Notwithstanding the foregoing,any and all information provided under this clause is subject to the provisions of Exhibit 3,it being the intent of this Agreement that whichever provisions are more strict shall control. §3.1.3 The Owner shal I establish and periodically update the Owner's budget for the Project based upon consultation with the Construction Manager and Architect. §3.1.4 Structural and Environmental Testa,Surveys and Reports.Upon reasonable and specific request by the Construction Manager,the Owner shall famish information or services under the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness so as not to delay the progress of the Work after receiving the Construction Manager's written request for such information or services and details as to the time by which Owner's response is required.The Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work §3.1.4.1 The Owner shall famish tests,inspections and reports required by law and as otherwise agreed to by the parties,such as structural,mechanical,and chemical tests,tests for air and water pollution,and tests for hazardous materials. §3.1.41 The Owner shall furnish surveys describing physical characteristics,legal limitations and utility locations for the site of the Project,and a legal description of the site.The surveys and legal information shall include,As applicable,grades and lines of streets,alleys,pavements and adjoining property and structures;designated wetlands; adjacent drainage;rights-of-way,restrictions,casements,encroachments,zoning,deed restrictions,boundaries and contours of the Site;locations,dimensions and necessary data with respect to existing buildings,other improvements and trees;and information concerning available utility services and lines,both public and private,above and below grade,including inverts and depths.All the information on the survey shall be referenced to a Project benchmark. §3.1.4.3 The Owner,when such services are requested,shall furnish services of geotechnical engineers,which may include but are not limited to test borings,test pits,determinations of soil bearing values,percolation tests, evaluations of hazardous materials,seismic evaluation,ground corrosion tests and resistivity tests,including necessary operations for anticipating subsoil conditions,with written reports and appropriate recommendations. §3.1.4,4 During the Construction Phase,the Owner shall furnish information or services required of the Owner by the Contract Documents with reasonable promptness.The Owner shall also furnish any other information or services under the Owner's control and relevant to the Construction Manager's performance of the Work with reasonable promptness so as not to cause delay in the progress of the Work after receiving the Construction Manager's written request for such information or services and details as to the time by which Owner's response is required. The InR AIA Document A133^'-2009(fomNriy A121missile-2MI.Copyright 0 1991.2003 and 2009 by The American Immune Architects.All deals rswrvM. WARNING:This Ali Document le protected M U.S.Copyright Law and International Truces.Unau ori reproduction or dteMbWlon of this Mass 13 Document or any portion of It,may result in sewn rings and criminal penalties,and will M panduated to the maximum ee a d possible underths law. ( This document was produced by AIA software at 20:53:1]on 01I112018 under Oder No.221231 which Wass an 0309ID19.and is not for resale. their Notes: (3311) Construction Manager shall be entitled to rely on the accuracy of information and services furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work. §3.2 OWNER'S DESIGNATED REPRESENTATIVE The Owner shall identify a representative authorized to act on behalf of the Owner with respect W the Project.The Owner's Designated Representative shall render decisions promptly and furnish information expeditiously,so as to avoid unreasonable delay in the services or Work of the Construction Manager.Except as otherwise provided in Section 4.2.1 of the General Conditions,the Architect does not have such authority.The term"Owner'means the Owner or the Owner's authorized representative. §3.3 ARCHITECT The Owner has retained an Architect to provide services,duties and responsibilities with regard to the design of the Project..Upon request of the Construction Manager,Owner shall provide the Construction Manager a copy of the executed agreement between the Owner and the Architect,and any further modifications to the agreement. ARTICLE 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES §4.1 Compensation §4.1.1 Compensation for the Construction Manager's preconstmction phase services,if any,is set forth in a separate agreement ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICES The Owner shall pay the Construction Manager for the Construction Phase Services as follows: §5.1 COMPENSATION For the Construction Manager's proper performance of the Work as described in the Contract Documents,the Owner shall pay the Construction Manager in current funds,and amount which shall not exceed the Guaranteed Maximum Price,as set forth herein. The Contract Sum is the Cost of the Work as defined in Section 6.1.1 plus the Construction Manager's Fee. §5.1.1 The Construction Manager's Fee,except as limited by the Guaranteed Maximum Price,shall be 2.75%of the Cost of the Work(as defined herein below)actually incurred by the Construction Manager in the performance of the Work. Notwithstanding the provisions set forth in Section 5.1.3 below,Construction Manager shall be entitled to earn its Fee on approved Change Orders. 15.11 For authorized changes in the Work that result in an increase or decrease in the Guaranteed Maximum Price, the Construction Manager's Fee shall be increased or decreased accordingly. The Construction Manager's Fee shall be the Construction Manager's complete fee compensation(which includes Construction Manager's profit and indirect overhead)and,together with the payment for the Cost of the Work for those costs which are expressly set forth in Sections 6.1 through 6.7 of this Agreement,shall constitute Construction Manager's sole reimbursement for indirect and direct costs and expenses,general conditions,and profit arising from or attributable to the performance of the Work as described herein. Ind. AIADocumem AllP'-2a09(Iormetly A121^ W-20a3).CopyAghtCl991,2003 and 2009 by The Amenwn Institute M Achilnda.All rights marved. WARNING:ThiSAIA®Dncumanth,p macbtl by U.S.Copyrlghttawend lMemeaanal Thorns.UnauMMred mproducrbnordleWbuaon O thly AIA- 14 Document or potion OR,may mull In sewn civil and criminal panaNles,and will be prosecuted Mlaw .I the maximum extant possible uer the la . Tnie d¢ument was pmdumd by AIA sonwam et 20'.531]Dn 04llnOtB under Oder N0.2212032907 which expims an 03105x019,and m uitha me m, tear Note: (3B9ADA11) §5.1.3 Limitations,if any,on a Subcontractors'reimbursable costs,as well as overhead and profit for changes in the cost of its portion of the Work are,except as otherwise expressly approved in writing by Owner,as provided in Exhibit E-"Change Order Pricing",and as follows: Subcontractor's combined markup for overhead and profit on additive Work shall not exceed twelve percent(12%) of the actual direct cost of the additional Work that such Subcontractor self performs. If any lower-tier subcontractor performs part or all of the additional Work,then such lower-tier subcontractor shall only be entitled overhead and profit not to exceed twelve percent(12%)of the actual direct cost of the additional Work. Subcontractor shall be entitled to a maximum of five(5%)percent mark-up on lower-tier subcontractor Work. The total combined mark-up for Subcontractor and lower-tier subcontractor shall not exceed seventeen (17%)percent. For any deductive adjustment to the Guaranteed Maximum Price for a change in the Work,Subcontractor's Overhead and Profit will be marked-down at the same percentage and on the same basis as mark-ups for increases as provided above. §5.2. GUARANTEED MAXIMUM PRICE §5.2.1 The sum of the Cost of the Work,Construction Manager's lump sum general conditions costs as set forth in Exhibit F—General Conditions Costs,which is attached hereto,and the Construction Manager's Fee(as set forth in Section 5.1.1 above)is guaranteed by the Construction Manager not to exceed the amount set forth in the GMP Amendment subject only to additions and deductions by Change Order properly approved and executed as provided in the Contract Documents. Costs that would cause the Guaranteed Maximum Price to be exceeded shall be paid by the Construction Manager without reimbursement by the Owner. Such maximum"not to exceed"value as adjusted by approved changes in the Work is referred to in the Contract Documents as the"Guaranteed Maximum Price"or "GMP." §5.2.2 Savings Treatment Savings,which shall be defined herein as when the sum of the total,reimbursable Cost of the Work incurred by the Construction Manager and the total Construction Manager's Fee is less than the Guaranteed Maximum Price, will be shared 75%to Owner 25%to Construction Manager payable to Construction Manager upon completion of the Work. The Owner shall pay the Construction Manager its share of the Savings as part of the Construction Manager's final Application for Payment following Final Completion;however,Owner shall not be obligated to pay such share of any Savings in the extent(1)this Contract is not delivered in accordance with the Contact Time,(2)is terminated prior to Substantial Completion for the non-pemtonnance of Construction Manager,(3)if Construction Manager is in material breach of any provision of this Agreement;or(4)any fraud or negligence by Construction Manager. Notwithstanding the foregoing,for the purposes of determining Shared Savings,any unused allowances shall not be part of the Shared Savings and the final Guaranteed Maximum Price shall be reduced accordingly. §5.3 CHANGES IMPACTING GUARANTEED MAXIMUM PRICE §5.3.1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work maybe determined by any of the methods listed in Subparagraph 7.1.3 and 7.1.4 of the General Conditions. §5.3 Changes in the Work §5.3.1 The Owner may,without invalidating the Contract,order changes in the Work within the general scope of the Contract consisting of additions,deletions or other revisions.The Owner shall issue such changes in writing in accordance with Article 7 of the General Conditions.The Construction Manager shall be entitled to an equitable adjustment in the Contract Time as a result of changes in the Work only as provided in the Contract Documents and subject to the requirements thereof,including the timely notice requirements applicable portions of Section 4.3. hill. AIADocumead A133n-20H(conset,Al21•sCre,_NO3).Cupyght01991.2003 and 2009 by The Amenran Institute of AmM1itects.All rights reserved. WARNING:mho AlAe Document ie protected by U.S.Copyright Law and Womenonal healNa.Urwumorizetl reproduction ordietdbuUon orris AlA' 15 Document or.,romon o1 S,may result In sevens civil and criminal imahies,and will bas prosecuted m me maximum earn[ponable under me law. This document was prtduced 4 ALA sokxem N 20'.53:1]on dam lama under Omer No,Ul2032907 which expires on 03,d5120t9,and is nm for resale. User Nobs: (3SSADAII) §5.3.2 Adjustments to the Guaranteed Maximum Price on account of changes in the Work subsequent to the execution of the GMP Amendment may be determined by any of the methods listed in Section 7.3.3 of the General Conditions of the Contract for Construction. §5.3.31n calculating adjustments to subcontracts(except those awarded with the Owner's prior written consent on the basis of cost plus a fee),the terms"cost"and"fee"and"mark-up"as used in Section 7.3.3.3 of the General Conditions and the term"costs"and a reasonable allowance for overhead and profit,which all combined shall be no more than the agreed upon percentage set forth in Section 5.1.3,as used in Section 7.3.7 of the General Conditions shall have the meanings assigned to them in General Conditions.Adjustments to subcontracts awarded with the Owner's prior consent on the basis of war plus a fee shall be calculated in accordance with the terms of this Agreement,unless the Owner has furnished the Construction Manager with prior written approval of the form and substance of a subcontract,in which case such adjustments shall be calculated in accordance with the terms and conditions ofthat subcontract. §5.3.4 In calculating adjustments to the Guaranteed Maximum Price,the terms"cost"and"costs"as used in the above-referenced provisions of General Conditions shall mean the Cost of the Work as defined in Sections 6.1 to 6.7 of this Agreement and the tern"fee"shall mean the Construction Manager's Fee as defined in Section 5.1 of this Agreement. §5.3.5 Notwithstanding the foregoing in this Section 5.3,no change in the Construction Manager's Fee or overhead will be allowed for any additive or deductive change orders except as specifically provided for in this Agreement. §5.3.6 Except as otherwise expressly provided herein or in the GMP Amendment,in calculating an adjustment to the Guaranteed Maximum Price for a change in the Work resulting in a change to the Construction Manager's onsite overhead and administrative expense,including Construction Manager's General Conditions Costs,such adjustment shall be based upon the actual estimated increase or reduction of such costs rather than a percentage or otherwise pre-determined mark-up or mark-down ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE §6.1 COSTS TO BE REIMBURSED §6.1.1 The term"Cost of the Work"shall mean costs necessarily incurred by the Construction Manager in the proper performance of the Work.Such costs shall be at rates not higher than the standard paid at the place of the Project except with prior written consent of the Owner.The Cost of the Work shall include only the items expressly permitted in Article 6. §6.1.2 Where any cost is subject to the Owner's prior approval,the Construction Manager shall obtain this approval in writing prior to incurring the cost.The parties shall endeavor to identify any such costs prior to executing Guaranteed Maximum Price Amendment. §8.2 Labor Costs §6.2.1 Wages and salaries of construction workers directly employed by the Construction Manager to perform the construction of the Work at the site(for such Work that Construction Manager is authorized to perform through its personnel,other than Self-Perform Work)or,with the Owner's prior written approval,at off-site workshops,and only to the extent such workers are actually performing Work directly related to the Project. §6.2.2 Wages and salaries of the Construction Manager's supervisory and administrative personnel when stationed at the site with the Owner's prior approval. Such rates shall not exceed those set forth on Exhibit C,unless approved in in advance in writing by Owner. §6.2.3 Wages and salaries of the Construction Manager's supervisory or administrative personnel engaged at factories,workshops or on the road,in expediting the production or transportation of materials or equipment required for the Work,but only for that portion of their time required for the Work. Such rates shall not exceed those set forth on Exhibit C,unless approved in advance in writing by Owner. §6.2.4 Costs paid or incurred by the Construction Manager for taxes,insurance,contributions,assessments and benefits required by law or collective bargaining agreements and,for personnel not covered by such agreements,and Inst AM comment A133'a-20091romwdy A121 uncoil-2003).Comn0ht 01991.2003 and 2009 by The Amenran Inseam or Amhilaor.All dome reserved. WARNING:This Area Document he protected by U.S.CopyrlMt Law and thermal Trieffiri.UnauMnrioed reprodualon or distribution of We AM. 16 Document,or any potion of a may result in seven civil and cdmlml penalties,and will be pronneuted W Me maximum extent onslble under Me law. i nbdocumentwasg uwdWAAsa ame2053:l7on MtllnOl8underCMer N0.2212032907whlMexpireson03r05M019,and lsnolbrmaale. clear N : (3a9ADA11) all other employee benefits such as sick leave,medical and health benefits,holidays,vacations and pensions,for such employees based upon wages or salaries reimbursable as Cost of the Work pursuant to Sections 6.2.1 through 6.2.3 above shall be included in the fixed wage or salary rates As set forth in Exhibit C attached hereto. Such wage or salary rates(including markups for benefits)for the respective classification of personnel performing Work or services hereunder are agreed upon and fixed as set forth in Exhibit C and such rates are not subject to audit. However,the time chargeable to the Pr l hereunder for such employees or that portion of the wages allocable to the Cost of the Work are subject to audit. §6.2.5 Bonuses,profit sharing,incentive compensation and any other discretionary payments paid to anyone hired by the Construction Manager or paid to any Subcontractor or vendor,with the Owner's prior written approval. §6.3 Subcontract Costs Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts properly entered into in accordance with the requirements of the Contract Documents. §6.4 Costs of Materials and Equipment Incorporated in the Completed Construction §6.4.1 Costs,including transportation and storage,of materials and equipment incorporated or to be incorporated in the completed construction;provided,that such materials and equipment are obtained pursuant to the terms of the Contract Documents. §6.4.2 Costs of materials described in the preceding Section 6.4.1 in excess of those actually installed but required to provide reasonable allowance for waste and spoilage.Unused excess materials,if any,shall be properly stored and protected during performance of the Work and handed over to the Owner at the completion of the Work or,at the Owner's option,shall be sold by the Construction Manager.Any amounts realized from such sales shall be credited m the Owner as a deduction from the Cost of the Work. §6.5 Coats of Other Materials and Equipment,Temporary Facilities and Related Items §6.5.1 Costs of transportation,storage,installation,maintenance,dismantling end removal of materials,supplies, temporary facilities,machinery,equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and fully consumed in the performance of the Work.Costs of materials,supplies,temporary facilities,machinery,equipment and tools that are not fully consumed shall be based on the cost or value of the item at the time it is first used on the Project site less the value of the item when it is no longer used at the Project site.Costs for items not fully consumed by the Constmction Manager shall mean fav market value. Notwithstanding the foregoing,any items used but not consumed,which are paid for by the Owner shall,at the Owner's option,become the property of the Owner and shall be delivered to the Owner upon completion of the Work in accordance with instructions famished by the Owner. §6.5.2 Rental charges for Construction Manager-owned or leased vehicles assigned to those personnel defined in Section 6.2.1 and 6.2.2 above,temporary facilities,machinery,equipment and hand tools not customarily owned by construction workers that are provided by the Construction Manager at the site and costs of transportation, installation,minor repairs,dismantling and removal thereof.Rates of Construction Manager-owned equipment and quantities of equipment shall be in keeping with industry standards In no event shall the Construction Manager be entitled to reimbursement for any cumulative total of rental charges in connection with any single piece of machinery or equipment in excess of eighty percent(805x)of its fair market value as of the date thin such machinery or equipment is first put into service in connection with the Work. The Construction Manager shall pay,without reimbursement,any such excess rental charges. §6.5.3 Costs of removal of debris from the site of the Work. §6.5.4 Costs of document reproductions,facsimile transmissions and long-distance telephone calls,postage and parcel delivery charges,telephone service at the site and reasonable petty cash expenses of the site office. §6.5.5 That portion ofthe reasonable expenses of the Construction Manager's supervisory or administrative personnel incurred while traveling in discharge of duties connected with the Work.Provided,however,that daily travel m and from the Project site is not considered reimbursable travel. The amount included in the Cost of Work with respect to automobile travel expenses shall be based on the mileage allowance permitted for ordinary and necessary business deduction under Section 162 of the Internal Revenue Code of 1986,as amended. Init. AIA Doo ment A133ov-20011(raiders A121^'CMC-2003).Copyn9bl®1991.2003 and 2009 by The American Institute 0 Architects.All rlabte msound. WARNING:This AM*Document is lamented by U.S.CopyrlBMLaw and lMmaeenalTro in.UnauMo Wmproduction or distrlbuUon&Mls AIA* 17 Document,or any porton of ul may result in severe civil and criminal penalties,and will be prosecuted W the maximum extent possible under eco law. I Tpladocumentwasp�uced W AlAsonware at 20:53:1]en MH 11201 a under Omer No.221203290]whi,h espiree on 03,0512019,and is not for male. User Notes: (3BRAOA11) §6.5.6 Costs of materials and equipment suitably stored off the site at a mutually acceptable location,subject to the Owner's prior approval and requirements of Lender,if any,and Owner,including but not limited to providing Owner with photographs of all materials received and stored,copies of bills of sale,insurance coverage in place for materials stored offsite,and protecting materials from theft or damage. §6.6 Miscellaneous Costs §6.6.1 The actual cost of premiums for that portion of insurance and bonds that can be directly suributed to this Contract,based upon such minimum limits for coverage as required by Exhibit H(Insurance Requirements) attached hereto,which rates shall be final for the duration of the Project(and only subject to adjustment for changes in the scope or duration of the Project). If Owner requests,Construction Manager shall purchase Subcontractor Default insurance to cover the default of its Subcontractors,such Subcontractor Default insurance cost shall be reimbursable as Cost of the Work at the rate of one point three five percent (1.35%)of the value of the subcontracts,including the purchase orders,covered by such Subcontractor Default insurance,and Construction Manager shall not be entitled to a markup for general conditions or Fee on Subcontractor Default Insurance. §6.6.2 Subject to Section 13.6 of the General Conditions,sales,use or similar taxes imposed by a governmental authority that are related to the Work and for which the Construction Manager is liable. §6.6.3 Fees and assessments for the building permit and for other permits,licenses and inspections for which the Construction Manager is required by the Contract Documents to pay. §6.6.4 Fees of laboratories for tests required by the Contract Documents,except those related to defective or nonconforming Work. §6.6.5 Royalties and license fees paid for the use of a particular design,process or product required by the Contract Documents;the cost of defending suits or claims for infringement of patent rights arising from such requirement of the Contract Documents;and payments made in accordance with legal judgments against the Construction Manager resulting from such suits or claims and payments of settlements made with the Owner's consent.However,such costs of legal defenses,judgments and settlements shall not be included in the calculation of the Construction Manager's Fee or subject to the Guaranteed Maximum Price. §6.6.6 Costs for electronic equipment and software,directly related to the Work with the Owner's prior approval. §6.6.7 Deposits lost for causes other than the Construction Manager's negligence or failure to fulfill a specific responsibility in the Contract Documents. §6.6.8 Expenses incurred in accordance with the Construction Manager's standard written personnel policy for relocation and temporary living allowances of the Construction Manager's personnel required for the Work. §6.6.9 Reasonable travel expenses for travel outside of Texas pursuant to specific request by Owner,and only as,approved in advance by Owner. §6.7 Emergencies and Repairs to Damaged or Nonconforming Work §6.7.1 Costs incurred in taking action to prevent threatened damage,injury,or loss in case of an emergency not caused by the Construction Manager,its Subcontractors,Suppliers,or anyone over whom Construction Manager has control or whom Construction Manager is responsible,affecting the safety of persons and property,as provided in Section 10.3.3 of the General Conditions. §6.8 COSTS NOT TO BE REIMBURSED §6.8.1 The Cost of the Work shall NOT include the items listed below: Inn. AMA cumld A133�-2008(fo dYA121sCMc-2003).Copydght®1991,2003 and 2009by The AmedwnlnstiWte of Archaecb.All rights marred. WARNING:ThItAIA'no.wrant is probcted by U.S.Copyright Law and lmtsmatl.nal Treatlas.Unautbodaed reproduction or distribution of flus AIA' 1B uncommon,or any potion of In,may result In ca are civil and criminal panalfles,and will be prosecuted W the maximum extant poulbra under the law. ) nisd=w ntwaspmdu by AlAsakwereat20:53'.17on Ml V201Bunder OMtr No.2212032907wMichexp1unon0305/2019,and ianotbrreaeh. U.,Round: (399ADA11) .1 Salaries and other compensation of the Construction Manager's personnel stationed at the Construction Manager's principal office or offices other than the site office,except as specifically provided in Section 6.2 herein; 2 Expenses of the Construction Manager's principal office and offices other than the site office,except as specifically provided for in Section 6.6; .3 Overhead and general expenses,except m may be expressly included in Section 6.1 herein; .4 The Construction Manager's capital expenses,including interest on the Construction Manager's capital employed for the Work; .5 Costs due to the negligence or failure of the Construction Manager,Subcontractors and suppliers or anyone directly or indirectly employed by any of them or for whose acts any ofthem may be liable to fulfill a specific responsibility to the Owner as set forth in this Agreement or required by Applicable Law,including but not limited to costs for the correction of damaged,defective,or non-conforming Work,indemnity obligations,and similar costs excluded from reimbursement .6 Any cost not specifically and expressly described in Sections 6.1 to 6.7; .7 Costs,other than costs included in properly approved and executed Change Orders approved by the Owner,that would cause the Guaranteed Maximum Price to be exceeded; .8 Costs for services incurred during the Preconstmction Phase;and .9 Costs reimbursed under one category of 6.1 through 6.7 shall not be reimbursed under another category. §6.9 Discounts,Rebates and Refunds §6.9.1 Cash discounts obtained on payments made by the Construction Manager shall accrue to the Owner if(1) before making the payment,the Construction Manager included them in an Application for Payment and received payment from the Owner,or(2)the Owner has deposited funds with the Construction Manager with which to make payments;otherwise,cash discounts shall accrue to the Construction Manager.Trade discounts,rebates,refunds and amounts received from sales of surplus materials and equipment shall accrue to the Owner,and the Construction Manager shall make provisions so that they can be secured. §6.9.2 Amounts that accrue to the Owner in accordance with the provisions of Section 6.9.1 shall be credited to the Owner as a deduction from the Cost of the Work. §6.10 General Conditions Costs §6.10.1 Construction Manager's General Conditions expenses as identified in the General Conditions Costs shall be a lump sum amount,which is set forth in Exhibit F attached hereto. These expenses include rented or purchased materials and equipment used by the Contractor at the Project site office in connection with the Work,and items as set forth in Exhibit F. Costs which are reimbursable but not included as"Cost of the Work"in Section 6.1 shall be included by Construction Manager in its lump sum General Conditions Costs. §6.11 Accounting Records The Construction Manager shall keep full and detailed records and accounts related to the cost of the Work and exemise such controls as may be necessary for proper financial accounting practices and management under this Contract and as evidence of all costs incurred.The accounting and control systems shall be subject to the approval of the Owner.The Owner and the Owner's auditors shall,during regular business hours and upon twenty-four(24) hours'notice,be afforded access to,and shall be permitted to audit and copy,the Construction Manager's records and accounta,including complete documentation supporting accounting entries,books,correspondence,instructions, drawings,receipts,subcontracts,Subcontractor's proposals,purchase orders,vouchers,memoranda and other data relating to this Contract.The Construction Manager shall preserve these records for a period of no less than six(6) years after Final Payment,or for such longer period as may be required by Applicable Law. §6.12 Records subject to audit,examination,and copying include,without limitation,accounting records(hard copy as well as electronic versions),written policies and procedures,bid documents,schedule analyses,Subcontract files,certified payrolls(if any),original estimates,correspondence,Change Order files,back charge logs and supporting documents,general ledger entries detailing cash and trade discounts earned,insurance rebates and dividends,agreements,purchase orders,contracts,commitments,memoranda,and any and all other sources of information and matters that may have any bearing on or pertain to any matters,rights,duties,or obligations under or covered by any Contract Document(all the foregoing as"Records"). Records shall include all forms of materials, including hard copy,electronic,computerized,and digitized.If the final audit by Owner of the Construction Int. AIA Document A133w-MOO Normandy A121 mCNc-2003L Copyright®1991,2003 and 2009 by The American InatllW of AnNibde.All rights reserved. WARNING:This AIA*Documant In protected by U.S.CWydghtrAw and hNamaaonal Treaties.UnauNorlaed reproduction or distribution brain AlAe 19 D , ud.. t..pomon pfkmayr . Innavels17. and criminal MefOas,and will02907 whMdtothe maximum O19,adis now o under qs bw. Th..1hb1 enlwa*produmtl by AlA sohwerc et2a:5Y1T pn ONHr1a18 uMer ONer No.2212032907 which expima on aJ/a5Ra19,and is nM lJ3rabandc BOAD Uor Nobs: (3BBADAI I) Manager's Records(and any other relevant data including correspondence,emails,and this Agreement)reveals an overcharge,including,without limitation,any untimely request for payment,the Construction Manager shall pay the Owner upon demand an amount equal to one hundred percent of such overcharge and the administrative expense incurred in determining the overcharge. Notwithstanding anything herein,if the final audit reveals an overcharge for payment in excess of one hundred thousand($100,000)then the Construction Manager shall,in addition to repayment of such overcharge,reimburse Owner either ten thousand dollars($10,000)or fifty percent(501/d)of the actual cost of the audit,whichever is greater. ARTICLE 7 PAYMENTS FOR CONSTRUCTION PHASE SERVICES §7.1 PROGRESS PAYMENTS §7.1.1 Based upon Applications for Payment submitted to the Owner and Architect by the Construction Manager, including,without limitation,all required supporting documentation,and Certificates for Payment issued by the Architect and approved by the Owner,the Owner shall make progress payments on account of the Contract Sum to the Construction Manager as provided below and elsewhere in the Contract Documents. §7.1.2 The period covered by each Application for Payment shall be from the first(Is)of each month through and including the last day of such month C'Payment Period"). §7.1.3 Construction Manager shall comply with the terms and conditions set forth in Section 9.3 of the General Conditions,including by way of example,submitting to Owner the pencil draw Draft Application for Payment on or before the twenty-fifth(25th)day of the current Payment Period,with the final and complete Application for Payment due on the fifth(5th)day of the month immediately following such Payment Period. §713 Provided an Application for Payment properly submitted pursuant to Section 9.3 of the General Conditions and this Agreement,is received by the Architect and the Owner not later than the fifth(5th)day following the Payment Period(the"Submission Date")and Architect issues a Certificate of Payment with respect to such Application of Payment pursuant to Section 9.4 of the General Conditions,the Owner shall make payments under the Certificate of Payment,as required by the Contract Documents,to the Construction Manager not later than thirty five(35)days following the Submission Date.The Owner,if the Application for Payment is not acted upon by the Architect within five(5)days of submission and the Application for Payment was timely submitted and complete and in full compliance with the provisions of the General Conditions and Construction Manager is not otherwise the cause of such delay,shall make an independent determination of the amounts due and shall proceed with making any payment which may then be due. §7.1.5 With each Application for Payment,the Construction Manager shall submit payrolls,petty cash accounts, receipted invoices or invoices with check vouchers attached,and any other evidence reasonably required by the Owner,Architect,or Lender to demonstrate that cash disbursements already made by the Construction Manager on account ofthe Cost of the Work equal or exceed(I)progress payments already received by the Construction Manager plus any retainage applicable to previous progress payments,less(2)that portion of those payments attributable to the Construction Manager's Fee,plus(3)payrolls for the period covered by the present Application for Payment. §7.1.6 Each Application for Payment shall be based on the most recent schedule ofvalues submitted by the Construction Manager in accordance with the Contract Documents.The schedule of values shall allocate the entire Guaranteed Maximum Price among the various portions ofthe Work,except that the Construction Manager's Fee shall be shown as a single separate item.The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as is customary in the industry,with such changes as the Architect or the Owner may reasonably require.This schedule,unless objected to by the Architect or the Owner,shall be used as a basis for reviewing the Construction Manager's Applications for Payment. §7.1.7 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end ofthe period covered by the Application for Payment.The percentage of completion shall be the lesser of(1)the percentage of that portion of the Work which has actually been completed,or(2)the percentage obtained by dividing(a)the expense that has actually been incurred by the Construction Manager on account ofthat portion of the Work for which the Construction Manager has made or intends to make actual payment prior to the next Init. AIA conversed A133ra-2009 pomisriy Al2"Chic-20034 Copyrun 0 1991.2003 and 2009 by The Amwcan lne8lub of ArMLbss.All dlh4 reserved. WARNING:This AlAe Cocumamk pmbcds by U.S.Copyrillti.m.nd Immaterial Treaties.Unaumoriaed reprounAlon or U4bibutlon oftAis Ame 20 Document,or any pmtlon of it,may Wsua in teveW cMI and criminal penalties,and will as pmusena d to Ne maximum eafent possible underthe law. This dowmentwas produced!by ALA sorters at 20:53:17 on 044112018 under Oder No.2212032907 Wiltli evylres on onnesn o19,and is not for reale. User NoM: (3BRADA11) Application for Payment by(b)the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values. §7.1.8 In addition to the other items required by the Contract Documents,each Application for Payment shall be accompanied by the following,all in form and substance reasonably satisfactory to the Owner: (a) A certification from Construction Manager certifying that: (i) The Application for Payment represents the actual costs then due Construction Manager under the terms of this Agreement. (ii) The Application for Payment does not include a request for payment for Work previously paid for or included in a previous Application for Payment. (iii) All Work covered by the Application for Payment has been completed in accordance with this Agreement,the Specifications,Plans and Drawings,and properly approved Change Orders. (iv) There are no known Mechanics'Liens outstanding at the date of the Application for Payment. (v) All due and payable bills(except for amounts in dispute with Subcontractors)with respect to the Work have been paid to date or are included in the amount requested in the Application for Payment. (vi) There is no known basis for the filing of any Mechanics'Liens for or relating to the Work, except for(a)unpaid bills included in the Application for Payment,all of which shall be paid from the amount due tu Construction Manager with respect to the Application for Payment,or(b)amounts in dispute with Subcontractors. (vii) Subject to receipt of payment,Construction Manager waives any Mechanics'Lien rights to the extent of such payment. (viii) To the best of Construction Manager's knowledge,there is no default,or event,which with the passage of time or giving of notice,or both,would constitute default under this Agreement. (ix) The remaining balance of the GMP is,in Construction Manager's reasonable estimation sufficient to complete construction of the remaining portion of the Work. (x) Construction Manager warrants that title to all Work and materials covered by an Application for Payment shall pass to Owner upon the receipt of payment by Construction Manager,free and clear of all Mechanics'Liens,claims,security interest or encumbrances. (b) A duly executed and acknowledged Construction Manager's Statement showing all Subcontractors and suppliers with whom the Construction Manager has entered into trade contracts or purchase orders,the amount of each such trade contract or purchase order,and the amount requested for any Subcontractor or supplier in the Application for Payment; (c) Duly executed conditional waivers and releases of liens from the Construction Manager and all Subcontractors and Suppliers,as found in Exhibit G—Lien Waivers,which are attached hereto,or as required by Applicable Law for all Work performed,for the Payment Period covered by the applicable Application of Payment contingent only upon receipt of payment for such Work. After Pay Application Number 1 and as a condition to receipt of payment for the next Pay Application,Construction Manager will provide Owner with Unconditional Waivers and Releases of Lien(in accordance with the forms attached as Exhibit G or in compliance with Applicable Law)from Construction Manager and all Subcontractors for the Work performed in the preceding month and for which Construction Manager received payment;and (d) Such other customary information,documentation and materials as the Owner or the Architect may reasonably request,including but not limited to evidence of payment sufficient to show payment to Subcontractors of any tier and suppliers. §7.1.9 Subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: .1 Take that portion of the Guaranteed Maximum Price properly allocable to completed Work as determined by multiplying the percentage of completion of each portion of the Work by the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values. Pending final determination of cost to the Owner of changes in the Work,amounts not in dispute shall be included as provided in Section 7.3.9 of the General Conditions; InR AIA coastal Altars-2009(fomwtly A121estate,-2003).Copyight01991,2003 and 2009 by The Ammon Institute of Amhaxls.All estate rssenad. WARNING:This AIM Document is prowled try U.S.Dppyrlant tawand lntematlonaI TraatlU.UneuthmiaMnpro eu e.rdlatrlbu8onor0la AIA' 21 Document,or any potion of k may result In saver clsll and criminal penalties,and will be prosecuted to Ne maximum extent possible underthe law. f TM1b documOnlwNpMumd by MA softreeat20:53:17an MI112018 under Order No.2212032807 which expires on ovoscl019,and is not For resale. User Nobs: (389ADA11) .2 Add that portion of the Guaranteed Maximum Price properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work,or if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing; .3 Add the Construction Manager's Fee,less retainage of ten percent(10%).The Construction Manager's Fee shall be computed upon the Cost of the Work at the rate stated in Section 5.1 or,if the Construction Manager's Fee is stated as a fixed sum in that Section,shall be an amount that bears the same ratio to that fixed-sum fee as the Cost of the Work bears to a reasonable estimate of the probable Cost of the Work upon its completion; .4 Subtract retainage often percent(100/6)from that portion of the Work that the Construction Manager self-performs; .5 Subtract the aggregate of previous payments made by the Owner; .6 Subtract the shortfall,if any,indicated by the Construction Manager in the documentation required by Section 7.1.4 to substantiate prior Applications for Payment,or resulting from errors subsequently discovered by the Owner's auditors in such documentation;and .7 Subtract amounts,if any,for which the Architect or Owner has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions. All retainage hereunder may be reduced or otherwise limited at Owners discretion,subject to any requirements of Owners lender and the submission of lien waivers and documentation as required by Owner. Approximately every ninety(90)days,Contractor shall submit to Owner a summary of that portion of the Work that had been completed as of the submission date and Owner may,but shall not be required to,release retainage for all or some of the work. Notwithstanding the foregoing,Owner shall not pay retainage without a fully executed final lien waiver conditioned upon payment that complies with Texas law,and Construction Manager shall provide to the Owner fully executed unconditional lien waivers as provided herein. §7.1.10 Except with the Owner's prior approval,the Construction Manager shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. §7.1.11 Notwithstanding any of the other terns of this Section 7.1 to the contrary,if at any time during the progress of the Work or before the Final Payment is made,any Lien or claim of Lien is filed,or notification to withhold money for labor or material furnished by the Construction Manager under the Construction Documents is served on the Owner relating to any Work for which the Construction Manager has received payment under the Construction Documents,Owner shall have the right to withhold from any further payments due the Construction Manager,an amount sufficient to discharge any or all such Liens or claims to the extent the lien or claim is not secured by a bond sufficient to discharge the lien or claim.Any release or receipted voucher in settlement of such Liens or claims in form and content satisfactory to Owner,must be furnished to Owner by the Construction Manager before any money withheld may be paid to the Construction Manager.If following Owner's notice any such Lien or claim of Lien against the Project is not discharged,released or otherwise settled in a manner satisfactory to the Owner promptly following Owner's notice thereof,Owner shall have the right,but not obligation,to satisfy any and all such liens or claims from the withheld money. §7.2 FINAL PAYMENT §7.2.1 Final payment shall be made by the Owner to the Construction Manager when: (1) the Contract has been fully performed(including,without limitation,completion of punch list items and the satisfaction of the requirements set forth in Subparagraphs 9.8.1 and 9.8.2 of the General Conditions)by the Construction Manager,except for the Construction Manager's responsibility to correct nonconforming Work,if any,that has not yet been discovered and m satisfy other requirements,if any,which necessarily survive final payment; (2) a final Application for Payment and a final accounting of the Cost of the Work have been submitted by the Construction Manager and reviewed by the Owner's accountants and approved by the Owner as in accordance with the requirements of the Contract Documents; InR AIA DCCYmam At33--2009 tfomleriy A121^Clac-30031.C,yrghtO 1991,2003and 2009 by The American Iotrol a Architects.All Italics marvad. WARNING:Thl.AIA-Document b protected by U.S.Copyright Use and International Trestles.UnsutAonaed repmducUon or tllaMbWon of this AIA* 22 Document,or any potion of a may result In seven civil and criminal penalties,and will M prosecuted W the maximum extent passible under Na law. ( The dawment was produced by AM scream at 20:53'.17 on W11=18 under Order No.2212032907 which eyires on 03/05/4019.and is not for maele. User Notes: (3B9ADA11) (3) final Certificate of Payment has been issued by the Architect and approved by the Owner,as in accordance with the requirements of the Contract Documents; (4) operations manuals,manufacturer's warranties of materials or equipment incorporated into the Project and a duly executed assignment of such warranties,in a form and substance acceptable to Owner,have been delivered to Owner; and (5) the Construction Manager has delivered to Owner conditional final releases of liens from the Contractor and all Subcontractors and suppliers of my tiey in the fort attached as Exhibit G or in conformance with the requirements of Applicable Law for effective releases of lien claims regarding the Project,along with the all bills paid affidavit as set forth in the General Conditions. Owner and its accountants shall act promptly in reviewing the foregoing information delivered by Construction Manager and Owner shall make final payment not more than thirty-one(3 1)days after the date the Construction Manager has met the requirements of the Contract Documents for final payment as determined by the Owner. §7.2.2 The amount of the final payment shall be calculated as follows: (a) Take the sum of the Cos[of the Work substantiated by the Owner's final accounting and the Construction Manager's Fee;but in no event more than the Guaranteed Maximum Price. (b) Subtract amounts,if any,for which the Owner or Architect withholds,in whole or in part,payment or final Certificate of Payment as provided in the Contract Documents;and (c) Subtract the aggregate of previous payments made by the Owner. If the aggregate of previous payments made by the Owner exceeds the amount due the Construction Manager,the Construction Manager shall reimburse the difference to the Owner upon demand. The Owner's accountants will review and report in writing on the Construction Manager's final accounting within 30 days after delivery of the final accounting to the Owner and the Architect by the Construction Manager.Based upon such Cost of the Work as the Owner's auditors report to be substantiated by the Construction Manager's final accounting,and provided the other conditions of Subparagraph 7.2.1 have been met,the Architect will,within seven days after receipt of the written report of the Owner's auditors,either issue to the Owner a final Certificate for Payment with a copy to the Construction Manager,or notify the Construction Manager and Owner in writing of the Architect's reasons for withholding a certificate as provided in Section 9.5 of the General Conditions. §7.2.3 If the Owner's accountants report the Cost of the Work As substantiated by the Construction Manager's final accounting to be less than claimed by the Construction Manager,the Construction Manager shall be entitled to proceed in accordance with Section 4.3 of the General Conditions.Unless otherwise agreed by the parties,a claims proceeding with respect to a disputed final payment amount shall be brought by the Construction Manager no later than 30 days after the Construction Manager's receipt of a copy of the Architect's final Certificate for Payment. Failure to initiate such proceedings within this 30-day period shall result in the substantiated amount reported by the Owner's auditors becoming binding on the Construction Manager,Pending a final resolution of the disputed amount,the Owner shall pay the Construction Manager undisputed amounts. In the event of a disputed Claim by Owner against Construction Manager with respect to any amount or circumstance covered by any final Application for Payment,Owner may withhold from the Final Payment an amount not to exceed one- hundred(100%)percent of the disputed Claim. §7.2.4 No interest shall be payable to the Construction Manager on overdue amounts under any provision of the Contract Documents,except as may be required under Applicable(state)Law. Notwithstanding the foregoing,Construction Manager shall be paid interest at a rate of prime plus one percent T%)per annum for payments made beyond the final Application for Payment due date and which were not being rightfully withheld in accordance with the Contract Documents. §7.2.5 Owner may engage a title company of Owner's choice to issue an endorsement,on or before the forty- fifth(45'h)day after the day on which a Notice of Completion pertaining to the Work was filed,stating that no AIA OacummsA133^-MOO 1bmNXy A131^CMc-20031.CopyrghtO 1991,2003 and 2009 by The Amencen InaeNfs e of Ahbhiteb .All rights wW rorv . IDK ALA AIA*Documant N protected by U.S.Copyright Law and International Treetlea.UnauthoXaaU reproduction or dlahlbution of this AIA* 23 Docum nst ora"bonson of a may mouth severs civil and criminal Wealth.aM MII M proaacub l to the maximum aslant possible undsrthe law. 1 Thledw.vmentwae produced by ALA sUMamat20'53'.I7m 01 firma under ONer No.2212032907wheh expree on0L052019,and is notbrnmale. Uta.Nobe (3B9ADA111 mechanics or matcrialmen's liens appear of record as a result of labor performed on or materials delivered to the Work §7.2.6 Acceptance by Construction Manager of each payment provided for in this Agreement shall be a representation by Construction Manger to Owner that all Work required by this Agreement to be performed before such payment became due has been completed by Construction Manager in accordance with the terms and conditions of this Agreement and in accordance with the Drawings and Specifications. Acceptance of Final Payment by Construction Manager,any Subcontractor,Sub-subcontractor or material supplier shall constitute a waiver of all claims by that payee,except for those claims previously made in writing and identified by that payee as unsettled at the time of Construction Manager's final Application for Payment. §7.2.7 Construction Manager will,within 10 days of receipt of Final Payment,provide Owner with Unconditional Waivers and Releases of Lien(in accordance with the forms attached as Exhibit G or in compliance with Applicable Law) from Construction Manager and all Subcontractors. ARTICLE 8 INSURANCE AND BONDS §8.7 INSURANCE For all phases of the Project,the Construction Manager and the Owner shall purchase and maintain insurance as set forth in Exhibit H—Insurance Requirements attached hereto. §8.2 PERFORMANCE AND PAYMENT BONDS If requested by Owner,and prior to the commencement of the Work by the Construction Manager, the Construction Manager shall provide payment and performance bonds in the penal sum of 100%of the Guaranteed Maximum Price from a surety or sureties acceptable to the Owner for the Work.The Owner shall reimburse the Construction Manager for the cost of the premiums for the bonds upon presentation to the Owner of the actual invoice for the premium for the bonds n set forth in 6.6.1.The bond forms shall be AIA A312,or as otherwise required by Owner. The surety or sureties shall appear on Treasury Department Circular 570 with approval to issue bonds in the amount required hereunder.The Owner's receipt of the fully executed bonds is a condition precedent to the Owner's obligation to make any payments otherwise due hereunder.Any decrease in the Guaranteed Maximum Price shall not reduce the penal amount of the bond unless specifically provided for in said Change Order and Owner shall be entitled a pro arta refund of premiums paid for the bond in that event.If the surety thereon becomes insolvent or if its right to do business or license to issue bonds in the state in which the project is located is revoked,the Construction Manager shall immediately notify Owner of such event and within three(3)days following notification famish alternative bonds in conformance with this Paragraph.If the Construction Manager fails to post replacement bonds,the Owner shall have the right,at its option,to terminate the Construction Manager for default and the Contractor and its surety shall remain liable for all obligations hereunder. ARTICLE 9 DISPUTE RESOLUTION § 9.1 Any Claim between the Owner and Construction Manager shall be resolved in accordance with the provisions set forth in Section 4.3 of the General Conditions,and then if not resolved therein,through the method of dispute resolution selected in Article 1 S. Init. AMOpeumantAI33m-200(r odyAI21 ' W-2003).CopyngM®1991,2003 and 2009 by The American Institute W Amhiti All rights rnerval. WARNING:Th" AIA®Document la probcbd by U.S.OopyrlpM Lawand lnbmaaonal Tosses,Unauthorhatl rapmducnon or distribution of this AIA• 24 Document,orany boost of IL may raeull In whe re dlell and ddminal bananas,and will ba prosecuted to the maximum extant poesible underthe law. ( This documentwas pnNumd Dy AIA sokxere at 20'.53:17 on 0a/11YL01a underoter No.2212032907 which expires on 0ab5=19,and is not be meale. Usher Nobs: (31HADA11) i ARTICLE 10 TERMINATION OR SUSPENSION §10.1 TERMINATION PRIOR TO ESTABLISHMENT OF THE GUARANTEED MAXIMUM PRICE §10.1.1 Prior to the execution of the Guaranteed Maximum Price Amendment,the Owner may terminate this Agreement upon not less than seven(7)days'written notice to the Construction Manager for the Owner's convenience and without cause. §10.1.2 If the Owner terminates the Contract pursuant to Section 10.1.1 after the commencement of the Construction Phase but prior to the execution of the Guaranteed Maximum Price Amendment,the Owner shall pay to the Construction Manager an amount calculated as follows: .1 Take the Cost of the Work incurred by the Construction Manager to the time of termination; .2 Add the Construction Manager's Fee computed upon the Cost of the Work to the date of termination at the rate studied in Section 5.1;and .3 Subtract the aggregate of previous payments made by the Owner for Construction Phase services. The Owner shall also pay the Construction Manager fair compensation,either by purchase or rental at the election of the Owner,for any equipment owned by the Construction Manager which the Owner elects in retain and which is not otherwise included in the Cost of the Work under Section 10.1.3.1. Construction Manager's recovery as expressly authorized in this Section 10.1.2 shall be Construction Manager's sole and exclusive remedy in the event of the Owner's termination of the Contract pursuant in Section 10.1.1 above. §10.1.3 To the extent that the Owner elects to take legal assignment of subcontracts and purchase orders(including rental agreements),the Construction Manager shall,as a condition of receiving the payments referred to in this Article 10,execute and deliver all such papers and take all such steps,including the legal assignment of such subcontracts and other contractual rights of the Construction Manager,as the Owner may require for the purpose of fully vesting in the Owner the rights and benefits of the Construction Manager under such subcontracts or purchase orders.All Subcontracts,purchase orders and rental agreements entered into by the Construction Manager will contain previsions allowing for assignment in the Owner as described above. If the Owner accepts assignment of subcontracts,purchase orders or rental agreements as described above,the Owner will reimburse or indemnify the Construction Manager for all costs arising under the subcontract,purchase order or rental agreement,if those costs would have been reimbursable as Cost of the Work if the contrut had not been terminated.If the Owner chooses not to accept assignment of any subcontract,purchase order or rental agreement that would have constituted a Cost of the Work had this agreement not been terminated,the Construction Manager will terminate the subcontract,purchase order or rental agreement and the Owner will pay the Construction Manager the costs necessarily incurred by the Construction Manager because of such termination. §10.2 TERMINATION SUBSEQUENT TO ESTABLISHING GUARANTEED MAXIMUM PRICE Following execution of the Guaranteed Maximum Price Amendment and subject to the previsions of Section 10.2.1 and 10.2.2 below,the Contract may be terminated as provided in Article 14 of the General Conditions. §10.2.1 If the Owner terminates the Contract after execution of the Guaranteed Maximum Price Amendment,the amount payable to the Construction Manager pursuant to Sections 14.2 and 14.4 of the General Conditions shall not exceed the amount the Construction Manager would otherwise have received pursuant to Section 10.1.2 of this Agreement. Intl AIA Oocumed A133^ -2009 tfomxrly AlN^'CMc-2OWI.Copyrphtm 1991,2003and 2009 by The Amensnn lnameaf Archne.n.All hires reserved. WARNING:Ibis Alas Document ill Protected by U.S.Capydaht Lawead lnremational Treaties.UnauMorized reprpductlpn or tliatdbuWn o(MIe AIAo 25 nocumed,or any portion of N,may mint in severe civil and criminal penalties,and Will bs pmseculed an We maalmum erten[pessible antler Me law. This comment was pmduced by AA software at 20:53:17 on 041112018 under Oder No,2212032907 which expires on 03/0512019,and is not M reale. User Notes: (3a9ADA11) i §10.3 SUSPENSION The Work may be suspended by the Owner As provided in Article 14 of the General Conditions.In such case,the Guaranteed Maximum Price and Contract Time shall be increased as provided in Section 14.3.2 of the General Conditions,except that the term"profit"shall be understood to mean the Constitution Manager's Fee as described in Sections 5.1 and 5.3.5 of this Agreement. §10.4 LIMITATION OF DAMAGES UPON TERMINATION Construction Manager agrees that,upon Construction Manager's termination for cause(or Owner's termination for convenience),Construction Manager's recovery for damages and lost profits,if any,for Owner's breach(or early termination),shall be limited as set forth in this Article 10 of the Agreement and Article 14 of the General Conditions. ARTICLE 11 MISCELLANEOUS PROVISIONS §11.1 Terms in this Agreement shall have the same meaning as those in the General Conditions. §11.2 OWNERSHIP AND USE OF DOCUMENTS Section 1.5 of the General Conditions shall apply to both the Preconstmction and Construction Phases. §11.3 GOVERNING LAW Section 13.1 of the General Conditions shall apply to both the Preconstruction and Construction Phases. §11.4 ASSIGNMENT The Owner and Construction Manager,respectively,bind themselves,their agents,successors,assigns and legal representatives to this Agreement.The Construction Manager shall not assign this Agreement without the written consent of the Owner. Owner may,upon written notice to the Construction Manager and without the consent of the Construction Manager assign this Contract and Owner's rights thereunder as provided in the General Conditions. In addition to,and without limiting its rights hereunder,Owner may upon written notice to the Construction Manager and without the consent of the Construction Manager,also assign this Contract to a parent,subsidiary,or affiliated entity of the Owner,and in addition that the Owner may assign this Agreement to a lender providing financing for the Project Except as provided in Section 13.2.2 of the General Conditions,neither party to the Contract shall assign the Contract as a whole without written consent of the other.If either party attempts to make such an assignment without such consent,that party shal I nevertheless remain legally responsible for all obligations under the Contract. §11.5 CONFIDENTIALITY Construction Manager recognizes that many facts of Owner's operations are valuable business secrets. Accordingly,Construction Manager will treat all of Owner's data and information that become known or are made available to Construction Manager in a confidential mamer. Without limiting the foregoing, Construction Manager agrees to comply with the confidentiality and non-disclosure requirements attached hereto as Exhibit I-Non-Disclosure and Confidentiality Requirements. The provisions of this Section shall survive the termination of this Contract. Further,the provisions of this Section shall be expressly incorporate into all agreements with Subcontractors entered into by Construction Manager in connection with the Project. §11.6 ATTORNEYS'FEES In my dispute by the parties hereto arising out of or related to this Agreement,the party or parties whose position is selected,awarded,or successful(regardless of whether damages are awarded)will be awarded its attomeys'fees, costs,and expenses incurred in connection with the dispute. The fact finder will determine the prevailing party and award to such prevailing party,in addition to my other relief to which such party is entitled to recover,its attorneys' fees,costs,and expenses incurred in connection with the dispute. §11.7 AUTHORITY OF ARCHITECT Notwithstanding my contrary provision contained herein,no consent,decision,determination,approval or certification to be made by Architect shall be binding upon Owner unless and to the extent agreed to in writing by Owner. Init. AP Document At 33^ -2009 formerly Au1weals-20031 copyright m 1991.2003 and 2009 by The Amenwn Institute of Architects.All rights reserved. WARNING:This AIA• Document lea protected by U.S.cartel law and International Treader.Unauthomed reproduction or distribution of this Alas 26 casement.or any portion of it,may nun In ween civil and criminal p rralnn,and will be prosecuted to the maximum extent poeYhiS under the law. f This document was produced by AA software at 20:53:17 an MH 12018 under Order No 2212032907 which eryires on 010513019,and is War male. Uaar Notes: (389ADA11) §11.8 LENDER'S REQUIREMENTS The Construction Manager acknowledges that the Owner is financing the Work,or any portion thereof,with a loan from Owner's lender("Lender"). Construction Manager shall provide to the lender(or lenders)famishing financing for the development and construction of the Project any Project information that such lenders)or its (their)designated representatives require or any such certification that Construction Manager is obligated to provide to the Owner under the Contract Documents.The Construction Manager further agrees to execute such documents w may be reasonably required by the lender or lenders furnishing financing for the development and construction of the Project and which are consistent with commercial practices for the financing of a project of the size and scope of the Project,including but not limited to the following examples:(a)a subordination of Construction Manager's lien rights(including a lien on removables or fixtures)to any liens of the lender(s)securing any obligations arising from the Project;(b)an agreement by Construction Manager to provide notice prior to suspension of the Work or termination of the Contract by Construction Manager and providing such lender(s)with an opportunity to cure Owner's default;(c)contingent assignment of this Agreement to the lenders)in the event of a default by Owner under this Contract or under the documents creating the loans)provided that Construction Manager shall not be required m perform additional work for lender unless lender has assumed responsibility for payment of such additional work;(d)an agreement by Construction Manager to certify its compliance with the Contract Documents; and(e)acknowledgment that no Change Order or Construction Change Directive resulting in a material increase to the Contract Time or Cost of the Work will be effective without the consent of such lenders). Construction Manager shall also agree to such modifications to this Agreement as such lenders)may reasonably require, provided the Construction Manager's costs or time of performance are not increased unless this Agreement is equitably adjusted. §11.9 OTHER PROVISIONS §11.9.1 Multiple Original Counterparts. This Agreement may be executed in multiple original counterparts,each of which shall be of equal dignity.Faxed or electronically scanned signatures shall be sufficient for the execution and delivery of this Agreement. §11.9.2 Partial Invalidity Does Not Invalidate the Agreement. The invalidity of any part,clause,or portion of the Contract Documents shall not impair or affect in any manner whatsoever the validity,enforceability or effect of the remainder of the Contract Documents. §11.9.3 Survival. All provisions of the Contract which by their nature survive termination of this Agreement or final completion of the Work,including without limitation,all warranties,indemnities,indemnity obligations, confidentiality obligations,and insurance requirements that extend past completion of the Work,shall remain in force and effect after final completion or any termination. §11.9A Section References. The section headings and Cross references contained in the Contract Documents are for reference purposes only and shall not affect the meaning or interpretation of the Contract. §11.9.5 Owner and Construction Manager both acknowledge and agree that each has reviewed the terms of this Agreement and has had an opportunity to consult an attorney. The parties further agree that the rule of contract construction that any ambiguities are resolved against the drafting party will be subordinated in the principle that the terns and provisions of this Contract will be construed fairly as to all parties and not in favor of or against any party. §11.9.6 Unless as otherwise specifically stated herein,Owner's rights under this Agreement and elsewhere in the Contract Documents,are cumulative and not in limitation of any rights of the Owner(i)granted in the Contram Documents;or(it)at law or in equity. ARTICLE 12 SCOPE OF THE AGREEMENT §12.1 This Agreement,along with the all Exhibits attached hereto which are incorporated by reference as if fully set forth herein,and the General Conditions,and any Modifications to this Agreement represent the entire and integrated agreement between the Owner and the Construction Manager and supersedes all prior negotiations, representations or agreements,either written or oral.This Agreement may be amended only by written instrument signed by both Owner and Construction Manager. AIADocurn MA133"-30x9 pnrmed ^y A121Mo-200]6 Comni®1991,M03 and 2009 by The American Institute of Antibiotic.All damn monad. Ink WARNING:%it Alto Document is protacbtl by U.S.Corsi Law antl lntmatlomalTreatln.UreuMpdzed reprodudlpnocdl9mbutlpn olMltAW 27 Document or any porton Oft,may mux In aawre civil and criminal pamaftles,and war ba pmecuMd to Me maximum exact content under Mt law. / Title document was produced by Ali aoawae at 20'.53:17on 04/11cW10 under Oow No,012032907 wi volume on 03101 and is motor resale. UNr Nobel (3B9ADA11) §12.2 The following documents comprise the Agreement: .1 AIA Document A133-2009,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price,as modified by the Ponies; .2 AIA Document A201-2007,General Conditions of the Contract for Construction,as modified by the Parties. .3 Exhibits,attached hereto and incorporated by reference as if fully set forth herein as follows: Exhibit A—List of Designated Representatives and Contact Persons Exhibit B-Legal Description of Land Exhibit C-Key Personnel Exhibit D—Liquidated Damages and Critical Milestones Exhibit E—Change Order Pricing Exhibit F—General Conditions Costs Exhibit G—Lien Waiver Forms Exhibit N—Insurance Requirements Exhibit 1—Non-Disclosure and Confidentiality Exhibit J—Prevailing Wage Rates(Round Rock,TX) Exhibit K—Reserved Exhibit L—City/T'EDCO Contribution Cap Exhibit M—Construction Manager's Design-Build Scope of Work Exhibit N-General Description of Project Scope and List of Plans .4 Any amendments or modifications duly approved and executed and made pan of this Agreement. This Agreement is entered into as of the day and year first written above. [-END OF DOCUMENT*] Ink AMDxumem rme A133'a-20091rurly A121^'CMpy Clio Con9nto ID91,2003 and 2009 M The Amencan lnstdute cff rohdecte All right;resemol. WARNING:Thb AIAe Docunhouls aotectal by U.S.Cppyrlaht leWBM lnbmatlontl Trxtln.Unauthorized mprodiclbn ordistriadi.n rthis AIA- 26 Document,or any addition of N,may nesull in severe civil and criminal pennies,mtl will be prosecuted to the maximum oxbnt aosslhle under Ne law. 1 This d.ornartweaproduced Ey AlAsonaam M20'.53:17 on 0U11nois undaGder Ne.U1203290)whiciI expecaon DY05I2019,and ianoHor renals. User Nobc (3119ADA11) SIGNATURE PAGE TO AIA DOCUMENT A133-2009 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONSTRUCTION MANAGER OWNER: ROUND ROCK TRANSPORTATION AND ECONOMICDEVELOPME CO TION By: 6teigB W, �-}ann I Vit, ( {V2 lDW CONSTRUCTION MANAGER: RENSEL PHELPS CONSTRUCTION A Delaware geqrdl partnership NS Its: C.E RtES1b�M' EXHIBITS TO AGREEMENT AIA / A133 - 2009 BETWEEN Round Rock Transportation and Economic Development Corporation AND Hensel Phelps PROJECT: The City of Round Rock Convention Center Round Rock, TX TABLE OF CONTENTS ExhibitA LIST OF DESIGNATED REPRESENTATIVES AND CONTACT PERSONS Exhibit B PROJECT SITE DESCRIPTION Exhibit C CONSTRUCTION MANAGER'S KEY PERSONNEL AND RATES SCHEDULE Exhibit D CRITICAL MILESTONES AND LIQUIDATED DAMAGES Exhibit E CHANGE ORDER PRICING Exhibit F GENERAL CONDITIONS COSTS Exhibit G LIEN WAIVER FORMS Exhibit H INSURANCE REQUIREMENTS Exhibit I NON-DISCLOSURE AND CONFIDENTIALITY REQUIREMENTS Exhibit J PREVAILING WAGE RATES Exhibit K [Reserved]. Exhibit L THE CITY OF ROUND ROCK/TEDCO'S MAXIMUM FINANCIAL RESPONSIBILITY PURSUANT TO AGREEMENT Exhibit M CONSTRUCTION MANAGER DESIGNED WORK EXHIBIT A LIST OF DESIGNATED REPRESENTATIVES AND CONTACT PERSONS OWNER'S DESIGNATED REPRESENTATIVES: Travis Wilkes Dale Hensen(KR Acquisitions/Kalahari) An additional Owner's Designated Representative may be added and the Owner's Designated Representative may be changed,effective only upon written notice to the Construction Manager executed by the then-current Designated Representative or an officer of the Owner. Without limiting any other provisions of the Contract Documents, all notices of claims for changes to the Contract Time or the Contract Sum, notices of all other claims by Construction Manager or its subwntractors (of any tier) against the Owner, notices of default on the pan of the Owner, notices demanding action or requiring cure by the Owner, or notices of termination or required as a condition of termination shall not be effective until and unless received by Owner's Designated Representative, with a copy contemporaneously sent to and received by the following: Laurie Hadley 221 E. Main Street Round Rock,Texas 78664 Stephan Sheets 309 E. Main Street Round Rock,Texas 78664 The parties further acknowledge that Owner may retain the services of one or more additional consultants to assist the Owner in connection with the Project and that, upon Owner's written direction, Construction Manager shall copy such consultants with regard to such notices or communications as directed by Owner and shall cooperate fully with such consultants and provide access to the Project as reasonably required by such consultants. No waiver, consent or modification of the terms of the Contract or Construction Manager's obligations to perform thereunder or any other approval shall be effective or enforceable against Owner except to the extent such waiver, consent, modification or approval is in writing and duly executed by Owner's Designated Representative.Without limiting the foregoing, all Change Orders, Change Directives,and Modifications must be executed by Ownefs Designated Representative. Consistent with the foregoing, no consultant retained by Owner, including but not limited to Owner's Project Manager, shall have authority to waive, excuse, or release Construction Manager with regard to any obligation arising under the Contract or to bind Owner with regard to any matter arising under the Contract or related to the Project, except to the extent expressly authorized in writing by the Owner's Designated Representative. Exhibit A-1 Architect's Designated Representative: Richard Johnston Steve Valenta HKS Architects, Inc. 350 N Saint Paul Street Suite 100 Dallas,TX 75201 All notices and other written communications to be provided by the Construction Manager to the Architect under the terms of the Contract shall be sent to the Architect's Designated Representative noted above. Construction Manager's Designated Representative: Michael Orlowski Erik LaRue Hensel Phelps 8326 Cross Park Dr. Austin,TX 78754 All notices to be provided to the Construction Manager under the terms of the Contract, including but not limited to all preliminary notices for claims for changes in the Contract Time or Contract Sum, all notices of claim, or other written communications that affect the Contract Time or the Contract Sum or that assert any claim by the Owner against the Construction Manager shall be sent to the Construction Managers Designated Representative noted above. Upon written notice signed by the current Construction Manager's Designated Representative or a duly authorized corporate officer of the Construction Manager and delivered to Owner, additional persons may be added as Designated Representatives of the Construction Manager, subject to such restrictions on their authority as specified in the written notice. Exhibit A-2 EXHIBIT B PROJECT SITE DESCRIPTION Lot 2, 9.476 Acres, Block C of the Final Plat of Kalahari Resort and Replat of Bertil Telander Subdivision 9CeV00Zb `{ 2-. (Q) 3-S, t!xAMelgf NU 2014�o353�j IV, -1'6re. &Rl- cc Xc -Me Cutz� w1LU'4m1t=A1 CwlVt.-Ej I tCXAca . Exhibit B-1 EXHIBIT C CONSTRUCTION MANAGER'S KEY PERSONNEL AND RATES SCHEDULE Construction Manager shall have the following Key Personnel dedicated to the Project: Michael Orlowski(Multiple Projects) William Higgins(Multiple Projects) Erik LaRue Cody Adams Scott Sansom Ed Kowalski Pursuant to Sections 6.2.2 and 6.2.3 of the Agreement, wages or salaries of Construction Manager's personnel, to the extent reimbursable as Cost of the Work under the Contract Documents, shall be reimbursed based upon the following rates, subject to such Labor Burden as authorized herein: Position Hourly pats Operations Manager $109.38 Project Manager $98.17 Design Manager $98.17 General Superintendent $119.94 Project Superintendent $98.67 Mop Superintendent $98.67 Area Superintendent $86.38 Project Engineer $70.14 Vdc Engineer $82.24 Project Scheduler $82.24 Safety Manager $83.23 OC Manager $90 92 OC Engineer $79.22 Office Engineer $58.65 Chief Estimator $109.38 Senior Estimator $98.17 Estimator $74.57 The foregoing Wage and/or Salary rates and Labor Burden for the respective personnel or classifications of personnel performing Work or services hereunder are agreed upon and fixed, and such rates are not subject to audit. However, the time chargeable to the Project hereunder for such employees or that portion of the wages allocable to the Cost of the Work are subject to audit. Further, the proper classification of employees charged to the Cost of the Work(when rates are based upon classification)is subject to verification as reasonably required by the Owner. Exhibit C-1 EXHIBIT D CRITICAL MILESTONES AND LIQUIDATED DAMAGES LIQUIDATED DAMAGES SCHEDULE Construction Manager acknowledges the date required by the Contract Documents for the Substantial Completion of the entire Work of the Master Project(including both Convention Center Contract and Kalahari Hotel, Waterpark, and Onsite Improvements Contract) are essential to the Owner's beneficial use of the improvements to be constructed hereunder and, therefore, time is of the essence in meeting each of those dates. Accordingly, the parties hereto expressly agree that, if the Construction Manager fails to meet such Contract Time requirements, subject to adjustments as provided in the Contract Documents, the Owner shall, as its sole remedy for delay damages arising out of the failure to meet such Contract Time requirements, be entitled to retain and/or recover from the Construction Manager, as Liquidated Damages and not as a penalty, the respective amounts set forth below, which are hereby agreed to be a reasonable estimate of damages the Owner will incur as a result of Construction Manager's failure to meet the applicable Contract Time requirements. Liquidated Damages for the entire Work: If the Construction Manager shall neglect,fail, or refuse to achieve Substantial Completion of the entire Work of the Master Project(including both Convention Center Contract and Kalahari Hotel,Waterpark, and Onsite Improvements Contract)by the date required below for Substantial Completion of the entire Work, subject to adjustments in the Contract Time as provided in the Contract Documents,then the Construction Manager (and the Construction Managers Surety, if any, in the case of default)agrees to pay to the Owner as Liquidated Damages,and not as a penalty or forfeiture, the sum or sums for each day of such delay as set for the below: Substantial Completion Date Amount of Liquidated Damages per Calendar Day November 1,2020 $50,000 per day Notwithstanding the foregoing, Liquidated Damages shall begin on November 23, 2020, and the time between November 1, 2020 and November 22, 2020 shall be referenced as the grace period("Grace Period"). The foregoing Liquidated Damages apply to the delivery by Construction Manager of the entire Master Project by the Substantial Completion Date listed above,taking into account the Grace Period. The parties acknowledge that the Liquidated Damages amount is a singular amount applicable to the Master Project and not to be aggregated between the Convention Center Project and Kalahari Project. Exhibit D-1 EXHIBIT E CHANGE ORDER PRICING 1. Chance Order Pricing Methods. Whenever Change Order proposals to adjust the Guaranteed Maximum Price become necessary, the Owner will have the right to select the method of pricing to be used by the Construction Manager in accordance with the pricing provisions found in this Section. The options for the pacing of the Subcontractors'Work will be(1) Lump Sum Change Order Proposal or (2) Cost of the Work plus Fee Change Order Proposal as defined in the following provisions: Lump Sum Change Order Proposals. The Construction Manager (through any lower tier subcontractor)will submit a properly itemized Lump Sum Change Order Proposal covering the additional work and/or the work to be deleted. This proposal will be itemized for the various components of work and segregated by labor, material, and equipment in a reasonably detailed format reasonably satisfactory to the Owner. Consistent with the foregoing, the Owner will require itemized Change Order proposals from the Construction Manager, Subcontractors, and Sub-subcontractors regardless of tier(Downstream Subcontractors). Details to be submitted will include estimates showing materials quantity take-offs, material prices by item, and related labor hour pricing information in such detail as reasonably required by Owner in order to determine how the proposed pricing was computed. Except as otherwise provided herein, such lump sum proposals shall be based upon costs reimbursable as Cost of the Work and subject to the limitations and conditions set forth in Articles 6 and 7 of the Agreement. Notwithstanding the foregoing, agreed reimbursement rates set out in the Agreement are only applicable to the Construction Manager, and agreed reimbursement rates set out in the respective Subcontract Agreements may be used for pricing for that Subcontractor's Change Order work. Estimated labor costs shall be based on the actual cost per hour paid by the Construction Manager(for Self-Performed Work) and the respective Subcontractors and Downstream Subcontractors for those workers who are reasonably anticipated to perform the Change Order work. Estimated labor hours shall include hours only for those workmen and supervisory personnel directly involved in performing the Change Order work. Labor burden allowable in Change Orders for Construction Manager's Seg Perform Work shall be as set forth in Article 6 of the Agreement. Labor burden allowable in Change Orders for Subcontractors and Downstream Subcontractors shall be defined as employees net actual cost of payroll taxes (FICA, Medicare, SUTA, FUTA), net actual cost for employer's cost of union benefits (or other usual and customary fringe benefits actually paid, if the employees are not union employees), and net actual cost to employer for worker's compensation insurance. Cost of the Work Plus Fee Change Order Proposals. As an alternative to Lump Sum Change Order Proposals,the Owner may elect to have any Change Order work performed on a time and material plus a fee basis. Upon written notice to proceed, the Construction Manager shall perform such authorized extra Work(for Construction Manager's Self Perform Work) or shall cause its Subcontractors (and their Downstream Subcontractors) to perform such authorized extra Work at actual cost for direct labor (working foremen, journeymen, apprentices, helpers, etc.), actual cost of labor burden(allowable as provided above), actual cost of material used to perform the extra work, and actual cost of rental of major equipment (without any separate charge for administration, clerical expense, general supervision or superintendent of any nature whatsoever, including general foremen, or the cost or rental of small tools, minor equipment, or plant plus the approved markup for fee or profit and general conditions costs in an amount not to exceed the percentages as set forth in Section 5.1.3 of the Agreement. Owner and Construction Manager may agree in advance in writing on a maximum price for this work and Owner shall not be liable for any charge in excess of the maximum. Exhibit E-1 2. Computing Subcontractor Costs. Any adjustments to Subcontracts shall,except as otherwise agreed in writing by Owner and Construction Manager, be subject to the Change Order Pricing requirements as provided herein or as may be set forth in the respective Subcontract Agreement(which, in the event of a conflict,the terms of the respective Subcontract Agreement shall control provided that Owner has approved such conflicting terns). Except as otherwise expressly agreed by the Owner, any adjustment to Subcontracts with regard to mark-ups for overhead and profit shall be subject to the limits as set forth in Section 5.1.3 of the Agreement. It is understood that the Subcontractor Change Order Pricing Requirements apply to all types of contracts and/or subcontracts specifically including lump sum (or fixed price contracts), unit price contracts, and/or cost of the work plus fee contracts with or without a guaranteed maximum price. It is further understood that these Change Order Pricing Requirements will apply to all methods of change order pricing specifically including Lump Sum Change Order Proposals, unit price Change Order Proposals (to the extent the parties agree on unit pricing), and Cost of the Work Plus Fee Change Order Proposals. 3. Accurate Change Order Pricing Information. Construction Manager agrees to submit accurate documentation to support any Change Order Proposals or other contract price adjustments in accordance with the terms of the Contract with respect to pricing of Change Orders. 4. Right to Verify Change Order Pricing Information. Construction Manager agrees that any designated Owners representative will have the right to examine the records of the Construction Manager to verify the accuracy and appropriateness of the documentation used to price Change Order Proposals. Construction Manager shall furnish Owner with copies of all Change Orders issued to Subcontractors. 5. Deductive Change Orders and Net Deductive Changes. The application of the markup percentages as set forth in Section 5.1.3. of the Agreement will apply to both additive and deductive Change Orders. Inthose instances where a change involves both additive and deductive work,the additions and deductions will be netted and the markup percentage adjustments will be applied to the net additive or deductive amount. 6. Change Order Proposal Time and Construction Change Directive. The Construction Manager's proposals for changes in the Guaranteed Maximum Price or the Contract Time shall be submitted promptly but within twenty one (21)calendar days of the Owner's request unless the Owner extends such period of time due to the circumstances involved or Construction Manager,by exercising reasonable diligence,is not able to finalize such proposal within fourteen calendar days. Construction Manager shall contractually require all Subcontractors to respond to requests for pricing in conformance with the pricing requirements herein and time impact information in an accurate, diligent and prompt manner to allow for Construction Managers' compliance with the twenty one day proposal submission requirement. If such proposals are not received in a timely manner, if the proposals are not acceptable to Owner,or if the changed work should be started immediately to avoid damage to the Project or costly delay, the Owner may issue a Construction Change Directive to the Construction Manager to proceed with the changes without waiting for the Construction Manager's proposal or for the formal Change Order. The cost or credit and/or time extensions will be determined by negotiations as soon as practical thereafter and incorporated in a Change Order to the Contract. In the event that the parties are unable to agree on the amount of the cost or credit of the changed work, the provisions of Section 7.3 of the General Conditions shall apply. Exhibit E-2 EXHIBIT F GENERAL CONDITIONS COSTS Convention Center Project lump sum General Conditions Costs are as follows: Supervision- $1,574,205 Plans and Printing- $2,930 Job Site Office Complex- $176,337 Total Lump Sum General Conditions: $1,753,472 Exhibit F-1 EXHIBIT G LIEN WAIVER FORMS Construction Manager shall use the following forms of lien waivers, or any form as may be required by Applicable Law, as required by the terms of the Agreement. [See forms on following page.] Exhibit G-1 CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT Project Job No. On receipt by the signer of this document of a check from (maker of check) in the sum of$ payable to (payee or payees of check) and when the check has been properly endorsed and has been paid by the bank on which it is drawn, this document becomes effective to release any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position that the signer has on the property of (owner) located at (location) to the following extent: (job description). This release covers a progress payment for all labor, services, equipment, or materials famished to the property or to (person with whom signer contracted) as indicated in the attached statement(s) or progress payment request(s), except for unpaid retention, pending modifications and changes,or other items famished. Before any recipient of this document relies on this document, the recipient should verify evidence of payment to the signer. The signer warrants that the signer has already paid or will use the funds received from this progress payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project in regard to the attached statement(s)or progress payment request(s). Date (Company name) By (Signature) (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job title) of (company name), known to me to be the person whose time was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which, witness my hand and official seal on this the _ day of NOTARY PUBLIC—STATE OF TEXAS Exhibit G-2 CONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT Project: Job No.: On receipt by the signer of this document of a check from (maker of check) in the sum of $ payable to (payee or payees of check) and when the check has been properly endorsed and has been paid by the bank on which it is drawn, this document becomes effective to release any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position that the signer has on the property of (owner) located at (location) to the following extent: (job description). This release covers the final payment to the signer for all labor, services, equipment, or materials furnished to the property or to (person with whom signer contracted). Before any recipient of this document relies on this document, the recipient should verify evidence of payment to the signer. The signer warrants that the signer has already paid or will use the funds received from this final payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project up to the date of this waiver and release. Date: (Company name) By (Signature) (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job title) of (company name), known to me to be the person whose name was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which, witness my hand and official seal on this the _ day of NOTARY PUBLIC—STATE OF TEXAS Exhibit G-3 NOTICE: This document waives rights unconditionally and states that you have been paid for giving up those rights. It is prohibited for a person to require you to sign this document if you have not been paid the payment amount set forth below. If you have not been paid, use a conditional release form. UNCONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT Project Job No. The signer of this document has been paid and has received a progress payment in the sum of $ for all labor, services, equipment, or materials furnished to the property or to (person with whom signer contracted) on the property of (owner) located at (location) to the following extent: (job description). The signer therefore waives and releases any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position that the signer has on the above referenced project to the following extent: This release covers a progress payment for all labor,services, equipment, or materials furnished to the property or to (or person with whom signer contracted)as indicated in the attached statement(s) or progress payment request(s), except for unpaid retention, pending modifications and changes, or other items furnished. The signer warrants that the signer has already paid or will use the funds received from this progress payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project in regard to the attached statement(s) or progress payment request(s). Date: (Company name) By: (Signature) Its: (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job title) of (company name), known to me to be the person whose name was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which,wimms my hand and official sea]on this the_day of NOTARY PUBLIC—STATE OF TEXAS Exhibit G-4 NOTICE: This document waives rights unconditionally and states that you have been paid for giving up those rights. It is prohibited for a person to require you to sign this document if you have not been paid the payment amount set forth below. If you have not been paid, use a conditional release form. UNCONDITIONAL WAIVER AND RELEASE ON FINAL PAYMENT Project: Job No. The signer of this document has been paid in full for all labor, services, equipment, or materials furnished to the property on the property of (owner) located at (location)to the following extent: (job description). The signer therefore waives and releases any mechanic's lien right, any right arising from a payment bond that complies with a state or federal statute, any common law payment bond right, any claim for payment, and any rights under any similar ordinance, rule, or statute related to claim or payment rights for persons in the signer's position. The signer warrants that the signer has already paid or will use the funds received from this final payment to promptly pay in full all of the signer's laborers, subcontractors, materialmen, and suppliers for all work, materials, equipment, or services provided for or to the above referenced project up to the date of this waiver and release. Date: (Company) By: (Signature) (Title) STATE OF TEXAS § COUNTY OF § Before me, the undersigned authority, on this day personally appeared (name), the (job tide) of (company name), known to me to be the person whose time was subscribed to the forgoing instrument and acknowledged to me that he/she executed the same for the purposes and consideration therein expressed. To certify which,witness my hand and official seal on this the_day of NOTARY PUBLIC—STATE OF TEXAS Exhibit G-5 EXHIBIT H INSURANCE REQUIREMENTS The following insurance requirements shall apply to the Master Project(as defined in the Agreement), which includes the Convention Center, Hotel and Indoor Waterpark,and certain onsite public improvements, and all insurance shall be in place prior to commencement of construction of the Work on any part of the Master Project, unless specified otherwise by Owner. For purposes of these insurance requirements the term "Owner whether singular or plural shall include KR Acquisitions LLC; the City of Round Rock, Texas; and Round Rock Transportation and Economic Development Corporation('TEDCO"). A. CONSTRUCTION MANAGER INSURANCE Construction Manager shall procure and maintain at Its own expense policies of insurance of the types and in the minimum amounts as follows: All policies above must be provided through insurers authorized to do business in the state in which the Project is located.These insurers must have an A. M. Best rating of no less than A and a financial size of VIII or more. If other contract documents require more stringent financial security criteria, the more stringent requirements shall control. 1. COMMERCIAL GENERAL LIABILITY("CGL") Construction Manager shall provide and maintain during the term of the Work and for a period not less than ten (10) years after completion of the entire Work of the Master Project (as defined in the Agreement), including any warranty periods the following commercial general liability insurance. Commercial General Liability written on an ISO Occurrence Coverage Form CG 00 01 (or a substitute forth providing equivalent coverage): Each Occurrence—Bodily Injury/Property $2,000,000 Personal Injury $2,000,000 General Aggregate $4,000,000 Products/Completed Operations Aggregate $4,000,000 If any of the insurance required to be maintained pursuant to this Agreement contains aggregate limits which apply to the operations of the Construction Manager other than those operations which are the subject of this Agreement, and such limits are diminished or reduced below the limits required hereunder after one or more incidents, occurrences, claims, settlements or judgments against such insurance or for any other reason, then Construction Manager shall take immediate steps to restore aggregate limits or shall maintain other insurance protection for such aggregate limits. CGL Policy must include: • Coverage for, premises and operations; products and completed operations; contractual liability of a type that provides coverage for the indemnification clause in this Contract;personal injury liability; employees as insureds; independent contractor protective liability; incidental medical malpractice; explosion, collapse and underground damage and must include, severability of interest language. It must also include coverage for cross liability claims between Insureds. • General Aggregate on a"per project"basis. • Additional Insured status using forms CG 20 10 (10 01)for ongoing operations and CG 20 37 (10 01)for completed operations or their equivalent to apply for: Exhibit H-1 KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round, Rock, Texas; TEDCO; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). Additional Insured status shall be provided during construction and for the duration of any applicable statute of limitations and statute of repose after Substantial Completion of the Project. Coverage to apply on a primary and non-contributory basis. • Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahad Management Co. LLC; the City of Round Rock, Texas; and TEDCO (as defined herein above); and their respective subsidiaries, parents, affiliates, and the directors, officers,employees, successors and assigns of these entities, and their lendegs). • Policy must not exclude coverage for Exterior Insulation and Finish Systems(EIFS). Construction Manager must agree to provide completed operations coverage under this policy during the construction phase and for the duration of the applicable statute of limitations and statute of repose (not less than 10 years)after substantial completion of the Project. 2. AUTOMOBILE LIABILITY Construction Manager shall provide and maintain business automobile liability insurance coverage during the term of the Work, including any warranty periods, on a standard form (approved by the Texas Department of Insurance) written to cover all owned, hired, non-owned automobiles, and motor vehicles, subject to the following minimum limits: Combined Single Limit $1,000,000 Including bodily injury/property damage arising out of the use, ownership and / or maintenance of owned, non-owned and hired vehicles. The Automobile Liability policy shall include an endorsement (form TE 0202A for Projects located in Texas or substantial equivalent for projects located in other jurisdictions) providing thirty(30)days' notice of cancellation to Owner. Policy must include: • Additional Insured status for: KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rack, Texas; and TEDCO; and each of their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities,and their lender(s). • Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC;the City of Round Rock,Texas;and TEDCO;and each of their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). • Contractual liability • Where transportation of any hazardous materials or pollutants may be required, the Automobile Liability insurance required by this Section shall include upset and overturn coverage and a broadened pollution endorsement. MCS 90 Endorsement should be included, where applicable. 3. WORKERS COMPENSATIOWEMPLOYER LIABILITY Construction Manager shall provide and maintain during the term of the Work, including any warranty periods, Workers' Compensation Insurance Coverage [as defined in Sec. 401.011(44) of the Texas Labor Code for Projects located in the State of Texas] for all Construction Manager's workers at the site of the Project with Employer's Liability Coverage with limits of: Each Accident $1,000,000 Disease Policy Limit $1,000,000 Disease Each Employee $1,000,000 Limits can be achieved via a combination of primary and excess policies. Exhibit H-2 In case any work is sublet, the Construction Manager shall require all subcontractors similarly to provide Workers Compensation insurance for all of the subcontractors' employees unless such employees are covered by the protection afforded by Construction Manager. Policy must include: • Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock,Texas; and TEDCO; and their respective subsidiaries, parents, affiliates,and the directors,officers, employees, successors and assigns of these entities,and their lender(s). 4. UMBRELLA I EXCESS LIABILITY(OCCURRENCE POLICY FORM)-MINIMUM LIMITS OF LIABILITY Construction Manager shall provide and maintain during the terms of the Work, including any warranty periods, excess liability coverage on a policy form acceptable to Owner, providing coverage in excess of the limits specified above. Such policy shall have the same inception and expiration dates as the underlying liability policies and coverage no less broad than those in the primary policies or program: Each Occurrence $150,000,000 Aggregate $150,000,000 Umbrella/Excess policies must schedule as underlying policies on a"follow form"basis: General Liability/ Auto Liability/Employer's Liability. Policy must include: • Additional Insured status must apply as shown in the underlying General Liability and Automobile policy sections of this exhibit with respect to parties and coverage. Coverage to apply on a primary/non-contributory basis. • Waiver of Subrogation must apply to the fullest extent allowable by law in favor of those identified in the underlying General Liability, Auto and Workers' Compensation policy sections within this exhibit. • This policy must provide that if the underlying coverage is exhausted, the excess coverage will drop down as primary insurance. • Umbrella / Excess Liability must be maintained and must include completed operations coverage during the construction phase and for the duration of any applicable statute of limitations and statute of repose (but in no event less than 10 years) after Substantial Completion of the Project. 5. PROFESSIONAL LIABILITY Construction Manager shall provide and maintain on an annual basis, at its expense, professional liability coverage for claims or damages arising from professional services required by or through Construction Manager for the Project. Professional liability shall be required for anyone or any entity providing Professional Services. Minimum limits of liability are: Each Occurrence $25,000,000 Annual Aggregate $25,000,000 Policy must: • Cover all professional services performed on behalf of Project. • As respects any retroactive date or prior acts exclusion to which such coverage is subject, said retroactive date must pre-date both the date upon which any services hereunder are commenced and the date of this Agreement. Exhibit H-3 • Include Waiver of Subrogation to the fullest extent allowable by law in favor of KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock, Texas; and TEDCO; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees,successors and assigns of these entities, and their lender(s). Professional Liability Coverage must be maintained while actual work is being performed and for the duration of the applicable statute of limitations and statute of repose(but in no event less than 10 years) after substantial completion of the project. 6. POLLUTION LEGAL LIABILITY Construction Manager shall provide and maintain during the term of the Work and a thirty(30)day extended reporting period, pollution liability insurance coverage, including mold coverage,with the following minimum limits: Each Accident $25,000,000 Policy must: • As respects any retroactive date or prior acts exclusion to which such coverage is subject, said retroactive date must pre-date both the date upon which any services hereunder are commenced and the date of this Agreement. • Include coverage for pollution legal liability, mold,third-party claims for bodily injury and property damage; remediation costs(clean-up);and first party discovery and third party claims. • Include Additional Insured status for KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; the City of Round Rock, Texas; and TEDCO; .and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities, and their lender(s). Coverage to apply on a primary and non- contributory basis. • Be maintained while actual work is being performed and for the duration of the applicable statute of limitations and statute of repose after substantial completion of the project. B. SUBCONTRACTOR'S INSURANCE REQUIREMENTS All Subcontractors shall obtain and maintain the insurance policies shown above(Sections 1 through 4)with the same coverage, terms and conditions and having the same or higher limits, with the exception of the additional insured coverage form which may be provided on the current ISO form or equivalent, and the Professional Liability, Pollution Liability and Umbrella/Excess Liability Limits which are shown in the exhibit immediately below titled: SUBCONTRACTOR'S INSURANCE REQUIREMENTS EXHIBIT. It is only with the Owner's written permission that policy limits may be lower than slated. The term .subcontractor(s)"shall include subcontractor(s)of any tier. It is the responsibility of Construction Manager to make certain their subs are aware of and in compliance with these requirements including the provision of Additional Insured and Waiver of Subrogation status to KR Acquisitions, LLC; KR CC, Inc.; Kalahari Management Co. LLC; City of Round Rock, Texas; and TEDCO; and their respective subsidiaries, parents, affiliates, and the directors, officers, employees, successors and assigns of these entities,and their lender(s). Exhibit H-4 SUBCONTRACTOR'S INSURANCE REQUIREMENTS EXHIBIT TYPE UMBRELLA/EXCESS PROFESSIONAL POLLUTION LIABILITY LIABILITY LIABILITY Plumbing,Process Piping, HVAC, $8,000,000 Each Occurrence/ Fire Protection, Electrical $8,000,000 Aggregate Contractors,Tower Crane (Subs in this category must have a minimum combined limit between their General Liability and Umbrella/Excess Liability policies of no less than $10,000,000 Each Occurrence/$10,000,000 Aggregate) Foundation, Exterior Wall Panels, $3,000,000 Each Occurrence/ Dependent on Concrete, Masonry, Steel&Misc. $3,000,000 Aggregate Services to be Iron, Drywall, Elevator, Preform ad— Windows/Curtainwall, Roofing, (Subs in this category must Required for anyone Indoor Fire Places, Resort Pools, have a minimum combined limit Dependent on Performing work that Low Voltage,Utilities, Earthwork, between their General Liability could have an Flooring and Umbrella/Excess Liability Services to be environmental policies of no less than Performed impact,including but $5,000,000 Each not limited to: Occurrence/$5,000,000 Environmental Aggregate) Testing, Drilling or Excavation Low Hazard,e.g., Painting, Doors, $1,000,000 Each Occurrence/ Appliances, Millwork,Outdoor $1,000,000 Aggregate Fireplace,Window Treatments, Final Cleaning, Signage,Trash Control, (Subs in this category must Landscaping have a minimum combined limit between their General Liability and Umbrella/Excess Liability policies of no less than $3,000,000 Each Occurrence/$3,000,000 Aggregate) C. CERTIFICATES OF INSURANCE Construction Manager shall submit to Owner a Certificate of Insurance prior to commencement of construction. Owner will have the right, but not the obligation, to prohibit entry to the Project or Project Site until such certificates or other evidence that insurance has been placed in complete compliance with these requirements is received and approved by Owner. The Certificate must show details of the coverage required (i.e., waivers, additional insureds, primary/ non-contributory and, forms when specified). All policies must include and, the Certificate must show that these policies will not be materially changed, cancelled or non-renewed without thirty(30) days' prior written notice to Owner, except for ten-days advance notice for non-payment.As Construction Managers policies renew new certificates of insurance evidencing the agreed upon coverage, terms and conditions must be provided to Owner, prior to the renewal date. At the request of the Owner, copies of full policies must be provided to the Owner. Construction Manager shall be responsible for verifying that all subcontractor's insurance is in compliance with the insurance requirements included within this Agreement and Construction Manager is responsible Exhibit H-5 for securing Certificates of Insurance from all Subs. The Certificate must show details of the coverage required (i.e.,waivers, additional insureds, primary I non-contributory and,forms when specified). Ali policies must include and, the Certificate must show that these policies will not be materially changed, cancelled or non-renewed without thirty (30) days' prior written notice to Owner. As subcontractor's policies renew new certificates of insurance evidencing the agreed upon coverage, terms and conditions must be provided to Owner, prior to the renewal date. At the request of the Owner, copies of full policies must be provided to the Owner. Construction Manager shall deliver to the Owner a copy of such Certificates of Insurance for their subcontractors prior to commencing the Work and, a copy of all renewal certificates prior to the renewal date. The insurance requirements set forth in this Section are not intended and shall not be construed to modify, limit or reduce any of the Construction Managers duties of indemnity under the Contract. If Construction Manager or its subcontractors fail to obtain or maintain the required insurance, Owner shall have the right to treat such a failure as a breach of the Contract and to exercise all appropriate rights and remedies,including contract termination. The acceptance of delivery by Owner of any certificate of insurance evidencing the required coverages and limits does not constitute approval or agreement by Owner that the insurance requirements have been met or that the insurance policies shown in the certificates of insurance are in compliance with the requirements of this Agreement. For any of the coverages that are required to remain in force after final payment, an additional certificate evidencing continuation of such coverage will be provided to the Owner at each policy renewal for at least ten years. D. BUILDER'S RISK COVERAGE Owner shall purchase and maintain, property insurance written on a builder's risk'all-risk" or equivalent policy forth in the amount of at least the initial Guaranteed Maximum Price, plus value of subsequent contract modifications and cost of materials supplied or installed by others, plus the value of the contents of the Project during construction for the entire Project at the site on a replacement cost basis, including costs to cover professional fees,without deductibles greater than$50,000 per occurrence, except that the deductible for the Cost of Correction or Making Good Amended Endorsement (U-ZBR-0307-A) can be $100,000. Such property insurance shall be maintained, unless otherwise provided in the Contract Documents or otherwise agreed in writing by all persons and entities who are beneficiaries of such insurance, until the project has reached Substantial Completion or until no person or entity other than the Owner has an insurable interest in the property, whichever is later. This insurance shall protect the interests of the Owner(s), Construction Manager, Subcontractors of every tier in the Project. The Construction Manager and Subcontractors of every tier shall be Additional Insureds under such policies and a Waiver of Subrogation shall apply. This property insurance shall cover portions of the Work stored off the site and also portions of the Work in Transit. Losses or claims not paid by insurance because such losses or claims fall within the deductible shall be bome by the Construction Manager to the extent Construction Manager's or its Subcontractors' negligence caused or are responsible for the loss. Likewise,deductibles paid for losses or claims shall be paid by Construction Manager to the extent Construction Manager or its Subcontractors' negligence caused or was responsible for the loss or claim. Construction Manager's or its Subcontractors'liability for any deductible will be the lesser of$25,000 with the exception of water damage claims which trigger the Cost of Correction or Making Good Amended Endorsement(U-ZBR-0307-A). If the Cost of Correction or Making Good Amended Endorsement is triggered for any claim relating to water damage,Construction Manager or its Subcontractors,where their negligence caused or is responsible for the loss,will be subject to a$50,000 deductible. Partial occupancy or use shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. Exhibit H-6 Loss of Use Insurance -The Owner, at the Owner's option, may purchase and maintain such insurance as will insure the Owner against loss of use of the Owners property due to fire or other hazards, however caused. NOTE: It is not the responsibility of the Owner to insure machinery,tools,and any equipment that will not become a permanent part of the project. Such Items are not insured under the Builder's Risk Policy. E. OTHER TERMS AND CONDITIONS APPLICABLE TO INSURANCE 1. Policies where Additional Insured and/or where Waiver of Subrogation status is required as a part of this Agreement shall extend to the full limits of liability maintained by the Construction Manager, even if those limits of liability are in excess of those required by this Agreement. 2. Insurance effected or procured by Construction Manager will not reduce or limit Construction Managers contractual obligation to indemnify and defend Indemnitees for claims or suits which result from or are connected with the performance of this Contract. 3. All liability policies required to be furnished and maintained by Construction Manager shall be primary insurance to any other insurance that may be available to Owner and the other Indemnitees identified in the Contract. It is the intent of the parties to this Contract that all insurance coverage required herein shall be primary to and shall seek no contribution from all insurance available to Owner and such other Indemnitees, with Owner's and such other Indemnified Parties' insurance being excess,secondary, and non-contributing. 4. Requirements by lenders for this project and/or, the land owner may cause the insurance requirements within this document to be revised. However, any changes would be usual and customary to their interests and are unlikely to impact the cost of Construction Manager's insurance. 5. Except as noted otherwise, all deductibles and self-insured retention amounts in the above-described liability insurance policies shall be assumed by,for the account of, and at the sole risk of the Construction Manager or Subcontractor. F. SURETY REQUIREMENTS 1. Construction Manager's Bonds Construction Manager will be required to furnish a statutory payment bond and a performance bond that complies with Texas law for the Convention Center Scope of Work. Owner, at its discretion, may require Construction Manager to furnish a statutory payment bond and a performance bond that complies with Texas law for all other scopes of Work. 2. Subcontractors' Bonds To the extent that premium costs for payment and performance bonds furnished by Construction Managers subcontractors are expressly reimbursable under Article 6 of the Agreement as Cost of the Work, such bonds shall be in forth and substance satisfactory to the Owner and furnished prior to the commencement of construction of the Work of the respective subcontract under the Contract Documents. a. For each subcontractor bond, Construction Manager shall obtain from each such subcontractor and the subcontractors surety a Dual or Multiple Obligee Rider, on a form acceptable to the Owner, naming as additional obligees the Owners Lender, and such other persons or entities as reasonably required for Owners financing. b. Each such surety bond must be executed by a responsible corporate surety acceptable to the Owner, holding a current certificate of authority from the United States Exhibit H-7 Department of Treasury to issue bonds to the federal government ('Treasury Listed'), and duly licensed and authorized to issue surety bonds in the jurisdiction in which the Project is located. C. If approved by Owner in writing, Constriction Manager may instead provide Subcontractor Default Insurance as recognized in Section 6.8.1 of the Agreement. All deductibles or losses that are attributable to subcontractor default but that fall below the deductibles shall be bome by the Constriction Manager. Exhibit H-8 EXHIBIT I NON-DISCLOSURE AND CONFIDENTIALITY REQUIREMENTS 1. Construction Manager recognizes and agrees that certain financial information furnished by Owner to Construction Manager regarding the financing of the Project and the Drawings and Specifications and other Contract Documents contain and comprise proprietary information and trade secrets of the Owner, its affiliates and third parties, and that the Drawings and Specifications and other Contract Documents and such other materials and information whether or not marked or specifically identified as CONFIDENTIAL (whether provided by the Owner or its affiliates or drawn or prepared by Construction Manager or any Subcontractor [of any tier] during performance of the Work) contain and comprise proprietary information and trade secrets of the Owner, its affiliates or third parties. Such trade secrets and proprietary information shall be regarded by Construction Manager as secret and confidential and Construction Manager, except for the purpose of the Contract, shall not publish or disclose to any third party or make use of such information without prior written consent transmitted by the Owner. 2. Construction Manager will obtain written agreements from its Subcontractors (or include provisions in its subcontract agreements) providing that such Subcontractors will hold secret and confidential all information which Construction Manager is required to regard as secret and confidential under this Contract for the purpose of their work for and on behalf of Construction Manager. Construction Manager will not disclose any information which it is required to regard as secret and confdenfial under this Contract to any Subcontractor or other third party who has not signed a written agreement that such party will hold secret and confidential all information which Construction Manager is required to regard as secret and confidential. 3. Neither Construction Manager nor any of its Subcontractors shall publish or release any publicity or public relations materials of any kind concerning or relating to this Contract, any Work to be performed pursuant thereto, any respective Project or proposed Project of the Owner, or any other activities of the Owner, unless such materials have first been reviewed and approved in writing by the Owner. Any request by a Subcontractor for consent in this respect shall not be acceded to unless such materials have first been reviewed and approved in writing by the Owner. This includes publication to social media, the internet, or any other public forum. This provision shall not apply to mandatory reports which Construction Manager or its Subcontractors are required by law to file with governmental authorities, or as may be ordered by a Court or legally required to provide by Applicable Law. Upon any such Court order or legal requirement, Construction Manager shall promptly notify Owner so that Owner may prevent such disclosure or seek applicable legal remedies. 4. The obligations of nonpublication, nondisclosure and nonuse imposed upon the parties shall apply(irrespective of any termination of the Contract)to all information except: (a) Information which at the time of supply or thereafter is in the public domain (otherwise than by any fault or omission on the part of the recipient); (b) Information which at the time of supply was in the possession of the recipient and was not acquired directly or indirectly from the other party or its affiliates;and (c) Information which is at any time received from a third party having a bona fide right to supply it and which (and to the extent to which)the recipient is or becomes free from all or any obligations to such third party not to disclose or use the same. 5. Upon completion or earlier termination of this Contract, Construction Manager shall promptly deliver to Owner all drawings, specifications, and other information relating to the Work with regard to all such completed or terminated Projects, and all copies thereof in Construction Managers possession; provided however, Construction Manager may retain one complete copy of all drawings, specifications and other information. 6. Construction Manager shall not use photographs of any respective Project or the existence of this Contract for the purposes of trade advertisement, publicity material, or other publication to third parties without Owner's prior written approval thereof. Exhibit 1-1 EXHIBIT J PREVAILING WAGE RATES [See attached.] Exhibit J-1 RESOLUTION NO.R-2016-3760 WHEREAS, Texas Govemment Code Chapter 2258.022 requires a City to determine the general local prevailing rate of per diem wages for each craft or type of worker in the locality in which public work is to be performed;and WHEREAS, a City is required to: (1) conduct a survey of wages received by classes of workers employed on projects of character similar to public works contracts awarded by a City; or(2) use the prevailing wages rate as determined by the United States Department of Labor (DOL) in accordance with the Davis-Bacon Act (40 U.S.C. Section 276a et seq), and its subsequent amendments;and WHEREAS, the City of Round Rock("City") has previously used the prevailing wage rate as determined by the DOL in accordance with the Davis-Bacon Act for its public works contracts; and WHEREAS, City staff recently conducted a survey of wages received by classes of local workers employed on projects of character similar to the City's public works projects and determined that wages received by workers employed on similar projects are consistent with wage rates published by the Texas Workforce Commission for the Austin-Round Rock Area; and WHEREAS, the 2015 Texas Workforce Commission Wage Rates are attached hereto w Exhibit"A';and WHEREAS,the City finds that based upon the results of the survey conducted,it is in the best interest to adopt the wage rates set forth by the Texas Workforce Commission for the Austin-Round Rock Area as the general prevailing wage rate for the City's public works contracts;Now therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That in accordance with Texas Government Code Chapter 2258.022(a)(1), City staff conducted a survey to determine the general prevailing rate of per diem wages and has determined that the Austin-Round Rock Area wage rates published by the Texas Workforce Commission accurately reflect the general prevailing wage rates for the locality. o,iaim,;awwwm Exhibit J-2 The City Council hereby adopts the wage rates published by the Texas Workforce Commission for the Austin-Round Rock Area, which establish the minimum rates that shall be used by all contractors or subcontractors on public works projects awarded by the City. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon,all as required by the Open Meetings Act, Chapter 551,Texas Government Code,as amended. RESOLVED this 8"day of September,2016. ALAN MCGRAW,Mayor City of Round Rock,Texas ATTEST: SARA L. WHITE,City Clerk Exhibit J-3 2 E3CMrr"A^ 2015 ANNUAL TEXAS WORFORCE COMMISSION WAGE RATES Construction and Extraction Occupations Hourlywage $11.92 First-Une Supervisors of Construction Trades and Extraction Workers Hourly wage $MIS Bdckmasons and Blockmasons Hourlywage $2024 Carpenters Hourlywage $22A2 Flow Layers,Except Carpet,Wood,and Hard Tiles Hourlywage $12.74 Tile and Marble Setters Hourlywage $11.79 Cement Masons and Concrete Finishers Hourlywage $12.18 Construction Laborers ,Hourlywage $10A8 Paving,Surfacing,&Tamping Equipment Operators Houdywage $1128 Operating Engineers and Other Construction Equipment Hourlywage $13.52 Drywall and Ceiling Tile lnstaliem Hourlywage $12.72 Electricians Hourlywage $16.03 Gimlers Hourlywage $1251 Insulation Workers,Floor,Ceiling,and Wall Hourlywage $12.67 Insulation Workers,Mechanical Hourlywage $1421 Painters,Construction and Maintenance Hourlywage $11.67 Pipelayers Hourlywage $12.77 Plumbers,Plpefitters,and Steamfitters Hourlywage $14.39 Reinforcing Iron and Rebar Workers Hourlywage $12.58 Roofers Hourlywage $1131 Sheet Metal Workers Hourlywage $12.76 Structural Iron and Steel Workers Hourlywage $1350 Helpers—erickmasons,Blockmasons,Stonemasons,andlile and Hourlywage $10.79 Marble Setters Helpers—Carpenters Hourlywage $1119 1 Exhibit J-3 Helpers—Electricians Hourlywage $1114 Helpers—Painters,Paperhangers,Plasterers,and Stucco Masons Hourlywage $10.65 Helpers—Pipelayers,Plumbers,Pipe0tters,and Steamfitters Hourlywage $1057 Helpers,Construction Trades,All Other - Hourlywage $987 Construction and Building Inspectors Hourlywage $20.15 Elevator Installers and Repairers Hourlywage $2236 Hazardous Materials Removal Workers Hourlywage $14.15 Highway Maintenance Workers Hourlywage $12.70 Septic Tank Servicers and Sewer Pipe Cleaners Houdywage $1193 Construction and Related Workers,All Other Houdywage $13.13 Service Unit Operators,Oil,Gas,and Mining Hourly wage $1241 Earth Drillers,Except Oil and Gas Hourlywage $1681 Rock Splitters,Quarry Hourlywage $10.54 Roustabouts,Oil and Gas Houdywage $11.17 Installation,Maintenance,and Repair Occupations Houdywage $1231 First-Une Supervisors of Mechanics,Installers,and Repairers Houdywage $19.84 Computer,Automated Teller&Office Machinery Repairers Houdywage $10.44 Radio Mechanics Hourlywage $11.48 Telecommunications Equipment Installers and Repair Hourlywage $1550 Avionics Technicians Hourlywage $3034 Electric,Motor,Power Tool,and Related Repairers Hourlywage $13.59 Electrical and Electronic Installers and Repairers Hourlywage $19.25 Electrical and Electronics Repairers,Commercial and Residential Houdywage $13.52 Electrical and Electronic Repairers,Powerhouse,Substation and RelayHourly wage $20.84 Electronic Equipment Installers and Repairers,Motor Vehicles Hourlywage $12.95 Electronic Home Entertainment Equipment Installers Hourlywage $10.93 2 Exhibit J-4 Security and Fire Alarm Systems Installers Hourlywage $15.47 Aircraft Mechanic and Service Technicians Hourlywage $21Ap Automotive Body and Related Repairs Hourly wage $14.85 Automotive Glass Installers and Repairers Hourlywage $13.74 Automotive Service Technicians and Mechanics Hourlywage $12.64 Bus&Truck Mechanics&Diesel Engine Specialists Hourlywage $14.75 Farm Equipment Mechanic Hourlywage $10.66 Mobile Heavy Equipment Mechanic,Except Engineers Hourlywage $1535 Motorcycle Mechanics Hourly wage $11.07 Outdoor Power Equipment&Other Small Engine Mechanics Hourlywage $1L95 Bicycle Repairs Hourlywage $12.75 Tire Repairers and Changers Hourlywage $10.26 Mechanical Door Repairers Hourly wage $13.34 Control and Valve Installers and Repairers,Except Mechanical Door Hourlywage $14.60 Heading,Air Conditioning and Refrigeration Mechanics and installers Hourlywage $14A1 Home Appliance Hourlywage $13.32 Industrial Machinery Mechanics Hourlywage $17.70 Maintenance Workers,Machinery Hourlywage $14.54 Millwrights Hourlywage $13.77 Electrical Power-Line Installers and Repairers Hourlywage $17.74 Telecommunications line Installers and Repairers Hourlywage $2432 Medial Equipment Repairers Hourlywage $17A4 Precision Instrument&Equipment Repairers,Other Hourlywage $14.27 Maintenance and Repair Workers,General Hourlywage $1U1 Coin,Vending and Amusement Machine Servicers and Repairers Hourlywage $10.73 Locksmiths and Safe Repairers Hourlywage $12.69 3 Exhibit J-5 i Helpers—Installation,Maintenance and Repair Workers Hourlywage $8.30 Instillation,Maintenance&Repair Workers,Other Hourlywage $10.50 Production Occupations Hourlywage $9.92 First-Line Supervisor of Production and Operating Workers Hourlywage $17.OD Coil Winders,Tapers,and Finishers Hourlywage $11.69 Electrical and Electronic Equipment Assemblers Hourlywage $11.78 Electrochemical Equipment Assemblers Hourlywage $14.71 Structural Metal Fabricators and Fitters Hourlywage $13.06 Team Assemblers Houdywage $9.95 Timing Device Assemblers,Adjuster&Calibrators Hourlywage $15.98 Assemblers and Fabricators,All Other Hourly wage $10.13 Computer-Controlled Machine Tool Operators,Metal and Plastic Houdywage $12.44 Numeric Tool and Process Control Programmers Hourlywage $18.89 Extruding and Drawing Machine Setters,Operators Hourlywage $10.93 Cutting,Punrhln&and Pre%Machine Setters,Operators Houdywage $10.29 Grinding,Lapping,Polishing,and Buffing Machine Hourlywage $10.33 Lathe and Turning Machine Tool Setters,Operators Hourlywage $14.17 4 Exhibit J-6 EXHIBIT K [RESERVED]. Exhibit K-1 EXHIBIT L THE CITY OF ROUND ROCK/TEDCO'S MAXIMUM FINANCIAL RESPONSIBILITY PURSUANT TO AGREEMENT Construction Manager acknowledges that the Convention Center scope of Work is part of a larger Master Project, which includes the Convention Center, Hotel, Indoor Water Park, and Onsite Public Infrastructure. The Convention Center is owned by the City of Round Rock (the "City"), and the Master Project is being developed by KR Acquisitions LLC ("KRA") pursuant to a Master Development Agreement ('Master Development Agreement") between the City, TEDCO, and KRA. In accordance with the Master Development Agreement, the CityrTEDCO has a maximum amount of funding to contribute to the design and construction of the Convention Center. Construction Manager acknowledges that the City/TEDCO's total contribution to the Convention Center portion of the Master Project shall not exceed Forty Million and No/100 Dollars ($40,000,000.00), which includes payments to HKS, Inc. ("HKS")for architectural services.The estimated total amount to be paid by the City to HKS is$2,953,744.00. TEDCO shall pay to Construction Manager for Work under this Agreement, the difference between $40,000,000 and the total amount due to HKS (the "City Contribution"). To the extent that the Contract Sum for the Convention Center pursuant to this Agreement exceeds the City Contribution, the amounts in excess of the City Contribution due and owing under the terms of the Agreement to Construction Manager shall be paid by KR CC, Inc. (the "KRCC Amount"). Under no circumstances shall the combined total amount of the City Contribution and KRCC Amount exceed the Guaranteed Maximum Price for the Convention Center. Notwithstanding anything to the contrary in the Agreement, Construction Manager agrees that the CityrrEDCO's obligations for payment for construction of the Convention Center under the Agreement is limited to the City Contribution. TEDCO acknowledges and agrees that any right to Liquidated Damages pursuant to this Agreement, if any, is hereby assigned to KR Acquisitions LLC and KR CC, Inc. [SIGNATURES ON NEXT PAGE] Exhibit L-1 AGREED: ROUND ROCK TRANSPORTATION AND ECONOMIC DEVELOPMENT CORPORATION By: ig.Morgap V,1}w •Pe�(c6fa,r� Its: midi n, V,-("c clTv"510 7110 By: . "- hA rq2n,,4 ayo, V%iL-L. VccicftaNl l N/Jayoi' PF4) I--o'j KR CC, Inc., a Delaware Corporation By: Todd R. Nelson Its: President HENSEL P a Delawar neral Pa . ership By. WINA Its: V IGC F1Z05*PcN't Exhibit L-2 AGREED: ROUND ROCK TRANSPORTATION AND ECONOMIC DEVELOPMENT CORPORATION By: Craig Morgan Its: President CITY OF ROUND ROCK, TEXAS By: Craig Morgan, Mayor KR CC, Inc., a Delaware Corpora on RKY By: Todd R. Nelson Its: President HENSEL PHELPS a Delaware General Partnership By: Its: Exhibit L-2 EXHIBIT M CONSTRUCTION MANAGER DESIGNED WORK Construction Manager agrees that portions of the Work may be required by the Contract to be designed and constructed by Construction Manager (the "Construction Manager Designed Work"). Construction Manager will cause the design of all Construction Manager Designed Work to be performed by one or more Subcontractors retained by Construction Manager(Design-Build Subcontractors). Standard of Care. These Design-Build Subcontractors shall perform all professional design services required by the Contract consistent with the professional skill and care ordinarily provided by architects or engineers practicing in the same or similar locality under the same or similar circumstances, and with regard to projects of this nature,size, and complexity. Owner-Supplied Information. 1. Owner or Architect, HKS, Inc., will provide Construction Manager with complete Project criteria, programming requirements, bridging documents, if any, and all other information reasonably necessary for Construction Manager to meet the Project requirements ("Owner-Supplied Information) in accordance with Contractors schedule. 2. Unless expressly stated to the contrary in the Contract Documents, Owner shall provide, at its own cost and expense, for Contactor's information and use the following, and which shall also be considered Owner-Supplied Information: I. Surveys describing the property, boundaries, topography and reference points for use during construction,including existing service and utility lines; it. Geotechnical studies describing subsurface conditions, and other surveys describing other latent or concealed physical conditions at the Site; iii. Temporary and permanent easements, zoning and other requirements and encumbrances affecting land use, or necessary to permit the proper design and construction of the Project and enable Construction Manager to perform the Work; Iv. A legal description of the Site, as set forth in Exhibit B to the Agreement; and V. To the extent available, environmental studies, reports and impact statements describing the environmental conditions, including Hazardous Substances, in existence at the Site. 3. Construction Manager shall be entitled to reasonably rely on the accuracy of the information represented in the Owner-Supplied Information or any design specifications contained in the Owner-Supplied Information, but to the extent that Construction Manager recognizes inaccuracies or defects in such Owner-Supplied information, Construction Manager will notify Owner of same. Construction Manager shall be entitled to an adjustment in the Contract Sum,to the extent that Construction Manager incurs actual additional costs subject to the terms of the Agreement, and Contract Time to the extent Contractors cost or time of performance have been adversely impacted by inaccurate Owner-Supplied Information, but only to the extent that the critical path is adversely impacted. Exhibit M-1 Work Product.All drawings,specifications,and other documents and electronic data furnished by Construction Manager to Owner("Work Product")are deemed to be instruments of service and Owner shall be considered the owner of the instruments of service and shall have property interests therein consistent with the terms of the Agreement, including but not limited to any intellectual property rights, copyrights, and patents, subject to the Owner's payment for the instruments. Construction Manager Performance. Subject to the Standard of Care, Construction Manager Designed work will be performed in accordance with the following requirements: Construction Manager shall cause the respective Design-Build Subcontractor to prepare and submit to the Construction Manager and Owner and Architect for review and approval,drawings and specifications for the installation of the Construction Manager Designed Work(the"Construction Manager Designed Drawings")in accordance with the Owner-Supplied Information.The Construction Manager Designed Drawings shall be prepared and submitted in accordance with a submittal schedule established by the Contractor.The appropriate Subcontractor shall revise the Construction Manager Designed Drawings for the Construction Manager Designed Work as may be required by the Architect to conform to the Owner-Supplied Information and the Contract Documents. Construction Manager shall cause the design of the Construction Manager Designed Work, the Construction Manager Designed Drawings,and the installation of the Construction Manager Designed Work to comply with (i) the requirements of the Contract Documents; and (ii) Applicable Law. Construction Manager shall obtain, or cause the appropriate Subcontractor to obtain all required approvals prior to the commencement of installation of the Construction Manager Designed Work. Construction Manager and/or the Design-Build Subcontractors shall work with the Architect to coordinate the Construction Manager Designed Work with the Contract Documents; provided that, the Architect shall have overall responsibility to ensure that the Project Construction Documents, including the Construction Manager Designed Drawings are complete, fully coordinated and that the Construction Manager Designed Work interfaces property with the other Construction Documents prepared by the Architect and the other consultants engaged by the Owner. Neither the review nor approval by the Architect or the other consultants of the Owner with respect to the working drawings or other documents prepared by the Design-Build Subcontractor(s) hereunder shall relieve Construction Manager or the respective Design-Build Subcontractor of its obligations hereunder. The design and engineering services required for any Construction Manager Designed Work shall be performed by person(s) or entity(ies) lawfully licensed to practice architecture or professional engineering in the state in which the Project is located and all Construction Manager Designed Drawings shall be properly sealed as required. Except the extent cause by a Construction Manager or Design-Build Subcontractor(s)failure to comply with the Standard of Care in the performance of its professional services,the Contract Sum or Contract Time or GMP shall be adjusted to compensate Construction Manager for any changes to the Construction Manager Designed Work, including revisions to the Construction Manager Designed Drawings necessitated by the directives of the Architect or the Owner,changes to or effors in the Owner- Supplied Information or Construction Documents or the effects of any changes in the legal requirements enacted after the date of the Contract affecting the performance of the Work. 20448215v.3 Exhibit M-2 AMENDMENT NO. 1 CONTRACT FOR CONSTRUCTION ROUND ROCK CONVENTION CENTER GUARANTEED MAXIMUM PRICE CONTRACT This Guaranteed Maximum Price Amendment No. 1 (this "Amendment") to the Construction Manager at Risk Agreement for the Round Rock Convention Center(the"Project") is made and entered into by and between Round Rock Transportation and Economic Development Corporation ("Owner") and Hensel Phelps Construction Company ("Construction Manager"), (sometimes collectively referred to as the "Parties"), effective as of the date set forth below. WHEREAS, Owner and Construction Manager entered into that certain Construction Manager at Risk Agreement(AIA Documents A 133—2007 and A201 —2007 as modified by the parties,and all Exhibits thereto,) dated April 26, 2018 (the "Agreement"); and WHEREAS, in the Agreement, Construction Manager and Owner have previously approved a Stipulated Sum for the performance of the Pre-Construction Phase Services,a Construction Manager's Fee, and a Stipulated Sum for the performance of the General Conditions; and WHEREAS, in compliance with the Agreement, as amended hereby, Construction Manager has submitted its final GMP Proposal for the Convention Center, (the "Scope of Work") as required for completion the Project, including the Cost of the Work, in accordance with the Contract Documents and as reasonably inferable therefrom; NOW THEREFORE, on the basis of the analysis, investigations, reports and other work processes and products developed in the Preconstruction Phase, Construction Manager hereby submits its Guaranteed Maximum Price ("GMP") Proposal for the completion of the Project pursuant to the Contract Documents, and Owner and Construction Manager agree to modify and amend the Agreement, as follows: 1. All terms used herein shall have the same meaning as such terms have in the Agreement, except as expressly stated otherwise herein. 2. The Scope of Work covered by this Guaranteed Maximum Price Amendment shall include the Work described in the Contract Documents for the Convention Center Project listed in Attachment 1 and as further described in the Contract Documents. 3. Owner and Construction Manager hereby agree that the Guaranteed Maximum Price for the Convention Center Project is set forth as follows: 1 The General Conditions Lump Sum is $1,902,386.00. GMP Amendment No. 1 Page 1 of 4 .2 The Subcontracted Work is $44,980,186; .3 The portion of the Construction Contingency allocated to this Project is $562,252.00; .4 The amount for Bonds, Insurance and SDI is $1,158,782.00 .5 The Construction Manager's Fee is $1,336,599.00; and .6 There is an Allowance to provide LT Light Fixtures at the event barn for$30,000 (the price of which is included in the amounts above,and if not selected will be credited back to the Owner). Accordingly, the Guaranteed Maximum Price for the Convention Center Project is Forty-Nine Million, Nine-Hundred and Forty Thousand, Two-Hundred and Five Dollars ($49,940,205.00), which includes all Work previously approved by any prior Work Authorization Letter and prior payments therefor. 4. The Schedule of Values for the Work is set forth in Attachment 2. 5. The GMP is based upon the Clarifications and Assumptions as set forth in Attachment 3. Attached to the Clarifications and Assumptions is the Convention Center RFI Log, the purpose of which is to list specifically which RFI items are associated with the Convention Center Project and the cost of which is confirmed to be included in the GMP. 6. Schedule. The Substantial Completion date for the Project is reaffirmed to be November 1, 2020, and the Project Schedule is attached hereto as Attachment 4. The parties hereto acknowledge and agree that the Contract Time (including all scheduling) requirements set forth in the Agreement, together with the Liquidated Damages applicable to the Contract Time requirements as set forth in the Contract, are hereby affirmed. 7. General Conditions. The amount of General Conditions Costs for the Convention Center Project as set forth in Exhibit F of the Agreement is increased to $1,902,386.00. This increase of $148,914.00 is to move all Layout and Control Costs from Cost of Work to the fixed General Conditions. 8. Effect of GMP Amendment No. 1. The Parties agree that GMP Amendment No. 1 amends the Agreement, as set forth herein and that, otherwise,the Agreement, as amended, is hereby ratified, approved, and confirmed. 9. Construction Manager Designated Representative.Joseph Sanders is added as a Designated Representative for the Construction Manager as set forth in Exhibit A of the Agreement. GMP Amendment No. 1 Page 2 of 4 10. Execution and Authorized Signatures. By its signature below, Construction Manager certifies that all necessary corporate acts have been taken to authorize the signing of this Agreement and to bind Construction Manager. 11. Effective Date. The Parties acknowledge that due to the maximum financial responsibility of the Round Rock Transportation Authority and Economic Development Corporation as set forth in Exhibit L to the Agreement, this GMP Amendment shall be effective upon the Effective Date as set forth herein below. Round Rock Transportation Authority and Economic Development Corporation is anticipated to execute this GMP Amendment at a later date, but this GMP Amendment shall be immediately effective upon the execution by KR CC, Inc. and Hensel Phelps and that Construction Manager shall not challenge the efficacy of this GMP Amendment based upon the timing of execution by Round Rock Transportation Authority and Economic Development Corporation. 12. Preconstruction Services. The parties entered into a Preconstruction Agreement for the Preconstruction phase of the Round Rock Convention Center and Kalahari Hotel, Waterparks and Infrastructure (the "Preconstruction Agreement"). Pursuant to the terms of the Preconstruction Agreement,if Hensel Phelps was awarded the construction for the Convention Center(the"Convention Center") and Hotel, Waterparks, and Infrastructure ("Hotel and Waterpark") Projects, then the fee (total amount) paid by the Owner's, respectively, would be reduced by Twenty-Five Percent (25%). Due to various reasons, including those raised by Construction Manager in its November 18, 2019 letter, KR Acquisitions, as Owner of the Hotel and Waterpark Project(and the Owner pursuant to the Preconstruction Agreement), has agreed to the following as full resolution of the issues raised in the Construction Manager's November 18, 2019 letter which is attached hereto as Attachment 5: (1) Pay to Construction Manager the remaining balance of $112,963.00 which shall total $765,000.00 paid in full to Construction Manager pursuant to the Preconstruction Agreement; (2) If Construction Manager reaches Substantial Completion of both the Convention Center and Hotel and Waterparks Project by November 1,2020,then Owner will waive the Twenty-Five Percent(25%)deduction owed by Construction Manager. If,however, Substantial Completion is not reached by November 1, 2020 for both Projects, then Construction Manager will return the Twenty-Five Percent (25%) paid pursuant to this Section 12 of GMP Amendment No. 1,via deductive Change Order. The foregoing is a full settlement of the issues raised in Construction Manager's November 18, 2019 letter, neither party acknowledging any liability regarding same, but rather for the purposes of avoiding any disputes related to the statements contained therein. GMP Amendment No. 1 Page 3 of 4 Effective Date of this Amendment is December 24,2019. AGREED: Hensel Phelps A Delaware a Pnership B ra inans Its:Vice President KR CC,Inc., A Delaware Company 01 By:Todd R.Nelson Its:President ROUND ROCK TRANSPORTATION AND ECONOMIC DEVELOPMENT CORPO TION By: Its: GMP Amendment No,i Page 4 of 4 GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER Z z Z DRAWING LOG 01 - V W H O W U O W U O O O 1 Q 2 j Z Y Q K O O U O w U Q z U Q U d 7 Z O Fz w d 6 0 0 0 0 p y Z z Z Z Z z Z H N W 2 Z 2 2 Z 2 O O O '0 'e c O W U Z U W W U J J p K C O GENERAL A0.000 COVER CA0.001 SHEETINDEX A0.002 PROJECT INFORMATION A0.003 BUILDING SUMMARY A0.010 OVERALL SECTOR PLAN CA0.020 CITY OF ROUND ROCK PLAN REVIEW COMMENTS CA0.101 CONVENTION CENTER AREA PLAN LEVEL 01 CAO.102 CONVENTION CENTER AREA PLANLEVEL02 LIFE SAFETY CALS.101 CONVENTION CENTER-LIFE SAFETY PLAN-LEVEL 01 CALS.102 CONVENTION CENTER-LIFE SAFETY PLAN-LEVEL 02 ARCHITECTURAL A1.000 OVERALL SITE PLAN A1.001 OVERALL SITE PLAN-SOUTH PORTION A1.100 DIMENSIONAL CONTROL PLAN CA2.101 CONVENTION CENTER-OVERALL LEVEL 01 FLOOR PLAN CA2.102 CONVENTION CENTER-OVERALL LEVEL 02 FLOOR PLAN CA2.103 CONVENTION CENTER OVERALL ROOF PLAN CA2.201.A CONVENTION CENTER-LEVEL 01-SECTOR'A' CA2.201.B CONVENTION CENTER-LEVEL 01-SECTOR'B' CA2.201.0 CONVENTION CENTER-LEVEL 01-SECTOR'C' CA2.201.0 CONVENTION CENTER-LEVEL 01-SECTOR'D' CA2.201.E CONVENTION CENTER-LEVEL 01-SECTOR'E' CA2.201.F CONVENTION CENTER-LEVEL 01-SECTOR'F' CA2.202.A CONVENTION CENTER-LEVEL 02-SECTOR'A&B' CA2.202.0 CONVENTION CENTER-LEVEL 02-SECTOR'C' El I IN IN lml IN CA2.202.D CONVENTION CENTER-LEVEL 02-SECTOR'D' CA2.202.E CONVENTION CENTER-LEVEL 02-SECTOR'E' CA2.2021 CONVENTION CENTER-LEVEL 02-SECTOR'F' CA2.203.A CONVENTION CENTER-ROOF-SECTOR'A' CA2.2033 CONVENTION CENTER-ROOF-SECTOR'B' CA2.203.0 CONVENTION CENTER-ROOF-SECTOR'C' CA2.203.D CONVENTION CENTER-ROOF-SECTOR'D' CA2.203.E CONVENTION CENTER-ROOF-SECTOR'E' CA2.203.F CONVENTION CENTER-ROOF-SECTOR'F' CA2.221 SINGLE-PLY ROOFING DETAILS CA2.222 SINGLE-PLY ROOFING DETAILS CA2.301 LEVEL 01 ENLARGED RESTROOMS GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER 2 Z W 2 DRAWING LOG U V O W O ¢p U 2 Z U p N OQ OF d J Z 2 U U O y d o O o 0 0 r 0 H J W N 2 Z Z Z 2 2 Q Z N N 2 Z 2 2 Z O J ¢ tt O J CA2.303 LEVEL 01 ENLARGED RESTROOMS CA2.305 LEVEL 02 ENLARGED RESTROOMS CA2.306 LEVEL 01 ENLARGED RESTROOMS CA2.307 LEVEL 02 ENLARGED RESTROOMS CA2.308 LEVEL 02 ENLARGED RESTROOMS CA2.401.A CONVENTION CENTER FINISH PLAN LEVEL 01 SECTOR'A' CA2.401.B CONVENTION CENTER FINISH PLAN LEVEL 01 SECTOR B' CA2.401.0 CONVENTION CENTER FINISH PLAN LEVEL 01 SECTOR C' CA2 401.D CONVENTION CENTER FINISH PLAN LEVEL 01 SECTOR D' CA2.401.E CONVENTION CENTER FINISH PLAN LEVEL 01 SECTOR E' CA2401.F CONVENTION CENTER FINISH PLAN LEVEL 01 SECTOR'F' CA2.402.0 CONVENTION CENTER FINISH PLAN LEVEL 02 SECTOR C' CA2.402.D CONVENTION CENTER FINISH PLAN LEVEL 02 SECTOR'D' CA2.402.E CONVENTION CENTER FINISH PLAN LEVEL 02 SECTOR'E' CA2.402,F CONVENTION CENTER FINISH PLAN LEVEL 02 SECTOR F' CA3.001 PARTITION TYPES CA3.002 PARTITION HEAD AND FRAMING DETAILS CA3.003 GYP.BOARD DETAILS CA3.004 GYP.BOARD DETAILS CA3.100 METAL FABRICATIONS CA3.101 METAL FABRICATIONS CA3.200 BOH ADAAG/ANSI TOILET LAYOUTS AND STD,ACCESSORIES CA3.201 FOH ADAAG/ANSI TOILET LAYOUTS AND STD.ACCESSORIES 101 CA3.202 ACCESSORIES,WALL PROTECTION EQUIPMENT 101 CA3.300 DOOR,SAFETY GLAZING,AND LOUVER INFORMATION 1 101 CA3.301 DOOR SCHEDULE CA3.302 DOOR DETAILS CA3.304 PARTITION HEAD DETAILS I IMI CA3.401 FLOOR TRANSITIONS CA3.500 STD.CABINET DETAILS CA3.501 BOH INTERIOR ELEVATIONS CA3.600 INTERIOR FINISH SCHEDULE CA3.601 INTERIOR FINISH SCHEDULE CA3.602 BOH ROOM FINISH SCHEDULE CA3.603 PLUMBING FIXTURES CA3.604 PLUMBING FIXTURES CA3.605 PLUMBING FIXTURES CA3.606 PLUMBING ACCESSORIES IF CA3.607 PLUMBING ACCCESSORIES CA3.608 DOOR HARDWARE SELECTIONS CA3.611 INTERIOR ELEVATIONS GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER w DRAWING LOG 0Q 0 VV H OQ � 00 40 W 2 Y 2 U O y O V O n y Z U y U O FZ F J W p C O OC G p N N N d 2 Z Z 2 Z N N WO 2 2 2 2 2 2 O Q 2 W W O O y yD ¢ W V U w O O ¢ t O O CA}612 INTERIOR ELEVATIONS CA3613 INTERIOR ELEVATIONS NJ I I NJ CA3.615 INTERIOR ELEVATIONS CA3.616 INTERIOR ELEVATIONS CA3.617 INTERIOR ELEVATIONS CA3.730 MILLWORK DETAILS CA3.735 MILLWORK DETAILS CA4.001 CEILING DETAILS 101 E 01 CA4.002 CEILING DETAILS CA4.101 CONVENTION CENTER-RCP-LEVEL 01 CA4.102 CONVENTION CENTER-RCP-LEVEL 02 CA4.201.A CONVENTION CENTER-RCP-LEVEL 01-SECTOR'A' > CA4.201.13 CONVENTION CENTER-RCP-LEVEL 01-SECTOR'S' Iff IN CA4.201.0 CONVENTION CENTER-RCP-LEVEL 01-SECTOR'C' CA4.201 D CONVENTION CENTER-RCP-LEVEL 01-SECTOR'D' CA4.201.E CONVENTION CENTER-RCP-LEVEL 01-SECTOR'E' CA4.201.F CONVENTION CENTER-RCP-LEVEL 01-SECTOR'F' 101 CA4.202.0 CONVENTION CENTER-RCP-LEVEL 02-SECTOR'C' IM10 01 CA4.202.D CONVENTION CENTER-RCP-LEVEL 02-SECTOR'D' IMIM 01 CA4.202.E CONVENTION CENTER-RCP-LEVEL 02-SECTOR'E' CA4.202.F CONVENTION CENTER-RCP-LEVEL 02-SECTOR'F' CA4.203 CONVENTION CENTER-RCP-KILIMANJARO BALLROOM El Nis I E CA4.204 CONVENTION CENTER-RCP-KILIMANJARO BALLROOM CA4.205 CONVENTION CENTER RCP KALAHARI BALLROOM E. CA4.300 ENLARGED RCP CA5.001 EXTERIOR MATERIALS SCHEDULE CA5.010 OVERALL PERSPECTIVES AND IMAGES CA5.101 CONVENTION CENTER ELEVATIONS CA5.102 CONVENTION CENTER ELEVATIONS CA5.210 ENLARGED ELEVATIONS 01 101 E E CA5.211 ENLARGED ELEVATIONS CA5.212 ENLARGED ELEVATIONS 101 CA5.213 ENLARGED ELEVATIONS CA5.240 ENTRY PORTE COCHERE CA5.250 ENTRY TRELLIS CA5.251 ENTRY TRELLIS DETAILS CA5.301 WINDOW AND LOUVER TYPES 75.302 WINDOW AND LOUVER TYPES CA6.001 BUILDING SECTIONS CA6.101 CONVENTION CENTER-WALL SECTIONS CA6.102 CONVENTION CENTER-WALL SECTIONS CA6.103 CONVENTION CENTER-WALL SECTIONS GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER Z Z DRAWING LOG JJ u u a � au . i _O N a 1. O U O U i a Z U asF U J O 0 0 o C O 2 2 y 2 Z 2 2 2 y y y OW Z_ Z Z_ Z Z 2 O Q Z W W W W O O U 2 U W W O W J K C O J J J J J J CA6.104 CONVENTION CENTER-WALL SECTIONS CA6.105 CONVENTION CENTER-WALL SECTIONS CA6.106 CONVENTION CENTER-WALL SECTIONSIF CA6.107 CONVENTION CENTER-WALL SECTIONS CA6.108 CONVENTION CENTER-WALL SECTIONS JCA6,101 CONVENTION CENTER-WALL SECTIONS CA6.110 CONVENTION CENTER-WALL SECTIONS CA7.000 TYPICAL FOUNDATIONS DETAILS CA7.001 BELOW GRADE WATERPROOFING DETAILS CA7.011 STONE DETAILS-RIGID INSULATION ICA7,111 STONE DETAILS-RIGID INSULATION CA7.021 EIFS DETAILS CA7.022 EIFS DETAILS CA7.031 CEMENT PANEL DETAILS CA7.101 SECTION DETAILS CA7.102 SECTION DETAILS CA7.103 SECTION DETAILS 101 CA7.104 SECTION DETAILS CA7.201 PLAN DETAILS CA7.202 PLAN DETAILS CA7.203 PLAN DETAILS CA7.204 PLAN DETAILS CA8.001 TYPICAL STEEL STAIR PLANS,SECTIONS.AND DETAILS CA8.002 METAL SCREEN GUARDRAIL DETAILS CA8.101 STAIR CST-01-PLANS AND SECTIONS CA8.201 ELEVATOR DETAILS CA8.202 ELEVATORS CS-01.-02,AND-03-PLANS AND SECTIONS CA8.301 TYPICAL ESCALATOR DETAILS I IN 0 IMI ELECTRICAL CE0.00 NOTES,SYMBOLS.LEGEND 8 ABBREVIATIONS CEI.100 ELECTRICAL DETAILS CE1.300 LIGHT FIXTURE SCHEDULE CEU2.101 CONVENTION CENTER-UNDERFLOOR PLAN-LEVEL 01 1 MI CEU2.201 A CONVENTION CENTER-UNDERFLOOR PLAN-SECTOR A' CEU2.201.B CONVENTION CENTER-UNDERFLOOR PLAN-SECTOR B' MI CEU2,201.0 CONVENTION CENTER-UNDERFLOOR PLAN-SECTOR'C' CEU2.201.1) CONVENTION CENTER-UNDERFLOOR PLAN-SECTOR'D' CEU2.201.E CONVENTION CENTER-UNDERFLOOR PLAN-SECTOR'E' CEU2.201.F CONVENTION CENTER-UNDERFLOOR PLAN-SECTOR'F' CE2.101 CONVENTION CENTER-FLOOR PLAN-LEVEL 01 GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER z z W W Z DRAWING LOG 0 O ° V V 1. O O Q w J Z Q Z Y ¢ K YO U a N U O n 2 U y U J Z O o 0 0 0 0 M F Z F J W U C O G O O p N N Z 2 Z Z y y y � Z 2 2 2 2 2 OZ Q Z W O O L y K O U Z U w O W J W K O J J J W J J O O O J J J J CE2.102 CONVENTION CENTER FLOOR PLANLEVEL02 CE2.103 CONVENTION CENTER-OVERALL CLERESTORY PLAN 10 1 CE2.104 CONVENTION CENTER ROOF PLAN CE2.201.A CONVENTION CENTER LEVEL 01-SECTOR'A' CE2.201.B CONVENTION CENTER LEVEL 01 SECTOR'B' 01 101 T v CE2.201.0 CONVENTION CENTER LEVEL 01-SECTOR'C' CE2.201.D CONVENTION CENTER-LEVEL 01-SECTOR'D' CE2.201.E CONVENTION CENTER LEVEL 01 SECTOR'E' CE2.201.F CONVENTION CENTER LEVEL 01-SECTOR'F' CE2.202.A CONVENTION CENTERLEVEL02-SECTOR'A' CE2.202.B CONVENTION CENTERLEVEL02-SECTOR'B' CE2.202.0 CONVENTION CENTER LEVEL 02-SECTOR'C' CE2.202.D CONVENTION CENTER-LEVEL 02-SECTOR'D' CE2.202.E CONVENTION CENTER LEVEL 02 SECTOR'E' I s NJ NJ FIT CE2.202.F CONVENTION CENTER LEVEL 02-SECTOR'F' CE2.203.A CONVENTION CENTER-ROOF-SECTOR'A' CE2.203.13 CONVENTION CENTER-ROOF-SECTOR'B' CE2.203.0 CONVENTION CENTER-ROOF-SECTOR'C' CE2.203.D CONVENTION CENTER-ROOF-SECTOR'D' CE2.203.E CONVENTION CENTER-ROOF-SECTOR'E' CE2.203.F CONVENTION CENTER-ROOF-SECTOR'F' CE3.100 ENLARGED LEVEL 01-GRAND BALLROOM-POWER CE3.101 ENLARGED LEVEL 02 JUNIOR BALLROOMPOWER IN CE3.102 ENLARGED FLOOR PLANS-POWER CE4.101 CONVENTION CENTER-RCP-LEVEL 01 CE4.102 CONVENTION CENTER-RCP-LEVEL 02 CE4.201.A CONVENTION CENTER-RCP-LEVEL 01-SECTOR'A' CE4.201.B CONVENTION CENTER-RCP-LEVEL 01-SECTOR'S' CE4.201.0 CONVENTION CENTER-RCP-LEVEL 01-SECTOR'C' CE4.201.D CONVENTION CENTER-RCP-LEVEL 01-SECTOR'D' CE4.201.E CONVENTION CENTER-RCP-LEVEL 01 SECTOR'E' CE4.201.F CONVENTION CENTER-RCP-LEVEL 01-SECTOR'F' CE4.202.0 CONVENTION CENTER-RCP-LEVEL 02-SECTOR'C' 1 10 NJ I I NJ IN IMI CE4.202.0 CONVENTION CENTER-RCP-LEVEL 02-SECTOR'D' CE4.202.E CONVENTION CENTER-RCP-LEVEL 02-SECTOR'E' CE4.202.F CONVENTION CENTER-RCP-LEVEL 02-SECTOR'F' NJ CE5.000 ELECTRICAL FEEDER SCHEDULES NJ CE5.010 SCHEMATIC ONE-LINE DIAGRAM-CONVENTION CENTER CE5.011 SCHEMATIC ONE-LINE DIAGRAM-CONVENTION CENTER CE5.012 SCHEMATIC ONE-LINE DIAGRAM-CONVENTION CENTER GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER z z W W Z DRAWING LOG ° U U O WU O Q W J Z Q Z Y Q K Y U O y O U O n 2 U aU Z O o 0 ~ Z F J d V G o C o p = _ Z Z Z Z Z N N N N 2 Z 2 2 Z Z Q Z w W O ❑ O M M K ❑ J J V Z U V W J K K O J .0 O O K - ll y J J J J J CE6010 ELECTRICAL PANEL BOARD SCHEDULES CE6.011 ELECTRICAL PANEL BOARD SCHEDULES CE6.012 ELECTRICAL PANEL BOARD SCHEDULES CE6.013 ELECTRICAL PANEL BOARD SCHEDULES 01 01 1 M CE6.014 ELECTRICAL PANEL BOARD SCHEDULES El 0 C E6.015 ELECTRICAL PANEL BOARD SCHEDULES CE6.016 ELECTRICAL PANEL BOARD SCHEDULES CE6.017 ELECTRICAL PANEL BOARD SCHEDULES CE6.018 ELECTRICAL DIMMING SCHEDULES CE6.019 ELECTRICAL DIMMING SCHEDULES CE7.010 CONVENTION CENTER-LIGHTING CONTROL RISER DIAGRAM CE8.100 FOOD SERVICE CENTRAL STORAGE PLAN-ELECTRICAL CE80100S FOOD SERVICE CENTRAL STORAGE PLAN SCHEDULE CE8.101 FOOD SERVICE BANQUET STAGING SERVICE STATIONS-ELECTRICAL CE8.101 Sa FOOD SERVICE BANQUET STAGING SERVICE STATIONS-SCHEDULES CE8.101 S6 FOOD SERVICE BANQUET STAGING SERVICE STATIONS-SCHEDULES FOOD SERVICE CFS1.000 CONVENTION CENTER-LEVEL 01-OVERALL LAYOUT CFS1.100 CENTRAL STORAGE-LAYOUT CFS1.101 STAGING KITCHEN I BEVERAGE STATIONS I COFFEE SERVICE ROOM-LAYOUTS CFS1.200 CENTRAL STORAGE-PLUMBING CFS1.201 STAGING KITCHEN I BEVERAGE STATIONS I COFFEE SERVICE ROOM-PLUMBING CFS1.300 CENTRAL STORAGE ELECTRICAL CFS1.300S CENTRAL STORAGE-ELECTRICAL SCHEDULE CFSI.301 STAGING KITCHEN I BEVERAGE STATIONS I COFFEE SERVICE ROOM-ELECTRICAL CFSI.400 CENTRAL STORAGE-SPECIAL CONDITIONS CFS1.401 STAGING KITCHEN I BEVERAGE STATIONS I COFFEE SERVICE ROOM-SPECIAL CONDITIONS CFS2.100 BEVERAGE STATIONLAYOUT CF52.200 BEVERAGE STATION PLUMBING CFS2.300 BEVERAGE STATION ELECTRICAL CFS2.400 BEVERAGE STATION-SPECIAL CONDITIONS TECHNOLOGY TELECOMMUNICATIONS CT0.000 COVER SHEET CT7.100 CONVENTION CENTER-LEVEL 01 ACTIVE SHOOTER FLOOR PLAN CT1.101 CONVENTION CENTER-OVERALL LEVEL 01 FLOOR PLAN CT1.102 CONVENTION CENTER-OVERALL LEVEL 02 FLOOR PLAN CT1.103 CONVENTION CENTERLEVEL 01 RCP PATHWAYS lq CT1.104 CONVENTION CENTER-LEVEL 01 WAP LAYOUT CT2.201-A CONVENTION CENTER-LEVEL 01-SECTORW-DATA COMM CT2.201-B CONVENTION CENTER-LEVEL 01-SECTOR'B'-DATA COMM 772.277CONVENTION CENTER-LEVEL 11-SECTOR'C'-DATA COMM GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER Z DRAWING LOG JJ U U W O W O O W U p O pQ J Z a Z U Q T C O y n a z J J J J d U � O K 2 2 N Z 2 2 Z Z N N N y OW Z Z 2 Z 2 Z Q 2 h - O p O tl N C O W W V Z V W W (] W W � J O O O C y J J J � CT2.201-D CONVENTION CENTER LEVEL 01-SECTOR'D'-DATA COMM 101 CT2.201-E CONVENTION CENTER-LEVEL 01-SECTOR'E'-DATA COMM ml CT2.201-F CONVENTION CENTER-LEVEL 01-SECTOR F*-DATA COMM CT2.202-C CONVENTION CENTER-LEVEL 02-SECTOR C'-DATA COMM CT2.202-D CONVENTION CENTER-LEVEL 02-SECTOR'D'-DATA COMM CT2.202-E CONVENTION CENTER-LEVEL 02-SECTOR'E'-DATA COMM CT2.202-F CONVENTION CENTER-LEVEL 02-SECTOR'F-DATA COMM CT2.301-A CONVENTION CENTER-LEVEL 01-SECTOR'A'-ACCESS CONTROL CT2.301-13 CONVENTION CENTER-LEVEL 01-SECTOR'B'-ACCESS CONTROL CT2.301-C CONVENTION CENTER-LEVEL 01-SECTOR C'-ACCESS CONTROL CT2.301-1) CONVENTION CENTER-LEVEL 01-SECTOR D'-ACCESS CONTROL CT2.301-E CONVENTION CENTER-LEVEL 01-SECTOR'E'-ACCESS CONTROL CT2.301-F CONVENTION CENTER-LEVEL 01-SECTOR F'-ACCESS CONTROL CT2.302-C CONVENTION CENTER-LEVEL 02-SECTOR'C'-ACCESS CONTROL CT2.302-0 CONVENTION CENTER-LEVEL 02-SECTOR'D'-ACCESS CONTROL CT2.302-E CONVENTION CENTER-LEVEL 02-SECTOR'E'-ACCESS CONTROL CT2.302-F CONVENTION CENTER-LEVEL 02-SECTOR'F'-ACCESS CONTROL CT3.100 CONVENTION CENTER-LEVEL 01-TECHNOLOGY SPACES CT3.101 CONVENTION CENTER-LEVEL 01-TECHNOLOGY SPACES CT3.200 CONVENTION CENTER-LEVEL 02-TECHNOLOGY SPACES AUDIO I VIDEO CAV0.001 AV COVER PAGE CAV1.001 AV REFERENCE PAGE CAV2.201 BD AV 1ST FLOOR PLAN SECTORS BID CAV2.201 EF AV 1 ST FLOOR PLAN SECTORS E/F CAV20202E AV 2ND FLOOR PLAN SECTOR E Iff CAV3.101 AV EQUIPMENT DETAILS CAV3.102 AV EQUIPMENT ELEVATIONS CAV4.201 BD AV 1 ST FLOOR RCP SECTORS BID JOIN CAV4.201 EF AV 1 ST FLOOR RCP SECTORS E/F JOIN CAV4.202E AV 2ND FLOOR RCP SECTOR E CAV4.202F AV 2ND FLOOR RCP SECTOR F STRUCTURAL C51.001 GENERAL NOTES AND TYPICAL DETAILS CS1.002 SPECIAL BUILDING INSPECTION PLAN CS1.011 WIND LOADING DIAGRAMS CS2.101 CONVENTION CENTER-FOUNDATION PLAN-LEVEL 01 CS2.102 CONVENTION CENTER-FRAMING PLAN-LEVEL 02 CS2.103 CONVENTION CENTER-FRAMING PLAN-LOW ROOF CS2.104 CONVENTION CENTER-FRAMING PLAN-HIGH ROOF CS2.201.A CONVENTION CENTER-LEVEL 01-SECTOR'A' CS2.201.B CONVENTION CENTER-LEVEL 01-SECTOR'B' GMP Amendment No. 1 - Attachment 1 KALAHARI CONVENTION CENTER z w DRAWING LOG 00 o � oaw z z a U O Q 0 ow w a z° z z° z° z° ZH = y N N OLL Z 2 2 2z a O0 iu w j p O O � - - y > 7 ! > j CS2.201.0 CONVENTION CENTER-LEVEL 01-SECTOR C' CS2.201.D CONVENTION CENTER LEVEL 01-SECTOR'D' CS2.201.E CONVENTION CENTER-LEVEL 01-SECTOR'E' 10.0 CS2.201.F CONVENTION CENTERLEVEL01-SECTOR'F' IMIM CS2.202A CONVENTION CENTER-LEVEL 02-SECTOR'A' CS2.202.13 CONVENTION CENTER-LEVEL 02-SECTOR'B' CS2.202.0 CONVENTION CENTER-LEVEL 02-SECTOR'C' CS2.202.D CONVENTION CENTER-LEVEL 02-SECTOR'D' 1 IN CS2.202.E CONVENTION CENTER-LEVEL 02-SECTOR'E' CS2.202.F CONVENTION CENTER-LEVEL 02-SECTOR'F' CS2.203.A CONVENTION CENTER-LOW ROOF-SECTOR'A' CS2.203.B CONVENTION CENTER-LOW ROOF-SECTOR'B' CS2.203.0 CONVENTION CENTER-LOW ROOF-SECTOR'C' CS2.203.D CONVENTION CENTER-LOW ROOF-SECTOR'D' CS2.203.E CONVENTION CENTER-LOW ROOF-SECTOR'E' CS2.203.F CONVENTION CENTER-LOW ROOF-SECTOR'F' CS2.204.A CONVENTION CENTER-HIGH ROOF-SECTOR W CS2.204.13 CONVENTION CENTER-HIGH ROOF-SECTOR'B' CS2.204.0 CONVENTION CENTER-HIGH ROOF-SECTOR C' CS2.204.D CONVENTION CENTER-HIGH ROOF-SECTOR'D' CS2.204.E CONVENTION CENTER-HIGH ROOF-SECTOR E' CS2.204.F CONVENTION CENTER-HIGH ROOF-SECTOR'F' CS3.001 FOUNDATION SECTIONS AND DETAILS CS3.002 FOUNDATION SECTIONS AND DETAILS CS3.003 FOUNDATION SECTIONS AND DETAILS CS3.004 FOUNDATION SECTIONS AND DETAILS CS5.011 COLUMN SCHEDULE CS7.001 STEEL SECTIONS AND DETAILS CS7.002 STEEL SECTIONS AND DETAILS CS7.003 STEEL SECTIONS AND DETAILS CS7.004 STEEL SECTIONS AND DETAILS CS7.011 STEEL FRAMING ELEVATIONS CS7.012 STEEL FRAMING ELEVATIONS IN CS7.020 STEEL SECTIONS AND DETAILS(BALLROOM) CS7.021 STEEL SECTIONS AND DETAILS(BALLROOM) CS7.022 STEEL SECTIONS AND DETAILS(BALLROOM) MECHANICAL CM0.00 NOTES,SYMBOLS.LEGEND 8 ABBREVIATIONS CM2.201A CONVENTION CENTER-LEVEL 01-SECTOR'A' CM2.201.8 CONVENTION CENTER-LEVEL 01-SECTOR'B' GMP Amendment No. 1 - Attachment 1 -- -- - - -- - - - - - KALAHARI CONVENTION CENTER z z W W DRAWING LOG 0 UU W O O O w u z � z a z u o F a F a i z F = r w w a c o 0 0 c p Z i z z z = H Z N N N 0 2 Z Z Z Z a - - O Z O W W p J J J J J J s z O J J CM2.201,C CONVENTION CENTER-LEVEL 01-SECTOR'C' CM2.201.D CONVENTION CENTER LEVEL 01-SECTOR'D' CM2.201.E CONVENTION CENTER LEVEL 01-SECTOR'E' CM2.201.F CONVENTION CENTER LEVEL 01-SECTOR'F' CM2.202A CONVENTION CENTER LEVEL 02-SECTOR'A' CM2.202.8 CONVENTION CENTER LEVEL 02-SECTOR'B' CM2.202.0 CONVENTION CENTER-LEVEL 02-SECTOR'C' CM2.202.D CONVENTION CENTER-LEVEL 02-SECTOR'D' CM2.202.E CONVENTION CENTER-LEVEL D2-SECTOR E' CM2.202.F CONVENTION CENTERLEVEL02-SECTOR'F' CM2.203.B CONVENTION CENTER-ROOF-SECTOR'B' CM2.203.0 CONVENTION CENTER-ROOF-SECTOR'C' CM2.203.0 CONVENTION CENTER-ROOF-SECTOR'D' CM2.203.E CONVENTION CENTER-ROOF-SECTOR E' CM2.203.F CONVENTION CENTER-ROOF-SECTOR'F' CM6.01 MECHANICAL SCHEDULES CM6.02 MECHANICAL SCHEDULES CM7.01 MECHANICAL DETAILS CM7.02 MECHANICAL DETAILS CM7.03 MECHANICAL DETAILS CM7.04 MECHANICAL DETAILS in I PLUMBING CPF0.000 NOTES,SYMBOLS.LEGEND&ABBREVIATIONS CPF2.100 CONVENTION CENTERUNDERFLOORPLAN-LEVEL 01 CPF2.101 CONVENTION CENTER FLOOR PLAN LEVEL 01 CPF2.102 CONVENTION CENTER FLOOR PLAN LEVEL 02 CPF2.104 CONVENTION CENTER ROOF PLAN CPF2.200.A CONVENTION CENTER-UNDERFLOOR LEVEL 01-SECTOR'A' CPF2.200.8 CONVENTION CENTER-UNDERFLOOR LEVEL 01-SECTOR'B' CPF2.200.0 CONVENTION CENTER-UNDERFLOOR LEVEL 01-SECTOR'C' CPF2.200.D CONVENTION CENTER-UNDERFLOOR LEVEL 01 SECTOR'D' CPF2.200.E CONVENTION CENTER-UNDERFLOOR LEVEL 01-SECTOR'E' CPF2.200.F CONVENTION CENTER-UNDERFLOOR LEVEL 01 SECTOR'F' CPF2.201A CONVENTION CENTERLEVEL01-SECTOR'A' CPF2.201.B CONVENTION CENTER-LEVEL 01-SECTOR'S' IN 01 1 CPF2.201.0 CONVENTION CENTER-LEVEL 01-SECTOR'C' CPF2.201.D CONVENTION CENTERLEVEL01-SECTOR'D' CPF2.201.E CONVENTION CENTERLEVEL01-SECTOR'E' CPF2.201.F CONVENTION CENTER LEVEL 01-SECTOR'F' CPF2.21)1.A CONVENTION CENTER-LEVEL 02-SECTOR'A GMP Amendment No. 1 - Attachment 1 g $ g KALAHARI CONVENTION CENTER w w DRAWING LOG0 p O `O 0 H 7 0 1 2 U G UQ U 0 Z O e 6 J O O o O _ J J 6 U O C C C O H O H = Z q W 2 2 2 2 2 q f y y y q 2 2 2 2 2 0 p O - b rc " 0 F F F F F U 2 U W W y $ W J J J W J w O J J J J X O '� O O 0 - - N > > > > > CPF2.202.B CONVENTION CENTER LEVEL 02-SECTOR'S' CPF2.202.0 CONVENTION CENTER LEVEL 02-SECTOR'C' CPF2.202.D CONVENTION CENTER-LEVEL 02-SECTOR'D' CPF2.202.E CONVENTION CENTER LEVEL 02-SECTOR'E' CPF2.202.F CONVENTION CENTER LEVEL 02-SECTOR'F' CPF2.203.A CONVENTION CENTER-ROOF-SECTOR'A' CPF2.203.B CONVENTION CENTER-ROOF-SECTOR'B' 01 1 101 01 CPF2.203.0 CONVENTION CENTER-ROOF-SECTOR'C' Mi I IMI 01 CPF2.203.D CONVENTION CENTER-ROOF-SECTOR'D' CPF2.203.E CONVENTION CENTER-ROOF-SECTOR'E' CPF2.203.F CONVENTION CENTER-ROOF-SECTOR'F' CPF3.100 ENLARGED RESTROOM UNDERFLOOR PLANS CPF3.101 ENLARGED RESTROOM PLANS CPF3.102 ENLARGED RESTROOM PLANS CPF3.103 ENLARGED RESTROOM UNDERFLOOR PLANS CPF3A10 ENLARGED WATER HEATER ROOM PLAN CPF4.100 ENLARGED KITCHEN UNDERFLOOR PLANS CPF6.01 SCHEDULES CPF7.01 PLUMBING AND FIRE PROTECTION DETAILS GMP Amendment No. 1 - Attachment 1 CONVENTION CENTER SPECIFICATIONS LOG ISSUES 2017-10-27 50% Design Development 2018-01-26 Final Design Development 2018-03-30 30% Construction Documents 2018-03-30 Foundation Package 2018-06-01 60% Construction Documents 2018-06-05 Shell and Core Package 2018-07-27 75% Construction Documents 2018-08-10 Shell and Core Update 1 2018-08-10 Progress Print 2018-10-05 Issued For Construction DIVISION 00 - PROCUREMENT AND CONTRACT REQUIREMENTS 2018-03-30 31000 Available Project Information 2018-03-30 52000 Agreement Form 2018-03-30 72000 General Conditions 2018-03-30 73000 Supplementary Conditions DIVISION 01 - GENERAL REQUIREMENTS 2018-03-30 12100 Allowances 2018-03-30 12200 Unit Prices 2018-03-30 12300 Alternates 2018-03-30 12500 Substitution Procedures 2018-03-30 12600 Contract Modification Procedures 2018-03-30 12900 Payment Procedures 2018-03-30 13100 Project Management and Coordination 2018-03-30 13200 Construction Progress Documentation 2018-03-30 13300 Submittal Procedures 2018-03-30 14000 Quality Requirements 2018-03-30 14200 References 2018-03-30 14323 Special Inspections 2018-03-30 14326 Testing Laboratory Services 2018-06-05 14339 Visual Mockup Requirements 2018-06-05 14516 Field Test for Water Leakage 2018-03-30 15000 Temporary Facilities and Controls 2018-10-05 15639 Temporary Tree and Plant Protection 2018-03-30 16000 Product Requirements 2018-03-30 17300 Execution 2018-03-30 17700 Close Out Procedures 2018-03-30 17823 Operation and Maintenance Data 2018-03-30 17839 Project Record Documents 2018-03-30 17900 Demonstration and Training DIVISION 03 — CONCRETE 2018-07-27 31000 Concrete Formwork 2018-03-30 32000 Reinforcing Steel 2018-03-30 33000 Cast In Place Concrete GMP Amendment No. 1 - Attachment 1 2018-03-30 33500 Concrete Finishing 2018-06-05 35300 Concrete Toppings DIVISION 04— MASONRY 2018-06-05 42100 Masonry Veneer 2018-06-05 42200 Concrete Unit Masonry 2018-10-05 44216 Site Stone Blocks, Boulders and Slabs 2018-06-05 47500 Adhered Masonry Veneer DIVISION 05 — METALS 2018-03-30 51200 Structural Steel 2018-06-05 51213 Architecturally Exposed Structural Steel 2018-03-30 52100 Framing Steel Joists and Joist Girders 2018-03-30 53123 Metal Roof Deck 2018-03-30 53600 Composite Metal Floor Deck 2018-06-05 54000 Cold Formed Metal Framing 2018-06-05 54300 Slotted Channel Framing 2018-06-05 55000 Metal Fabrications 2018-10-05 55013 Site Miscellaneous Metal Fabrications 2018-06-05 55100 Metal Stairs 2018-06-05 55213 Pipe and Tube Railings 2018-10-05 55214 Site Guard and Hand Railings 2018-06-05 55300 Metal Gratings 2018-06-05 57000 Ornamental Metal 2018-06-05 57300 Ornamental Handrails and Railings DIVISION 06 —WOOD, PLASTICS AND COMPOSITES 2018-03-30 61000 Rough Carpentry 2018-06-05 61053 Miscellaneous Rough Carpentry 2018-10-05 61063 Site Exterior Rough Carpentry 2018-03-30 61300 Heavy Timber Construction 2018-03-30 61600 Sheathing 2018-06-05 61643 Exterior Gypsum Sheathing 2018-03-30 61753 Prefabricated Wood Trusses and Bracing 2018-03-30 61800 Glue-Laminated Construction 2018-10-05 62013 Exterior Finish Carpentry 2018-10-05 62023 Interior Finish Carpentry 2018-10-05 64023 Interior Architectural Woodwork 2018-10-05 66400 Plastic FRP Paneling 2018-06-05 66813 Plastic Gratings DIVISION 07 - THERMAL AND MOISTURE PROTECTION 2018-06-05 71352 Modified Bituminous Sheet Waterproofing 2018-06-05 71413 Hot Fluid Applied Rubberized Asphalt 2018-07-27 71616 Waterproofing Crystalline Waterproofing 2018-06-05 71800 Traffic Coatings 2018-08-10 72100 Thermal Insulation GMP Amendment No. 1 - Attachment 1 2018-06-05 72400 EIFS 2018-06-05 72423 DEFS (Direct Applied Exterior Finish System) 2018-06-05 72617 Below Slab Vapor Retarder 2018-06-05 72726 Vapor Permeable, Fluid Applied Membrane 2018-06-05 74114 Metal Roof Panels 2018-06-05 74213 Formed Metal Wall Panels 2018-06-05 74343 Composite Fiber Cement Panels 2018-06-05 75013 Single Ply Membrane Roofing 2018-06-05 76200 Sheet Metal Flashing and Trim 2018-06-05 77200 Roof Accessories 2018-06-05 78116 Sprayed Fire Resistive Materials 2018-08-10 78413 Penetration Firestopping 2018-08-10 78446 Fire Resistive Joint Firestopping 2018-06-05 79200 Joint Sealants 2018-10-05 79500 Expansion Control DIVISION 08 - OPENINGS 2018-06-05 81113 Hollow Metal Doors and Frames 2018-06-05 81416 Prefinished Flush Wood Doors 2018-06-05 81426 Stile and Rail MDF Doors 2018-06-05 81433 Stile and Rail Wood Doors 2018-06-05 81613 Fiberglass Doors and Frames 2018-06-05 83113 Access Doors and Frames 2018-06-05 83213 Sliding Aluminum Framed Glass Doors 2018-06-05 83313 Coiling Counter Doors 2018-08-10 83323 Overhead Coiling Doors 2018-06-05 83326 Overhead Coiling Grilles 2018-10-05 83813 Traffic Doors 2018-06-05 84229 Automatic Entrances 2018-06-05 84400 Glazed Aluminum Framing Systems 2018-10-05 87100 Door Hardware 2018-06-05 88800 Glazing 2018-06-05 88300 Unframed Mirrored Glazing 2018-06-05 89100 Wall Louvers DIVISION 09 - FINISHES 2018-10-05 92600 Veneer Plastering 2018-10-05 92900 Gypsum Board Assemblies 2018-10-05 93000 Tiling 2018-10-05 95113 Acoustical Panel Ceilings 2018-10-05 96340 Stone Flooring 2018-10-05 96400 Wood Flooring 2018-10-05 96500 Resilient Flooring 2018-10-05 96513 Resilient Base and Accessories GMP Amendment No. 1 - Attachment 1 2018-10-05 96800 Carpeting 2018-10-05 97200 Wall Coverings 2018-10-05 97500 Interior Stone Facing 2018-10-05 97713 Stretched Fabric Wall Systems 2018-06-05 99100 Painting 2018-10-05 99300 Staining and Transparent Finishing 2018-06-05 99600 High Performance Coatings 2018-06-05 99639 Epoxy Containment Coating 2018-06-05 99663 Textured Acrylic Coatings DIVISION 10 — SPECIALTIES 2018-10-05 102113 Toilet Compartments 2018-10-05 102213 Wire Mesh Partitions 2018-10-05 102238 Operable Panel Partitions 2018-10-05 102613 Wall and Corner Guards 2018-10-05 102813 Toilet Accessories 2018-10-05 103116 Manufactured Fireplaces 2018-10-05 104400 Fire Protection Specialties 2018-10-05 105113 Metal Lockers DIVISION 11 — EQUIPMENT 2018-08-10 111300 Loading Dock Equipment 2018-06-05 112400 Building Maintenance Equipment DIVISION 12 — FURNISHINGS 2018-10-05 122113 Horizontal Louver Blinds 2018-10-05 122413 Roller Window Shades 2018-10-05 123640 Stone Countertops 2018-10-05 123661 Simulated Stone Countertops 2018-10-05 124843 Entrance Floor Mats 2018-10-05 129300 Site Furnishings DIVISION 13 — SPECIAL CONSTRUCTION 2018-10-05 132640 Prefabricated Modular Bathrooms 2018-10-05 133100 Tensile Membrane Structures DIVISION 14 — CONVEYING EQUIPMENT 2018-10-05 142100 Electric Traction Elevators 2018-08-10 143100 Escalators DIVISION 21 — FIRE SUPPRESSION 2018-10-05 210001 Basic Fire Protection Requirements 2018-10-05 210002 Fire Protection DIVISION 22 — PLUMBING 2018-10-05 220501 Basic Plumbing Requirements 2018-10-05 220505 Plumbing DIVISION 23 — HEATING, VENTILATION, AND AIR CONDITIONING 2018-10-05 230501 Basic Mechanical Requirements GMP Amendment No. 1 - Attachment 1 2018-10-05 230510 Basic Materials and Methods 2018-06-05 230540 Vibration Isolation 2018-06-05 230593 Testing, Adjusting, And Balancing 2018-10-05 230701 Insulation 2018-10-05 230901 Building Control System 2018-10-05 230993 Sequence of Operations for HVAC Controls 2018-06-05 232500 HVAC Water Treatment 2018-08-10 232923 Variable Frequency Drives 2018-10-05 233113 Metal Ducts 2018-06-05 233300 Air Duct Accessories 2018-10-05 233401 HVAC Equipment—Air Side 2018-06-05 235110 Breechings, Chimneys and Draft Control Devices 2018-10-05 235201 Heating Equipment 2018-08-10 237413 Packaged, Outdoor, Central-Station Air Handling Units 2018-06-05 238126 Split System Air-conditioners DIVISION 26 — ELECTRICAL 2018-10-05 260501 Basic Electrical Requirements 2018-10-05 260510 Basic Materials And Methods 2018-08-10 260526 Grounding And Bonding For Electrical Systems 2018-08-10 260553 Identification for Electrical Systems 2018-08-10 260573 Overcurrent Protective Device Coordination Study 2018-08-10 260920 Lighting Control Systems 2018-10-05 260936 Digital Network Lighting Control 2018-06-05 261116 Secondary Unit Substation 2018-06-05 261216 Substation Transformers 2018-06-05 261317 Metal Enclosed Load Interrupter Switchgear 2018-10-05 262000 Electrical Distribution 2018-08-10 263213 Engine Generators 2018-10-05 263356 Single Module Uninterruptible Power System 2018-08-10 263623 Automatic Transfer Switches 2018-06-05 264113 Lightning Protection For Structures 2018-10-05 265100 Architectural Lighting Fixtures 2018-06-05 265101 Lighting 2018-03-30 266000 Electrical Testing DIVISION 27 — COMMUNICATIONS 2018-11-01 270000 Low Voltage Communications 2018-11-01 270100 Operation and Maintenance Of 2018-11-01 270200 Communications Systems Systems 2018-11-01 270300 Pathways for Communications Systems GMP Amendment No. 1 - Attachment 1 2018-11-01 270400 Underground Ducts and Raceways For Communications Systems 2018-11-01 270500 Identification for Communications Systems 2018-11-01 270600 Schedules for Communications 2018-11-01 270700 Telecommunications Spaces 2018-11-01 270800 Telecommunications Backbone Cabling 2018-11-01 270900 Telecommunications Horizontal Cabling 2018-11-01 271000 Server Room Sr and Demarc 2018-11-01 271100 Communications Connecting Cords Devices and Adapters 2018-11-01 271200 Data Communications Wireless Access Points 2018-11-01 271300 Data Communications Cameras 2018-11-01 271400 Data Communications Parking Lot Cameras 2018-11-01 271500 Distributed Antenna System Das 2018-11-01 271600 Appendix 1 2018-11-01 271700 Appendix Ii 2018-11-01 273000 Audio Visual Overview 2018-11-01 274000 Audio Visual Systems DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 2018-11-01 280000 Electronic Safety and Security 2018-11-01 282000 Access Control and Cctv Overview 2018-11-01 282040 Cctv Devices 2018-06-05 283163 Digital, Addressable Fire-alarm System 2018-11-01 284000 System Integration 2018-11-01 285000 Cctv Project Completion DIVISION 31 — EARTHWORK 2018-06-05 313116 Termite Control 2018-03-30 316100 Spread and Continuous Footings 2018-03-30 316329 Drilled Piers DIVISION 32 — EXTERIOR IMPROVEMENTS GMP Amendment No. 1 - Attachment 1 DIVISION 33 — UTILITIES SUPPLEMENTAL INFORMATION 2018-05-18 Marrakesh Market—Lighting Fixture Schedule Data Sheets 2018-10-05 Mondo Sortinos—Plumbing Fixture Data Sheets 2018-10-05 Mondo Sortinos—Lighting Fixture Schedule Data Sheets 2018-10-05 B-Lux Burgers—Plumbing Fixture Data Sheets 2018-10-05 B-Lux Burgers—Lighting Fixture Schedule Data Sheets SUPPLEMENTAL INFORMATION — FOOD SERVICE 2018-08-07 Convention Center- Data Sheets GMP Amendment No. 1 - Attachment 2 Form PC603 p R..121a.09 V = Construction Co. Financial Status Report Summary Project: Kalahari Resorts A Conventions-Round Rock TXConvention Center Project Manager: Jos Sanders Project Number: 7018142 Data: 1 2/7 81201 9 Bid Package Purchasing Subsystem Description Estimate Completed emaming Gain or(Loss) Remarks 0.05.A Prefabricated Metal Stair Systems American Stair 73,205 73,205 0 0 0.05.8 Prefabricated Metal Stair Systems(Erection) patriot 40,445 40.445 0 0 0.06 Elevators&Escalators Oris 585,226 580,396 4,830 0 0.06 Testing Ades 0 Not Bought o 2.03 Earthwork Ranger 240,000 240,000 0 0 3.01 Turnkey Concrete Hensel Phelps 3,691.655 3,891,655 0 0 4.01 Masonry/Stone Veneer Brains 309,500 309.500 0 0 4.02 Structural&Miscellaneous Steel Alamo 6,261,158 6,175.296 85.662 0 4.05 Timber Framed Event Barn Sand creek post a Beam 316,191 171.191 145.000 0 4406A Waterproofing(Below Grade) CHM Ntatherguard 64,578 64.578 0 0 4.06.8 Waterproofing(Above Grade) Alpha 304,316 292.041 22,275 0 4.07 EIFS Galindo 6 Boyd 825,788 825,788 0 0 4.08 Roofing Rain King 1,667,701 1,645,600 22,101 0 4.10 Fireproofing Aohe 472.752 434.158 38,594 0 4.12 Loading Dock Equipment Miner 32,134 32,134 0 0 4.14 Exterior Glass Haley Greer 1,108,018 935,357 172,661 0 4.17 Drywall Standard 6,215,152 6,141,450 73,702 0 4.20 Fire Protection Casteel 638,489 528,489 110,000 0 4.21 Mechanical&Plumbing TDI 7,449,344 6,879.190 570,154 0 4.23 Building Control System Automated Logic 340,850 333,350 7,500 0 4.24 Electrical Bergelechic 4,308,986 3,830,560 476,426 0 6.00 Operable Panel Partitions Hulcor 1,016,486 1,016,488 0 0 6.01 Ornamental Metals Metalink 88,240 58.240 30,000 0 6.02 Carpentry 63,960 Not Bought 63.960 - 6.04 Architectural Millwork ISEC 473,612 502,574 23.562'. 0 6.06 Metal Panels National Panel Systems 156.602 156,602 0 0 6.07 Doors,Frames&Hardware LeForce 703,116 562.116 141,000 0 6.06 Overhead Coiling Doors&Grilles Overhead Dow of Austin 245,452 235,452 10,000 0 6.09 Overhead Fire Doors w/6.08 0 Not Bought o contracted veth 6.08 6.10 Interior Glass&Glazing Anchor ventana 64,356 81,856 2,500 0 6.12 Acoustical Ceilings Heartland 586.997 596.536 19.539) o 6.13 Tile&Stone Centex Flooring 270,546 274,246 (3.-00) 0 6.14 Carpet&Resilient Flooring Flooring Solutions Group 1,196.755 1.025.378 173.377 0 6.16.3 Paint&Wall Coverings Hagler&Kerr 1,322,736 1,387.852 ;65 116) 0 6.19 Public Area Toilet/Shower Partitions&Accessories Spectrum 121,815 121.615 0 0 6.20.1 Building Specialties Alpha 15,611 15,611 0 0 6.20.2 Building Specialties Spectrum 14.532 11.032 3,500 0 6.20.3 Building Specialties OFOI 0 Not Bought 0 OFIO per 10232019 Meeting 6.25 Countertops ISEC 235,177 190.277 44,900 0 6.26 Testing,Adjusting&Balancing TAB Technotogres 170.000 Not Bought 170.000 - 6.27 Decorative Site Fencing OFOI 0 Not Bought 0 OFIO per 10232019 Meeting 6.31 Fire Alarm Johnson Controls 208,700 1 207,300 1,400 0 8.01 Communications Structured Cabling Infrastructure&Equ Brycomm 654,651 654551 0 0 8.02 Distributed Antenna System(DAS) o Not Bought 0 - Scope has been deleted from project by Omer 8.03 Audio Visual CTI 1,151,636 1,151,636 0 0 8.04 Electronic Safety&Security Brycomm 48,415 48.415 0 0 9.05 Low Voltage System Pathways Bergelechic 429,400 421,400 8.000 0 9.01 Final Clean TBD 154,650 Not Bought 154,650 - Remaining:Issue Bid Package COW Cost of Work 621,253 621,253 0 0 GENERAL CONDITIONS 1,902,386 1,902.386 0 0 INDIRECTS 1.158,792 1,158.782 0 0 CONTINGENCY&RESERVES 562,252 Not Bought 562,252 - C NTRA TOR'S FEE 1,336.599 Not Bought 1,336.599 APPROVED I N TRENDS/CHANGE (Temp laceholder) 0 TOTAL $48,940,205 $45,616,279 $4,323,926 $0 PERCENT 91.34% 18.66% 1 0.00% GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) 0.05.A 7018142-0552000 Prefabricated Metal Stair Systems American Stair C2010 Prefabricated Metal Stair Systems(30%Construction Documents) 80,205 80,205 Issued for Construction Documents No Change No Change Bulletin 01 No Change No Change Bulletin 02 No Change No Change Internal Change-Stair CST-01 Landing Revisions(To 0.05B Patriot) C:00> -.000) Subtotal 73,205 73,205 0 0.05.13 7018142-0550000 Prefabricated Metal Stair Systems(Erection) Patriot C2010 Prefabricated Metal Stair Systems(30%Construction Documents) 33,445 33.445 Issued for Construction Documents No Change No Change Bulletin 01 No Change No Change Bulletin 02 No Change No Change Internal Change-Stair CST-01 Landing Revisions(From 0.05A American Stair) 7,000 7.000 Subtotal 40,445 40,445 0 0.06 7018142-1400000 Elevators&Escalators Otis D1010 Elevators&Escalators 582.476 582,476 CS-01 Passenger Elevator(Pre-Function)4500 LBS,200 FPM(Front/Rear Entry) w/Above w/Above CS-02 Service Elevator(Loading Dock)4500 LBS,200 FPM w/Above w/Above CS-03 Service Elevator(Loading Dock)4500 LBS,200 FPM w/Above w/Above Elevator Finish Allowance(Passenger Elevator) w/Above w/Above CE-01 Escalator(Pre-Function)100 FPM w/Above w/Above CE-02 Escalator(Pre-Function)100 FPM w/Above w/Above Bulletin 01 No Change No Change Bulletin 02 No Change No Change Internal Change-Crane Invoice(To Cost of Work) (2080, Subtotal 580,396 580,396 0 RFI#0273-Diamond Plate Flooring at Service Elevators 4,830 4,830 0.08 7018142-0202000 Testing Arias A1010 Material Testing w/cost of work w/cost of work Bulletin 01 No Change No Change Bulletin 02 No Change No Change Subtotal 0 0 -- 2.03 7018142-3100126 Earthwork Ranger G1020 Building Pad Preparation 240,000 240,000 Excavate to Required Elevation w/Above w/Above Moisture Condition to Site Material and Fill w/Above w/Above Select Fill Top 12 w/Above w/Above Bulletin 01 No Change No Change Bulletin 02 No Change I No Change Date. 2019.12.18 Page i of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) Subtotal 240,000 240,000 0 3.01 7018142-0300000 Turnkey Concrete Hensel Phelps A1030 Turnkey Concrete(30%Construction Documents) 3,433,496 3,433,496 Event Barn Foundations&Slab on Grade 139,000 139,000 Issued for Construction Documents&Bulletin 1/2 128,820 128,820 Internal Change-CE 30,31 32(to 4.02-Alamo) 19,661 (9 Subtotal 3,691,655 3,691,655 0 4.01 7018142-0400000 Masonry/Stone Veneer Brazos 82010 Masonry/Stone Veneer(30%Construction Documents) 309,500 309,500 Bulletin 01 No Change No Change Bulletin 02 No Change No Change Subtotal 309,500 309,500 0 4.02 7018142-0500000 Structural&Miscellaneous Steel Alamo 61010 Structural&Misc.Steel(30%Construction Documents 5,731,754 5,731,754 Internal Change-CE 30,31 32(from 3.01-HP Concrete) 9.661 9,661 Issued for Construction Documents(60%to 100%) 431,599 431,599 RFI#0596-Delete Rigging Points (113.4001, (113 400) RFI#0733-Curtain Wall Steel 7,904 7,904 RFI#0891-Expansion Joint Plate Steel 16,898 16,898 RFI#0933-Escalator Truss 6.394 6,394 Bulletin 01&Bulletin 02 76.322 76,322 RFI 955-Skid Plate Credit -,!,i is (2,6101 RFI 1438-Hoist Beam at Elevator 10,774 10,774 Subtotal 6,175,296 6,175,296 0 RFI 1426-Loading Dock Finish Changes Added C Channel at Loading Dock Door 5,862 5,862 Miscellaneous Metals not scheduled or detailed 60 000 80.000 4.05 7018142-0613000 Timber Framed Event Barn Sand Creek Post&Beam 81020 Timber Framed Event Barn(30%Construction Documents) 147,142 147,142 6 Pair Sliding Doors&Additional Access Doors(Add Alt) 12,049 12,049 Wind Loading Engineering(Add Alt) 12,000 12,000 Subtotal 171,191 171,191 0 Installation Including Additional Doors&Interior Framing(Texas Timber Frame Separate Contract to be 4.05B) 140 000 140.000 Support Beam for Light Fixtures 5,000 5.000 4.O6.A 7018142-0700000 Waterproofing(Below Grade) CHM Weatherguard A2020 Below Grade Waterproofing(30%Construction Documents) 63.361 63,361 Date 2019 1218 Page 2 of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) Bulletin 01&Bulletin 02 1.217 1,217 Subtotal 64,578 64,578 0 4.06.8 7018142-0702000 Waterproofing(Above Grade) Alpha 81010 Above Grade Waterproofing(Progress Set dated 8/13/18) 282,041 282.041 RFI 320Fluid Applied Air-Barrier @ Metal Panels(Screen Walls) 33,000 Not Included RFI 847. Back of Wall Change to DEFS(Screen Walls) (33000) Not Included Subtotal 282,041 282,041 0 Event Barn-Cavity Insulation(Final Pricing from Alpha) 10,692 10 Event Barn-Air Barrier(Final Pricing from Alpha) 11,583 1 1 583 4.07 7018142-0704000 EIFS Galindo&Boyd B2010 EIFS 842,800 842,800 RFI#0847-Eliminate EIFS at Screen Walls 166.850) (66.8501 RFI#0847-Add DEFS at Front/Back of Screen Walls 57,366 57,366 RFI 1426-Loading Dock Finish Changes (7.528) (7.528'1 Subtotal 825,788 825,788 0 4.08 7018142-0703000 Roofing Rain King 83010 Roofing(Progress Set dated 8/13/18) 1,497,107 1,497,107 Roofing-Event Barn 148,493 148,493 Bulletin 01 &Bulletin 02 No Change No Change Subtotal 1,645,600 1,645,600 0 RFI#0847-Add Coping Cap at DEFS Screen Walls to match roof perimeter 14,310 14,310 RFI 1107-Porte Cochere Vapor Barrier 7,791 7,791 4.10 7018142-0702000 Fireproofing Alpha B1010 Fireproofing(Progress Set dated 08/13/18) 434.158 434,158 Subtotal 434,158 434,158 0 Silicon Firestopping at Perimeter slab edge 7,438 7,438 Fireproofing Patching Excluded from Contract,Budget to Be Tracked via T&M 26 156 26 156 Fireproofing of Elevator Shaft Steel Supports and Stair Overrun(Required per CoRR Inspector) 5000 5.000 Dote 201J 12.18 Page 3 of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) 4.12 7018142-1113000 Loading Dock Equipment Miner E1030 Loading Dock Equip-Levelers/Bumpers(30%Construction Documents) 32,134 24,900 Loading Dock -Seals and Shelters w/above 7,234 Issued for Construction Documents No Change No Change Bulletin 01 &Bulletin 02 No Change No Change Subtotal 32,134 32,134 0 4.14 7018142-0880000 Exterior Glass Haley Greer 82020 Exterior Glass(Haley-Greer)-Progress Set dated 08/13/18 935.357 935.357 Subtotal 935,357 935,357 0 IFC Documents-Extended face caps at vertical accent bands.mullions and flashing 85.478 85,478 AMF-01-Metal Panel(Steel Column Covers)w/IFC number 72,600 72,600 IFC-Bronze Anodized Finish 11.250., (1250; Bulletin 01&Bulletin 02 15,833 15,833 4.17 7018142-0900000 Drywall Standard B2010 Drywall,Fiber Cement Panels&Vapor Barrier(Progress Set dated 08/13/18) 6,087,685 6.087,685 IFC Documents 42,130 42,130 Bulletin 01&Bulletin 02 151-89) 15.289) RFI 840-Eliminate Light Coves at Prefunction Area (1,593) (t5934 Add Sheathing at back side of screen walls 20.000 11,588 RFI 847-Add Sheathing at back side of screen walls(Delta between actual and budget) (8 412) w/above Blocking for Downspouts 20,000 6,929 Blocking for Downspouts(Delta between actual and budget) (13.071) w/above Subtotal 6,141,450 6,141,450 0 Bulletin 03 1,575 1,575 RFI 1426-Loading Dock Finish Changes-Rework of Door Openings 3,587 3.587 RFI 1509-2 Hour Fire Rated Ceiling at Elevator Shaft 3,502 3.502 RFI 1435-Drywall Ceiling at Deleted T&G Wood Ceiling at Pre-Function(Part of Millwork VE) 7,323 7.323 RFI 1190-Bulletin 2 Swap for Glassmat 7,003 7.003 RFI 1593-Porte Cochere and Loading Dock Venting 5,026 5.026 Bulletin 05 10,266 10,266 RFI 1287-GFRC Column Wrap increase at Porte Cochere 10 OD0 10 000 Event Barn 25.420 25 420 4.20 7018142-2210000 Fire Protection Casteel D4010 Fire Protection-30%Construction Documents 507,000 507,000 IFC Documents No Change No Change Bulletin 01 &Bulletin 02 No Change No Change MDF FM 200 system 21.489 21.489 Subtotal 528,489 528,489 0 Event Barn Fire Protection 41.000 41.000 Dry Pipe System at Porte Cochere 30.000 30.000 Upgrade Hazard Requirements(per Kalahari Insurance)(reduced from$50,000 to$39,000 at 8/13/19 39.000 39,000 Date 2019.12.18 Page 4 of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) 4.21 7018142-2200000 Mechanical&Plumbing TDI D3040 Mechanical&Plumbing (30%Construction Documents) 6.879,190 6.879,190 Subtotal 6,879,190 6,879,190 0 IFC Documents 97,900 97,900 Bulletin 01/Bulletin 02 90.174 90,174 Perimeter Drainage System 92,705 92,705 Event Barn Mech/Plumbing Incl.Radiant Heat&Fans 198,819 198,819 Bulletin 03 3,877 3,877 Bulletin 04 39,748 39,748 RFI 1282 Mop Sink 7,018 7,018 RFI 1289 Hose Bib 3,847 3,847 Bulletin 5 25,066 25,066 RFI#0820-Porte Cochere Drains 11.000 11.000 4.23 7018142-2301000 Building Control System Automated Logic D3060 Building Control System(30%Construction Documents) 323,350 323.350 IFC Documents 10.000 10.000 Subtotal 333,350 333,350 0 Event Barn(Add A/C to BAS/Control System) 7,500 7,500 4.24 7018142-2601000 Electrical Bergelectric D5020 Electrical(30%Construction Documents) 3,968,300 3,968,300 IFC Documents 333,408 333,408 IFC Lighting Clarification-Prior to VE 53,605 53,605 Generator Package(iFC) f215.570) (215.570) Savings-Combined Electrical Gear Package/Generators(IFC) ;52.475) (52.475) Savings-VE Lighting Package and Lighting Controls(IFC) (100.0061, (100.0061 Bulletin 01 &Bulletin 02 35,915 35,915 RFI 0596-Deletion of Rigging Points (97.747) 197,7471 RFI#0840-Eliminate Light Coves at Prefunction Area ;11.56_'; 111,562) RFI#0617A-Location of Lighted Mirrors and Power Information 5,942 5,942 LT Fixture Credit(Berg Mat'I Only) ;89.250; (89.250; Subtotal 3,830,560 3,830,560 0 Event Barn 217.000 217,000 RFI 1244-Mech Equipment Power Change 17,380 17,380 RFI 1080-Power for Signage 7,154 7.154 RFI 1281-Elephant Sign Power Requirements(Includes lighting controls) 8,810 8,810 RFI 1397-Forklift/Pallet Jack Charging Station 3,176 3,176 (2)Additional 1 1/2"Conduits to floor boxes per IT Underground Coordination 71,039 71,039 Bulletin 03 27 555? (27.555) Bulletin 05 21,411 21,411 Installation of Light Fixtures.Raceways to Freezers/Coolers(Excludes Fixtures) 8,011 8,011 Power from Electrical Room to FA Panels 20.000 20.000 FSD Power/Misc Power 100,000 100.000 Allowance-Event Barn LT Fixtures if not Fumished by Kalahari 30,000 30.000 Date'. 2019.12.18 Page 5 of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) 6.00 7018142-1022000 Operable Panel Partitions Hufcor C1010 Operable Partitions(IFC Documents) 1.022,250 996,986 Approved VE by Kalahari""STC 52 Wall Panels ILO STC 55 w/Above BiFold Doors at Kilamanjaro Ballroom 19,500 19,500 Subtotal 1,016,486 1,016,486 0 6.01 7018142-0550100 Ornamental Metals Metalink C1030 Ornamental Metals(IFC Documents) 58,240 58,240 Subtotal 58,240 58,240 0 Revised Handrail to cover stringers and layout at EscalatodStair Detail 30 000 30.000 6.02 Carpentry 82010 WD-02-Wood Tongue-Groove Soffit(Porte Cochere)(ISEC and Texas Timber pricing) im Misc.Blocking not shown on documents(removed per meeting w/DH 10/23/2019) Subtotal 63,960 0 -- 6.04 Architectural Millwork ISEC C3010 Millwork(IFC Documents) 502,574 502,574 Subtotal 502,574 502,574 0 RFI 879A-Deleted Wood Wallcovering at Ceiling L2 111.991) (11,991; Delete BI-fold Doors at Kilamanjaro Ballroom (12.195) (12.195) Approved Millwork VE Items(Meeting with Kalahari 4/10/19) 132,776) (132.775' RFI 1554-Liquor Display Cabinet Revisions 3,000 3.000 Bulletin 01&Bulletin 02 100,000 100,000 Acceleration Due to limited crew/labor resources 25,000 25.000 6.06 7018142-0705000 Metal Panels National Panel Systems 82010 Metal Panels(IFC Documents) 156,602 156,602 RFI#0320-MTL-02-Backside of Screenwall 123,540 Not Included RFI#0847-Eliminate-MTL-02-Backside of Screenwall (123.540) Not Included Subtotal 156,602 156,602 0 6.07 7018142-0891000 Doors,Frames&Hardware LaForce C1020 Doors.Frames&Hardware(IFC Documents) 547.958 547.958 Event Barn 14,158 14.158 Subtotal 562,116 562,116 0 Date. 2019.12.18 Paye 6 0l 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) Bulletin 01&Bulletin 02 25.000 25 000 Convention Center Ballroom Doors 96 000 96 000 Automatic Openers(Not Specified or Scheduled) 20.000 20 000 6.08 7018142-0833000 Overhead Coiling Doors&Grilles Overhead Door of Austin 82030 Overhead Coiling Doors&Grilles(IFC Documents) 134,237 134.237 Change OH Coiling Shutters at Registration Desks to Wood 101,215 101,215 Subtotal 235,452 235,452 0 Controls Wiring and Conduit(Final number from Berg) 10 000 1&500 6.09 Overhead Fire Doors wl 6.08 BUDGET w/6.08 Subtotal 0 0 -- 6.10 7018142-0870000 Interior Glass&Glazing Anchor Ventana C1020 Interior Glass&Glazing(Anchor Ventana)-IFC Documents 80,462 80.462 Event Barn-Full Length Mirror&Restroom Mirrors 1,394 1,394 Subtotal 81,856 81,856 0 RFI 1390-Door into Sales Office 2 500 2 500 6.12 7018142-0903000 Acoustical Ceilings Heartland C3030 Acoustical Ceilings(Heartland Acoustical)-IFC Documents,Bulletin 01&02 596,536 596,536 High Impact Resistant Tackable Wall Panels-WP-101 17,484 Not Included Eliminate per Kalahari-High Impact Resistant Tackable Wall Panels-WP-101 17.464) Not Included Subtotal 596,536 596,536 0 FOH Finish Revisions 11,204} i2 Event Barn-ACT(MA2.301,Unknown Type) 1,665 1.665 6.13 7018142-0904000 Tile&Stone Centex Flooring C3020 Tile(IFC Documents) 244,950 244,950 Event Barn-T-140 Floor Tile/T-141 Wall Tile 7,546 7,546 Bulletin 01&Bulletin 02 21,750 21,750 Subtotal 274,246 274,246 0 RFI#0862-No Quarry Tile at Freezers f3,700) 3.1001 6.14 7018142-0905000 Carpet&Resilient Flooring Flooring Solutions Group C3020 Carpet&Resilient incl.RC-101 Chair Rail(FSG)-IFC Documents 1,025,378 1,025,378 Date 2019.12.18 Page 7 of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) Subtotal 1,025,378 1,025,378 0 Bulletin 01&Bulletin 02 (6.0° 41 Carpet Tile at BOH Corridor 60,335 60,335 Credit for Service Elevator Flooring 1.00Qt RFI 1190R-Finish Revisions Added Protect-All 61,880 61,880 Change of Reslient Flooring Type 13,868 13.868 Floor Protection 44.378 44.3)8 6.16.3 7018142-0991000 Paint&Wall Coverings Hagler&Kerr C3010 Paint and Wall Coverings(Hagler&Kerr) 1,377,773 1,377.773 Event Barn-Finished Spaces Interior Paint 10,079 10.079 Subtotal 1,387,852 1,387,852 0 Sprayed Texture ilo Roller 121,600 121,600 Bulletin 01&Bulletin 02 (7.550) (7.550) RFI 119081-BOH Finish Clarifications 38.786) (38.786) FOH Finish Revisions 184 748) (184.748) RFI 1426-Loading Dock Finish Changes 2,440 2,440 RFI 1504-LT 912 Light Fixture Details(Rework) 1,307 1,307 RFI 879A-Deleted Wood Wallcovering at Ceiling L2 10.621 10,621 Painters Caulking and Paint Touch-up Outside of Contract Requirements 2000Q 20.000 Stain/Seal Event Barn(Board&Batten Siding)(Need final pricing H&K and Cherry) 10.000 10 000 6.19 7018142-1010000 Public Area Toilet/Shower Partitions&Accessorie!Spectrum C1030 PP6.19-Toilet Partitions&Accessories(Spectrum)-IFC Documents 118.610 120,382 PP6.19-Event Barn-Toilet Partitions&Accessories(Spectrum)-IFC Documents 1,772 w/Above PP6.19-Bulletin 01&Bulletin 02 3,657 3,657 RFI 1525-Credit to Remove Trash Grommett 112.224) (2.224) Subtotal 121,815 121,815 0 6.20.1 7018142-0702000 Building Specialties Alpha 0030 PP6.20-Bldg Specialties-Expansion Joints(Alpha)-IFC Documents 15,611 15,611 Subtotal 15,611 15,611 0 6.20.2 7018142-1010000 Building Specialties Spectrum C1030 Bldg Specialties-AED's&Cabinets(Spectrum)-IFC Documents 6,634 6,634 Fire Protection Specialties(Spectrum)-IFC Documents 5,039 6,039 Event Barn-Fire Protection Specialties(Spectrum)-IFC Documents 1,000 w/Above Bldg Specialties-Corner Guards(Spectrum)-Bulletin 02 478 478 Fire Protection Specialties(Spectrum)-Bulletin 02 218 218 RFI 1238-Deletion of 2 AED's (2.337} (2,337) Date 2019.12.18 Page 8 of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) Subtotal 11,032 11,032 0 RFI 1338-Knox Box Locations 2.500 2.500 Column Protection at BOH Columns 1,000 1.000 6.20.3 Building Specialties OFOI C1030 PP6.20-Remaining to Buy: Signage(Code) OFOI Subtotal 0 0 — 6.25 Countertops ISEC E2010 Countertops(ISEC)-IFC Documents 183.777 183,777 RFI 1525-Trash Gromment Removal 6.500 6,500 Subtotal 190,277 190,277 0 Approved Countertop VE Items(Meeting with Kalahari 4/10/19) 11 OM (100) Bulletin 01&Bulletin 02 20,000 20,000 Acceleration Due to limited crew/labor resources 25,000 25,000 6.26 Testing,Adjusting&Balancing TAB Technologies D3070 BUDGET w/Below Test&Balance 170,000 Subtotal 170,000 0 -- 6.27 Decorative Site Fencing OFOI G2040 Event Barn-Screening Fence BOH(HP RFI) OF GI Subtotal 0 0 -- 6.31 7018142-2810000 Fire Alarm Johnson Controls D5030 Fire Alarm 207.300 207,300 Subtotal 207,300 207,300 0 Event Barn Conduit 1,400 1,400 8.01 7018142-2700000 Communications Structured Cabling Infrastructure i BryComm D5030 PP8.01-Communications Structured Cabling Infrastructure&Equip(BryComm)-Event Barn 601,596 654,651 Event Barn 53,055 w/Above Subtotal 654,651 654,651 0 8.02 Distributed Antenna System(DAS) Date 2019.12.18 Page 9 of 12 CMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) D5030 Deleted by Owner(Pathways Remain with 8.05) Deleted Deleted Subtotal 0 0 -- 8.03 7018142-2830000 Audio Visual CTI D5030 PP8.03-Audio-Visual Sys-Pathways.Cabling,Devices and Equipment 1.038.647 1,055,547 Event Barn 16.9D0 w/Above Bulletin 05 96,089 96,089 Subtotal 1,151,636 1,151,636 0 8.04 7018142-2800000 Electronic Safety&Security BryComm D5030 PP8.04-Security-Pathways,Cabling and Devices 12,211 48,415 PP8.04-Security(Camera Purchase per direction from Kalahari)(Review Breakdown between Hotel and CC) 18,442 w/Above PP8.04-Security(NVR Servers&Licenses Purchase per direction from Kalahari)(Review Breakdown between Hotel and CC) 19.506 w/Above PP8.04-Security(Camera VE accepted by Kalahari) w/Above Subtotal 48,415 48,415 0 8.05 7018142-2601000 Low Voltage System Pathways Bergelectric D5030 PP8.05-Low Voltage Pathways(Bergelectric) 421,400 421.400 Subtotal 421,400 421,400 0 PP8.05-Low Voltage Pathways(Bergelectric)-Event Barn 8 D00 8.000 9.01 Final Clean TBD C1030 Final Clean 150 900 Event Barn 3.750 Subtotal 154,650 0 -- COW Cost of Work Layout&Control 182,006 182,006 Layout&Control 182 006) (182.006) Arias-Testing 74,650 74,650 Dumpsters 49,651 49,651 Weekly Clean 81.000 81,000 Temp Toilets 21,807 21,807 Sump Pit Grating 434 434 Water Truck 11,000 11,000 Temp Weather Protection 12,500 12,500 Temp Access Protection 15,000 15,000 Temp Signage 3,000 3,000 Dumpster Backhoe 0 0 Date 2019.12.18 Page 10 01'12 CMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) Support Cranes-Material&Other Cost 100,211 100,211 Support Cranes Equipment 0 0 Forklift Operator-Labor 150,000 150,000 Forklift Fuel Oil Gas 0 0 Forklift Monthly Rental 80,000 80,000 Equipment Insurance 2,000 2,000 Backhoe for Dumpster Management 20,000 20,000 Subtotal 621,253 621,253 0 Dale 2019.12.18 Page 11 of 12 GMP Amendment No. 1 - Attachment 2 Column A Column B Column C Column D Column E Column F Column G Column H Bid Package Cost Gain or Subsystem Control# Description Estimate Purchasing (Loss) GENERAL CONDITIONS General conditions 1,753,472 1,753,472 Layout&Control 148,914 148,914 Subtotal 1,902,386 1,902,386 0 INDIRECTS Contractor's Bonds(.55%of GMP) ($49,667.789`0.0055)(GMP Less Bond) 273,173 273.173 SDI(1.35%COW and Contingency)($44,358,933'.0135)(All costs above COW) 598,846 598.846 Insurance(.59%of GMP less Fee)($48,603,872'.0059) 286,763 286,763 Subtotal 1,158,782 1,158,782 0 CONTINGENCY&RESERVES Bidding&Construction Reserves(1.25%of Cost of Work less GC's) 562,252 ($44,980,186`0.0125) Subtotal 562,252 0 -- 9099000 CONTRACTOR'S FEE Contractor's Fee(2.75%) 1.336,599 ($48,603,606-0.0275) Subtotal 1,336,599 0 -- CO# APPROVED DESIGN TRENDS/CHANGES(Temp Placeholder) TOTAL $49,940,205.00 $49,940,205.00 $45,616,279 $45,616,279 $0 Percent Purchased: 91.34 Percent Gainiii.osst: 0.00 Date 2019.12.18 Page 12 of 12 GMP Amendment No 1 Attachment 3 December 18, 2019 Kalahari Resorts and Conventions Round Rock Convention Center Guaranteed Maximum Price Proposal Clarifications & Assumptions General Comments 1. This proposal is based on the Kalahari-Round Rock,Texas—IFC Documents Package dated October 5,2018 prepared by HKS,Inc.and their sub-consultants,inclusive of Bulletin 01 dated November 1, 2018, Bulletin 02 dated January 22, 2019, Bulletin 03 dated April 24, 2019, Bulletin 04 dated June 7,2019 and Bulletin 05 dated September 12,2019. 2. This proposal includes all Convention Center costs associated with Requests for Information as defined in the attached log(RFI Summary Log). The items in gray are not applicable to this proposal and not included,the items in green are included in this proposal and the items in red have not been included in this proposal and will be addressed on an individual basis via the change estimate process. 3. We have not included any costs for hazardous remediation of soil or water. If contaminated materials are encountered,Hensel Phelps will notify the Owner. 4. The Convention Center has been included as tax exempt. 5. Special payment terms, such as deposits and up-front payments, that differ than those in the prime agreement that cannot be negotiated for overseas suppliers or specialty vendors are assumed to be billable at the time the expense is incurred and at the same value. 6. Per owner direction, no standalone (sacrificial) mockups have been included. References to standalone mockups within specification sections have been excluded. 7. Per the meeting held between Hensel Phelps and Kalahari on October 23,2019 code required signage, that is not shown in the plans and specifications,will be OFOI and therefore all costs associated with this scope have been removed. 8. The cost of permits and City of Round Rock inspection fees have been assumed to be waived or by the owner,including any City required third party inspections and water meter impact fees. 9. The following items have been included as allowances: a. Event Barn LT Fixtures-$30,000 10. Cost associated with costs highlighted in the attached document, "2019.12.18—Kalahari CC GMP Cost Back-up," are budgets for items that remain to be bought or changes to the original contract documents that have not been fully reviewed,confirmed or approved by the Owner. These costs will be presented to Kalahari in accordance with the contract. It. The following IFC specification sections or materials have been excluded as they could not be found in the documents or do not apply to the Convention Center portion of the project: a. 015639-Temporary Tree and Plant Protection b. 033800—Post Tensioning c. 034100—Precast Structural Concrete d. 044216—Site Stone Blocks,Boulders and Slabs e. 055013—Site Miscellaneous Metal Fabrications f. 055214—Site Guard and Hand Railings g. 061063—Site Exterior Rough Carpentry h. 071800—Traffic Coatings i. 073113—Air and Water Barriers Asphalt Shingles J. 073213—PVC Thatch Shingle Roofing k. 083326—Overhead Coiling Grilles 1. 084500—Translucent Insulating Panel Assemblies in. 085113—Aluminum Windows Page 1 of 6 Kalahari. ® HENSEL PHELPS ---- RESORT9 & Plan. 6u id. Manage. CONVENTIONS GMP Amendment No 1 Attachment 3 December 18, 2019 n. 096400—Wood Flooring o. 096623—Thin Set Terrazzo Flooring p. 099639—Epoxy Containment Coating q. 101443—Photoluminescent Exit Path Marking System r. 102213—Wire Mesh Partitions s. 102819—Shower Doors and Enclosures t. 103116—Manufactured Fireplaces u. 105113—Metal Lockers v. 107500—Flagpoles w. 111213—Turnstiles and Gates x. 112400—Building Maintenance Equipment y. 129300—Site Furnishings z. 122113—Horizontal Louver Blinds aa. 132640—Prefabricated Modular Bathrooms bb. 133100—Tensile Membrane Structures cc. 149100—Chutes dd. 232123—Hydronic Pumps ee. 236416—Centrifugal Water Chillers ff. 236514—Open Circuit,Mechanical-Draft Cooling Towers gg. 312219—Landscaping and Fine Grading hh. Division 32—Exterior Improvements ii. Division 33—Utilities 12. Fire Watch or other temporary measures that may be required by City of Round Rock AHJ for temporary stocking or owner move in prior to permanent FA/FP systems being active have not been included. 13. Any coordination required above and beyond standard permit requirements, with the Authority Having Jurisdiction(AHJ)for operational sign-off for final opening is by Kalahari. 14. The Owner intends to utilize the Kilimanjaro Ballroom within the Convention Center for staging and storage of Owner Furnished items prior to completion.Owner and Contractor will develop the punch list prior to the start of Owner staging and storage activities. It is assumed that Owner vendors and suppliers will be responsible for their own wall and elevator protection,daily cleanup and loading into dumpsters,and labor; as well as any rework or repairs due to damages by the owner,their vendors or suppliers. Coordination with the AHJ for approval of the use of this area as storage/stocking is assumed to be by Kalahari. 15. In order to finalize the Convention Center finishes in the ballroom,all OFOI, OFCI and FFE will need to be removed from the Kilimanjaro Ballroom 30 days prior to final completion. 16. Materials are being provided per specifications. The selections are best value and may vary from Hotel,Parks and Site materials. Costs associated with requiring single source across all projects/buildings has not been included. A 10—Foundations A20—Basement Construction 1. Crystalline waterproofing is included at Convention Center escalator pits. No other locations are identified and are therefore not included. Page 2 of 6 !W HENSEL PHELPS KalahaRESORTSri. Pian. Build. Manage. CONVENTIONS GMP Amendment No 1 Attachment 3 December 18, 2019 B 10—Superstructure 1. Square and rectangular tube steel is priced as ASTM A500-B instead of A501 as stated in the specifications. 2. Any long span steel members longer than 69'-0"have been priced as spliced members. 3. One coat of rust inhibitive primer has been included where AESS steel is indicated. 4. Fireproofing of roof structural members are excluded where every part of the roof construction is 20 feet or more above any floor immediately below. The structural columns and brace frames in these conditions will be fireproofed up to the roof deck. 5. Fireproofing of metal decking is not included where 4.5"NW concrete is on 3"metal decking.Floor beams and columns are included. 6. Fireproofing has not been included at trellises,the Event Barn or screen wall framing. 7. A 5-year extended warranty for the area where light weight mix design was placed at Level 2 Sector C has been included. B20—Exterior Closure 1. All exterior stone veneer corners will be a return using butt joints; L-shaped corner stones have not been included. 2. Thermal spray insulation is included at the Convention Center loading dock soffit only where the above slab is occupied interior space. This product was listed in specification section 07 21 00 — Thermal Insulation. 3. Fluid applied weather barrier per specification section 07 27 26 is included all exterior applications in lieu of self-adhered weather barrier per specification section 07 27 13. 4. The 08 8000 Glazing specification indicates an ETA membrane to be utilized at all aluminum framing systems perimeters to seal the air barrier. Standard sealant details are indicated in the documents and have been included in lieu of ETA membrane. 5. Manufacturer warranty for Anodized Aluminum has been included as 10 year. B30—Roofing C 10—Interior Construction 1. In reference to part 3.5 of specification 10 22 38 for Operable Partitions, no field testing of the partitions has been included.Manufacturer test data has been included in our proposal. Similarly,no field testing of rated walls has been included; walls will be constructed per contract documents and details. 2. Per 1.12.A.2.a of specification 10 22 38, we have included the 2-year base bid warranty period for the operable partition panels. 3. Per 2.7.1b finish facing of specification 10 22 38,we have included vinyl-coated fabric wall covering. 4. Operable partitions have been included at STC 52 ILO STC 55 per the drawings 5. We have included 4' tall unpainted plywood at all BOH corridors (on drywall partitions) and electrical/IT room walls. 6. The following items are assumed to be Owner Furnished: a. Paper Towel OFCI b. Toilet Paper Dispensers OFCI c. Decorative Mirrors and Lighted Mirrors OFOI d. Loose Lockers and Benches OFOI e. Mop&Broom holders OFOI Page 3 of 6 �al_ahari, HENSEL PHELPS RESORTS & flan. fiJAd. Manage. CONVENTIONS GMP Amendment No 1 Attachment 3 December 18, 2019 f. LT Light Fixtures OFCI g. Loose furniture,curtains,trash bins,artwork,clocks,loose planters OFOI h. Attendance time clock OFOI i. Office furniture and equipment OFOI j. Trash compactors and plates OFOI k. Oil System and fill boxes OFOI 1. Code Required Signage(not identified in the plans and specs)OFOI 7. Masonry cell insulation has not been included as it does not apply to the project. 8. Flooring system sound reduction membranes have not been included. 9. Custom Vinyl Graphics on Coiling Counter Doors have not been included. 10. Acoustical Wall Panels(WP-101 and WP-102)have not been included per owner direction. 11. Wood Door casings over HM frames have not been included per Owner direction. C20—Stairs 1. We have assumed and included an American Stair Endura system at all exit stairs. These stairs will include a fadeaway post and rail system as well as preplaced treads. C30—Interior Finishes 1. The following owner accepted VE items have been incorporated within the Interior Architectural Woodwork value: Location hem Color Description ISEC Amount Accepted YIN Carried Cmsr�nts 60 CC Purple CA3.616,Conv Ctr.Reg.Desks.-Use tile backer and flat/plam on norrina17�8'trim at face(trim strould o�erlep filo provide 1x6 trim ILO of build up.Tile backer backer and stand oud so fnishetl tib is recessed sl k$7,583 Yes 17,583 should be covered b tile subcont—tor? 61 CC Blue Delete all Wood door casing at Conv.Ctr 16,17FW3.302 512,755 Yes (12,758) 62 CC Yellow 01 -Delete wood bifolding doors at both sides of elewbon 512,1951 No 0 covering rollup doors delete WD-135 at soffit and portal vertical surfaces 63 CC Pink 02/CA4-002,delete WD-135 wood soffit at amval lobby $15 194, Yes (15,194) this location 64 Cc Red Delete a1 WD-128 ceiling planking in pre-furdion lobby 593,2671 Yes 93,267) CC Green Delete Ight caves at pre-function corridors per RFI#0840 $0 Yes 0 Berg&Standard 65 CC Orange 03 &F;Remove 4x4 WD-134(or 148)at Prefunction 03 ($3.976] Yes (3.978) so 0 so 0 Total Proposed To Date: 5144 971.09 ACCEPTED TO DATE:';($132,7761 D 10—Conveying 1. Plexi-glass cut out for card readers and Auxiliary car operating panel in passenger elevators have not been included per Owner direction. D20—Plumbing 1. Plumbing fixtures have been included per owner selection which has been documented via RFI 812. D30—HVAC 1. Vibration isolation for ductwork is limited to fabric duct connections at motor-driven equipment and the first 4 hanger locations on each side. No other ductwork has vibration isolation. Page 4 of 6 VICalahan. ® HENSEL PHELPS RESORTS & Plan. BBlid. Manage. CONVENTIONS GMP Amendment No 1 Attachment 3 December 18, 2019 2. Duct cleaning per 23 3113, 3.12.B and 3.13 has been excluded. Commercial standard duct cleaning for a facility of this type has been included. D40—Fire Protection 1. We have included the design and installation of a code compliant system with the City of Round Rock Standards. D50—Electrical 1. Light fixtures have been included per the attached Light Fixture Matrix which includes owner selections for manufacturer alternates. 2. Lighting control system has been included per owner selection for a Lutron system across the resort. 3. Taylor Power has been selected as the Generator and ATS provider for the entire project,they will supply a 5-year extended warranty. 4. GE has been selected as the Gear provider for the entire project. D50—Low Voltage,AN and Communications 1. The following have not been included as they have been identified to be OFOI or OFCI;this proposal does include conduit and raceways as required: a. Digital Signage servers and software b. Digital Signage display monitor framing(meeting rooms/ballrooms) c. Pagers and cell phones d. Computers,network servers, POS system electronic components e. Main switches, software and telephone handsets f. MATV system satellite dish, monitors,software and installation g. Two-way radio equipment,devices, software h. Rack mounted UPS units for Owner provided equipment/devices(included as OFCI) i. Wireless Access Point devices and equipment(included as OFCI) j. Distributed Antenna system(DAS)for cellular DAS equipment and cabling k. SFP POE Units 1. Access Control equipment,Vingcards, software devices, and programming 2. Empty pathways for cellular DAS system have been included above hard ceilings only. 3. Security cameras,NVR servers and licenses have been included per owner direction. D50-Fire Alarm 1. Fire Alarm system has been included as an open spec which complies with minimum requirements for City adopted codes of NFPA 72 and IFC 2015. Some specific items within the issued specification that have not been included,due to being manufacturer specific or above code requirements for a facility of this type, are: a. 100%amp power backup b. Seismic performance requirements c. 100%conduit pathways d. Firefighter's phone e. Pre-action panels f. Positive alarm sequencing Page 5 of 6 HENSEL PHELPS Kaiahar,. PLaO Bal d M1 na]P, CONVENTIONS GMP Amendment No 1 Attachment 3 December 18, 2019 2. Design and install of an emergency first responder wireless radio communications(DAS)is included and based on readings of-60.51 dBm @ 857.962 500 MHz taken on site at the Convention Center Level 2 entrance. E 10—Equipment 1. All Food Service Equipment,Kitchen Equipment, Walk-in Coolers and Freeze are assumed to be furnished and installed by the Owner's Food Service Equipment contractor. Page 6 of 6 10 HENSEI. PHELPS Kalahari. RESORTS & Plat. Ba_id. Manage. CONVENTIONS Gi=jHENSEL PHELPS 20191203 Plan. 6ulld. Manage GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 0001 H.P C.S-Pier Spiral Ties Hensel Phelps Construction Co. HKS.Ina 511712018 6/172018 1 0002 H-Fotaxaaua,Package CooNnation-Structural.Medianlcal and Ardut®crural Hensel Phelps Corstru tion Co- HKS Inc 522F1018 81=018 1 0003 H.P C,S-G e achninal Density Test Reduction Hensel Phelps Construction Co. HKS,Inc, 5212018 51212018 1 0004 H.P.C,S-Drilled Prer Rebar Supports Hensel Phelps Corsiruction Co. HKS,Inc. 5232018 6/11/2018 1 0005 S-Site Paving-Lime Statal—tion Hensel Phelps Corstruchon Co. HKS.Inc. &412016 6/52018 1 0006 C.S-251,Grease Interceptor Hemel Phelps C.rtbt—b-Co. HKS,Inc. 6/41.2018 6/42018 1 0007 H-Zone Gmemlos for ShearWaikt Hensel Phelps COnstructlon Co. HKS.Inc. 6/512018 1 0008 H-Missing Sheet HS8.201 Hensel Phelps Construction Co. HKS,Mc. 6152018 6/52018 1 000.9 H,Zone H.J.K Concrete Wall&Pier Cap Missing Details Hemet Phelps Construction Co. HKS,Inc 6152018 6?2018 1 0010 P-Zone V&Z Missug Concrete Wall Details Hensel Phelps Construction Co. HKS,Inc. 6152018 1 0011 P-Missing Wall Detail at Medranioal Shed Hertel Phelps Construction Co_ HKS,Inc. 644/2018 &182018 1 0012 P-PS3.004 Defeo i s 2 kiermficanon Hemet Phelps Construction Ca. HKS.lec, 6182018 r1182018 1 , 0013 S-Grading Qlscreprencies Hensel Phelps Construction C. HKS,Inc. 6/132018 &182018 1 0014 S-Unkravm Abandoned Item Hansel Phelps C.m rucbn Co HKS,Irx. 611212018 8118/2018 1 0015 H-5.Wit ch Request-Water D6stnbutcn Piping.PEX-a Hensel Phelps Construction Co. HKS,Inc. 6/12/2018 6/14/2016 1 0016H-Fractional HP Fa s TEF-1-1.TEF-4.2.DEF.4.1,and DEFA-2 Hensel Phelps Construction Co. HKS.Inc. 6/122018 &1372018 1 0017 H-Pier and Wall Dimension Clarifications Hensel Phelps Construction Ca HKS,Inc, 6113/2018 6/262018 1 0018 H-Unidentified Mechanical Units in Great Karoo Buffet Hensel Phelps Construction Co. HKS,Inc. 6/132016 0 0019 S-Added Berm Near C—ancon Center Hemel Phelps Construction Co. HKS,Inc. 61132018 &182018 1 0020 H-Pier Diameter Clarification. Harrel Phelps Construction Co. HKS,We 6(1312018 61182018 1 0021 H-Guest Pao.S—e-11 Foundation Hemet Phelps Construction Ca.. HKS fix 6/142018 £122/2018 1 0022 H-Lever 3 Roof Storm Drainage ITof Phelps Cohapaob0n Go: HKS fr., 611412018 1 0023 H-StraP Beam TraniClarlflcaoon Hens&Phelps Construction Co, HKS.Inc. 611412018 5/18/2018 1 0024 S-Curb IN 5¢e Clanhcatma Hemel Phelps Construction Co. HKS,Inc. 6/142018 &212018 1 0025 P-Ejector Pump Schedule Hensel Phelps Cor truet ish Co. GLUM Cosultirg Engineers 6/18/2018 7/3/2018 1 0026 H.P,C-4"Drainage Layer Hensel Phelps Construction Co. HKS Inc. 6/182018 &132018 1 0027 P-Pias Locations for FEC&IWP Hemel Phelps Corstructcn Ca Brockette7D.v./Drake,Inc. 61182018 71182018 1 0028 S•ElactneConduits for WW Meter Detail Hensel Phelps C—itntctl al Co. HKS,Inc. 6/1912018 7212018 1 0029 H-Level 1 Underfloor PWmting Hensel Phelps Comtriiction Co, HKS,Inc. 6MB2018 9/72018 1 e 0030 H.P.C-Pier Surface Roughing Requirements Hemet Phelps Cor truchon C. HKS.Inc 61192018 7f3r2018 1 00$1 P-Gild Discrepanoes Hensel Phelps Comt aobon Co: HKS.Inc. 6/192018 6/19/2018 1 0032 S-Clarification on 8ackfi l and Topsoil Hensel Phelps Cor ecru tion Co. HKS,Inc. 61192018 81292018 1 0033 P-Top of Pier Elevation at Braced Framers Hemet Phelps Construction Ca Brockette/Davc/Dreke.Inc. 61192018 8.222018 1 0034 H-Beams at Mechanxal Room H1H-38 Hensel Phelps Construction Co. HKS,Inc. 6/192018 &212018 1 0035 P-Waterproofing Details Clarification Hemel Pt+etps Construction Co. HKS,Inc. 8202018 7126/2018 1 0036 H•Guest Room Mechanxail aro Plumping Hensel Phelps Construction Co. HKS,Inc. 6202018 7/172018 1 0()37C H-Pler Locations for Convention Center And HOW Hensel Phelps Construction Co. HKS,Inc. 6202016 &212018 1 0038 H-Bathroom POD Prophead solutions Hansel Phelps Cost—tion Co. HKS,Inc. 6202018 8/612018 1 0039 H.P,C-Use of Epoxy and Acroc Adhesives Hansel Phelps Construction Co. HKS.Inc. 6212018 6/212018 1 0640 C-Top of Per Elevation Cl.,de tan Hansel Phelps Comtruction Co. HKS.inc. 6212016 6222018 1 0041 C-Dimes—and Elevations for Screen Wall Hemet Phelps Construction Co. HKS.I— 6212018 9/142018 1 0042 C-GatingOvemead Door Framing Hensel Phelps Construction Co. HKS.Inc. 6212018 9182018 1 0043 C-Partition Packet Framing Hensel Phelps Construction Ca HKS,Inc. 6212016 10/102018 1 0044 C•Adiones Details Needed Hensel Phelps Construction Co. HK5.Inc. 6212018 7/122016 1 0645 C-e":.e Joint m Basement Wall Climf—tlon Hensel Phelps Construction Co. HKS.Inc_ 4212016 9162018 1 0046 C-Structural Member Clanf—bon Hemel Phelps Construction Ce Hensel Phelps Consrmctlon GO 6212018 7/1712018 1 0047 S-Utility Pole off Highway 79 Hensel Phelps Construction Co. HK5,Inc. 6212018 etwolil 1 0048 P-RamtorcamerR Clargxatios Hemel Phelps Construction Co, 8222018 1 0049 P-InBenor Pier Elevatwns m et IWP Heel Phelps Construction Ca 8rockette7OavrefDrake.Inc. 62220'18 7/9/2018 1 0050 HP.0 Coordination Meeting Between HKS anti Otis Elevator Hensel Phelps Construction Co. HKS,Inc. 67,.12018 &262018 1 0051 H-C18 COWmn Clathoutom Hansel Phelps ComtruoOno Co, HKS,Mc, 6222018 710!2018 1 0052 H-Extanpr W alkv ey Canopy Hensel Phelps Construction Co. HKS,Inc 6222016 8/252018 1 0053 P-Pier Elevation and Depth Conf rmation Hensel Phi"Construction Co. HKS,Inc. 6252018 8/82018 1 0054 P-Sur9e Tank Detail Hensel Phelps Coshuction Ca HKS,Jr- 6252018 8126!2018 1 0055 H-Column Coordinalfon aro recessed concrete areas barrel Phelps Construction Co. HK5.kc. 6252018 7/132018 1 0066 H,P-Section N Fearing Detail and Pier Clarification Hensel Phelps Construction Co. HKS,Inc, 8262018 &202018 1 0057 P-Pler/Column et PN/P9 Clearance Confirmation Hemet Phelps Costnetion Co. HKS,Isla 6262018 6129/2016 1 0058 5-Conflict in Grading and SOP Plan Hensel Phelps Construct-Co. HK5,Inc. 6272018 1 0059 P-Central LAArty Plan Condenser Piling S¢a Hamel Phelps Constructor Ca HKS,Inc. 6272018 71102018 1 0060 H-Plumtzrig Dram Types K.L and M Hensel Phelps Construction Co. HK5,Inc. 67272018 7116/2018 1 0061 C.H-Typical Wall Control Joint Derail Hemel Phelps Construction Co. HKS,Inc. 6272018 8/62018 1 0062 H-Grease Waste Heat Trace&Imulation Confirmation Hemel Peraps Construction Ca HKS,Inc.. 6272018 7/10/2016 1 0062A HC.P-Grease Waste Gonfinmabon Hensel Phelps Construction Co. HKS,Inc &7/2018 8/7/2018 1 0063 H-Prelinishad Metal Awneg Steal Cl-floations at Sector J Hensai Phelps Construction Co. HKS,lex. 6272018 91172018 1 0664 P.C-Loads for Trusses aril Brenrg Hensel Phelps Construction Ca HKS,Inc. 6272018 7192018 1 0065 H.P.C-Structural Steel Nota 4 Hese[Phelps Construction Co. HKS.Ire. 6272018 &102018 1 0068 H-Pier Dowel Lap Clanfication Hensel Phelps Construction Ca HKS,Inc. 6272018 6292018 1 0067 C-Datall Requested at Steel Column at Elevator Pit Hemet Phelps Construction Co. HKS,Inc, 6272018 7/192018 1 0068 C-Top of Pier Elevation Confirmation Hensel Phelps Construction Co. HKS,Inc. 6282018 7122016 1 0069 C-Steel Framing Design Guid.1— Hemel Phelps Construction Ca HK5,Inc. 6282018 7262018 1 0070 P-Trench Drains H.-.i Phelps Construction Co. HK5,Inc,. 6292618 9/102018 1 0071 5-Waste Water Line B Hensel Phelps Corsrruchon Co. HKS,Inc. 71212018 7152018 1 0072 Steel Column Clanficahom Hensel Phelps Castrucbon Co. HKS.Inc. 722018 7/3/2018 1 0073 H-Bammom POD Fire Rarkg Details Hemet Phelps Construction Co HKS.Inc. 7/2/2018 7/202018 1 0074 H-Bathroom POD Product Data Hemel Phelps Corstrucbon Ca HKS,Inc. 773/2018 72&2018 1 0075 H-Plumd D— ng T ypas G,N.J Hansel Phelps Comlructlon Co. HKS,Inc. 7/3/2918 7/162018 1 0076 P-Truss Chord Length and Camber Hemet Phelps Construction Co. HKS,Ire. 7152018 7/122018 1 0077 C-Corerere Column Details C9LE.6 Hensel Phelps Construction Co. HKS Inc. 7152018 719/2018 1 0078 C-Section Gut References on Siructwal Framvg Plan Hemet Phelps Comtnatlon Co. HK5.Inc. 7152018 8/102018 1 0079 H-Curb T-mranafion and Waterpnofvg O—do at HSS Column Hemet Phelps Construction Co. HKS.fix. 7162018 1 0080 Expansion Bolt Penetration Clanficares Hemet Phelps Construction Co. Hensel Phelps Cosh tion Co 7/572018 7192018 1 0081 H.P-Elevator Pit Pier Locations Hemet Phelps Cemtruench Co. HKS,Inc, 7/5/2018 7/912018 1 0082 H-Par Spacing Hadeal Phelps Construction Co. HKS,Inc. 7/52018 7152018 1 0083 H•4"Concrete Wall Booth Backing Hensel Phelps Construction Co. HK5.lea. 7/5.,018 7272018 1 0064 C-PifurColumn Deletion GP1125 Hensel Phelps Costruchon Co. HKS,Inc. 7/6/2016 7182018 1 G�) HENSEL PHELPS GMP Amendment No 1 Attachment 3 2019.12.c3 Plan. Build. Manage. CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Data Created Date RespoMed Closed? 0085 C-Elevated Escalator Pit MC Channel Hensel Phelps Co Jt bon Co. HKS.Inc. 7/6/2018 81812018 1 0086 C-Truck-Restraint Warlock Herm{Phelps Construc0on Co- HKS,Inc. 716f2018 &1!2018 1 0087 P-LW 2&Roof Steel Framing Clashi atmns Hensel Phelps Construction Co, HKS,Inc. 7/612018 7282018 1 0088 P.C-Crystalline Waterprooferg Hensel Phelps Construction Co. HKS.Inc. 7/62018 1 0089 P-LA 1 Cokanns®P3.7&PDA Hensel Phelps Censtrunt—Co. HKS.Ina. 716/2018 7/12(2018 1 0090 P-Low Pool Steel Framag Clanf—bons Hensel Phelps Construction Co. HKS,Inc- 7/6/2018 71172018 1 0091 P-HSS Typical Perimeter 8e4m Hansel Phelps Construction Co. HKS.Inc. 7162018 8/112018 1 0092 P-Cross Brading&Screen Wal Clarification Hensel Phelps Cd istna son Co. HKS,Ino 71612018 7/192018 1 W93 P-Sector O Low Roof Steel Fnemirg Hansel Phelps Construction Co_ HKS,I— 7162018 727/2018 1 0094 H-EI-Inc.1 Clarifications Hensel Phelps Construction Co. HKS,Inc. 71W2018 8192018 1 0095 H P,C.S-Gas lane Dscrepanci- Hensel Phelps Gorstrution Co. HKS.Inc. 7/182018 71202018 1 0096 C-TreAis Fnsmng Dscrepancies Hensel Phelps Cormtnlct-Co_ HKS,Inc, 7192018 720201$ 1 0097 C-Elevator and Escalator Pit Key Ways Hensel Pt>e�s Construction Co. HKS,Inc, 7)W2016 7/262018 1 0098 P-Drain Types in Central Utility Plans and Laundry Hansel Phelps Corstniction Co. HKS,Inc 7192018 0 0099 H-ATS-Pt and ATS-P2 bcatronb Her"Phelps C*hsgdotion Ca. HKS.Ino 7/912018 &102016 1 0100 H,C.P-Positive Slope to Drain Hensel Phelps Cor nridion Co. HKS.Inc. 7192018 1122018 1 0101 H-Bakony Curtain Well Sit Detail Hensel Phelps Corstruetion Ca HKS,Inc 7192018 8212018 1 0101A H-Balcony Curtain Wall Sil Dead Hensel Phelps Castruction Co. HKS.Inc. 91102018 9/212018 1 0102 H-Entrance Floor Mats Hensel Phelps Corsiri.iclion Co. HKS,kx, 7192018 71312018 1 0103 H-Below Grade Bituminous Damp Proofing Hensel PheIPs Construction Co. HKS,Inc. 7192018 &62018 1 0104 H-Food Service EquRpment Electrical Ragwmments Hensel Phelps Corstrecuon Co. HKS,Ice_ 71912018 8/62018 1 0105 C-M(ssing Sheet C83103 Hensel Phelps Construction Ga HKS.Inc 71102018 71112018 1 0106 C-Escalator Sump Pit Hensel Phelps Const-ton Co HKS,Inc. 71101201$ 81222018 1 0107 S-Sign Voaage Hensat Phelps Construction Co. HKS,Inc. 71102018 12/512018 1 0108 H-Sector G Lug Elevations Hansel Phelps Construction Co. HKS,M 7/11/2018 7272018 1 0109 P-MSS Members at fWP H on Roof Her"Phelps Coretruction Co_ HKS,Inc. 7/112018 7262018 1 0110 P-Low Roof&High Roof Mind Hensel Phelps Construction Co. HKS,Inc. 71122018 7272018 1 0111 H P-Elevator Sump Pit Location Clanfioations Hensel Phelps Construction Co_ HKS Inc. 71122018 7272018 1 0112 C-Elevation et Concrete Wall Hensel Phelps Construction Co. HKS,Inc, 7/122018 &102018 1 0113 S.C-Surtace Prep.Primer Type and Fireproofing Hansel Phelps Cermtruction Ce- HKS,Inc. 7/122018 92612018 1 0114 C•Dimension to Center of Column Hensel Phelps Construction Co. HKS.ape 7!12201$ 7/192018 1 0115 P-Truss 01,02,&03 Detals Hensel Phelps Corstrution Co. HKS.Inc. 7!122018 8182018 1 0116 H-Missing Dovvek In Piers Hensel Phelps Construction Ca HKS,lx 7/122016 1 0117 H-Column Dlmermwra and Canopy Beem ElevaBow Hermes Phelps Ca vmtion Co. HKS.Inc. 71132018 822018 1 0118 H-"V'Coksnn Clan$cagons Hensel Phelps Censtr Tion Co- HKS,Inc. 7/162018 71182018 1 0119 H-'Y"erd'Y"Bracket Base&Oanopy Beam Dates Hensel Phelps Coisu-tion Co. HKS.I- 71l6201e 71171201$ 1 0120 H-Eyebrow Tresis Clenficeti Hensel Phelps Constructer,Co. HKS,Inc. 7/162018 7/1132018 1 0121 H-Sector H Level 5 and 6 Frameg Hensel Phelps Construction Co. HKS.ax, 7!162018 727/2016 1 0122 H-Embeds aro Angles err Concrete Slab Edge-Revised Hensel Phelps Construction Co HKS,ape, 7/182018 7/272018 1 0123 H-Surface Prep and Primer Type Hensel Phelps Co. HKS.Inc 711(52018 1 0124 H-Desert 0ueen Towel Reck Hensel Phelps Construction Co HKS,Inc. 71162018 10/812018 1 0125 H-Filing Materials Hermes Phelps Ce traction Co. HKS,Iris. 71182018 724/2018 1 0126 P-Walsltrade Beeni Areavey Clarification Hensel Phelps Ceretructivn Co. HKS,Ix 7/172018 8!13/2018 1 0127 H-Ewtrlcal Room Swap Hermes Phelps Construction Co. HKS,Inc. 7/172018 822018 1 0128 P-CMU Leyot Clathficafion Hensel Phelps Construction Co. HKS,Inc. 71172018 &152018 1 0129 P-IW P Surface Prep&Primer Type Hensel Phelps Coretruction Co. HKS,Inc 7/182018 9r.2018 1 0130 G-Ekvafioro at Floor Depression Hensel Phelps Construction Go. HKS.Inc. 7/182018 &132018 1 0131 P-Pier Elevation Change G.Wernation Hensel Phelps L'orrtruction Co. HKS,Inc. 711$2018 71272018 1 0132 H-PUrnei Garners Hansel Phelps Construction Co. HKS,Ina 7/19/2018 7232018 1 0133 H-Curb w Seton M ant Sector H Steps Hensel Phelps Co nstrucaon Co_ HKS.die, 7/192018 7/202018 1 0134 P-Basemem Wells on Grid PT&PV Hensel Phelps Corsh-hon Co- HKS,.ktc. 720/2018 724/2018 1 0135 H-Rewsed shear "SMedule Nolo) Hansel Phelps Cotstruc8on Co. HKS,Inc, 720/2018 1 0136'H-vtiay Trenches Near Piers Hensel Phelps Cnrstrucvon Ca HKS,Mc, 7232018 7262018 1 0137 P-UMerBoor Piping to Floor Drams Hensei Phelps Construction Co. HKS,kc. 7202018 7242018 1 0138 P-Precast Well Panel Clarification at Archway Hormel Phelps Consfruction Co- HKS,Inc. 7202018 "12018 1 0139 H-Sector L Sordtaly Mem Perlmeten Grade Baan Crossing Hensel Phelps Corstruten Co, HKS,Inc, 7202018 7)232018 1 0140 H-Underg..M Hydro Test,", Hensel Phelps Corstru _Co. HKS,Inc 72020113 7252016 1 0141 H-Waterproofing Clenfiwtiore Hensel Phelps Go-'uction Co_ HKS,Inc. 7242018 &3012018 1 0142 H-Elevator Sump Pump Reroute Hensel Phelps Corotruclion Ca HKS,Vc, 7/312018 &6/2018 1 0143 H-Sector L Sanitary Waste Fete)BPp El.-ton Hansel Phelps Construction Co. HKS,Ice. 7252018 8/312018 1 0144 H-Ciey Dam Alternate Hensel Phelps Construction Co HK5,tic. 7262018 71262018 1 0145 C-Broken Anchor Boa Hansel Phelps Construction Co. HKS,1-- 7262018 8!/2018 1 0146 H-Masonry Mock ups and 50 Hormel Phelps Calstrucson Co. HKS,Iris, 7/302018 91122018 1 014dA H•Masonry Mack Ups Details 1 Oraw+ngs Hensel Phelps Construction Co. HKS,Im 9212018 10/12018 1 0147 H-Hotel Skin Spec[h.tion Claraicaters Hensel Phelps Conti bon Co. HKS,Ina 71302018 9/192018 1 0148 H-Sector J)K Sump PlbSbap Beam Conflict Hermes Phelps Construction Co. HKS,Inc 71302018 8112018 1 0149 H-ThermalI 'AWion Clanfkatumste Drain Rouh q Cdanfk 1a Hansel Phelps Consh-fwn Ca HKS,Ire. 7/302018 &92018 1 0150 H-Level 1 CorMefsaHersel Phelps Cominxtion Go- HKS..I7/30/2018 8272018I 0151 H-Domestic Water Sea Cenflct Hensel Phelps Construction Co. HKS.Inc. 7/3012018 8(72018 1 0152 P.H.C-Termite Cwdod Hensel Phelps Construction Ca HKS,Inc. 71312018 8!92018 1 0153 S-Contract Gow�fg Speaf-bons Hereat Phelps Construction Co. HKS,Inc. &15mla $192018 1 0154 H-Per Dowel Faf Hensel Phelps Corstruution Co. HKS,Inc. $132018 882018 1 0155 P-2tiu Gil&Be,Struturel Dimensions Harrel Phelps Coretruction Co. HKS Inc &32018 8162018 1 0156 P-Sector P Pwmlrrg Clenfications Hensel Phelps Core,Vuekon Co. HK5,Inc, &312016 9172018 1 0157 S-W11.Phase"'Color H—al Phelps CanWruction Co. HKS,Inc. $82018 8/62018 1 0158 H Hotol UtUy Connetens Her"Ptrelps Conshuctlon Go. HKS.Inc. &6/2018 916/2018 1 0159 H.C-CFSF Speed Material Value Etgineenrg Hansel Phelps Construction Co. HKS,Inc &7)2018 982018 1 0160 P-PST-2,PST-3.PST4,&PST-5 Discrepancies Hansel Phelps Coreaructlon Co. HKS,Ix 8117/2018 925/2018 1 0161 P-FEC Wal Clarlfcation Hormel Phelps Construction Co. HKS.Ino &W2018 9/912018 1 0152 5-Traffic Signal Ca>YrmaOon Hensel Phelps Corstrppen Co. HKS,ax- W%201 el 8192018 1 D163 H-Geese Waste Leta Food Se,i-Leve12 Hensel Phelps Construction Ca HKS,Ina 8/102018 9!712018 1 0164 P-Sump Pit Lo""on Hensel Phelps Construction Co. HKS.Ind, &102018 91612016 1 0165 C-Gel C121CM B Dirac Anchor Boas Hensel Phelps Gene,..tion Co. HKS,Inc 8/102018 &172018 1 0160 P-Mechan,oal Sts d Floor Drain C1aifflcationr Merisel Phelps Colslrueto Co. HKS.Ire. 8/102018 9/132018 1 0187 P-Diagonal Member e1 Truss Hensel Phelps Contraction Co. HKS,Inc. 8102018 &132018 1 HENSEL PHELPS GMP Amendment No 1 Attachment 3 2015 12(i3 Plan. Build. Manage, CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 0168 H-Bathroom POD R.Ratug bet—en Desert Queens Hansel Phelps Construction Co. HKS,Inc. 8/132018 8/22/2018 t 0,%P-Strap Beam at Braced Frame Dlmersiors Hensel Phetps Construction Co. HKS_boo,. 811412018 8/15/2018 1 0170 VOID Hensel Phelps Construct—CO3 8/142018 81142019 7 0171 C-Passenger Elevator Tube Steel and Hast Beam Hemel Phelps Construction Co. HKS Inc. 811612018 915/2018 1 0172 P-Central Utility Plant Pump Schedule and Spefifieanom Hensel Phelps Construction Co. HKS,Inc &162018 8292018 1 0173 P-Domestic Water Pipe S¢e Hemel Phelps Construction Co. HKS,Inc. 8/16/2016 8/202018 1 0174 P-Roof Collection Piping Hensel Phelps Constructlpn Go. HKS.Inc. 81182018 10/82018 1 0175 P-Stam Sump Elector Line Hensel Phejpa Comtruction Co. HKS,Inc. 81162018 &212018 1 0176 P•From of Home Froures Hemel Phelps Construction Co. HKS,Inc. 8/16/2018 10/122018 1 0177 H-Drawing request HA-,002 Hensel Phelps Comtrubon Co. HKS,Inc. 8117201B &242018 1 0176 H-Level 2 Sector H Areaway Grate Hensel Phelps Conarubon Co. HKS,Inc. 8/172018 8212018 1 0179 H-PI—Mg Water Saes Hemel Phelps C—huction Co. HKS,Inc, W1712018 &202018 1 wner 0180 H-OF.m.ned tem Structural Support Hensel Phelps Construction Ca, HKS.Inc. 8202018 1 0181 P-Root Drainage System Hamel Phelps Cpnstru tion Ca, HKS,Inc. 820/2018 9/4/2018 1 0182 C-Requested Section Cuts.Dimensions ani Elovatwns Heraef Phelps Construction Co. HKS,Inc. 821/2018 8292018 1 0183 H,P-Pier/Graft Beam Conflict Hensel Phelps Corntruction Co, HKS,Inc. 8/212018 81242018 1 0184 P-Grease Waste Line Hansel Phelps Construction Co. HKS,Inc. 82212018 8232018 1 0185 H-PRV Schedule Hensel Phelps Construction Co. HKS.Inc. 8222018 8/292018 1 0788 H-Eiectrx:al Feeder Schedule Hensel Phelps Corstructwn Co. HKS.Inc. 8222018 &232018 1 0187 H-Hotel Plumbing Fatures ant Fireplaces Hemel Phelps Construction Co. HKS.Inc, 82212018 9+242018 1 0188 H-E1ectrical Room Layout Hensel Phelps Construcfon Co. HKS,Ine. &222018 &232018 1 0189 H-Food Service Refrigerator Amperage Hamel Phelps Co,sW,-tuction Ca HKS,k 82212018 9212018 1 0190 S-Updated Sheet SE5.010 Hensel Phelps Construction Co. HKS,Inc. 8232018 8/232018 1 0191 S-4:1 Safety End Treatmertts Hensel Phelps Corstrucaon Co. HKS,Inc. 8232018 8/232018 1 0192 P-Low Roof Steel El-art.- Hansel Phelps Constr"it Co. HKS,Inc. 8/2312018 9/19/2016 1 0193 P-Wel Located onGrin PA Clantiwiwn Hensel Phalpa Construction Co. HKS,Inc. 8232018 9/112018 1 0194 P-Pilaster a(P 10.PT) Hensel Phelps C.henr ction Co. HKS,Inc. 8232018 W42018 1 0195 C,H-MDF Demarcation Point Hensel Phelps Construction Co. HKS.Inc. 824/2018 9J2018 1 0196 C-Data&AN Floor Box COMuit Hensel Phelps Construction Co. HKS,Inc. 8242018 1023/2016 1 0197 P-Basement Mechanical Egcipmera Dram Conflicts Hemsef Phelps CorstnrcUon Co HKS,ax_ 624/2018 9/612018 1 0198P-IWP PVC Coated Duct Requuements Hensel Phelps Corstruotion Co. HKS,Inc, 8242018 10/3/2018 t 0199 H-Level 2 Food Servme Hensel Pt1efIca Construction Co. HKS,ft. 8242018 10/32018 1 0200 P-Me.—al Shed Trends Drain Coordination Hemel Phelps Construction Co. HKS,tx 82412018 9/1272018 t 0201 P-IWP/FEC Structural Steel Clardcatrom Herbal Phelps Construction Co. HKS,Inc. 8242018 9/172018 1 0202 S-L.QN Pule Bess Details Hensel Phelps Const/—l—Co. HKS,Inc. 62412018 9(/2018 1 0203 C-Escalator Pa Pier Dowel Locatipns Hensel Phelps Construction Co- HKS,iha 8252016 9/272018 1 0204 C-4`Water Service Stainless Riser Hensel Phelps Construction Co. HKS.Inc 8252018 14/112018 1 0205 H-S.It-s Steel Canopy Cl rrficapone Hamel Phelps Corstruct.h Co. HKS,Inc, 8272018 123172018 1 0206H-5p 206H-Spreader beam at Stairs Hensel Phelps Construction Co. HKS,Inc. 8272016a/3012018 1 0207 H-Balcony Handrail Com-tion Hansel Phelps Co isnucron Co. HKS,Inc. 8272019 91102018 1 0208 H-Jamb Dalai at Glazed Aluminum W all System With No Jemb Attachment Hensel Phelps Constriction Co, HKS,Inc. 8272018 91572018 1 0209 P-Mechanical Shed U W.,ground Hensel Phelps Construction Ca, HKS.Inc. 8272018 91122018 1 0210 H-NE Wing Sector M expansion joint transition Hemel Phelps Corstrubon Co. HKS,Inc. 8272018 8812018 1 0211 P-Precast Glanhcanors Henna)Phelps Construction Go- HKS Inc- 8272018 92412018 1 0212 H-Batfvoom Door Ctanfi lion Hensel Ph.4.Comnuct—Co, HKS.Inc_ 8272018 9/42018 1 0213 P-Sector O Pier Elevation Hansel Pnelps Construction Co. HKS,Inc, 8272018 627/2018 1 0214 H-Musing Pier Cap D—Is Hensel Phelps Comtructton Co, HKS.Inc. 8282018 9/4/2018 1 0215 P-laundry Equipment Servi— Hensel Phelps Corslruction Ca HKS,Inc. 82812018 9152018 1 , 0216 H-Insulation Through Penetrations Domestic Ha,Colo and Return Hemel Phelps Construction Co_ HKS.Inc. 8282018 W02018 1 0217 H-Chilled Wale,Supply/Return Branch Piping S.- Hensel Phelps Construction Co. HKS.Inc. 82820th &292018 1 0218 H-CoMemate Pip"'S— Hensel Phelps Cgrstruction Co. HKS,Inc. 8282018 9/122018 1 0219 P-Mechanical Shed Baaemenn Wall MEP Penetrations Hensel Phelps Corwtructlon Co. HKS,Inc- 8282018 9WY2018 1 0220 P-Axial Connection Hensel Phelps Comtruct282 ich Co. HKS.Inc. 8018 9172018 1 0221 P-Domestic Water-Grotto Bar&RR P1R-06 Hensel Phelps Construction Co. HKS,Inc. 8292018 SM2018 1 0222 P-Zulu GrrWBanSector Y Domestic Water Sing Hensel Phelps Construction Co HKS.Inc. 8292018 9/192018 1 0223 P-Restroom P1.083/84 Domestic Water Hensel Phelps Coretrucfon Co. HKS.Inc, 8292018 91312018 1 0224 P•Subsoli Drainage Filter Feb-Clenifcalion Hensel Phelps Coislru t-Co. HKS,Inc 8292018 &2912018 1 0225 5-SIP-Ewstag Wastewater Manholes Hensel Phelps Construction Co HKS.Inc, &3012018 9152019 1 0226 H-Proposed Sump Tarlo in Sector M Hemel Pnelps C—thuctwn Ca HKS,Inc. 8/302018 982018 1 0227 P-Wast Plaster Re,oforcement Hensel Phelps Construction Co. Broolatte/Geva/Dtake.Inc. 8/302018 91412018 1 0228H-Missing Carwpy Detailsat Double Cut Steakhouse and Fitness Center Hensel Phelps Construction Co- HKS.Inc 8/302018 91182018 1 0229 H-Window Header end Sill Support Clenfictin— Hamel Phelps Corstruction Co. HKS,Inc. 8/3112018 9/72018 1. 0230C-K,,I er Tube Dela) Hensel Phelps Construction Co, HKS,Inc. 8/312018 9!72018 1 0231 H•Domestic Water Riser Conflict At Sector L Hensel Phelps Conanucoon Co. HK$.ax. 9/42018 9/192016 1 0232 H-VAV ant FPU Maximum A➢owable Sound Poway Levels Hemel Phelps Construction Co. HKS Inc. 9142018 9142018 1 0233 H-Fourrtam Pump Room Cianfcanons Hensel Phelps Construction Co. HKS,Inc. 9/412018 9/252018 1 0234 H-POD Bethnoom Doors no Frames Clanficia n Hemel Phelps Co,etrucbon Co, HKS.Inc. 9/4/2018 9142018 1 0235 C-5huturel Steel Clanf—t,om Hensel Phelps Construction Co. HKS,Inc, 914/2018 9/122016 1 0236 H-Subsoil erernage Clarifications Hensel Phelps Construction Co HKS,hic. 9/42018 9!62018 1 0237 H-Stair,6 Clertficim.- Hansel Phelps Construction Go. HKS_Inc. 9142018 9/1612016 1 0238 H-Domesfc Cold Wafer inwaationD,—panty Hensel Phelps Gomtruction Co_ HKS.iris. 9/5/2018 9152019 1 0239 H-Leve12 Sector L Beam Conflict With Plumlarg Hemel Phelps Construction Co HKS,Inc. 9/52018 9252018 1 0240 H-Level 2 Sector G Canopy Attacrnlent Clanneatiom Hensel Phelps CorntrucIr—Ca HKS Inc. 9152018 9/1820181 0241 H-Sector L Sink Locations Without Plumdrg Hensel Phelps Construction Co. HKS,Inc. &5/2018 9/252019 1 0242 H-Watkway Canopy Attactvnent Clonficau— Hensel Phaj.Construction Co, HKS.Inc, 9152018 928/2018 1 0250 S-51P/SDP-Clay Plrys al Ponds Herne!Phelps Coreitruction Co. HKS,loo, 952018 9/52018 1 0251 H-,Sector H P,er Elevation Clarification Hensel Phelps Corntruntion Co, HKS,I., &5/2018 9172018 1 0252 H-Onis Elevator Comments on Steel Requeemenits for P2-11 66-9 Hamel Phelps Construction Co. HKS,Inc 9152018 9/18/2018 1 0253 P-Secler Z 1%Floor Underfloor Sanitary Perretrahon Hensel Phelps Construction Co- HKS,Inc, 9/52018 9/1112010 1 0254 P-Restroom WC Chase Wags Hensef Phelps Construction Co. HKS,Inc. 9152016 2172018 1 0255 C-Roof Truss Splice Locations Hensel Phelps Construction Go HKS,Inc, 9152018 9!52018 1 0256-*VOID"'H-Hotel 8.1—y Dead Additional Curb Hemel Phelps Corstruch—Co- 915/2018 1 0267 P-IWP Storm Dram Corrosion Protection Hensel Phelps Cpr9rucrion Co. HKS,Inc. 9162018 9242018 1 0258 H-Sector G Level 2 Canopy Support Steel Hensel Phelps Construction Go. HKS.Inc. 9/0/2018 1002018 1 0259 P-Sector P Roof Dr.,Requirements Hemel P11e1ps C—luceon Co- HKS,Inc, 9/6/2016 &282018 1 HENSEL PHELPS zolslz cs Plan. Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 0260 H.PAbove .C- Gmde Waterproofing Hensel Phelps Construction Co_ HKS,Inc. 9/62018 9252018 1 0261 P.C-Singie-Ply Memor—Roofing Specs Hensel Pheips Corusth cuon Co. HKS,Inc. 9/712018 1 0262 H-Sector G Grade Beam Elevation Helsel Phelps Construction Co. HKS,Inc, 9/72018 9/182018 1 0263 H•Level 2 Sector K 4 J Oimemron Confirmatnn to Tube Steel Hensel Phelps Construction Co. HKS.Inc. 9/72018 9/182018 1 0264 P-Pier 9(P3,PS/PT) Hensel Phelps Corstruchon Co. HKS,Inc. wlT 2018 9172018 1 0265 H-CMU wall Gonxtion Cle"t"Aom Hemet Phelps Construction Co. HKS,Ix. 9!72018 9!72018 1 02%H-Hotel Podium Foroxers and Ice Maker Detatls He,-,sol Phelps Construction Co. HKS Inc. 9172018 9/792018 1 0267 H•LgM Fixture Cww—tams Hensel Pi1elp.Cotrtrudwn Co. HKS,1— 9172018 1 0268 H-6tormPiping Confgets Hensel Phelps Construction Co. HKS,Inc. W2018 9(132018 1 0268A H-Storm Piping Conf4ats Hensel Phelps Construction Co_ HKS,Inc. 10/22/2018 12/2/2018 1 0269 H-Olelectnc Isolators on Cxlled Water Piping Hensel Phelps CorstrutionCo. HKS.h1c 9172018 9/192018 1 0270 H-Curb st sed. HPhelps Cow—liah C. HKS.th. WIC12018 9+1672018 1 0271 C-Structural Slab Detail for Floor Boxes Hensel Phelps Construction Co. HKS,Irc. 9/102018 9)112018 1 0272 H-Wag Thcl mss at Elevators Hensel Phelps Corsi-ton Ca HKS,Inc. 91102018 102/2018 1 0273 H-Ei—tw Floor Fr,lsh Hensel Phelps Constnletlon Co. HKS.mc. 0/1012018 91182018 1 0274 H-Elevator D—gnafed Emergency Egress Larxiag Floors Hensel Phelps C---Co- HKS.Inc. 9/102018 10/42018 1 0275 H-Elevator Emergency Power Requvemer9s Hensel Phelps Construction Co. HKS,Inc, 9/102018 9262018 1 0276 C-Roof Deck Joet Connection Hersol Phelps Construction Co. HKS,Inc. 9/102070 9/112018 1 0277 S-SOP-Gas Line Rouang to Nyumbas Hersei Phelps Co[atrut,on Co. HKS,Irk:. 9!102018 111152010 1 ,,278S-.Landscape Product Discrepancies Hensel Phelps Cooskuctlon Co. HKS,Inc 0/1012018 9119+2018 1 0279 C-&0[me CA Stud Well Hensel Phelps,Construction Co- HKS,Inc, 9/112010 9/182018 1 0280F4-COWmn Dowels Placed Too Wide Hansel Phelps Corsirudion Co. HKS.Ins, 91112018 9!1912018 1 0281 H-Encore XFMR and Generator Location and L rn, a Hensel Phelps ComV.0tlon Co- HKS,lac, 9/112018 12!112018 1 0282 H•Gue—rh Bathroom Lite Safety Hensel Phelps Comt—on Co. MKS,Ire', 9/712018 1011ot2ale 1 0283 S-Concrete Found—for Exterior Ught Futures Hensel Phelps Construction Co. HKS,Inc. 9/112018 92612018 1 0284 C-Accent Panel Det ad Hensel Phelps Consirudlon Co. HKS,Inc, 9/122010 9/782018 1 0285G -Wastewater Lme C Fbw Una Hensel Phelps Corstru tion Co. HKS,Inc. 9/122018 9112/2018 1 02W H-Upper Lobby VAV Locations Harrel Phelps Corshh cb-Co. HKS,Inc. 9/122018 9/792018 7 0287 C-In enwr Sng Trim Hensel Piletpe Construct-Co. HKS,Inn. 9/122018 9242018 1 0288 H-C-11Tags Nomanwlature Hensel Phelps Construction Co. HKS,1-1 91122018 10/9/2018 1 0289 H-CHU Cl.Mcanon Heise{Phelps Construction Co. HKS,Inc. 9/722018 9/242018 1 02W H-G---m Bam—ro Ughtmg Code Requirement Hensel Phelps C.—ch-Co. HKS,1-c 91122010 912512018 1 0291 H-Water Closet Install Heigh Hensel Phelps C.—,—.h Co. HKS,trc. 9/132018 10/12018 1 0292 H-Stair 6 8 9 Rensed Dimensions Hensel Phelps Construction Co. HKS,Inc, 9/132010 9/1&2018 1 0293 S-SOP-Storm Line A2 Curb mW Elevafon Hensel Phelps Corshu tion Co. HKS,Inc, 9113201 B 9/18/2018 1 02WP-Surge Tank Wag(P10.5,PT) Hansel Phelps Construction Ca HKS,Ina 9/142018 9/182018 1 0295 H-Revised Sheet Request far St—1-9 Hensel Phelps Construction Co. HKS,Irc. 9/142018 91182018 1 0296 H.P,C-5pray-Applied Thermal 1-ulanon Hensel Phelps Corern.aon Co. HKS,Inc. 9/142018 10/192018 1 0297 H-Sector G Elevated Exterior Terrace Waterp—finq Hensel Phelps Construction Co. HKS,Irc, 97142018 9/182018 1 0298 S-Feepits and Shang.Gate Eledrnai Req—rherts Helsel Phelps Construct—Co- HKS,Inc. 91142018 101.72018 1 02%S-Elecbicel Service Mourar g Locewn to Sheryl. Hensel Phelps Construction Co. HKS,ina 9/142018 1022018 1 0300 S-"Zma Eledncal Ragteremerlfs Hensel Phelps Corst[uoton Co_ HKS,kc. 91142018 10/912018 1 0301 S-Bungalow Electrical Requuemeras Hensel Phelps Cor>etrucaon Co. HKS,Irc. 9/142018 10/92018 1 0302 H-Hotel ElectrKal Bbckouts Hemet Phelps Construction Co. HKS,Inc. 9/152078 9(192018 1 0303 S-Pod Resuooms Elecacal Hensel Pheg»Corstrud—Co. HKS,Irc, 9/172018 10/192018 1 0304 S-Event Bam Electrical Hansel Phelps Coretructian Co. HKS,Inc. 9/172018 10/172078 1 0305 S-Electrical P.—to Nyumbas Hers./Phelps Construction Co. HKS.Inc. 9/772010 10292078 i OW S-Lease Space Location-Electrical Hensel Phelps Corstrutwn Co- MKS Irc. 9/172018 9/242018 1 0307 S-Parkug Lot Features Efecm.1 Requremarrts Hansel Phelps Construction Co, HKS,Inc, 9/172018 122019 i 0308 5-Upighte Hensel Phelps Comtrucaon Co. HKS.Inc. 97172018 11/52018 1 03",5-Company Svlach Hansel Phelps C—I ucb—Co. HKS,hc. 91172Dt8 9252018 1 0310 S-Geaffe U9Mm9 Hesse!Phelps Construction Co- HKS.Ina 91172018 1!142019 1 0311 5-Charging Siatwm Hensel Phelps Comtruetipn Co. HKS.Irc, 9/17201/ 91252018 1 0372 S-Vel.t Booth Hensel Phelps Cor Truction Co. HKS,ac. 91172018 92572018 1 0313 H-Elect-at Busway Go— ahm Hensel Phelps Construction Co. HKS,Inc. 9/172018 10/42010 1 0314 C-Re"mr;Wall/Basement Wall Clanticatwn Hensel Phelps Con amction Go. HKS,Inc. 91172018 91242018 1 0315 H-Sector H Spa Basement Wall Hensel Phelps Construction Co. HKS,Inc. 911712018 9/192010 1 0316 H-Sector H Wail CtaafcaLon Helsel Phelps Comtrut—Co- HKS,Inc, 9/172018 1022018 1 0317 H-Suiso9 Peno-ad.Oram Ldt Siat—Eleoma/Chanatanstns Hemsei Photos Corstnuchon Co. HKS,Inc. 91182018 10/3/2018 1 0318 H-Porte Cochere RCP Hansel Phgps Corsambon Co. HKS_Inc 9N82ole 9/242018 1 , 0319 H-Sector G and J Oram Relocation S Tex Mex Bar Charges Hensel Phelps Corstram-Co- HKS.Inc. 9/182018 10/312018 1 0320 C-Screen Wag EIFS Hensel Phelps Cormtruction Ca HKS.Inc. 9/182018 925/2018 1 0321 H.P,C-Waterproofing System Hensel Phelps Construction Co. HKS.Inc. 9/192018 9/252018 1 052'2H P-Sector N Footing Comecuun Hensel Phelps Cetrutwn Co. HKS,tnc. 91192018 9/242018 1 0323 H,P-PVF CTS Flange Herr oI Phelps Comtruction Co. HKS,Inc 9/192018 9242018 1 0324 H-Hydrotherapy Room El.—cal Requirem.nts H—ol Photos C.mhuctwn Co. HKS,Inc. 91192018 10232018 1 0325 H-Pe h—NC Raquirements Hemel Phelps Ometruction Ca HKS,1-- 9/192018 10/102018 1 0328 C-Revsed Sale Demers ms Hensel Phelps Comtrucfoa Co HKS,Inc 9202018 9242018 1 0327 C-Deted Requested at Stone Ledge Hensel Phelps Corstramon Co. HKS,Inn. 9212018 9/242018 1 0328 H.C,P-Vibration Isolation tiensei Phelps Cor tructlon Ca HKS Inc 9212018 12/62018 1 0329 P-CUP Water Entry Fgtmg Hermon Phelps Comtruttion Co. HKS,Inc, 9212078 9282018 1 0330 H-Central tARy Plant Electrical R-m he Laundry Equipment Requirements Hersrn Ph0ps Construct—Co. HKS,Inc. 9272018 10192018 1 0331 H-Facade Support Harrel Phelps Construction Co. HKS,Inc, 9212018 10/12/2018 1 0332 H-Metal Wag Panel Clenfcatwh Hensel Phelps Construct..Co. HKS,Irc. 9212018 9242010 1 0333 H-Uppen Lobby VAV New Lo rv— Hemel Phelps Corstrutnon Co. HKS,Inc. 9242018 10/42018 1 0334 H-SIaWCuru Tet—men at Metal A—I g Hensel Phelps Construction Co. HKS,Inc. 9242010 10/32078 1 0335 H-Sector J Metal Awning Vertical Column Support Hensel P11.[P.Coretrudcn Co. HKS,Inc. 9252018 91272018 1 0336 P-Ceihng CWif bons Hensel Phelps Corstmcoon Co. HKS Inc, 9262018 10/4/2018 1 0337 P-D[ywalf Ciantcatwhs Hensel Phelps Comir-hon Co HKS.Mc, 9262018 722019 1 0338 C-Generator Wall F.— Hensel PhelPs C.n a ucfonon CO- HKS Inn, 9202018 9/272018 1 Hansel 0339 H-Sedor G Campy Slab TNckness Phelps ConstructiC s HKS Inca 9262018 10/122018 1 0340 P-Electrical Coordmtlon Hensel Phelps Construction Co. HKS,Inc, 9262018 10/42018 1 0341 H.P-Sects N Footing Changes Hensel Phelps Corsnutw.n Co. HKS,Inc. 9262018 9282018 1 0342 P-Reinlarcemod at Wall Penetrations H—ol Phelps Construction Co. BrockettelDavnslLlraka,Inc. 9272018 9/282018 1 0343 P-Sector N CL.b and Ledge Clerilnatan Hensel P1leips Comtrucnon Co. HKS.lac. 9272D18 10/82018 1 zoly a D; HENSEL PHELPS Plan. Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Data Responded Closed? 0344 P-Sector N Grade Beam Clardlcah.h ".-�''--� '""'S*�-L�` +"` .. Newt Phelps Conshuction Co. HKS,Inc. 9/27/2018 1019(2018 1 0345 H,G-Grade Beam Exparslon Joint Herwel Phegrs Construction Co. HKS.Inc, 9282018 1 0345A H.C-Corb Exponsron JaM Clanficalmn Hensel Phelps Const—bon Co. MKS,Inc. 10/10/2018 10!1912010 1 0346 H-Sector L Pour Strip Conflict Hemel Phelps Construction Co. MKS,Inc. 92812018 10/8(2018 1 0346A H-Sector L Pour Strip C-M. Hensel Phelps Construction C. MKS,Inc. 10/32018 108/2018 1 0347 H-Sado,K Trench Drain Type and Associated PI—oing Hensel Phelps Construclwn Co. HKS,Ix. 928/2018 10112!2018 1 0348 H-5eclor K Fountain Room Drain Location Hensel Phelps Com uetion Co, MKS.1— 92812018 10/212018 1 0349 H-Spa Equipmerd Plumbing Raginrem.nts Hensel Phelps Cmtruct—Co. MKS.Inc, 9/282018 1012018 1 0350 H-Fireproofing at HSS Be— Hemel Phelps Construction Ca MKS,Inc. 101112018 1014/2018 1 0351 H-Grease Duct Stipa Hensel Phelps Constnretion Co_ HKS.Inc. 102/2018 107/2018 1 0352 H-Sector G Shear Wal Penetrations Hensel Phelps Construction Co. MKS,Im 10(272018 1011/2010 1 0353 C-Fire Stopping Details Hensel Phelps Construction Co. MKS Inc. 1013/2018 107412018 1 0354 H-Elevator P01 Matrix Discrepancy Hensel Phelps Construction Co. MKS,Inc. 10/32018 1042018 1 0355 P-FEC Electrical Floor Boxes Hensel Phsdp Cortmdee Co. HKS,Inc. 10/3/2018 1092018 1 0356 P-CUP Anchor Sops Hensel Phelps Construction Co. HKS.Inc. 10/32018 104/2018 1 0357 H-Start 5&7 Starclpipe One— Hensel Phelps Construction Co. HKS,Inc, 10/32018 1041'2018 1 0358 H-Sector L Shear Ram C1.0-1— Hensel Phelps Construction Co. MKS,Inc, 10/312018 10112018 1 0359 H-Duct Riser Sector L level 1 Hensel Phelps Construction Co. HKS.Inc. 10152018 1082018 1 0360P-SP-HT2 Decllarga Conflict Hensel Phelps Comt—filch Co_ HKS,Ix. 1=r2T18 1042018 0 0361 P-Sector X Basemere Trench Dram Hensel Phelps Corstntetlon Co_ HKS.Inc. 10312018 10/34018 1 0362 VOID Her t P11elp5 Construction Co. 10M2018 482019 1 0363 P-Wave Equipment Room Structural Dimensions Hansel Phelps Corstruotiern Ca, MKS,1— 10/5/2018 10122018 1 03&1 C-Broken Ando,Beps Continmaaon Hersel Phelps Construction Co. MKS,Inc. 10!512018 1011Y2018 1 0365 C-Spandrel Door Glass Hensel Phelps Construction Co. MKS,Inc. 10/52018 1012/2018 1 0368 H-Parapet at Double CW Roof Hensel Phelps Constnictlon Co_ MKS,Inc. 10/512018 10112018 1 0367 H-AMU Auto Dampers Flersel Phelps Construction Co. MKS,Inc. 1052018 1082018 1 0368 H-South Canopy Details Hensel Phelps Construction Co. HK$,Inc. 10/82018 1022/2018 1 0369 H-Wel Type Cohn matron Hemel Phelps Construction Co. MKS,Inc. 10/84018 0 0370 H-Levet 1 Sector L D.meshc Water Line Hensel Phelps Corstruction Co. MKS,Inc, 10/92018 10!2312018 1 0371 H-Domestic Cod Water Instdatwn Requa.—A Hemel Pholpa Corstruclen Co. HKS,Inca 10102018 10122018 0 0372 P-Pier Locations at Sector(Mechanical Shed Hensel Phelps Construct-Co, HKS.Inc. 101112018 10/22018 1 0373 P-Sump PA Modifications Hensel Phelps Construction Co, MKS,Im 10/102018 1011112018 1 0374 S-SDP-Deletion of SF3 Foc.—,Admb.of SP3 Fixhaes Hensel Phelps Construction Co_ MKS,Inc. 1010!2018 30192018 1 037 4R1 S-Fixture S132 Changing to SBI Hensel Phelps Construction Co. MKS,Inc. 12152018 12/11/2018 1 0875 H-Elevator Jamb Clanfl-tion Hensel Phelps C.nritructon Co. MKS,Inc, 1011/2018 10112/2018 1 0376 H-Gueshooni Batr000ms Calling Heght Hemel Phelps Construction Co. MKS,Inc. 1011/2018 10122018 1 0377 P-Catwalk Support System Hensel Phelps Construction Co. HKS,Inc. 10/112016 10112/2018 1 0378 H-Level 4 Structurel Deck Support of Exterior Wall Hensel Phelps C.rtruehon Co. HKS,1-- 101112018 10122018 1 0379 C-Emoed and Rebar Conflict Hensel Phelps Construction Co. MKS,Inc. 10/112018 1012!2018 1 0380 S-Imgatlon Control.,Pedestal Mount Hensel Phelps C.nan hon Co. HKS,trc. 101132018 101162018 1 0381 H-Marekesh Market Grease Varp are Domestic Water Penetrations Herres Phelps Conal—toe Co. MKS,kc. 1(1/15(2018 10242018 1 0382 P-IWP Hydrants/H—Bibb. Hensei Phelps Construction Co. MKS,Inc. 14)152018 12/16/2019 1 0383 S-SPI Light Pole Bas®BOC Drse— Hensel Phelps Construction Co. MKS,Inc. 10152018 101192018 1 0384 C-Stair Stange(Ander Bops Hemel Phelps Const—ton Co. MKS,Inc 10716/2016 l(VI62018 1 0365 H-POO Mockup Review 1-1-1 Phelps Construction Co. MKS,Inc. 101152018 10/1912018 1 0386 P-Sump Pit Covers Hansel Phelps Construction Ca HKS,Inc. 101162018 10242018 1 0387 H-Level Sed.,M Slot Diffusers Hensel Phelps Construction Co. MKS,tic. 10)162018 10192018 0 0388 H-Level 1$.do,H Steam Room Dram Hensel Phelps Construmon Co. HKS,trc- 10116/2018 101192016 1 0389 H-Dolneshc Water St in Sege,K Hemel Phelps Construction Ca MKS,I- 10162018 101192018 1 0390 H-Lei 2 Sector M Supply Lee Relocation Hensel Phelps Construction Co. HKS,hi 101162018 101192018 1 0391 H-Vit-than Isolat—Lateral Bnaccg of Harpers Hersei Phelps Cortrucron Co. MKS,Inc. 10182018 1 0392 P-Cellos-Envb.nmerd Extents Clall-tion Hemel Phelps Construction Co. MKS,lno. 10162018 11/672018 1 0393 H-LJte Safety Panel Location and Elevator Floor Designations Hensel Phelps C.cen cnon Co. MKS,Inc. 10/16/2018 10262018 1 0395 P-Epoxy Coatirg Regwr...few-Mechanical LIM. Henkel Phelps C—larction Co, HKS,Inc, 1016(2018 10192018 1 0396 P-Corrosive Envirunmeri Air Dewces Flersel Phelps Goistructon Co. MKS,Ino 10172018 10/172018 1 0397 C-LgMvg Gone.[Sctedulos Mensal Phelps C.hsuucbon Co. HKS,Inc. 10/172018 11126/2018 1 0398 C-Storm Line Deletion C12/CN Hensel Phelps Construction Co. MKS Irk 10172018 10232018 1 0389 H-L.uvers at Double Cut Hensel Phelps Construction Co. MKS,Inc. 10/172018 10/192018 1 0400 H-UPS Panel Lpwti- Hansei Phelps C.netnuction Co. HKS,Inc. 10172018 101222018 1 0401 H-Transformer Dooking Station Hemel Phelps Construction Co. HKS,Inc. 10172018 11112018 1 0402 H-Velrati.n Isolation-R,gd Harper Alternate H-1 Ph."Co shucnon Co. MKS,Inc. 101172D18101=018 1 0403 H-(LTZ)Light Fldure Mourtsg Cher l—hons Hersei Phelps Construction Ga HKS,Inc. 10117/2018 10192018 1 0404 H-C—stroom Pafton Type Hensel Phelps Construction Co. MKS,Ire. 10172018 10/172018 1 0405 H-Royal African queen Floor L ri Discrepancy Hensel Phelps Construct—Go. MKS,Inc. 1011712018 10!302010 1 0406 H-Leve11 Sector L and K Domestic Water and Hot Water Return Une S¢es Henkel Phelps Construction Ce HKS.Inc. 1017/2018 1029201B 1 0407 H-Leve!2 Sector J and K Archnnowral ve MEP Slot Discrepancies Hensel Phelps C--ton Co. MKS,Inc 10/17M18 11/62010 1 0408 C-Kihmanjaro and Kelahan Baltic—Floor Box Ouantdy and Location Hensel Phelps Cortni bon Go. MKS,Inc. 10/172018 10/312018 1 0409 C-Level 2 Floor Boxes Locations Structural Hen1sH Phelps C—trucaon Co_ HKS.Inc. 10172018 11282018 1 0410 P-IWP Interior Cokimn Rough-in Requvemerft Hensel Phelps Corcnucnon Co. MKS,Inc. 10117/2018 10232018 1 0411 P-FEC/IWP Digital Network Lighting Control Hensel Phelps Cortruouch Co. MKS,Inc. 101772018 17282018 1 0412 P-Aot.Fil Regtivemenis Hensel Phalps Cortruetlon Co_ MKS,Ino. 10172018 10122J2018 1 0413 H-Rwanda Roasting SAS Scheduled vs Tagged CFM Valu,s Hensel PhWps Corea!-ion Co. MKS,Inc. 10172016 101192018 1 0414 H-Level 1 Sector M Dimensions to Lowers ant Doors Hensel Phelps Construction Co. MKS,Inc 10172018 10192018 1 0415 VOID Hensel Phelps Construobon Co. 10/182018 4182019 0 04113 P-Zud Grua Beem-Vent Corcl4an Hansel Ph."Cortmclion Co. MKS,Inc, 10192018 11/122018 1 0417 P-Food$e,—Floor Sink Locations Memel Phelps Construction Co. MKS,trio 1019/2018 11/142018 1 0418 H-Tequde Be,Canopy Support Dnscrepancy 1-1-1 Phelps Consnucbon Co. HK$.Inc, 10/19/2018 10192018 1 0419 P-IWP Restroom&ZWu Structural Framing Hensel Phelps Construction Go. HKS,Inc. 10/192016 11272018 1 0420 5-100'Flagpole.Pole Base,ant Assembly Herne!Phelps Construction Co MKS,Inc. 10192018 1792019 1 0421 H-Light F,Asne Clai,bmrors Hensel Phelps Construction Co. M"'Im 10122/2016 11112/2018 1 0422 H-Lghtirg 01—Ne Architectural and Electrical Hansel Phelps Curtruction Ca MKS,Vc. 10222018 12/42018 1 (A 3H-DomesticWait.,Risers Relocation in At—0...h PODs Hensel Phelps Cone,oetr-Co. HKS,Inc. 1072212018 112/2018 1 0424 H-Desert Oueen Domestc Water Shut Off Valve Locations.Access Penal Locah.m,and Exhaust GHI Location Hensel Phelps C.rtnnden Co. MKS,Inc. 1012'1'2018 1/22019 1 0425 H-Baaxoom POD electrical and accessory heglXs are locmwns Hersel Phelps Consti-mbon Co. MKS,Vic. 10222018 10292018 1 0426 C-8asemer,—11 arcs Enteric,Retaining Wal Htterecron Hensel Phalpa Comtrumon Co, HKS,Inc. 10723/2018 1024/2016 1 (E�DHENSEL PHELPS GMP Amendment No 1 Attachment 3 2019 12 03 Plan. Build. Manage, CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Respontled Closed? 0427 VOID Hensel Phelps Construction Co_ 10/23!2018 418(2019 1 0428 H-Missing Dom ii Unes to Sinks Hensel Phelps Construction Ca HKS,Inc. 1023/2018 11/14/2018 1 0429 H-Elevator SO4 Rear Door Rough Opening Hensel Phelps Construction Co- HK$,irc. 102 020 312018 12018 1 D430 C-Operable Partition Head Beam Hensel Phelps Construction Co. HKS Inc. 10/232018 1 v82016 1 04 31 C-Bollard Dena l Requested Hensel Phelps Construction Co. HKS.Inc, 1023/2018 11114/2018 1 0432 C-Sector F Electrical Room Hensel Phelps Construction Co HKS,Inc. 10/2312018 10!242018 1 0433 C-Roof Gutter C6,61caboo Hensel Phelps Construction Co. HKS,Inc. 10/232018 11130018 1 0434 C-Roof Area Drager Hensel Phelps Conabortion Co. HKS.Inc, 1023/2018 1028/2016 1 0435 H-Sector L Wag Ttxckryess Conflict With Plumbing Hensel Phelps Construction Ca HKS,Inc 10/23/2018 11/62018 1 0436 H-Lavel9 Sector L-VFCU S—Confirmation Hensel Phelps Construction Co, HKS_fri 10232018 10123/2018 1 0437 H-Sector M E Amor Doo"ay Charges Hesse!Phelps C.,stmoton Co- HKS,Inc. 10232018 10!3112018 1 0438 H-Ice Maker Room PkemMng Hensel Phelps Construction Co HKS,too, 10P232018 11/1420/8 1 0439 C-South Beverage Station Drain to Strap Beam Clasel h HensPhelps Construction Co- HKS_Inc. 10/242018 11/12)2018 1 0440 S-Updated Sharga/Sharga Solely Local— Hemel Phelps Cmetruckon Co. HKS.Inc. 10242018 11/2/2018 1 0441 P-IWP Just Glider Connections W Prasad Columns Hensel Phelps Comtructlon Co- HKS.Inc. 10242018 11202018 1 0442 Panel H-Pal H4KLB Clarification Hensel Phelps Cmeanuon-Co. HKS,Inc. 102412018 111WD18 1 0443 H-Aff o Queen Shower UM Hensel Phelps Construction Co. HKS,Inc, 10/24/2018 10/312018 1 0444 S-Eterwr ughang Clanficat— Hensel Phelps Construction Ca HKS.Inc. 10/242018 12/112018 1 0445 S-Flagpole Lighbmg and Updated Flagpole Spacing Hemel Phelps Construction Co. HKS,Inc. 10/24/2018 12/52018 1 0446 C-Reinforcement Congestion at Plasters Hensel Phelps Construction Co. HKS Inc. 10/2-02 8!2 018 1012018 1 0447 C-Top of Wail Elevators Hensel Phelps Construction Co- HKS.Inc. 10/2412018 10/31/2018 1 0448 S-Pond Aerates,Wells,111 Pumps and Associated Equipmen i Hemon Hensel Phelps Construction Co. HKS,Inc 10252018 121112018 1 0449 C-Thidksnad Slab at Partition Pocket F—mg Hensel Phelps Construction Co- HKS.Inc. 107252018 10262018 1 0450 S-Primary Power.One line Diagrams,Load profiles Hensel Phelps Construction Co. HKS.Inc- 1 012 512 0 1 8 ❑ D451 S-Sgn Locadom Hemel Phelps Constructor Co. HKS,Inc 10/252016 111132018 1 0452 5-Missing Deta42rL2A 2 Hereat Phelps Construction Co. HKS-Inc. 10,252018 IWW2018 1 0453 S-Incorrect Transformers and Swewakr Layout Hemel Phelps Construction Co- HKS,Inc. 10252018 11172018 1 D454 S-C—rourncm-Pu11 Box Locations Hensel Phelps Construction Co. HKS.Inc. 10252018 12/62016 1 0455 S-Westewaten Lire,to Shangas Hereei Phelps Corstrucnon Co- HKS,Inc. 10252018 12/52018 1 0456 S-Rock Walls Hamel Phelps Cmendonon Ca HKS.Inc, 1025!2018 1 0457 S-Musing Ike Irngalron Hensel Phelps Construction Co HKS.Ino, 10,252018 11/8/2018 1 0458 P-IWP Storm&Beam Conflict Hensel Phelps Conanucnon Co. HKS,Inc. 10125/2018 1026/2018 1 0459 C 4DF and Electrical Room Floor Finish Hmsel Phelps Construct-Co. HKS,Inc. 10/25/2016 1232019 1 0460 C-Leva12 T--h Drain Here d Phelps Construction Co, HKS.Inc. IQ262018 10/302018 1 0461 C-Ep—u—Joint Clanficabon H—al Phelps Construction Co. HKS.It.. 1026/2018 10/302018 1 0462 H-E88H Baseboard Heaters Hensel Phelps Construction Co. HKS,Inc. 10262018 11/62016 1 0463 H-Diagonal Hangers Hensel Phelps Construction Co- HKS,Inc. 10/292018 111122018 1 0.464 H-Condensate Lire,Confirmanon Hensel Phelps Coretrncbon Ca HKS,in. 10292018 10/312018 1 0485 H-Elactncal lam#1665 Hereat Phelps Construction Co- HKS,Inc 101292018 11112018 1 0466 H-Karoo From Desk Floef Box Locations Hensel Phelps Corsouction Co. HKS,inc. 10292018 101312018 1 0467 H-Seaton K Level 2 Deepend Slab Riser Conflict Hersel Phelps Construction Ca HKS,ix 10/292018 1116/2018 1 0468 H-Rwanda Roes"Water and Waste Risers Cuisine of Walls Hensel Phelps Construction Co_ HKS,km. 102912018 11/132018 1 0469 H-Double Cut Grease Vent and Domestic Water Penetranars Hensel Phelps Carotroclion Co- HKS,Inc. 102912018 101312018 1 0470 H-Sleeve Openings Around Columba Hensel Phelps Construction Co. HKS,Mc. 10/292018 112201a 1 0471 S-Lghtiirg Panel. Hensel Phelps Construction Co. HKS,Inc. 1029/2018 12/112018 1 0472 S-On—Svmchgeer StuhOss Hensel Phelps Constructor Co. HKS.Inc. 10292018 11202018 1 0473S-Data/Pover for L—Plate Readers Hinoat Phelps Comhuction Co. HKS,Inc. 10292018 10292018 1 0474 5-Parml Schedule for Mira Power Zones Hensel Phelps Corsuucnon Co. HKS,Irc. 10292018 1/3/2019 1 0475 S-Per"Lot V Hensel Pheips Constructor Co. HKS,Inc. 10292018 12/42018 1 0476 S-Oreiine Diagram for Car Chargers Hensel Phelps Construction Co. HKS.Inc, 10/29/2018 1132019 1 0477 S-Or—Swechgear USG-4 Locatwn Hensel Phelps Cons{ruetion Co- HKS.Inc. 10292018 111152018 0 0478 5-Vaunt Power Requirements Hensel Phelps Cood"n"lon Ca HKS Ire- 1029/2018 1162019 1 m 0479 S-Water Feature Copaoy 5wrtch Hensel Phelps Coratr"""Co- HKS.Inc. 10292018 11202018 1 0480 H-Piano Bar Storage Map Sink Beam Congo Hemel Phelps Construction Go- HKS,Inc. 10/302018 10/312018 1 0481 P-PJ/PK Gratia Beam Penetration for IWP Data Hensel Phelps Construction Co. HKS,Inc. 10130/2018 11/52016 1 0482 S-Pod Post—Emargercy Lig"rglmec Hemel Phelps Gmisb.bu-Co. HKS tic. 10!3012018 12!52018 1 0483 H-Piano Bar Ricer 0--noWater enol Vent Riser Locations Herisei Phelps Construction Co. HKS,Inc. 101302016 11/1212018 1 0464 S-Sgnw9e Power Roo uaemeres Hensel Phelps Construction Co. HKS,Inc. 10/302018 11/192018 1 0485 H-Sort—Restroom Future Type and Chase Hensel Phelps ConetmMon Co. HKS,Inc. 10/3042018 11/122018 1 0486 H-Levet 1 Sector G Gas leaving B.W,N Heryal Phelps Construction Co. HKS.kis. 101312018 1115/2018 1 0488 P-Zulu Gr Chase to Root Hensel Pnelpa Counnucnon Co- HK$,It., 11/12018 362019 1 0489 H-Leval2 Sector G Domino,Water Rears Hansel Phelps Corietmcmon Co. HKS.Inc 11/12018 11/9/2018 1 0490 ue H-Gstnoom Subduct Clanfillobin Hemel Phelps Comtructlon Co- HKS_Inc. 11/22018 1122018 1 0491 P-Pier Locatwns W Sector Y&Z Mechanical She" Hemet Phelps Corathimon Co. HKS.Inc. 11/72018 12/112018 1 0492 H-Added Steel Support at Man Ennance Door Hensel Phelps Construction Co. HKS.Inc. 11212016 11/92018 1 0493 H-Sector J ercl K Scda/Been Line Conduit Length Hensel Phelps Construction Co. HKS,Inc. 1122018 11192018 1 0494 H-Level t Sector K Counting Area Architectural vs MEP Diffuser Drierepancies Hensel Phadps Construction Ca HKS.Inc. 1122018 11/72018 1 0495 H,P,C-Root Hose Bibs Hensel Phelps Construction Co. HKS,Inc. 11!32018 11/152018 1 0496 G-Duct Structural Beam Clash Entering Resirooms Level 1 Hensel Phelps Construction Co. HKS,It.. 11/52DIB 111012019 1 Grade 0497 C- Beam end Wag intersection Hemel Phelps Construction Ga HKS,Inc 11152018 11/72018 1 0498 H-Sado,J Canopy Upper Steel Suppon Hensel Phelps Constructor Co. HK5.the. 11/52016 11!192018 1 0499 H-Level 1 and 2 Sector J Domestic Water 8— Hemel Ph."Carsnuclion C. HKS,Inc. 11152018 11/1921718 1 0500 H-CornerAfrican Queen Pumping Fixture Hensel Phelps C-almction Co. HKS,Inc. 11152016 12/62018 1 0501 H-Laval 1 and 2 Sector M Domestic Hot Water 5¢e Dsciapanxues Hensel Phelps Construction Co. HKS.Inc. 11/52018 11/192018 1 0602 H-Transfer Ar Openings in Walls Hensel Phelps Consaucb-Co, HKS,Inc 11/52018 12/3/2018 1 0503 H-Laval 2 Sector H Fbture Typs and Chess Hemel Phelps Construction Co. HKS,Inc. 11152018 121112018 1 0504 H-Porte Cochere Missing Dimensions&Design Details Hensel Phelps Corsoucnou Co. HKS.Ibi 11152018 1 0505 S-Lendscii Gradeig CAD discrepancy Hemel Phelps Ccretructon Co. HKS,Inc 11152018 11/132018 1 0500 P-FEC S—ca Combo,P1 P-16 Ceiling Hansel Phelps.Construction Co. HKS,Inc. 11/82018 11262018 1 0507 H-Desen Queen Lavatory or Sink Cianfication Hemel Phet s Cc hxttion Ca- HKS.Mx.. 11$2018 11/262018 1 0508 H-Skm Coat Ceiling Height Level 1 Sector L Hensel Phelps Construction Co_ HKS,kc. 11612018 11262016 1 0509 H-Elechicar Panel EH11KHLR Hensel Phelps Construct-Co. HKS,Inc, 1162018 11/192018 1 0510 H-Double Cut Canopy Top of Steel&Angle S— Hensel Phelps Cershucn-Co HKS,Inc. 11/62018 11262016 1 0511 H-5ector H Slorm Piping Ceding,Conflict Hensel Phelps Coretructiaf Co. HKS,Ins. 11/72018 l lf72018 1 0512 P-Precast Panel Edge Dimension at Pop Ups Hensel Phelps C.ndtruonon Ca HKS,Iris, 11/72018 1111212018 1 HENSEL PHELPS 2019.12.03 Plan. Baud. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Sublect Author Company Answer Company Date Created Date Responded Closed? 0513 C-Window Headnse Header Supports Hel Phelps Const—!ran Co. HKSnc..I 11/72018 11/13/2018 1 0514 H-Wadge Insert and Shelf Angle Elevation Hemel Phelps Construction Co- HKS,bio 11!92018 11/132018 1 0515 H-ADA Room Pkmicing F140re Cladf—hom Hensel Phelps Cor Gro torn Co. HKS,Inc. 1111212018 1/10!2019 1 0516 H-Level 8 Ma1ng Station and PRV Assembly L.cnrcm Hensel Phelps Construction Co. HKS.Inc. 11/122018 111192018 1 0517 H-Sector H Equipment Room Drain HIH-06 Hemel Phew Construction Co. HKS,klc. 11112!2018 11/192018 1 0518 H-Red Piano Bar Sanitary to Grease Wasle Hensel Phelps Cormtl lion Co. HKS,Inc. 11/12/2018 11/192018 1 OS19 P-Sector 2 Pilaster and Column Clarification HenPual Phelps Construction Co. HKS,Irc 11/132018 1126/2018 1 .� 0520 S-Landscape Drainage Note Hemel Phelps Construct!n,Co. HKS,Inc. 11/13/2018 12/11/2018 1 0521 P-Conceive Metenal Clanifaation Himsel Phelps Construction Co. HKS Ing 11113/2018 1/142019 1 , 05225-Savaged Wood Hemel Phelps CorstrucOon Co. HKS.Inc. 11/132018 12/32018 1 0523 S-Tribal Fence Zigzag Pole Material Hensel Phelps Corsnuctwn Co. HKS.Irc. 11113/2018 12!32018 1 0524 S•Paving Overhang Srpport and Epoxy Liner Hamb f Phelps Construction Co. HKS.Mc11/132018 12732018 1 0525 P-Compressed Ar ant W star at Tower Area Z Hemet Phelps Corstructon Co- HKS.ba. 11/13/2018 11162019 1 0526 S-P2 Meterrei Designation Hamel Phelps Conshuction Co. HKS,Inc. 11113,2018 12/32018 1 0527 5-Tree Guying Deadman Hi sel Phelps Construction Co. HKS.Inc. 111132018 11!272018 1 0526 S-Concrete Fooling at Seating Bbck Hemel Phelps Corelrucaon Co, HKS,Inc, 11113/2018 12/312018 1 0529 S-R.rot cirg NotesMota A8 Hemet Phelps Constructor Co. HKS,1— 11/1212011 119/2019 1 0539 S-Fountain Bowl Boner Hensel Phelps Construction Co. HKS.Inc. 11313-018 12/172018 1 0531 S-Vngation at Trees Hensel Phelps Comtruction Co. HKS.Inc, 11/13/2018 11272018 1 0532 S-Iinflow.Symbols Hansel Phelps Construction Co. HKS Mc. 11M32018 1-1272018 1 0533 H-Edenor Canopy arc!Roof Details Hensel Phelps Cd-an an Co- HKS,Inc. 1 11 1 32 01 8 12142018 1 0534 S-Mow Line at Steel Edger Hemet Phelps Corstruclion Ca HKS,In, 111132018 123/2018 1 0535 S-Nothings and EasGrgs-Shanga and Event Ram Hensel Phelps Consbvctton Co- HKS.Ino. 11{132018 12132018 1 0536 P-Zola Grse Elevator Sump Pump Hensel Phelps Cors m aon Co. HKS.Inc. 11/13/2018 11/182018 1 0537 S•Water Line E Hat Box eM RPZ Detail Hensel Phelps Constnktlon Go. HKS,Inc. 11/14,2018 12/732918 1 0538 P-Mea Z Sump Dschmge Fl—Sink Hensel Phelps Coisirucaon Co. HKS.Inc, 11/142018 11/182018 1 0539$-Incomplete Finish Schedule Hensel Phelps Corstructwn Co. HKS,Inc. 111140018 W184019 1 0540 S-Incomplete Malenal Lager I Hamel Phelps Construction Co. HKS,MG 11/142018 13202018 7 0541 P-Asea We@ Elevation Hensel Phelps Constmction Co. HKS,Inc. 11/142018 2152019 1 0542S-SP3 LigM Pole Base BOG Distance Hansel Phelps Corstiuction Ca HKS,Inc 11/152018 2152019 1 0543 H-Level 1 Sector G Main Kitchen ns Dome..Water Heel Phelps Construction Co. HKS,Inc. 111152018 13212018 1 0544 H-Sector H Beverage Condun Reroute HensConstruct—el Phelps ConstrucCo- HKS,Inc. 11)15/2018 1/32019 1 0545 H-Level2 ab 3 Sector K Mop Sink Wth No Services Shown Hensel Phelps Construction,Co. HKS,I+� 11/152018 11/212018 1 0546 H-RW and Storm 1-arts Hensel Ptialpe Construcdon Co. HKS.Ino. 117152018 11212018 1 0547 H-Spa Pedicult Chair P-Trap Locations Hensel Phelps Cprstrucaoil Co. HKS,Inc. 11/15/2018 12/62016 1 0548 H-Double CiA Hand Sink Wall Move Hansel Phelps Construction Co- HKS,Irc. 11/152018 12162078 1 0549 P-taster Heater Power Requirements Hensel Phelps Couerrucaon Co. HKS.Irc. 11/1512018 12/4fl9ttl 1 0550 P-HWHP-1 S CWHP-1 Power Clanhcation Hemet Phelps Construction Co. HIS Ix. 11/182018 121112018 1 0551 S-Storm Lure F Ino 0 Pipe Hamel Phelps Construction Co. HKS,Inc. 11!162018 1 0562 H-Marakesh Market and Java Coffee Shop Slot Diffusers HenselPhelps Coret—tron Co. HKS,lex. 111192016 72/3/2018 1 0553 H-HM2.202_M Diffuser Locations 2 Hansel Phelps Car19[_U"Co. HKS.Inc. 11119!2018 12/3/2018 1 0554 H-Combination Grease Waste and VsM Audit.- Hensel Phelps Go ""on Co HKS,Inc. 111192018 11202018 1 0555 H,P-Building Gomel Power Central Unity Plard Pana)Locatan Hensel Phelps Corsad.,on Ca HKS,Inc. 11/192018 12/112018 1 0,556 H-Leval 2 Sector H Double Cul Kitchen Drain Relocations Hensel Phelps Corlstrucli-Cc HKS,lex. 117192018 12/192036 1 0557 H-Spa Saturn Discrepancies Hensel Phelps Construction Co. HKS.Inc. 11/192018 11202018 1 0558 H.P.C-CMU TMckened SCG Hensel Phelps Construction Co. Brossette/DavislDfake,Inc. 11202018 11282018 1 0558A P-CMU Well Elevated Decks Harrel Phelps Construction Co. HKS,Inc. 1/9/2019 1/102019 1 0569 H-Level 4 Edge of Stab Hensel Phelps Construction Co. HKS.Irc. 11n92018 17262018 1 0560 H-Bnck Shea Angle Installation ro Embeds Merisel Phelps Comtruc4on Co. HKS,Sic. 11292018 12172018 1 0561 H-Sector J amd K Locau ns of HU7 r,gnound Fixture Hemet Phelps Construction Co- HKS,Ira. 111202018 12/42018 1 0562 P-HSI C—te/Precast Tolerance Hemet Phelps Construction Co. HKS,Inc, 1172Qt2018 1/72019 1 0563 P•Womens Restroom P10-19 SW V-Grade Beam Conflict Hensel Phelps Construction Cc HKS,Inc- 11202018 112012018 1 0564 H-Sector M Stair 09 Shear Well Hensel phelps Construction Co. HKS.I— 11232018 11262018 1 0565 H.P C-Wall hydrantslhose bibs Hansel Phelps Construction Co. HKS,1- 11262018 121512018 1 0566 H-Level 2,Star 7 Missed Spreadm Spreader BeaEm bads He-"Fheips Construction Co. HKS.Inc, 11/262018 1213/2018 1 0567 H-Double Cut Canopy Msaed Retailwlg Wel Embeds Hensel Phelps Construction Co. HKS,Inc. 112612018 12/32018 1 0568 H-Lave12.Sec.H Missed Area Well urate Angle Embed Hensel Phelps Construction Co. HKS Inc. 11262018 12r312016 1 0568A H-Level 2.Sec H Missed Area Wel Grate Angle Embed REVISION Hensel Phelps Construction Co. HKS,Irc. 1002019 11112019 1 0569 P-Setvr T Bsthrocm Sardtary Line Hensel Phelps Construction Co. HKS,Inc. 11272018 17312019 1 0570 C-Gas Meter Location Hensel Phelps Coistruct Co. HKS,Inc. 11272018 12242018 1 0671 H-Typical Floor Sink 6bekeut Oetad For(Sieh On Grade! Marisa!PMlps Construetion Co. HKS,Mc. 1112'72018 12/22018 1 0672 H-Domestic Water Riser Diagram Hersei Phelps Comtnuer-Ch, HKS,Ino 11272018 1/10/2019 1 0573 6-bas Routing from Co—onch Career to Flrepd Hensel Phelps Constructed Co. HKS,Inc, 11/282018 1!&2019 1 0574 H-Steam Room.Tank Room and Tequler Wall Curbs Hansel Phelps Construction Co. HKS,Inc. 11282018 12/32018 1 0575 H-Outside Air Riser 8etveg Bunk Rooms u1 Sector K Hensel Phelps ConsenKtion Co. HKS,enc 1128/2018 12/412016 1 0576 P-Sector N Retaining Wel and Anchor Boas Clanficahon Hanes!Phelps Corstruehn Co- HKS,Ino. 11/292018 1:162018 1 Grade 0577 C- Beam at Gndina LCP Hensel Phelps Construction Go. HKS.Inc. 11292018 1214/2018 1 0578 S•Gas to Resor Pool Harissi Phelps Con i nucaoo Co- HKS,Inc. 11292018 12/612016 1 0539 S-Storm Drees and Coch-tions ar Hotel Hensel Phelps Ccrstruction Co. HKS,Inc. 111292018 1 0580 H:Misplaced Hooked Dowels for Basement Wal Tie in Hemet Phelps Corstnucton Ca HKS,Inc 11292016 12!412018 1 0581 5-Landscape Dnaln M—"9 Pipe Hansel Phelps Construction Co. HKS,Inc. 117302018 12/42018 1 0582 5-Landscape Dtain Pipe Desigratwns Hemet Phelps Construction Co. HKS,Itx. 111302018 1214/2918 1 0562R1 S-Landscape Drain Pipe Deeigrietions Hansel Phelps C-struclion Co. HKS,t- 3/512019 3/132019 1 0583 5-D-1 44 0.1 Hemet Phelps Chrstructn Co. HKS.Inc, 1113012018 12/62918 1 0584 S-C.1 vs ArchAecruml landscape Di-.9a Nota Hensel Phelps Construct-Co. HKS,Irc. 11/39/2018 21122019 1 0585 5-Landscape Drain Coore,Wns HensW Phelps Colslructlon Co. HKS,Ina, 11!30/2018 2!122019 1 0585R1"Vod'-S-Sheet 11.1.7 incomplete Hensel Phelps Construction Co. HKS.Inc. 51102019 1 0586 P-Concrete Encased Electrical @ Mechanical Shed Hamel Phelps Construction Cc HKS,Inc, 11!302018 12/92018 1 0567 B-Storm Drake Connections at Hotel Sector G He,"Phelps Construction Co. HKS,1., 1N302078 12/112018 1 0588 P-Storm Use Penetration of Glade Beam in Sector P Hemet Phelps Constructwn Co. HKS,Nc 12132018 12/42018 1 0589 P•IW P Pop lips Hensel Phelps Corlstrilction Co. HKS,Inc. /2/32018 121102018 1 0590 H-SternsBe-1n Line Penetration of Grade BeSector G Hemel Phelps Coralrucbon Co. HKS.Ira. 12132018 12/3!2018 1 0591 H-Level3 Seater L Shear Wall 2—h edge Hensel Phelps Cowniuctr—Co. HKS.Inc. 12/3/1320 1 18 12/32018 1 0592 P•Mssing Pier Cap Dowels Hemel Phelps Corsictiou Co. Blocke0e1Dav51Drak®,Inc. 12/ 08 12262018 1 0593 H-South Pace Stone Support Archne Murstrut al Conflict Harrel Phelps Corron Co. HKS,Inc. 12/32018 12/172018 1 HENSEL PHELPS GMP Amendment No 1 Attachment 3 2019.12.03 Plan. Build. Manage. CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Data Responded Closed? 0593A H-South Face Slane Support Arch4ectural Conflkt REVISION , %'. Hensel Phelps Costrud—Ca HKS.Inc. 1212V2018 12/182018 7 O594 5-Missing Root Dram Connection � Hensel Phelps Construction Co_ HKS,tris. 12142018 1192019 } 0595 P-Top of Culumn Configuration Hensel Phelps Construct—Co. HKS,Inc. 12742018 12/62(178 1 0596 C-Powered Ceam Heng Powis Hensel Phelps Construction Co. HKS Inc. 12/42018 124/2018 1 0597 C-Hang Form Clarifications Hensel Phelps Construction Co. HKS.Inc, 12/42018 4212019 1 0598 C-Emergency Generator Soong Hensel Phelps Lunen udl-Co. HKS,1- 12/4/2018 12/112018 1 0599 P,5-Transformers&Grease Line Conflict Hensel Phelps Construction Co. HKS,Inc. 12/42018 12)112018 1 0600 S-Gas Rounrg to Future Restawan Hensel Phelps Construct—Co. HKS,Inc. 12/42018 7/92078 1 0601 P-Elacti-I Boards.IWP Hensel Phelps Corstructlon Co. HKS,Inc 12/412018 12/812018 1 0602 P-Daylight Sensors Hemel Phelps Construction Co. HKS,Inc. 12142018 12212019 7 0603 H-SaCe,J Lovell2 Poke D-Claralcation Hese1 Phelps Construction Co. HKS,IM. 12/42018 0 0804 C-Le..12 Fluor Bruen Telecom Coraan Hensel Phelps Co-Imot n Ca. HKS Inc, 121512018 1/52019 1 0605 P- Floor Receptacles at EJVP Hensel Phelps Constru tion Co. HKS,Inc. 12152018 415/2019 1 0606 S-Telecom to Nyumbas-Shared Trench-VOID. Hensel Phelps Corsa—t-Co. HKS,Inc. 12152016 1 0607 P-Weatherprocf OR Receptacles at FEC Real Hain Phelps Construction Co, HKS.Inc. 12/5/2018 1/2&2019 1 0608 S-Telecom to Nyumbria Changes Hensel phew Construction Co. HKS,hoc. 12/52018 12/1112018 1 0609 H-Sector K Level Wall Sae Conflict Hensel Phelps Construction Co. HKS,W, 121512018 12762018 1 0610 C-Panel R.1-anon Strap Beam CH4-CH5 Hensel Phelps Construction Co. HKS,Irk. 12/62018 12/112018 1 0611 S -GradN Dscrepency at Load"Dock Hensel Phelps Construct—Co. HKS,Inc, 12162018 12/11/2018 1 0612 P-CUP Anchor Softs Hensel Phelps Construction Co. Brockettelpays/greke.Inc. 121812018 12162018 1 0613 H-Roof Drain Details Hereel Phelps Co sineclion Co- HKS,Inc. 12162018 11142019 1 0614 P-Waterproofing Sector X Hansel Phelps Construction Co. HKS,IMI 1216/2018 V1520191 0615 H-Leval 173 Edge of Slab Hensel Phelps Comtruotlon Co- HKS,Ina, 12/712018 12!122018 1 0616 C-Light Cove Deletion Hansel Phelps Construction Co. HKS,Inc. IM2UIB 21132019 1 0617 C-OFCI Lighted Mirrors Hensel Phelps Comtruou-Co. HKS.Inc. 12/8/2018 1/30/2019 1 0617A C-OFCI Lighted Mirrors Hensel Phelps Construction Co, HKS,true. 4292019 5/132019 1 0618 C-Door SNff DWH Room C2C-01 Hanel Phelps Corstruow Co. HKS.Inc. 12182018 12/112018 1 0619 S-Landscape Dren Few.Ownficatwn Hensel Phelps Construction Ca HKS,loo 121102018 1/1412019 1 0620 H-Lobby 8 Spa Concrete Bench Removal Hensel Phelps Construction Co. HKS_Inc. 12/102018 1/162019 1 0621 H-Sector J&K Mach Layoue of Duct and Fan Placemen vs Arch.and Sri—. Hensel Phelps Cois1mcvon Co. HKS,Inc. 12/102018 12/172078 1 (1622 H-Box Header at Non-Raled Wall Duct Conflicts Hensel Pheips Construchon Co HKS Inc. 12/102018 1/142019 1 0623 H-Double Cut Restroom Mimor eq Pendant Lights Hensel Phelps Costruchon Co. HKS.11k. 12110/2018 11242019 1 0624 H-W.9 Relocation in Sector J•IDF is Changing Room Hensel Phelps Construct—Co. HKS.Incl 12110mis 12/172078 1 0625 H-Laval 2 Sector K Bunk Room Wall Relocation to Meet EOD Hansel Phelps Construcroon Co. HKS.Inc. 12/102018 102019 1 0626 C-Ce@r1g Hegn Kahan Jr.Ballroom Eniraues G71 Hensel Phelps Cons ructwn Co. HKS,Irc, 12/112016 1252019 1 0627 P-Pnorw Awnings at IWP Harsei Phelps Construction Co. HKS,Inc. 12/112018 1242019 1 %27R P-Primed A—"at IWP Hensel Phelps Convaucaon Co. HKS,Ink. 2/142019 31732019 1 0628 H-Sector J&K HU7 Future Alternate Hansel Phelps Construction Co. HKS,Inc. 12/112018 3152019 1 0629 H-Lobby Fountain Adddionsl Information Her..4 Pholps Construction Co. HKS.Inc, 12/112018 1 d 0630 H-Level 2 Sector L-PSA Suite With Plumbing Conikct Hensel Phaps C.wn.clion Co- HKS,Inc. 12/112018 122019 1 y 1 0631 H-Level through 8 Edge of Sao at She-11 Conditions Hansel Phelps Construct-Co. HKS.Iw, 12/122016 1118!2019 1 0632 H-Finish Charge on Elevation 011HA5.212 Hensel Phelps Construct-Co. HKS,Irk. 121122018 12 I62018 1 0633 H-Tons/Parapet Construction D a—panty Hensel Phelps Construct-Co. HKS,Inc. 12/122018 t/10/2018 1 D634 P-Cenral Plane Reducers at Dieters!Bypass Conroi Valve Hensel Phelps Costructlon Co. HKS,Inc 12/722018 12102018 0 0635 H-..semen Wali Penetraoos to Meet I for Plumbing Hemel Pheips Costrucnon Co. HK$,Inc. 12/12/2018 12/182016 1 0636 S-Convenwn Cerner Generator Pad Hensel Phelps Coastru -Co. HKS,Inc. 122132018 V152019 1 U637 S-Convention Center Water C-inficnan Rek catkin Hese)Phelps Construction Co. HKS,Inc, 12/132018 11912019 1 0636 H-Level Sector K Entry Door Hardware Ctarttrcetion Hensel Phelps Costrucnon Co HKS,Inc. 122132018 12212018 1 0639 S-Relocated Telecom Connection at Cornenion Center Hensel Phelps Construction Ca HKS,Ina, 12/132018 1130=19 1 0640 P Wave Pool Concrete Cl.nl—bo-REVISED RESPONSE Hensel Phelps Construction Co. HKS,Inc. 12213,2018 1/212019 7 ' 0641 H-Mcdulan Bathroom Plumbing CarAwation Hensel Ptrelps Co-truction Co. HKS,Inc. 12113/2018 1211812018 1 0642 H-5hea-11 Group 4 EW—Grade EJ Howl Phelps Construction Co. HKS,Inc. 121132018 1/152019 1 0643 S.H-Transformer Docking StallonlXFMR Clearance at CUP Hensel Phelps Corstrucaon Co. HKS,Inc. 122142018 12/182018 1 OU44 H-Hydrotherapy Sb—Deta4s Hensel Phelps Construction Co, HKS,kc. 12/14/2018 12/18201 B 1 0645 5-Water Maragemea at Spa Pool Hensel Phelps Construct—Co. HKS,Inc, 122142018 1/142019 1 0646 H-SO4 Control Room Rebcetion-REVISION Hfinei Phelps Corstwol—Co- HKS,Inc. 121142018 1/212019 1 0647 H-Level 4 Mop Sink Connections Hensel Phelps Construction Co. HKS,Inc. 12/172018 12/172018 1 0848 H-Pour Strip Duration Hensel Phelps Construction Co. HKS.Inc. 12/172018 12/192018 1 0649 H-Pre-fab Skin lssue W Ah Evenswn J.,u s et Grid l--H05 Hensel Phelps Coretrucnon Ca HKS,hoc. 12/172018 1/14/2016 1 0650 H-Expansion JO1nS Detail HA7-102102 fssuea Hensel Phelps Cosiruction Co. HKS,IiC 12!172018 1242018 t 0651 C-Curtain Wall and Steel Channel C.ofgct Hemel Phelps Construction Co. HKS.1- 122172018 122172018 1 O652 H-Demising Wall Detail HA2631 Hasei Phelps Construction Co. HKS,Inc 12/17QU18 1 0653 H-Level 2 Sector J Ceding Height Ropuest for Feeder Conduits Heal Phelps Construction Co. HKS.I- 12/182018 1/10720191 0654-'VOID"'H,C-Sector G Duct Comfl¢ts with C—shki-Canter Structure Hensel Phelps Construction Co. HKS.kc. 12/192018 1 '...'.:. 1165 H-Sector G Tegwa Bar Space Corstrertte Hansel Phelps Cor0ructon Co. HKS,Ina. 12/192018 1110/2019 1 P 0656 H-Sector G HFCU Clear—.Issues Hensel Phelps Cosrruc0..Co. HKS,Irk. 121192018 12272018 1 0057 H-Sector G Plumoirg Corrects with Duct Hanel Phelps Co traction Co. HKS.hoc 12/19/2018 11102019 1 0658 VOID H-5ecor G Storm Conihcts weh Duct and CNIed Water Pping Hansa!Phelps Construction Co. HKS,W. 12/192018 1 0859---VOID"--H-Sector G Sala Lane Conduits Conflicts win Duct Hensel Phelps Construction Co- HKS,hoc. 12/192016 1220/2018 1 0660-'VOID'-H-Sector G Plumbing Conflicts vnth Grease Duct Hensel Phelps Construction Co. HKS,I-- 12/192018 720/2018 1 0661 H -Sector G RAF Fan C-Hitt with Convention Center Duct and Cc irg Hensel Phelps Costrucbm Co- HKS,Iro, 12/192018 1/212019 1 0062 P-Drain ClarNcation w Level 1 Mecbar"Shed Hemel Phelps Corralled on Co. HKS.kc. 12/192018 1/92019 1 1163 H-L-1 Chute D1e41 Hensel Phelps Construction Co. HKS,Inc. 12/192018 1232019 1 0664 P-Cenral Plant Chilled Water.Mai-Method of Overhead Support Ha sof Phelps Construction Co, HKS,Inc, 12192018 12/192018 1 0665 H Roof-ptor Sanitary Piping Hansel Phelps Construction Co. HKS,Inc. 12/19/2018 1/10/2019 t 0668 H-Sector M Shear Wall Mlssvg Dowell Hese)Phelps Construction Co. HKS,Ine- 17/192018 12!212018 1 0667 S-Camera and Pole Count Dscrepanc- Hensel Phelps Construct,-Co. HKS.Im. 12220/2018 1222019 1 ;.' 0666 P-Precast Anchor Both Remediation at GL PK-P3 Hensel Phelps Construction Co. Bfooketta/DaviafDrake,Inc 1212112018 121212018 1 0669 H-Washer/Dryer Room Floor Dram Hensel Phelps Construction Co. HKS,Iia 121212018 1/142019 1 0870 5-Missing Storm Corme"os-Line D at Com entron Ctr Heal Phelps Construction Co-. HKS,Inc. 1222229-18 1/2/2019 1 0671 H-PVC Skeeve in Slab Hensel Phelps Construction Co. HKS.Inc. 12/262018 1/32079 1 0672 P-IWP WPIGFCI Receptacles Hensel Phelps Construction Co. HKS,Ik. 12/272018 110/2019 1 0073 P-E.dr—k Cis®to Called Pion Hensel Phelps Co-traction Co. HKS,Inc. 1227/2018 1/9/2019 1 0674 P-Transfer Air Ducts Sector V Lvi 1 Hasa)Phelps Constnictloo Co HKS,Inc. 12272018 12/272018 1 0675 P-Domestic Water LN 2 Merch Shad Hemel Phelps Castructial Co. HKS.Inc. 122272978 21132019 1 HENSEL PHELPS2011120, P�d� ad��d. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 0676 VOID Hensel Phelps Cormtructon Co. 12i27J2018 11312019 1 0877 H-House Keep-Rooms RCP Hemet Phelps Comtructon Co. HKS,Inc. 12/272018 1/10/2019 1 0678 H-Red Piano Bar Floor Bor Civil-- Hensel Phelps Construction Co. HKS.Inc. 12272018 11102019 1 0679 VOID Hensel Phelps Construction Co. 12127/2018 1 0880 P-CMU Wall Location®CUP Electrical Room Hensel Phelps Construction Co_ HKS,Me. 12!272018 1/7!2019 1 0681 P-Neuman ElecpKal Bbckout @ PT/P1 t Wall Hensel Phelps Construction Co. HKS,Inc. 1/15/2019 11172019 1 0682 H-L.ewd 10 Edge of Slab at Screen Wall Embed Hensel Phelps Const—bou Go. HKS,Inc. 1132019 11102019 1 0683 P-Cooling Tower VI Spec Clarification Hemel Phelps Construction Co. HKS,Ino. 1/7/2019 11102019 1 0684 H-Downspouts and Scuppers Hansel Phelps Cor truchon Co. HKS,Inc. 1172019 124/2019 1 0686 H-Linen Chute Slab Opening Hemet Phelps Coratructlon Co_ HKS.tro. 117/2!119 1/102019 1 0686 P-Grade Beam M Zulu GNI Hensel Phelps C.mtruch-Co. MKS,Inc. 17712019 1/82019 1 0687 P-Coding ToEnclosure Discrepancy Hemet Phelps Constru0cm Co. HKS,Ma 1172019 2/8/2019 1 0688 H-Smoke and Cven Exhaust Specification Hemet Phelps Construction Co. HKS.Inc. 11712019 111012019 1 0689 6-Dow Disweparcres Hansel Phel ers ps Comtmtion cCo. HKS.Inc. 1/82019 2113f2019 1 0690 S-Lot G Car Chargers- and Panels Hensel Phelps Comtructon Co, HKS_Inc, 1/8/2010 1/9/2019 1 0691 H-Level 1$acro+l Transfer Air Ow Beam Conflict Hensel Phor,Phelps ConstructCo. HKS,Inc. 1/812019 1/142019 1 0692 P•Sector Q Trench Drains Hensel Phelps Construction Co_ HKS,Inc. 1/8/2019 1/8/2019 1 06""'H-Smoker Submittal ClauNcaw- Hernial Phelps Construction Co. HKS.Inc. 118/2019 1!912019 1 0694 P-FEC Elevator Pit Clarification Hensel Phelps C.mtructon Co. HKS,inc. 1181'2019 1!82019 1 0695 S-W ascewater Line A2 profile to Grease Trap at CUP Hensel Phelps Constructor,Co. HKS.Inc. 1192019 11152019 1 06W P-FEC Electrical Clanhcotic m Henmd Phelps Corst,.Mon Co- HKS,ire, 1/9/2019 21112019 1 0697 C-B-Wall Notch @ Staging Room Sink Hemet Phelps Constructor,Co. HKS.tno 1/10/2019 122/2019 1 0698 P-IWP 8 FEC Undengro"Domestic Water Piping Hensel Phelps Commotion Co. HKS,kxi:. t it x2019 1!1412019 1 0699 C-Oro CAI/C10 Embed FIX Hensel Phelps Corstrucbon Co. HKS.Iro, 11112019 11172019 1 07W S-Water to Ever4 Bem Hemel Phelps Construction Co. HKS,Inc. 1/14/2019 2112019 1 0701 H-South Canopy Steel Clash wlh Deck Hersel Phelps Comtructlon Co. HKS,into. 1/142019 2/72019 1 0701A H-South Canopy Steal Clash wdh Deck-HSS Ekvatbn Changes Hemel Phelps Co---bon Co. HKS,lo. 3/6/2019 31192019 1 0702 S-Trails Footing Dim-her-m Hemet Phelps Construction Co HKS,Inc. 1/142019 124f419 1 0703 S-Entry Wall By Sherpa Fel-211228 Hemel Phelps Corstruct.n Co. HKS,Inc. 1/142019 1/172019 1 0704 P-Waterproofing Panel=Dwar Hensel Phelps Corotrucbon Co. HKS,Inc 1/15/2019 1115/2019 1 0705 S-Storm Line B Rim Elevation Hemet Phaso Comtroclon Co. HKS.Inc 111512019 11152019 1 0706"Vod-S-French rain DBackfill Hemel Phi"Construction Co. HKS,Mc. 111512019 1 0707 P-Grade Beam,Trench Drain&CMU R—twung Detail Hensel Phelps Conmtructon Ca HKS,plc, 1115/2019 11162019 1 0708 H-Door Frame Fir h D—ap._.s Hensel Phelps Construed..Co- HKS,Inc. 1/182019 1/222019 1 0709 H-Door Type T06 Hensel Phelps C.W—I'm Co. HKS,Inc. 10612019 2/12019 0 0710 P-Type'PB1'Lght Flaws Locations, Hemet Phelps Constructlon Ca HKS.9c. 1/162019 21612019 1 071 1 S-Sherge Galery DoorsMG116 and MG117 Hensel Phelps Comtruotor,Co. HKS,Iro. 11162019 2/132019 1 0712 P_ Sector 2 Sectbn Cut for 48"x 34"Beam Hensel Phelps Constructor,Co. HKS,I% 1/1712019 1252019 1 0713 H-incomplete Details and Aimsnrg Door Doegnatiom-HA2.777 Hemet Phelps G—huctlon CO. HKS,Mc, 1/172019 2/52019 1 0714 S-Comrrlunceton Routing Value Engineering Hemet Phelps Constructer,Co. HKS,Inc, 1/172019 11812019 1 0715 H-foe Maker Room Ceiling Conflicts With Plumbing Hemet Phelps Cormbooton Co_ HKS,ins. 1/172019 11292019 1 0716 H-Lavel4 Sector J W hApool Suite Wall Discrepancy Hemel Phelps Construction Ca HKS,i% 11172019 1/182019 1 0717 H-Level 2 Sector G Fur Out For Storm Honest Phelps Construction Co. HKS.Inc, 1/172019 1242019 1 0718 H,P-Walk-In Free4er D. —m Hensel Phelps Construction Co. HHS,Inc. 1!1712 1212019 1 0719 H-Leve14 Sector J CHW Blockout in Conhct watt W all Hensai Phelps Corot ruornm Co. HKS.Inc. 11172019 1/212019 1 0720 H-Level Sector H Floor Mounted Thilets Hemet Phelps Construction Co. HKS.Inc. 1/172019 1/192019 1 0721 H-Guest Room Ful Height Minor R000—Tints Hemel Phelps Construction Co. HKS.Inc. 1/182019 2h32019 1 0722 P-Zdu Gale Roaf Hemel Phelpe Construction Co. HKS,Inc. 11182019 3182019I IVV 0723 P-FEC/ P Finish Conon firmatHansel Phelps Cormtructon Co. HKS.Inc. 1OW019 2!112019 1 0724 P-Attraction Fwmdat or e Hensel Phelps Construction Co_ HKS,to. 1/182019 V212019 1 0725 H,P-CUP Electrical Room Ladder Relocation Hornet Phelps Construction Co. HKS,lc. 11182019 2!612019 1 0726 H"VFCU Serving Room H3K-06 Hemet Phelps Colxtructon Co. HKS,e. 71182019 121/2019 1 0727 H-Electrical Room H1K32 Uocr S" Hensel Phelps Construction Co. HKS,Iro. 11182019 2/52019 1 0728 H-Aceeasibllay for FSD Serving Desert Queen Rooms by Stairwale Hemet Phelps Construction Go. HKS,Inc 11182019 2172019 1 0729 H-Sector J Wel Layout Conflict, Hensel Phelps Constructor,Co. HKS,Inc. 1/192019 2/712019 1 0730 H-Shower Dram CorllKt Mh Strap Beam Hensel Phelps Construction Co. HK5,Im. 12112019 2172019 1 0731 H-Level4 Sector J Roof aw Overflow Drain Ralaaton Hensel Phelps Construction Co. HKS,Inc. 1212019 272019 1 0732 H-Leva12 Sector M Curtain Wall Sl Dowd Hensel Phelps Construction C., HKS,Inc. 1212019 1/242019 1 0733 C-Carwpy Support Beam at Curtain Wail Hensel Phelps Corstrucl—Co. HKS,Inc. 1212019 1/252019 1 0734 H-Conflict With Sector J at Penetrations xh Fars Hemet Pheips Construction Co- HKS,Ina, 12112019 1 0735 H-Level 5 Sector J S.-M Stack Looatien Hensel Phelps Comtructon Co. HKS,Mc. 1212019 123/2019 1 0736 H-Level 4 Sector J Room BKA H4-101 Wall Expansion for VFCU Hemet Phelps Construction Ca HKS_Inc. 1212019 217/2019 1 0737C-Ballroom and Storage Room Sic-la.,Design Criteria Hensel Phelps Corstructon Co. HKS,I., 1222019 2113/2019 1 0738 H,P,C-BOH COFnd.r Fin"Ze S""i vs Pian Sheers Hemel Phelps Cerstw.—Co. HKS,Inc. 1222019 1 0739 P-FEC Roof Detail on Metal Dad( Hemel Phelps Construction Co HKS,Ina 12212019 2/6/2019 1 0740 H-Sector H Leva12 Deck Confirntetwn Hermes Phelps Construction Co. HKS,Iro. 1/_'22019 2/812019 1 0741 S-VVsI atw Leve E Heat Trace and DI Pipe Hensel Phelps Construction Co. HKS,Inc. 1222019 2/722019 1 0742 S-Poll Box Submittal and Speclxaton Oixreponcy Hensel Phelps Comhocton Ca HKS,hc. 1232019 1292019 1 0743 P-Wave Pool Wall and Slab Questions Hensel Phelps Cershuchon Co. HKS,Inc. 1232019 2182019 1 0744 H-E deriw O,asioe Aa Inmrla non Hemel Phelps Construction Ca HKS,plc 1232019 4!12019 1 0745 P-FEC Ton. .Toe Hensel Phelps Construction Co- HKS,Inc. 1232019 2!42019.. 1 0746 H-Leval4 Expargion Jornt Greased C....c tin Confemation Hemet Phelps Construction Co. HKS.Inc. 1232019 1/2&2019 1 0747 H-ADA Shovxr Pan Dlmem.ns mt Hemet Phelps Corr-b-Co. HKS.Inc 123/2019 2/122019I 0747R H-Confirming ADA Shower Pan Dimension Hermes Pholm Cor Con-ton Co. HKS,Inc. 3202019 3/292019 1 0748 P-Stae PST-4 Wal Dimernnon Hemel Phelps C.mtruction Co. HKS,Inc. 1232019 1/31/2019 1 0749 H-1--i 4 Deters 08 and U9 on sheot HA7.101 Hensel Phelps Construction Co. HKS,Ino. 1232019 31512019 1 0750 S-Structural Foam Hensel Phelps GOristructon Co. HKS,In.. 1232019 2/72019 1 0750R0001^VOID"S-Structural foam Hemet Phelps Construction Co. HKS,Inc 3182019 1 075tH-Door Hardware Selections-HA3.608 Hensel Phelps Comtructon Co. HKS.kxc 1282019 2!7/2019 1 0752 C-AHU 12W CKculs tar Nheh chance Outlets Hensel Pnelps Combustion Co. HK5.Inc. 1242019 2/122019 1 ,)753S -Site Wal Discfepanaes Hemel Phelps Construction Ca HKS.hoc 1242019 129!2019 1 0754 S-FourrteinBowl Footing DiHemet Phe9xa Corsuucton Co. HKS,Inc. 112420192/13/2019 1 0755 H,Sector,H Area ny Beam Dowels Hemet Phelps C.mtruction Co. HK5,Inc. 1242019 1282019 1 0756 C-Door Schedule Omttepancles Hamel Phelps C-41rctbn Co. HKS.Inc_ 1242019 2/132019 1 0758 H-Level 1 t and 12 Sector J&K Edge of Dock Herman Phelps Construct.,,Co. HKS,Inc. 10512019 2142019 1 HENSEL PHELPS 20191203 Plan. Bond. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Data Responded Closed? 0759 S-Messirg Material Desg-bon Hotel Sector L Hensel Poole,Construction Co. HKS,Inc, 1252019 2121/2019 1 0760 P-(PT,P9.Sy Column Hensel Phelps Conshuot.n Co. HKS,Inc. 1282019 1/312019 1 0761 S-F4e Hydrant Lkce and Lghlpote Base Conflict Hensel Phelps C.rstnuction Co. HKS,Inc. 1282019 2222019 1 0762 H-Level 1 Sector L Guestmom ore StFront 0—pancy Hensel Phelps Construction Co. HKS ie 128/ .h2019 1282019 1 0764 C•Folding PartMon Sound Rating Hensel Phelps Construction Co. HKS.Inc. 1282019 2/122019 1 0765 H-Level 1 Sector H L1-09 Lower Elevation Hansel Phelps Conshuc}wn Co, HKS,Inc. 12812019 2182019 1 0766 H-Leve11.3 Sector L Doniesbc Water!Ane S2a Hensel Phelps Construction Co. HKS.Inc. 1292019 1/302019 1 0767 S-Fe+eh Floor Elevat.ns Hensel Phelps Comtnuction Co. HKS,Inc. 1292019 2162019 1 0768 H-Level 1 Sector G Continuous DifAser enIno,Phelps Construction Co. HKS_ 12912019 2113,'2019 1 0769 H-Sector H&M Lower Discrepancy Hensel Phelps Construction Co_ HKS,Inc. 1292019 2162019 1 0770 S-E*terlor Ughhng Controls Hensel Phe$s Construction Co. HKS,for. 1292019 4222019 0 0771 H-HWC Reer Sv g Hensel Phelps Construct,-Co. HKS,hie 1/302019 21&2019 1 0772 H-Level 2 Se 3or G Family Restroom H2C 07 Chase Extension Hensel Phelps Construction C¢ HKS,tiro. 1/302019 4132019 1 0773 C-Generator Pad Slab Elevaban Hensel Phelps C.mtrucbon Co. HKS,Inc. 1/30/2019 1/30/2019 1 0774 P-Mechanical Shed Underground Draeage system Hensel Phelps Construction Co. HKS,Inc 113012019 3/20!2019 1 0775 P-El.cwoal Switchgear Hensel Phelps Construction Co. HKS,Inc. 1/312019 2/152019 1 0776 P.FEC/IWP Domesto Underground Pi ing Hansel Phelps Construction Co. HKS,Inc. 1/312019 2&2019 1 0777 C-Event Barn Design Loads Hensel Phelps Construction Co. HKS.Inc. 1/312019 214!2019 1 0776 H-Level 2 Sector G RCP Elevation Hensel Phelps Construcboo Co. HKS,Inc. 1/312019 2/142019 1 0779 H-Sector G Canopy Co k4s Hansel Phelps Corstruoton Co. 1131/2019 0 0780 H-Isolation Valves at Plumbing Fun,res Hensel Phelps Construction Co. HKS,lnc. 1/312019 2!122019 1 0781 H-Eldenor Wall Defle non Clips Exposed Hensel Phelps Corsrruction Ca HKS,Inc 1/312019 2/132019 1 072H Typical African Queen Wall Locaa.n Hensel Phelps Construction Co HKS.Inc. 71120192/132019 1 0783 H-Hotel Kichen Area ACT-02 Washable Tile Hereof Phelps Construction Co. HK$,4m. 2112019 2/132019 1 0784 H-Modular Wall Panels Clarification Hansel Phelps Constructon Co. HKS,hoc 2142019 0 0786 H-Missing Hoisl/Safety Beams a12-Level Elevators Hensel Phelps Canstrucron Co. HKS.Ira, 2/1/2019 2152019 1 0786 P-Mech Shed Lower Plenum Cehng Contbut Hemel Phelps Construction Co. HKS,Inc ?112019 2/132019 1 0787 H,C-Backlit Detal at Perimeter Well Hemel Phelps Const—t-Co. HKS Iho 2/2J2019 2/5/2019 1 0788 H-Domestic Hot Water Rser Insulation Afternate Ferret Phelps Construction Co. HKS,Inc. 2!212019 2/5/2019 1 0739 H-Guestroom Floor Finish Clarification Harrel Phelps Construction Ca HKS,Inc, ?142019 2282019 1 0790 H-Corcierge's Desk Gale Rein-al Hensel Phelps Comtrutton CO HKS.Mc, 24/2019 2/132019 1 0791 H-Cashier's Area Buitetproof G4—Removal Hemet Phelps Combucaon Co. HK$.Inc. 2/4/2019 2/132019 1 0792 H-Ornamental R.ri Scope Chnficat,n Hansel Phelps Construction Co. HKS,Inc. 2/42019 3/152019 1 0793 H-OFOI Display Gondolas and Fruit Cabinets Hensel Phelps Construction Co. HKS,hie. 242019 21132019 1 0194 H-Sall Room 8u1k1-Qui Confifmabon Ferrell Phelps C.haba.f o Co. HKS,Inc. 2142019 21132019 1 0795 C-Offset Embeds Hensel Phelps Construction Co. HKS,Inc. 2M2019 2152019 1 0796 C-Anu:Mr Bok Profadan Hensel Phelps Construction Co. HKS,Inc. 2/412019 2/52019 1 0797 C-Beam Shear Stud Hensel Phelps Construction Co. HKS,Inc. 2142019 2142019 1 0798 enma P-Dow Fraena Thert Break Construction Hensel Phelps Construction Co. HKS,trio. 2/4/2019 2!132019 1 0799 P-FEC Anchor Bolls Hansel Phelps Corstrucbon C. HKS,4x. 2142019 2/62019 1 00 08 C-CH1C2 Broken Anchor Bop Hensel Phelps Construction Ca HKS,trio. 2152019 2152019 1 0801 C-Level 2 Floor SING Hereat Phelps Construction Co. HKS.Inc. 2!512019 2152019 1 0602 VOID Hemel Phelps Corstruct+on Co. 2152019 2/62019 1 0803 C-Slab Dowels at Grade Seam Hensel Phelps Constructor Ca HKS,Inc. 2/5/2919 2!5+2019 1 0604 H-Placing Back 8dckouts Level 2&3 Hereel Phelps Construcaon Co. HKS,Inc. 2152019 2/872019 1 0805 P-Precast Shear Wap Cond h.h at Mechanical Shad Hamel Phelps Construction Co, HKS,Mc. 2162019 2/612019 1 0806 H.P C-C.",DAS Re—vel Hamel Phelps Comlructioo Co HKS,loco 25/2019 1 0807 S-Gas Sleeyes Hensel pilellyr Corstrudion Co. HKS,410. 2/62019 272019 1 0808 H.P C-CMU Clanhcatrons Hemel Phelps Construction Co. HKS,Inc. 2/8/2019 2/122019 1 0809 H.P-Elevator Cab Finches Hereat Phelps Construction Co. HKS Inc. 2612019 2/132019 1 0810 C-Door Depneenuo at Cull Hamel Phelps Construction Co. HKS,Inc. 2/62019 2172019 1 0811 H C-ATS&Generator Taylor Power w!VE opuprs Hemel Phelps Construction Co. HKS,Inc 7182019 2212019 1 0812 H.P,C.S-FOH pkanbeg ti—e selaeaom Hemet Phelps Construct—Co. HK5,Inc. 2/&2019 2132019 1 0613 P-Ecteno,CMU Attachment to Structure Hemel Phelps CweKruction Go. HKS,ka, 21&2019 2182019 1 0814 H-Level 1()HW lin-Wall Loops at Resttooms Hereei Phelps Construction Co. HKS,Inc. 2612019 2262019 1 0615 S -Masi Roof Ore.Connections Hemel Phelps C.retruction Co. HKS.Inc. 282019 3x5/2019 1 0616 H-Tub Bene at Elevator Shaft Shear Wall Hemel Phelps Construct-Co. HKS Inc 21",19 2222019 1 0817 H-Sector J SoveN Riser Relocation Hensel Phelps Corlsfructon Co, HKS.Inc. 2&2019 2222019 1 0817R H-sedor J Sovent Rser Rat..bon Hemel Phelps C.mtruction Ga HKS,Inc. 3202019 4/112019 1 0818H-Level 4 Oisln puma Valves Access Doors Hemel Phelps Construction Co. HKS.Inc 282019 1 0819 H-Structural Slab Edge Conflicts wRh Storefront Hemel Phelps Construction Co. HKS.Inc. 2821/19 21212019 1 0820 C-Dr.—at Porta Cool— Hemet Phelps Construction Co. HKS,Inc. 2/8/2019 2/122019 1 0821 H.P.C-Additional CMU Ganfoations Hensel Phelps Construction Co. HKS,Inc. 2&2019 2132019 1 0821A P-CMU vrolls(c9 FEC Hemel Phelps C.retrudion Co. HK$,4u. 3/7/2019 3/132019 1 0822 H-Level 1 Sector L Storefront Door Removal Hansel Phelps Construction Co_ HKS,Inc. 2/8/2019 2/122019 1 0823 H-North Perimeter Wag Pomfret—Dela l Hensel Phelps Corlstmotion Co. HKS,Inc. 2&2019 2122019 1 0824 H-Canopies and Porte Cochere Lghhrg and Soffit Romovai Hemal Phelps Construction Co. HKS.Inc. 2/&2019 1 0625 H.P•CUP/Laundry Lghang Circuity Hamel Phelps Construct.,Co. HKS,Inc ?1&2019 302019 1 0826 H-Comer African Queen ADA Fluor Dream Hensel Phelps Construction Co. HKS,Inc. 2112019 2112019 1 0827 H-EIFS Send at Exports—Joint Hemel Phelps Construction Co, HKS,Inc. 2112019 2122019 1 0828 H-FAA Lighting Ronuirem a Hensel Phelps Construction Co. HKS,Ina 21112019 2112019 1 0829 H-Mop and Broom Holder R—..l Hemel Ph 1p5 Corebuchoo Co. HKS,Inc. 292019 2132019 1 0830 H-Root Drans and Scuppar40ovaspoula Cl n6oation Hansel Phelps Coostrucbon Co. HKS,Inc. 2112019 2262019 1 0830R H-Roof Dram arra Scupper-Ddvv spoufa Clanhcati.n Hensel Phelps Construction Co. HKS.ins. 41172019 5/222019 1 0831 P-FEC Floor Box Honnarun Ra—ye Hemet Phoips Construction Co. HKS,Inc. 2112019 2/112019 1 0632 P-Electrical Switergear Clanlcatwm Hemet Phelps Construction Co. HKS,Inc. 2/112019 3/112019 1 0833 C-Added Doer Openng-Room lit C2C.01 Hemel Phelps Comtrudion Co. HKS,Inc. 2/112019 3762019 1 0834 P-Laperda y Panels N FEC Hemel Phelps Construction Co. HKS.tic. 2112019 3182019 1 0835 C-Beam Flange Confkt at Concrete Well Haeal Phelps Constructon Co. HKS,Inc. 2112019 2112019 1 0836 H-CorerW.loins at Doer Frames end Wirdows Hemel Phelps Comtacton Co.. HKS.Oce. 2122019 1 0837 H-Leve12 Sector G Canopy Curb GanHcation Hamel Phelps Construction Co. HKS.Inc 21122019 21262019 1 0838 C-Partaion Pocket Support Embeds Hemet Phe4 a Carte ruction Co. HK5.Inc. 2122019 2142019 1 0839 H-18 Inch Door Swing Clearance Hensel Phelps C.mtructon Co. HKS,Inc. 2122019 2/142019 1 0840 C-EAmrnale Cove Lighting at Level 1 P r unction Hemel Phelps Construction Co HKS Inc. 2/132019 22512019 1 0841 C-Level t Floor Box CILBRA Panel Discrepancy Hemet Ptwips Comtrudion Co. HKS.Inc. 2/132019 3/812019 1 HENSEL PHELPS2019.12,03 GMP Amendment No 1 Attachment 3 Plan. Build. Manage. CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 0842P-Domestic Water Room Plumbing Details Hansel Phelps Construction Ca HKS,Inc 2/13/2019 31712019 1 0843H -Level 2 Sector M Sleeve Relocation Herwed Photos Construction Co- HKS.Inc. 21132019 V142019 1 0844 C-CILBRB&CiLLS Panel Location Hensel Phelps Corstruclwn Co. HKS,Inc, 2/142019 3/112019 1 0844A Panel Location C1B-10 vs C18.08 Hensel Phelps Construction Co_ HKS,Ino, 3(122019 4222019 1 0845 P-FEC Intenor Drywall Clarifications Hensel Phelps Construction Co. HKS,Inc. 2/142019 3162019 1 0646 H.P.C,S-Fire Alarm AHJ Requirements Hensel Phelps Construction Co. HKS,Inc 2/14/2019 3182019 1 0846A H.P C,S-Fire Alarm AHJ Requiremeois JCI Design Hensel Phelps Construction Co- MKS,Inc. 51&2019 5!132019 1 0847 C-VE Mechanical Yard DEES Screen Wal, Hensel Phelps Cowtuction Co. HKS.Inc. 2152019 awol9 1 0648 P-FEC Anchor Bok For Hemel Phelps Cortruction Co. HKS,Inc. V1512019 4/8/2019 1 0849 H-Leve!5 Sector J Sovent Stack Location w Room W SA H5-1-2 Hensel Phelps Comhoet..Co. HKS,Ore 2/182019 2212019 1 0850 H-CIP Concrete Wall at Stags m Wings Hensel Phelps Construction Co_ HKS,lm. 2/182019 V212019 1 0851 H-Level 13 Sector J Deep Beam Embed for Panal¢ed Ereenc, Hemel Phelps Construction Co HKS.sic: 2/18/2019 2/268019 1. 0852 H-Exterior Egress lighting Hensel Phelps Construction Co. HKS,Im. 2/182019 31&2019 1 0853 P-Blux M—am"Stair&Catwalk Hensel Phelps Construction Co. HKS.Inc. 2/18/2019 3162019 1 0854 P-rWP/FEC Roof Sapper&DomsPoum Hensel Phelps Construction Co. HKS.Inc- 2/16/2019 3/8/2019 1 0854R0001 S-Unused Storm Lm%Conne eem H-1 Phelps Construct—Co, HKS_Inc. 5/6/2019 &52019 1 ,,865 H.P.C,S-Tile Sound Reduction Membrane Hansel Phelps Carroiruction Co. HKS Inc. 2118/2019 316/2019 1 0856 P-H CP Schedule Hensel Phelps Coostmetton Co. HKS.Inc. 2/182019 3fT12U19 1 0857 H-Roof Accu Panel Hensel Phelps Cerstrucbon Co. HKS,Inc. 2182019 2/272019 1 0857 R1 H-HM Roof Access Doors Updated Schedule Hansel Phelps Construction Co. HKS.Ise. 311$12019 4/1/2019 1 0858 P-IWP Vapor Be,l Hansa)Phelps Corstruoton Co- HKS,Mc, 2/182019 4/9/2019 1 0859 P-Outdoor Grotto Bar CWrif...- Hamel Phelps Coreavabon Ca HKS,Ind, 2JI&2019 413012019 1 0860 P,C-Elevator Finishes Hensel Phelps Construction Co. HKS.Inc, 211912019 3/8/2019 1 0861 H.P.C-BOH Resilient Base Hensel Phelps Construction Co. HKS.Inc. 2/192019 4/222D19 1 0862 H.P C-BOH Quarry Tie Deletion Hensel Phelps Construction Co. HKS.Inc 21&2019 3/13/2019 I 0863 H-Guastroom Ugfted Manors Hensel Phelps Coostractoo Co. MKS.line, 2282019 3/&2019 1 0864 P-Laundry Equipment Duct Clad%cations Hensel Plasft-Cmsh—on Co. HKS,Mc. 21192019 31142019 1 0865 P---ry Equipmeo Claohcatlons Hansel Phelps Construction Co. HKS,Inc. 2/1912019 3/4/2019 I 0866 H-Sector H Relief Au Shah Clarification Hensel Phelps Comtruction Co, HKS,I- 2/192019 21211!2019 1 0867 P-Mechanical Shed and W—Pool Connection C—fi—00n Herne)Phelps Cri tnucton Co. HKS.Inc 220/2019 3/138019 1 'E f( 0868 P-CUP Dao,Depresses&Location Clerdzaton Herrsel Phelps Comtruction Co. HKS.Ind. 2202Q19 2212019. 0869 H-Leval t Sector L Room Dii gnatiem is Restroom Layout Hensef Phelps Corstruction Co. HKS.tnc. 2802019 21282019 1 0870 6-Removal of Outdoor Spa Trellis Hensel Phelps Cont,tion Co. HKS Inc 2212Q19 3/8"2019 1l'f U871 C-Door Divider at Eztenor Doors Hensel Phelps Comtruct-Co. HKS,Iric, 2222019 2/222019 1 0872 P-Redemption Store&laser Tag Eleetncal Clanif—tions Hensel Phelps Coratruenoo Co. HKS,tru, 2222019 4/152019 1 0873 H-From Entry Canopy Grad%Beam Hensel Phelps Construction Co. HKS,Inc. 2222019 3/132019 1 0874 H-Air Be..,Tramaion Detail From Pre-Instated to Postdrrstelled Products Hensel Phelps Comtrucaon Co. HKS,the. 2222019 31132019 1 0875 P-Domestic Main Sing Clarification Hensel Phelps Cor h-lion Co. HKS,Inc. 2252019 2258019 1 0076 C-Lapendary Elenkets Hensel Phelps Construction Co. HKS,Inc. 2252019 31152019 1 0877 P-B-Lux Waste Piping Requirement Hensel Phelps Construct—Co. HKS,Nc, 2252019 $120/2019 1 0879 C-Level 2 Se— E Ceding Fetishes Herne)Phelps Corers—boo Co. HKS.Ise 2252019 3/138019 1 0879A C-Leve12 Sector E Getting Fimshes Hensel Phelps Corsauchon Co. HKS,Inc. &8/2019 9/412019 1 0881 H-Schuss's HSS Column Embed Canfact Hensel Phelps Construction Co. HKS,Inc. 2252019 5222019 1 0882 H-Leval 12 Roof 5crean Wall Deletion Hensel Phalps Comtruction Co HKS.Inc 2852019 3/152019 1 0863 P-Modthcawri Y-19-9 at CUP Hensel Phelps CotntrucLon Co. HKS-Inc. 2252019 2262019 1 0684 P-Preuss Attachment Remed,auon at GL PTIP6.5 Hensel Phelps Cm,s ruction Co. HKS,Inc. 2852019 2126!2019 1 0885 H-Floor Dram Requeemorns for AOA Rooms With Showers Hensel Phelps Comtruction Co. HKS,Mc. 2282019 0 0886 H-Level/Seiner H DHW In-W ad Loops at Mem and W omam Locker Hensel Phi ps Corstwehon Co. HKS,Inc. 2262019 2882019 1 0887 H-Level 2 Sector G Somhos PR2a&Anapaste Cedrc g HegM Cnnfir is Hensel Phelps Construction Co. HKS,Inc 2868019 3158019 1 0888 S-OAC Meeting Electrical Adjustments Hensel Phelps Comtrueb—Co. HKS.Inc. 2282019 4122019 1 0889 C-Access to Company Switches Hensel Phelps Construction Co. HKS,Ix, 2872019 4118019 1 0890 S-Latttuaps and Ingation Hensel Phelps Construction Co. HKS,Inc. 2278019 316MI9 1 0891 H,C-Gap Between Hotel and Convention Center Hensel Phelps Contruct—Ca HKS,Inc. 2872019 31182019 1 0892 H-CHW Control Valves at AHUs and FCUs Clardicetion Hemel Phelps Construction Ca HKS,inc. 2278019 317/2019 1 0893 H-AHU CHW Valva Feil Open or Fad Closed Ciandication Hensel Phelps Comtrucdon Co. HKS,Inc 2272019 3142019 1 0894 H-Sector M Blackout Repairs Hemel Phelps Cdrs[ruction Co, HKS,Inc. 2872019 31182019 1 0895 C-Level 2 Floor Be.Additional Reinforcing t Embedded Conduct Hensel Phelps Corstruchon Co. HKS Inc. 2278019 3142019 1 0896 P-Skylight Curbs Hensel Phelps Cvrlstruchon Co. HKS,Inc. 2272019 4/92019 1 0897 P-Relocate Electrical Parrel PIOLKS a 8-Lux Hamel Phelps Corstructi:Ca HKS,Nin 2278099 2282419 1 ,,898 H,C-Mechanical Chase File Rating Herne)Phelps Construction Co. HKS,Inc. 2288Q19 31IW2019 1 0899 H-OA-15 Duct Riser Hensel Phelps Cvratruction Co. HKS,Mc, 242 019 288!'2019 1 0"H-Fiber Cement Panel Dimension at Beicorues Hemel Phelps Cors[ruclion Ca HKS,lnc 2888019 37198019 1 0901 H-Gyp.Board Cartrol Joint Dscrepaney Hensel Phelps Construction Co. HKS,Iris. 2282019 3/132019 1 0902 H.P,C-Card Reader and VvQC;.Id Dacrepancies Hemel Phelps Construction Co. HKS,Ix. 2882019 41112019 1 0902R1 H.P.0-Update Hardware Schedule to Match RFI N 902 Hensel Phelps Conshuc0on Co. HKS.Inn 4/118019 1 0902R2 H-Rough Opening Drawirgs to Match RFI 902 H-1 Phelps Comtruetion Co. HKS,Irc- 4/112019 / 0903 H-Missag Hardware Spec HK-AL1 Hensel Phelps Corshocbon Co. HKS.Inc 2282019 3/122019 1 0904 H-Piping io AHU's Hensel Phelps Comtructioo Co. HKS,Ino 2288019 3118019 1 0905 H-VFCU G,4,Location at P—dem.1 Sud. Hereat Phelps C.ow uetiou Co. HKS.Mc. 2282019 31192019 1 0906 C-inside Corner Metal Pared Hemel Phelps Cor traction Co. HKS,Inc. 2888019 31612019 1 0907 S-Fee Protection and Water to Pool Restroom Hertel Phelps Comtruics—Co. HKS,hoc. 2282019 3/192019 1 0908 P-Msplaced Pler in The FEC Harrel Phelps Carstruceon Co. HKS,Inc, 3/V2019 3118019 1 0909 H-Level 10 Sector K-Ica Vending Room Dmin Clarification Hensel Phelps Corertnuotan Co. HKS,Iris 3r12019 3N012019 1 0910 Domestic Hat Water Return Pipe S—in Bathrooms P10-02 and P10-03 Hensel Phelps Comtruction Co. HKS,Inc. 3/112019 3712019 1 0911 H-Reused PRV Schedule Hensel Phelps C—Aoictwn Ca HKS,Inc 3112019 3172019 1 D912 H-PF-012 Deck Mounted tstakation kiemel Phelps Comtruction Co. HKS,Inc. 3812019 4/198019 1 0913 H-Top of Basement Wall W atarpmefing D--.saes Helsel Plelpe Corns—ti-Co. HKS,Inc 328019 3/52019 1 0913R H-Top of Basement Well Waterproofing Discrepancies Hemel Phelps Cortruction Co. HKS,irc 3/222019 4112019 1 0914 P-Sanitary&Vert Pip.Ccnaici @ Glen.Grade Beam H—ei Phelps Cmstnwtioo Co. HKS.lnc, 3!412019 3/8,,2019 1 0915 S-Panel Number,Lease Space.Sign Hsi Phelps Corstrunten Ca- HKS,Im. 3/5/2019 4/252019 1 0917 H-Whirlpool Tub PF.014 Bower Protrusion Hamel Phelps Construction Co. HKS.Im, 3152019 3202019 1 0918 H-Sector G L...15 end up Shaft Location Dsaapancy Hensel Phelps Construction Co. HKS,1— 3152019 3752019 1 D919 H-Level 2$ector K Slab Infill Hemel Phelps Cortruction Go. HKS thin. 3/52019 3182019 1 0920 H-Level 4 Walkway Canopy Missed Embeds Hemel Phelps COM10uC110n Co. HKS,Ino. 3152019 3/112019 1 U921 S-Eliminate Fans at Resort Pool RR Building Hemet Phelps Cohd runmi,Co. HKS,Inc, 3/512019 3/182019 1 HENSEL PHELPS 201512`"3 Plan. Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subjact Author Company Answer Company Date Cneatad Date Responded Closed? 0922 H.P.C,-Eaton VE BOH and Typical non-LT PCH Fixtures Hensel Phelps Construct-Co. HKS.1 r 3/612019 3/192019 1 0923 H,P.C,-SOH Plumbing RMure Selection aria Location Hensel Phelps Comtmcton Co. HKS,Inc. 31612019. 4/8/2019 1 0924 H-Level 4 South Side J/K Mssed Embeds Hensel Phelps Cor st—tiem Co. HKS,IMI 3162019 3=019 1 0925 6-Elimination&Fire Features Hensel Phelps Construction Co_ MKS,Inc. 3/6.2019 37132019 1 0926 H-Passenger Elevate deck Wall Pattern Deletion Hensel Phelps Construction Co. HKS,Inc, 3!612019 3/82019 1 0927 H-S. Side Curtain Wall Backup Steel Orientation of Embeds Hensel Phelps Construction Co- MKS,Inc. 3/5!2019 3/132019 1 0928 M-Level4 Sector G VFCU Blockout n Conflict oath Structural Seam Hensel Phelps Construct-Co. MKS.Inc. 3/6/2019 3!82019 1 0929 H-Double Cut Carwpy HSS Column to Deck Connection Hensel Phelps Constructor Co. HKS,Inc, 3172019 32012018 1 0830 H-Domestic Water Sing and Routing Sector L level 9 down to level 7 Hansel Phelps Construebon Cn HKS,Inc. 3172019 32112019 1 0931 H-South Side JIK HSS Columns to Level Embed Hensel Phelps Construction Co- HKS,Inc. -3/72019 3/192019 1 0932 P-Sector X Truss Spice Locations Hersed Phelps Cowa w tion Co- HKS,Inc. 3/72019 3/82019 1 0933 G Escalator Truss Hansei Phelps C. on Ca HKS Int 3(72019 3!192019 1 0933A C-Eecafeton T— Hensel Phelps C.-ucnon Co. HKS.loc, 32720tH 4112019 1 0934 H-Clarification of Rated Wad Pendti at-oa HM2.201.M Hensel Phelps Contrucnon Co. HKS,Inc 3[/2019 3172019 1 0936 H-EIFS Trim Dimensrom fe detail 41MA7.102 Hensel Phelps Construction Co. HKS,Ino 3/7/2019 3262019 1 0936 H-Whirlpool Tubs PF-014 through PF.017 Hensel Phelps Corebridn n Co. HKS,tri 3/72019 11112019 0 0937 H-Pni Wena!Suite PF-012 Faucet Installation Hensel Phelps Construction Ca HKS,Inc 3772019 3252019 1 0938 C-Door C2C-03B Shift Location Hensel Phelps Construction Co. HKS,Inc. 318/2019 31192019 1 0939 P-Motor operated Doors Hensel Phelps Contriutwn Co. HKS.Inc. 3/82019 5132019 1 0940 airoowe C-Retng Wall Dl claw—n— Hensel Phelps Cortructon Co. HKS.ev, 3182019 31152019 1 0941 Seton L level 3 Edge of Deck at Stair HST-O8 Hensel Phelps Construction Co. HKS,Inc 3/8/20193/1W019 1 0942 P-Louver Type t1-14 4 CUP Hansel Phelps Corehucton Co- HKS,be 3/9/2019 3/19/2019 1 0943 P-Mach Shed Pier Cap Waterproofing Hensel Phetps Construction Co, HKS,k4. 3/92019 3262019 1 0944 H-esulaton of Dian Piping Receweg Condensate from Guest—,VFCU's Hensel Phelps Constructed Co. HKS,Inc, 31112019 3/272019 1 0945 H,P.C-Wall Hydrant Hansel Pulps Conshucton Co. HKS,Inc. 3/112019 320!2019 1 U946 H-Holel Lobby Topping Stab Leval 1 Hensel Phaln Construction Co. HKS.In:, 3/112019 3/112019 1 0947 P-EIFS Deign Patterns Hensel Phelps const—len Co. HKS,Mc, 31112019 4/52019 1 0948 H-510 Control Phelps Room Additional Walls H-1 Cortmob-Co. HKS.Inc. 3112019 3/192019 1 0949 P-IWP Deck Frresn Cob, Hensel Phelps Construction Co. HKS,Inc. 3/122019 31132019 1 0950 C-R—sad Parapet H,9N and Added Gravel Stop Hansel Phelps Construction Co. HKS_Inc. 31122019 520/2019 1 17951 H-Lower Rough Opening RequinemeMa Hensel Phelps Conetrai Co. HKS_Inc. 37122019 3/212019 1 0952 P-Beverage Une Laxations Hensel Phelps Construction Co. HKS.Inc. 3/122018 3+182019 1 0953 C-Elewi 1 Device Calors Hansel Phelps Cortrunion Co. HKS,Ins 37122019 3/1312019 1 0954 Sector G HFCU Cie.,.—issues-Ceiling Elevation Hensel Phelps Construction Co. HKS.Mix, 3/132019 4/12019 1 0955 C-Dumpsten Skid Plates Hensel Phelps Contructon Co. HKS.1- 3/132019 1 0956C-Exterior Access Door for Water Soberer H-0 Phelps Construction Ca HKS inc. 3/132019 1 0957 C-Food Service Millwork Hansel Phelps Corffiruct—Co. HKS,Irrc. 311412019 4232018 1 0958 P-SCG in Sector RN Hansel Phelps Cartur tial Co. HKS,Inc. 3/142019 3/18/2019 1 0959 S-Grease Trap Sample POR.VeM.and Detail Hensel Phelps Constructed Co. HKS,Inc. 31142019 3/182019 1 0960 H-Guestroom Plumbing Rxrur� 1ps Conftmabon Hensel PheCortruMon Co. HK5,Inc. 3/182019 41152019 1 0961 H-Express CHWS&R Rear Support Dated at Structural Sbekouts Hensel Phelps Coretructon Co. HKS,Ire. 3/182019 3202019 1 0962H-Low Pressure Reducing Valve Assembly Hens1ps elPheips Comtnaction Co- HKS,Mc, 31182019 3202019 1 0963 H-OA Dun in ConM t wdh Exterior Wad Pedal Jomt at Low Roof Section Wings Hemel PheCortruction Co- HKS,Inc. 3/182019 3/202019 1 0964H-Roof Drain PowBe"BaHensel Phelps Cortructlon Co- HKS,lyd, 3/182019 4/302019 1 0965 H-Level Sectc,K(PRV Room)Pex ening Hensel Phelps Construction Co. HK5.Ins. 3/182019 3/152019 1 0968 P-Sector O Floor 5irdxs Hansel Phelps Constructed Co- HKS,tic 3/182019 311912019 1 0967 S-Landscape Sheet Cl.4—bons Hersel Phelps Comtruotan Co HKS,Mc, 31162019 3/21/2019 1 09138 H-Pabal Schedules Ctai9daton Hensel Phelps Construction Co. MKS,Inc. 3/182019 3272019 1 0969 H-Bess of Monumental Starr Hansel Phelps Construction Co- HKS,do 3/192019 3/272019 1 0970 H-Exposed Corridor Cordues and Ceiling Clanfication Hensel Phelps Cortruenon Co. HKS.Ino. 5192019 4/152019 1 0971 H-Mini Fndgo Location Clanficabon Hensel Phelps Conetnlchon Co. HKS,tic. 3M9£2019 3/192019 1 0972 H-P"sdemal Suite Circudry Helsel Phelps Constructed Co. HKS.Inc. 31192019 3292019 1 0973 P,Panel EHtHLL&Feed Clarification Hensel Phelps Corstrucuon Co. HKS,Inc. 3/192019 3272019 1 0974 H-D—dw.M Attachment to EIFS Hensel Phelps Cortrucbon Co. HKS Inc 31192019 3/192019 1 0975 P-RTU's at FEC 8 fWP Hensel Phelps Construction Co. HKS,Inc. 3/192019 3/272019 7 09713 P-Toe at Water Cooler Wall(FEC) Hensel Phelps Corstruchon Co, HKS.Inc. 3092019 4/12019 1 0977 P-Turnstile Cerxednne Location Hansei Phelps Construction Go. HKS,Inc. 3/19/2019 4132019 1 0978 H-Monumental Stair am Strap Beard Conftct Hensel Phelps Construction Co. HKS.Inc. 3262019 3/272019 1 0979 H-Level 10 Shear wap Sloekouls Sectors G,H.L a M Hensel Phelps Cortrucnon Co. HK5,Inc. 3202019 3212019 1 0980 C-LghtwegM Concrete on SOMD Senor C Hensel Phelps Construction Co. HK5.kin. 3212019 4/172019 1 0981 P-Relocated Perforated Delle To FEC Hensel Phelps Construction Co. HKS,Inc. 3212019 312212019 1 0982 H-Hotel FOH Plumbing Fwtwe Seledlon Hemet Phelps Contruct—Co. HKS,I— 3212019 4/102019 1 0984 H-Level 1 Sector L Shalt Well Offset Horsel Phelps Comtructon Co. HKS,Ire 3212019 4112019 1 0985 S C-N-o Conveltbn Center Rei ,dq Wad Grating Hamel Phelps Corstnuction Co. MKS,Inc. 3212019 4/12019 1 0986 H-Cashier's Area 81-3-01 Wmdovr S¢a Hensel Phelps Coretructon Co. HKS,tic. 3212019 422019 1 0987 P-Aquatltenm Underground Testing Procedure Hensel Phelps Construction Co. HKS.Inc. 3212019 3272019 1 0988 P-Pex Undeg—rd!Ppug Testing Procedure Hamel Phelps Cortrunion Co. HKS,the 3212019 3272019 1 0990 H-Pat—Guestroom Datalis/22 GA SS Flashnng Hensel Pflalps Construction Co- HKS.tic. 3222019 402019 1 0991 H-Roof Hatch Slab Opedgg Hensel Phelps Corsturetr-Co- HKS,Inc. 3252019 3/252019 1 0992 H-Level 2 Sector J Storm Riser Cores Hansel Phelps Cort—lion Cu HKS,tris 3r262019 3272019 1 0993 H-Level South Side JIK Missed Embeds in Pour Strip Hensel Phelps Constructor Co. HKS.knc. 3282019 422019 1 0994 P-Chdad Wu,,Piping Support Hebei Phelps Cartrunan C. HKS,Its. 3262019 422019 1 0996 P-Watenpark Entry Into Retail P10-03 Hensel Phelps Construction Co. HKS,Inc 3272019 42912019 1 0995A P-Wads pabe Ent y IMo Ratad P1D-03)rev 11 Herset Phelps Constructed Co- HKS,Ind. &42019 71242019 1 0997 N-Sector M NonU1 Sde Escada Bump ht Hemet Phelps Cortrunion Co. HKS.Ix. 3272019 4112019 1 0998 H-Door Hardware F,Nsh vs POD Finish Hensel Phelps Comtructon Ca HKS,W. 3282019 4/302019 1 0999 S-Fecal Light Pole Layout Hensel Phalpa Corrshuction Co. HKS,Ince, 412019 41212019 1 1000 P-IWP Tali Window Double Flame Cernedions Hensel Phelps Cortrucnon Co. MKS,Ire, 412019 4132019 1 1001 S-SG1 Tdu Torch Final Locations Hensel Phelps Construction Co. MKS,Ino, 4241019 1 1002 H-Level 7 Sector L Vent Line at Egwse i Cea sv Hensel Phelps Cortruction Co. HKS,Inc. 4112019 4112018 1 1003 S-Landscape and U9ht Pefe Receptacle L_ars Hansel Phelps Coretruebon Ca HKS,tic. 4212013 1 1004 H-Specification Saran 07 76 00 Roof Pavers and Pedestal Assemblies Hansel Phelps C—huction Co- HKS,Ine, V V2019 4812019 1 1005 H-Walkway Canwpy to P9asler Coruiectlon Hensel Phelps Cortrunion Co. HKS.Inc. 412019 4152019 1 1006 H-Sector L SouUl West Elevation Slone Ledge Wrth Corxrele 8ackbcartl Hansel Phelps Comlnucton Co. MKS,Ire. 422019 442019 1 1 W7 C-Trash Room Fire Rating Hensel Phelps Conste b.,Co. HK5,I- 422019 4/872019 1 HENSEL PHELPS GMP Amendment No 1 Attachment 3 2015.12 03 Plan. Build Manage CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 1008 C-Pone Cochere Sgo Clelehon Hensel Phelps Conshucuon Co. HKS,Inc. 4122019 4/172019 1 1009 H-Blo."For Doom Sports Hansel Phelps Construction C., HKS,oro. 41212019 4/1012019 1 1010 H-Waterproofing Coordination a4 Parapet of Panelded Ederror Hensel Phelps C.horo mri Co. HKS,Ins, 412J2019 4/102019 1 1011 S-Event Barn Final Dravnrgs Hemel Phelps Construction Co HKS me 422019 424/2019 1 1013 H-Remaining Hotel RCP Drawings Hensel Phelps Constmetion Co- HKS,Inc. 4!3/2019 4/102019 1 1014 H-Level 11 Shear Wall Blockouts Sector J&K Hensel Phelps C.,efth bon C., HKS,Inc, 4142019 4/572019 1 1015 S,H,C.P-Update H.,,(—.,Door Schedule to Match Submatals Hensel Phelps Constnwaon Co. HKS.Inc. 414/2019 1 1016 H-Stas 8 Level 7 Slab Edge Hensel Plrelps Construntion Co. HKS,Mc. 4/412019 41162019 1 1018 H-Opening T07.AK1 Deletion Hansel Phelps Corshuction Co. HKS,Inc. 4152019 41182019 1 1019 P-Wag Tile Deleted at FEC 6,IWP R.Wooms Hensel Phelps Corutrucfton Co. HKS,Inc. 4152019 4!1212019 1 1020 H.P,C-Stand Alone Mock-Up Cmfamatan Hensel Phelps Construction Co. HK5.Inc. 4/82019 1 102t H-Food Servi. =Duct iropad Hensel Phelps Construction Co. HKS,Inc, 4!8/2019 4!1012019 1 1022 H,P-Floor Expar�on Joint Ciardicatrom Hensel Phelps Corstrueeon Co. HKS,Inc. 4/8/2019 4162019 1 1023 H-Level 1 Sector H Restroom Wall Conflcl-h VAVs Manuel Phelps Construcbon C¢ HKS,1- 4/8/2019 4/1012019 1 1024 H-Walkway Canopy Grade Beam&Pian Hemel Phelps ComWcaou Co. HKS.Inc. 4/812019 4/1212019 1 1025 H-Lobby Oar Step Clarification Hemel Phelps Carstructen Co. HKS,Ins. 4/812019 4118/2019 1 1026 H-Level Sector K Demrstng Wag T.-matron Detatl Hansel Phelps Construction Co. HKS,Inc. 4/8/2019 4/16/2019 1 1027 P-Tele&Stone Facing PanIDon Defl.ctcn Ceitere Hensel Phelps Construction Co. HKS,Inn:. 4/812019 4)172019 1 1028 P-CMU Alternative Attachment Hensel Phelps Construction Co. HKS.Inc. 4/82019 41102019 1 1029 P-Overhead Doors Hemel Phelps Constructlon Co. HKS,Inc. 418,2019 4/1012019 1 1030 H-Pilaster Cast Stone Cap Dlmansions Hensel Phelps Construction Co- HKS,Inc. 4/802019 4/10/2019 1 1031 P-Subsal Drainage Sump PA Dlscharga Routing Hemel Phri Conedmdion Ca HKS.8+c. 41812019 51142019 1 1032 H-Service Elevator Keyed Access Hensel Phelps Construction Co_ HKS Inc. 419/2019 4/102019 1 1033 P-Tumtile S_iy Grdla Hensel Phelps Corstrucaon Co. HKS,Ix, 4;92019 41172019 1 1034 P-Subsoil Sump Prt Electrical Panel Location Hensel Phelps Corsi xl-Co. HKS,Inc. 4192019 422/2019 1 1035 Hensel Phelps Comtr ton Co, 4/102019 0 1037 C-Roof/Floor Separation at Pampers Hemel Phelps Corshucaon Co_ HKS,Inc. 41102019 1 1038 H-Walkway Canopy Embed Layout Hamel Phelps Construction Co. HKS.Inc. 4110r2019 4/172019 1 1039 H-Walkway Canopy Embeds Too High Hensel Phelps Conslnucaon Co. HKS.Inc. V112019 41172019 1 1040 P-Dsletron of HM Frame PlO-12A an d PIQ-120 Hamel Phelps Construction Co. HKS,Mc, 4/112019 471712019 1 1041 H-Hotel Front Er"Walk-Cff Mats Ferri Phelps Construction Co. HKS'Ina 41112019 5/162019 1 1042 H-Countiptacle ng Room ReceCitudoatan Hensel Phelps Corstrucaon Co. HKS.Inc. 4/122 /1320 019 519 1 1043 C-Kaknanjaro Ballroom Wal Bump-ours Hensel Ph.lps C.s mcaon Ca HKS,Inc 4/12/2019 429/2019 1 1044 H-Elevator P2-Pll 0lockort Localrom Hensel Phelps Comrruchou Co. HKS.Inc, 4/172019 5192019 1 1047 P-Chgle l Water Lrres a Mechanical Shed Hensel Phelps Construction Co- HKS,Inc. 4/182019 4118/2019 1 1048 P-Emergeroy Electrical Room P7N-19 AcoesvE4uhs Hensel Phelps Comrroction Co. HKS.Mc. 4/132019 52272019 1 1049 P-FECIIWP Parapet Transom t Detail Hensel Phelps Construction Co. HKS,Inc. 41152019 4/172019 1 1050 P-IW P Cabana EledDala Hemel Phelps Corstruction Co. HKS,Inc. 4/152019 3292019 1 1051 P-Sector O Drains Her"Phelps Construction Co. HKS,Inc. 41182019 41172019 1 1052 P-Ladder Hatch Wall Herne!Phelps Corstructnon Co. HKS.Ino. 4!162019 41192019 1 1053 P-Vapor Banner @ Gro PJ Hemel Phelps Coredn tion Co. HKS,Inc. 41162019 5142019 1. 1054 P-Domestic Water Pipe Riser Conflict with Grade Beam Hersei Phelps Construction Co- HKS,Inc. 41162019 4/172019 1 1055 P-SE-P-1-Pump Dscharge Pipe Material Hemel Phelps CorsUudbon Ca HKS,tic. 4!182019 4118/2019 1 1056 P -FEC Roof Steel Conflict with Hotel LA 4 Concrete Deck Hamel Phelps C.Mur,;tion Co. HKS,Ina 4/162019 41162019 1 1057 P-FEC&IW P Prudery Scuppef&Ovenlow Scupper Hensel Phelps Comtruntion Co. HKS,Inc. 4/172019 4172019 1 1056 P-Wag Tile Deleted at FEC&INJP Hemel Ph.lps C.rsh-barn Co. HKS,Inc. 4;172019 1 1059 H-Electrloal Rooms HIM-07&HI WOl Rated Ceiling Hansel Phelps Construction Co. HKS,Inc 41172019 51232019 1 1050 H-Added Trackened Edge Reinforcement at Timber Columns Hensel Phelps Con udelion Go. HKS,Inc 4/172019 5129/2019 1 1061 H-Beer Dispensing Tourer Domestic Cold Water Supply Hemel Phelps Construction Co. HKS,tic. 4222019 422/2019 1 1062 H-Level Sector H Walk In Cooler Supply Air Location Harrel Phelps Co shueti n Co HKS.Inc 4222019 42272019 1 1063 H-Kitchen Eq.ipment Sink Rolgh In Dimensions Hensel Phelps Coriddo on Ca HKS,Inc. 4222019 4222019 1 1064 P-GC195-205 Dryer and IronerlFokler Makn-Dp Air Removal Hamel Phelps Construction Co. HKS,Inc. 4222019 51142019 0 1065 S-light Pole Spec aro Submittal Dunepan- Hensel Phelps Cemhuction Co. HKS,Mc. 4222019 52272019 1 10%H-Cladding Details Continnetwn Hemel Phelps Construction Co. HKS Inc. 4/222019 5/142019 1 1067 C-Sha"vel Systems at S03 Elevator Hermel Phelps Comtructiar Co. HK5,Inc. 4222019 4/232019 1 1058 C-Fire Wag All Corshuclabd4y al K&manjam Helsel Phelps Construction Co. HKS.Inc. 4222019 6!3/2019 1 1059 H.P.C-HVAC Sequence of Operations vs Plan Sheets Hensel Phelps Construction Co. HKS Inc. 4232019 512019 1 1070 H-Bulletin#2 Flom Bares Clarification Hensel Phelps Comtructr n Co. HKS.Ino, 4232019 6242019 1 1071 C-Dishwasher and Restroom Exhaust Duct Fire/Smoke Dampers Hamel Phelps Construction Co. HKS,Inc. 4232019 4242019 1 1072 H-Love!1 Sector M-DAS Room Equipment Cecwtry Hensel Phelps Coostrue on Co. HKS,Inc. 4232019 1 1073 H-Level 12 Pea Stop between HB8 aro HB9 Hensel Phelps Corstruoa-Co. HKS.Inc 42312019 4232019 1 1074 H-BCM Light Folies Cleric—b— Hemel Phelps Construction Co. HKS Inc 4232019 5212019 1 1075 H-EMenor Door Sig Waterproofing Cla,dlcaeon Henkel Phelps Construction Co- HKS.fns, 4232019 5/142019 1 10715 H-Fire Pump Dockeg Station Hensel Phelps CorfA1=,.h Co. HKS.lrc 4232019 51302019 1 1077 H-Level 1 Sector H lighting Cecumy Hansel Phelps Construc ion Co. HKS,the 4232019 6142019 1 1078 H-Sector K Level 11 Beam Width Along HBK.2 Hensel Phelps Cmistrid d-Co. HKS,1., 4232019 41232019 1 1079 H-Mach usdal Equrpmnrd Power Clenfi-dans Hensel Phelps Corehuctan Co. HKS,Inc, 4232019 5222019 1 1080 C-Calvenlan Centel Sign EIFS Detatl Hansel Phelps Construction Co. HK5.Inc. 4242019 1 1081H-Elevation for Storm Duen Doom Spout Nozzle Horsed Phelps Corstrucaon Co. HKS.Inc. 4242019 5142019 1 1082 H-Rated Waft et Storage Rooms Hansel Phelps Construcaon Ca HKS,Inc. 4242019 4292019 1. 1063 H-South Canopy Timber R.ftarto Steel G.h-eon Hensel Phelps Comrruction Co. HK5.Inc. 4242019 42912019 1 1084 S-New Benchmark Hensel Phelps Construction Co. HKS.ins. 4252019 5232019 1 1085 H-Semno'a Conflicts arc/Elevation Algnmehts Hansel Phelps Construction Co. HKS.kis. 4252019 5232019 1 10435 P-Floor Box Relocation Hensel Ptmlps Construction Go. HKS,Inc. 4252019 5132019 1 1087 H.C-Women's Restroom and Spa L'rs Confirmation Hensel Phelps Construction Co. HKS,Inc. 42x2019 5292019 1 108&P-Hurricane Rated FRP Doors Hensel Phelps Construction Co. HKS,Inc. 4292019 4/302019 1 1089 H-H5T-09 Splash.,B.am Clip Enlargement Hensel Phelps Corsdoet al Co. HKS.Inc. 4292019 5/132019 1 1090 P-Mechanical Shed SOG Finish H—al Phelps Construction Co. HKS Ino, 4292019 4292019 1 1091 H-Sector G Level2 Curb Cable.1 VWntd,P,-f,N Hansel Phelps Corot ucton Co, HK5,Mc, 4/302019 4/302019 1 1052 H-Radial Pilasters al Main Entrance Hensel Phelps Coretnuctron Co. HKS,lc. 4/302019 6162019 1 1 M2 H-Radial Pilasters at Main Erdi-Frarrerg Support 8 Waterproofing Hemel Phelps Construct-Co. HKS,in- 712/2019 71912019 1 1093 H-Dowrspout Conducle,Head Ciduhi alron Hensel Phelps Construction Co. HK5.Inc. 4/302019 511512019 1 1094 H-5 Ninos Tenaca Derck Embed Elevation Hansel Phelps C.'eit ction Co. HKS,Ins. 5/12019 516/2019 1 1095 P,Nasal pot—,Fenders Hensel Phelps Comtruchon Co. HKS,Ire 51212019 5/172019 1 1 096 C-Msalrgned Botts a CO1C4 and CQ/G9 Hensel Phelps Comtrucvon Co. HKS,1- 5212019 522019 1 �) HENSEL PHELPS 2019 12 03 Build. ManageGMP Amendment No 1 Attachment 3 . CONVENTION CENTER RFI LOG Number Su blest Author Company Answer Company Date Created Dare Responded Closed? 1097 H-Sector H Top of Column Anchor Bogs Herne)Phelps Construction Co. HKS,Inc5/32019 5/1312019 1 1098 S-Relocation of UE at Nyumhas Hansel Phelps Construction Co. HKS,Mc, 51312019 5/3/2019 1 1099 H-Sector J Eyebrow Canopy 10—Embeds Hemel Phelps Construction Go, HKS,Mc, 5!312019 5/1312019 1 1100 P-FRP Door and finish CWdoithers Hensel Phelps Construction Co. HKS,Im 5142019 51132019 I 1101 H-Dishwasher Exhaust Duct Wrap Hensel Phelps Corstruehon Co_ HKS,Inc. 5/612019 51612019 1 1102 H-RAF-1-2 Fan Wal VI Hensel Phelps Corstiuclion Ga HKS,too 5/6/2019 5/202019 1 1103 P,H-Aboveground PlumWrg Systems Testing Henkel Phelps Collstruchon Go. HKS.Inc, 5102019 5192ul9 1 1104 H-ECH-3&ECH-7,5 VI Hensel Phelps Construction Co. HKS,Inc. &&2079 512012019 1 1105H.Sector K VTR Hensel Phelps Construct,—Co. HKS,Inc 51611,-019 5/6/2019 1 1106H-Shock Absorber Lo cations Hensel Phelps Construction Co. HKS,lie. 5162019 51132019 1 1107 C-Porte Cochere Vapor Sanier Hensel Phelps Construction Co. HKS,ins. 5/6/2019 5/15/2019 1 1108P-Lgheng Q FEC Sloe H-1 Phelps Construction Ca HKS,Inc, 5162019 $1132019 1 1109 H-Top of CMU Wal Connecaors Hensel Phelps Construction Co. HKS,Inc 55712019 1 11,0 Hensel Phelps Corsiructwn Ga. 5/62079 0 1111 H-FCU Riser Valves Hensel Phelps Construction Co. HKS,Inc. 5162010 51142019 1 1112 C-Missing Dimensions Reyui steel Hensel Phelps Carstrucnon Co. HKS.Inc. 51712019 1 1113 H-Housekeeping H4J-07 PRV Assembly Wall Conflict Hensel Phelps Corstructon Co. HKS,mc. 5172019 5/712019 0 1114 H-Housekeeping H8J-07 PRV Room and Drain Herein)Phelps Consaucaon Co. HKS,Inc. 5/7/2019 51162019 1 1115 H-Level 6-9 Seapr H DQA's Room Layout Hensel Phelps Construct—Co. HKS,Inc. 5572019 51202019 1 1116 H-Level 1 Sector L Shall Waft Not Shove Hensel Phelps Construction Ca HKS.Ix 5172019 5120/2019 1 1117 H-Sesmr G Level2 Steel An*Curtaai Wal Support Hensel Phelps Construct—Co- HKS,Ism. 55772019 5/132019 1 11 t8 H-Sector J1K Washer-Dryer Rooms Dryer F-xhaust Line 6¢e Hensel Phelps Corrstrucvoe Ca HKS,Inc 5!712019 1 1119 P-FRP Door VeMkalich Hensel Phelps Construction Co, HKS.Inc. 517!2019 5(132019 1 1120 C-Slots in Screen Wall Bracing Hensel Phelps Construction Co. HKS.Inc. 5172019 51132019 1 1121 P-FRP Door Confirmation-PIR-03A Hensel Phelps Construction Co. HKS.Inc. 5172019 5+132019 I 1122 H-Sector H Basement Wal Along HA9 7 and HAG Hensel Phelps Construcaon Co. HKS.Inc. 517/2019 6/132019 I 1123 P-Openings PIX-04A and PIX-040 Herne)Phelps Construction Co. HKS,Inc. 5172019 5/132019 1 1124 H-Additional Electric Water Cooler Level 2 S-01 M R—oOm-Petal Hensel Phelps Cohiamkiuon Co. HKS,InC 5172019 5/142019 I 1125 H-Stair 8 Level 8 Opening Too Small Hensel Phelps Ccestnuoaon Co. HKS,Mc. 5/102019 5/162019 1 1128 P-Parapet of rifcailon Hensel Phelps Construction Co. HKS thi 51712019 5/1512019 1 1127 C-Differing Roof System Heights Hensel Phelps Constructton Co HKS.Inc, 5/&2019 5/202019 1 1127R C-1)fiemg Roar System Neighs Hensel Phelps Construction Co. HKS.Inc. 6/142019 1 1128 C-Hollow Metal Frame Wood Casing Removal Hensel Phelps Construction Co. 5/8/2019 0 1129 S-Anes Test Repon 2017-967309 Hensel Phelps Construct-Co. HKS.Inc. 5f&2019 51942019 1 1130 C-MI-i g Dinn—ons for Interior Walk HMnel Phelps Construction Co. HKS.Inc. 5q&2019 5202019 i 1131 H.C-FM200 Suppression System AWN- Hensel Phelps Colstruoton Co. HKS.Ina 5!&2019 5/302019 1 1132 H,P.C-Phwar Assisted Pedestal for ADA Access Hensel Phelps Construction Co. HKS.Inc. 5/642019 5202019 1 1133 H-CFCP Connection to Metal Panel Desalt Cianficaten Hensel Phelps Construct-Go. HKS,Inca 5/6/2019 5212019 1 1134 P-Sealant at the IWP Hansel Phelps Construction Co. HKS.Inc. 5/912019 51172019 1 1135 H-Karoo Buffet Changes to BOH Ares Hemet Pnelps Construction Co. HK5.Inc. 5182019 $292019 1 1136 P-Exterior Tekt—Coat Colors Henssi Phelps Corstructlon Co, HKS,be 5/8f2019 5212019 1 1137 H-5 Ni@os Terrace Parapet Contact Gaerficaaon Hensel Phelps Const,--Co- HKS,Inc. 51&2019 51212019 1 1138 P-CMU Wal Height Glarificat- Hensel Phelps Construction Ca HKS,Inc 51912019. $202019 1 1139 H-Door Schedule 0—pan— Hensel Phelps Construction Co. HKS,Ike. 5192079 611&2019 1 1140 P-Potycarbonara&U9hf Gauge Framing D-1 Hensel Phelps Corshootbb Co. HKS,Inc. 5/9/2019 1741 S-Ertarwr Light Fmure Alec Stock Requirements H-1 Phelps Coristrucaon CO. 5/912019 1 1142 P-CUP Pressures Hensel Phelps Construction Co. HKS,Inc. 5IW2019 5)122019 1 1143 H,P-CUP and Hotel Podium Natural Gas Rag,".,Vehang Requirements Henkel Phelps Corsbuceon Co. HKS,Inc. 5192019 5114/2019 0 1144 C-Exhaust Fan 8ackdnaft Dampers Hensel Phelps Cohsluxaon Ca HKS.Inc. 5/102019 1 1145 H-Level 1 and 2 Receptacle and J-0-L—bons'X and Y Dimensions Hensel Phelps Construction Co_ HKS,Inc. 51102019 0 1146 H-FOH Light Future Clarification Hansel Phelps Construction Co. HKS,krc. 5/1912019 61112019 1 1147 H-Restaurant Light Foot—Clarticatwn Hensel Phelps Co-huchon Co. HKS,Inc. 5/132019 5612019 1 1148 H-Cup Roof Power Hensel Pinatas Corstruchon Co. HKS,Inc. 5/132019 5/292019 1 1149 H-FD UPS Panel Hensel Phelps Construction Co. HKS,Inc. 5/132019 5202019 1 1150 H-Elevator Controller Onelme Designations Harrel Phelps Cwmtrucaon Co. HKS.Inc. 6/132019 615/2019 1 1151 H-Exrenor Lighting Clarification Hensel Phelps Consuor bon Co. HKS,kx. 51132019 5!302019 1 9' 1152 S-Landscape Dram Fall Hensel Phelps Construction Co. HKS.Inc. 5/1312019 1 1153 P-Cababe Lncaaons Hensel Phelps Corshucton Co_ HKS,Inn, 5/132019 5/222019 1 1154 H.P-Chiller Eled—I Control Certar Relocation Hensel Phelps Construction Ga HKS,kw, 51132019 5228019 1 1155 H.S-Leve11 Sector L Pate Dr klers Hensel Phelps Construction Go. HK5,Inc. 5/142019 5232019 I 1156 H-Last Bae Wall of Canny Adjustment Hensel P tips Corttrucaon Co. HKS.the. 51142019 5123.2019. 1 1157 S-Signage Electrical Reci-paints Hensel Phelps Construction Ca HKS,ktc 5114/2019 1 1158 C-Reraiiarg Well Waterproofing Hensel Phelps Constructen Co- HKS,Inc 51142019 1 1159 H.C-Expareno Joni Transition at Level 2 Hensel Phelps Corstao rob Co. HKS.Inc. 5/142019 1 1160 P,Lghm..g Protection Q IWP Hensel Phelps Construction Co. HKS,Inc. 5/152019 5212019 1 1161 S-Concrete Encasement at Nyumbas Hensel Phelps Construction Co. HKS,Inc. 5/152019 5292019 1 1162 H-Level 1 an42 Sad.,M-Aboveground Plumbing Systems In Wal Tasting With Au Hensel Phelps Construction Co. HKS,ft51152019 5288019 1 1163 P-Stair PST-5 Slab Openings Hensel Pn ilps Construction Ca HKS,me 6(152019 5232019 1 1164 H-Egwsed Plimrxng Rnhis at Room H4J-11 and H&K-08 Hensel Phelps Construct—Co. HKS.Inc. 51152019 51238019 1 1165 P-Food service reeds Hansel Phelps Construction Ca HKS,Inc 5/162019 5262019 1 1166 C-Level 20ve1tead D-1 Waterpenfing Hensel Phelps Construction Co- HKS,Inc. 51182019 5/212019 1 1167 C-Fee Restive JOat Fkestoppeg Claofkafwrm Hensel Phelps Construction CO. HK$.hi:. 511&2019 5212019 1 1168 H-Exterior Masonry Joint$ealant Color Harrel Phelps Construction Co. HKS,Inc. 5/162019 5212019 1 1169 H-Fire Rating of OF Room Wells Hensel Phelps Construction Co. HKS.Inc. 5)178019 5/302019 1 1170 H_P.C-Relef Aa Fan Press—S.—Local— Hansel Phelps Corstrucaan Co. HKS,Inc, 51172019 521/2019 1 1171 H-Framed in Place EIF5 Reveal Clarification Hensel Phelps GOnstruCtlon Co. MKS,9e, 5/172019 5212019 1 1172 C-01_4 Light Specrhcaton Hensel Phelps Construction Co. HKS,Inc. 5202019 $12312019 1 1173 Hensel Phelps Construction Co. 5202019 0 1174 H,P,C-Sump High Leval&Daneshc Water High Pressure Alarm Setpoul Hensel Phelps Camtruction Co, HKS,Inc. 5202019 51302019 1 1175 C-Additional Missing Dimensions Hensel Phelps Corstru.,db Co. HKS.ft. 5212019 5298019 1 1176 P-IWP Underground Clafieation Henset Phelps Construct-Co. HKS,9tc 5212019 5/22120191 1177 P-RTU-P-700 Location Conflict Hensel Phelps Construction Co. HKS,Inc. 5212019 5/222019 1 1178 Henkel Phelps Construction Go. 5228019 0 1179 P-SemHary Dnaw P-Trap Location Hersel Phelps Construction Co. HKS,Mc 5222019 6/312019 1 11 80 P-Piping Material Q Zulu Chile Clanfipatnn Hensel Phalle Construction Co. HKS,Inc. 5222019 5/222019 1 HENSEL PHELPS 2015.1203 Plan. Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Data Responded Closed? 1181 H-CHI 5&CH19 VFCU Rser Runow Sizec9 Harass/Phelps Const—h-Co. HKS,Inc 522/2019 5/22/2019 1 1182 H-Plate Added to Vertical Channels Hemet Phelps Construction Ca HKS_Inc. 51222019 5292019 1 1183 P-Roof Framing Detail a PJ HerseiPhelps Comhuch"r,C. HKS,Inc. 5222019 &232019 1 1184 H-Mechanical Plpirg Riser Sprang iscitac a Wall Conflict Hensel Phelps Construction Co. HKS,Inc. 517212010 &4/2019 1 1185 H-Tamale Condrot Locators Hensel Phelps Construction Co. HKS,Inc. 5222019 611012019 1 1186 Hereof Phelps Conshui Go, 5122/2019 1 1187 H,P.C-Dis"sheu Exhaust Fan HOA Switch Hensel Phelps Construction Co. HKS.Inc 523/2019 528/2019 1 1188 H-Added Hard Utl in Electrical Room H1J-37 Hensel Ptlels Cors==.Co. HKS.Inc. $232019 6/312010 i 1189 H-3"Vert Line Termination at Level 4 Sactor J Hersey Phelps Construct-Co. HKS,Ix 523/2019 5292019 1 1190 C-BOH Fmish Schedule Clarifications Hensel Phelps Corstru f-Co- HKS.Inc, 5232019 1 11908 C-BOH Fbush Schedule Ctarnkations Helsel Phelps Construction Co. HKS.Ime, 6!112019 72201$ 1 1190" am 1 C-BOH Plastic Laminate Clerifinetion Hensel Phelps Construction Co. HHS.Inc_ 7/3112019 0 1191 S-Water Line Relocation Hansel Phelps,Construction Co. HKS,Irk. 5/242019 6!712019 1 1192 P-Joint Sealtim(M.—S-1 NP2) Hensel Phelps Construction Co. HKS,Ix. 528/2019 528/2019 1 1193 H-Level 11 Sector K Ice Machine Hemel Phelps Coretrtretlon Co. HKS,lac. 5282019 6292019 1 1194 H-Level9 Sector G Due Riser Fire Damper Conflict Hensel Phelps Construction Co. HKS,Ihc. 5282019 5/292019 1 1195 H-Deletion of Acoustkel Ceiling Tile at BOH Hensel Phelps Construction Co. HKS,In. 529/2019 6/12/2019 1 1196 H-Sink at ADA Guest Su4es Hamel Phelps Construction Co. HKS,Inc. 5292019 &122019 1 1197 H-Sector G Level 6 Missed Drift Track Hensel Phelps Construction Co. HKS,Inc, 5/302019 51302019 1 1198 H-HVAC Bwkixg Controls Camhcatrone Hensel Phelps Construction Co. HKS.Inc, 5/30/2019 616!2019 1 1199 P-EAe Design O"xnerlson Clarification Hemel Phelps Construction Co. HKS,Inc. 5/302019 &312019 1 1200 H-BOH Paint and Plywood Clarification Hensel Phelps Construction Co. HKS.in. 5/302019 712/2019 1. 1201 H-Double Cut Lower Clash Harsel Phelps Construction Ca. HKS.Ins. 573012019 6/52019 1 1202 H-Domestic Water Clarfion cahSector L era M-Levels Hensel Phelps Corstruchon Co. HK$,plc. 5/302019 5/312019 1 1203 ns H.P,C,S-CO Detection at Gas Fire Equipment Heel Phelps Construction Co. MKS,ft 573112019 1 1204 H-2.000 CFM Smoke Detectors Hemel Phelps Construction Co. HKS.Inc. 5/312019 1 1204A H-2,000 CMM Smoke Detectors Is,FP-VAV Hensel Phelps Coretruchon Co. HK$.Inc. 61112019 1 1205 H-Starr Pre—harem FOP Sv itchinm g Mecbasm Hensel Phelps Construction Co. HKS Inc. 5/312019 1 1206 H,P,C,-Fire Smoke Dampen Monitoring Requirements Hensel Phelps Construction Co. HKS.Inc. 5/312019 1 1207 S-Deletion of Electrical Sleeves Hensel Phelps Construction Co. HKS,Inc. 51312019 6M 112019 1 1208 H,P-Condenser Water Pump and Caching Tower D—F, Hemel Phelps Construction Co. HKS.Inc. 51312019. 6!112019 1 1209 H-Sector K Level 12 CHWSlR Rowing to OAHU-12.1 Hensel Phelps Construction Co. HKS,bps, 5812019 61182019 1 1210 H.Sector H Cahnnn Embed Elevations Hensel Phelps Construction Ce. HKS,Inc. 5/312019 6N 02019 1 1211 H-Level i Sector H-HFCU-D-20 Runout Sarong Hensel Phelps Construction Co. HKS.Inc. &112018 6/3/2019 1 1212 P-Cooling Tower Basin Heater Cordroler Enclosure Hensel Phelps Corstrucuon Co. HKS,Inc. 6112019 6!42019 1 1213 S-Retaining Wall Material Change Hansel Phelps Construction Co. MKS.Inc. 3/3/2019 6/142019 1 1214 S-Everlt Sam MEP aro Fan Clanfrcatror» Hensel Phelps Construction Co. HKS.1— 61312019 6/272019 1 1215 S-Waterpark Electrical StwbOri!Locatims Hensel Phelps Construction Co. HKS,Inc, 6/3/2019 6162019 0 1216 H-Level 9 and 10 RCP Clarification Hemel Phelps Construction Co. HKS,Inc. 6/32019 1 1217 C-Misloceb dl FokLrg P.nef n Embeds Hansel Phelps C.Muicbon Co. HKS,Inc. 6132019 &112019 1 1218 P-Cobb of Joint Layout Hensel Phelps Construction Ca HKS,Inc 6142019. 1 1219 H-Missed Embeds at Level 1 Service Elevatcas Hensel Phelps Construction Co. HKS.Mc. &472019 611 tN2019 1 1220 P-Sector N Restroom-Proposed Reuse Shed Sae Hansel Phelps Construction Co. HKS,tic- 6142019 6142019 1 1221 H-Mined Lobby Bar Ramp-Sector K Hensel Phelps Construction Co. HKS.Inc 6742019 6/122019 1 1222 P-Sector N Con dor Wal-Proposed Reuse SlW Sae Hensel Phelps Construct—Co. HKS.Inc. 6/42019 6/42019 1 1223 Leval 2 Sector G-J-dor Room H2G-05 Hansel Phelps C-ah.ction Co. HKS,Inc 6152019 8/122019 1 1224 H-Wall Type at Servko Elevators with Tube Steel Hemel P"ps Conetruction Co. HKS,Inc. &52019 61112019 1 1225 P-Furfdown a 8awkng Alley Hensel Phelps Construction Co. HKS,the. 6/&2019 6/112019 1 1226 H-Horse Pump Dscorvscte Hensel Phelps Construction Co. HKS,ak. 6152019 6/14/2019 1 1227 P-Svairdase Steel Minors Q Water Park Hensel Phelps Coret—ton Co. HKS.Inc. 5512019 &112019 1 1226 H,P-HFCU Colt Kit Clanhicahcn Hensel Phelps Construction Co. HKS,1— 615/2019 6/62019 1 1229 P-Additional Supports;Cooling Tourer Hensel Phelps Construction Co. HKS,Mc662019 6N"12079 1 1250 P-Sector 0 CMU Curb Clash Hemel Phelps Construction Co. HKS,Inc. 6/512019 6,i112019 1 1231 H-Missed Embeds on Leval 4 Sector H Hensel Phelps Construction Co, HKS,1— 6162019 &10/2019 1 1232 G-Ballroom Doors Hensel Phelps Construction Co. HKS,Irk. &&2019 &242019 1 1233 H-Roof OAHU Cad Pull Zones Helsel Ptmlrs Cnrstruchon Co. HKS,IM. 6/62019 &112019 1 1234 P-Extenor Wall at Plan West WxIV 2nd Floor Oack Hensel Phelps Conetruwfon Co. HKS,Inc. 61&2019 61112019 1 1235 P-FEC Expansion Joir4®PJ Lme Hensel Phelps Construction Co. HKS,Inc. 61772019 &112019 1 1236 P-Sector N Elevator Spreader Beam Hansel Phelps Corstructron Co. HKS,tic. 6112019 6/72019 1 1237 P.0`L_ •B-L_Supply gnle Steel Clash Hensel Phelps Construction Co. HKS.Inc 6772019 &2012019 1 1238 H.P.C-AED Cabeat Duantdy and Local..- Helsel Phelps Ccnstruchen Co. HKS,I- &712019 & 20 1919 1 1239 P-R-u-p Door&Man Doors Hensel Phelps Construction Cm HHS,Inc 662019 6202019 1 1240 VOID Hai Phelps Cwetruction Co. 6/7/2019 1 1241 P-FEC Para EIFS Detail Heaset Phelpe Comtructon Co. HKS,Inc. 6/72019 51122019 1 1241A P-FEC Parex EIFS Angle Iron Hansel Phelps Construction Co. HKS Inc 6172019 7222019 1 1241B P-FEC Pere.EIFS Dead Hensel Phelps Corelruetion Co. HKS,Inc. &1/2019 11/52019 1 1242 H,P-Natural Gas Piping C—rileci-d Urrvenartated Aneas Hensel Phelps Conetrucl on Co. HKS.1- 61102019 &17/2019 1 1243 H-Sector J Pop up Roof Deep Beam Hemet Phis Construction Co. HKS,Ix. 61102019 1 1244 C-Mecherocai Equipment Power Reyuremenits Hemet Phelps Cor eruct—Co. HKS,Inc. 6/102019 &20x2019 1 1245 P-Slower Head Locations Hansel Phelps Constructen Co- HKS,1— 61112019 6/13/2019 1 1246 P-Hot Water Temp Hensel Phelps Construction Co. HKS.Ins, 6/112019 6/1712019 1 1247 H-Parapet ant CFCFIOFS Panel In lereactio t Connection Cl.aftation Hensel Phelps Construction C. HKS,Inc. 6/122019 7132019 1 1248 H.P.C-Interior Finish Schedule Clanfiahons-Paint Hensel Phelps Co!ruction Co. HKS Inc. 6/122019 724/2019 1 1249 H.P.C-Irternor Fmsh Schedule Clanfkations-Wall Covenirgs Hensel Phelps Construction Co. HKS,Ins. 61122019 7/24/2019 1 1250H,P.C-;senor Fimh Schedule Clarifications-Tile Hensel Phelps Corstrucion Co. HKS,Inc. 722019 '7242019 1 1251 H.P.C-Interior Fmleh Scheoule Clarifications-Carpet Hensel Phelps Construct—Co. HKS,Inc, 6/122019 7/312019 1 1252 H-ST-1116 Stone Baru%on Lobby Wallis Hensel Phelps Construction Co. HKS,Inc, 6!122019 &212019 1 1253 H-EIFS An Niche Detail at Grade Clenfioatc- Hemel Phelps Construction Co- HKS,l-, 6/12/1019 6242019 1 1254 P_,dont Pt N-19B Schedtde S¢e Hensel Phelps Conetnkaon Co. HKS,Inc. 61132019 1 1255 H-LAI Ramp Slope at Lobby Be,C3anRrcation Hensel Phelps Construction Co- HKS,Inc. 6/132019 &162019 1 1256 P-Roof Decal Clarrteoation Hensef Phelps Construction Co. HKS.Inc 6/132019 62072019 1. 1257 C-Disconnects for Trash Compactors Hensel Phelps Construction Co. HKS,irk. 611420/9 7/92019 1 1260 H.P C-Interior P,r h thedpae CWnfications-Special Frnnsh Hemel Phelps Construction Co. HK5,Inc 6/142019 7242019 1 1261 H,P,C-Inferior Finish Schedule Clarifications-Stone,Simulated Stone 8 Sold Surface Hensel Phelpa Construction Co. HKS,Inc. 131142019 7242019 1 HENSEL PHELPS20191203 Plan. Baud. Manage. GMP Amendment No 1 Attachment 3 L';�D CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed'! 1252 P-Skylyenin hi Curb Preg Hensel Phelps CorstruInc otiort Co. HKS, 671412019 82612018 7 1263 P-Opening at Storage PIQ-23 Hensel Phelps Constructor Co. HKS.k.- 61142019 6/202019 1 1264 H,P-Natural Gas Regulator Saes Hensel PhelpsConstruct-Co. HKS.Inc. 81172019 7212019 1 1265 P-FEC Metal pecking Rrepwfing Hensel Phelps Corstructon Co. HKS,1- 611712019 6202019 1 Op-mg P-Opug Modifications via RFI#1048 Hensel Phew Construction Co. HKS.Inc. 6/172019 W262019 1 1267 S-K—Caps Hemel Phelps C—h.cron Ca HKS,1-, 6/172019 &2012019 1 1268 H-H'2 Future at Sector H Outdoor Seating Area Hensel Pholps Construction CA HKS,Inc. 6117/2019 5262019 1 1269 H-Level 1 Sector G Main Kitchen RR Wag S¢e for Underground Feeders Hensel Phelps CCnstrudion Co. HKS,Inc. 6117/2019 6126/2019 1 1270 H-Karoo Buffet Storage Electrical Raquirmenas Hensel Phelps Construction Co. HKS,Inc. 6!17/2019 71172019 4 1271 H-Level Through 10 Sector J/K Vent Lina Sue Confirmation Hensel Phelps Construction Co. HKS,Inc, 61172019 722019 1 1272 H-PresldeMlat Suite Shower Pan Henkel Phelps Construction Co. HKS,Inc. ..64172019 616/2019 1 1273 H,P,C,-Wood vs MDF Stie and Rail Door Spec Searons Hensel Phelps Comtnuctlon Co. HKS Inc, 6/182019 642712019 1 1274 H-Leve19 Sector J/K Duct Modlicat— Hensel Phew Construction Co. HKS.Inc 61182019 722019 1 1275 H-Level Sector L Domestic Water Lima Exposed Hensel Phelps Cormttuct—Co. HKS,Inc. 6/182019 6262019 1 1276 H-Stone Return at Ah Niche Hemet Phelps Construchon Co. MKS Inc. 6/182019 713/2019 1 1277 H,C-Ovemead Door Re,..- Hemet Phelps Comtrudwn Co. HKS,Inc. 6/182019 6262019 1 1278 P-Location of Remote EPOS Hemel Phelps Construction Co. HKS,a,a 6/182019 7/16/2019 1 1279 H,P,C-Time Clock Details Hensel Phelps C—itruction Co. HKS.Inc. 61192019 61262019 1 1280 H-Chdler W ire Raqurremerds Hensel Phelps C.nstrucbon Co. HKS,Inc. 611&2019 7132019 1 1281 C-Elephant Sign Power Require— Hensel Phelps Construction Co. MKS.Inc. 6/19/2019 7222019 1 1262 C-Mop Sink Sector C Level 2 Hensel Phelps Co+strucbon Co. HKS,Inc, 61192019 81192019 1 1283 H-Level4 Sector K Housekeeping H4K-02 Mop Sink Loon Hansel Phelps Comtrucbon Co HKS.mo, 6/192019 6262019 1 1284 H-Exposed Oomestio Water RAens at Level 6-7 Sector G End Surras Hensel Phelps Construction Co. MKS Ina 611912019 6252019 1 1285 H-ADA Shower Pan Dimemio. Hensel Phelps Corstrucbon Co. HKS,t-. 6192019 722019 1 1286 C-Primary and Ovarfbw Dram Swap Hensel Phelps Cor truction Co. HKS.Inc. 6/19/2019 1 1287 C-Porte Cochere Column Wraps Hensel Phelps Construction Co. HKS,Inc. 6/192019 1 1286 C-Elect-1 Rooms Column Fumng Hensel Phelps Cormtruutnn Co. HKS,Inc. 6202019 &262019 1 1289 se C-HoBit/Level 1 Secw'F Hensel Phelps Construction Co. HKS.Inc. 7/3/2019 7/1612019 1 1290 H-Java Coffee Shop."'Marrakech Market Dalebon of Door 8 Wag Type ClaMiat— Hensel Phelps Construction Co. HKS,!no. 6/202019 6/282019 1 1291 P-FEC&RNP Lighting Redeegn Hensel Phelps Cormhuction Goo, HKS,Inc 6202019 9162019 1 1292 H-Sector H Column Anchor Boit Sheared Off Hensel Phelps Gonstruction Co HKS,Inc. 6202019 6212019 1 1293 P-FRP Door Frames Q FEC Hemel Phelps Gorstn.-Co. HKS,tris. 6/212019 7212019 1 1294 H-Cast Stone Support at Art Niche Lirnels Hassel Phefps Corstnsti:Ca HKS,Inc. 62112019 72612019 1 1295 H-Level 10 CHW Roralrg m Sector J and K Hassel Ptrelps Cwstruch Co. HKS.Inc. 6/242019 7132019 1 1296 H-Cearg HeigM Clanfl:ation Air Rwanda Klchen Hensel Phelps Cormtnut]ion Co. HKS,mc. 6242019 7=019 1 1297 H-Gap Under Doors at Stalls 5&7 Hamel Phelps Construction Co HKS Irk- 6242019 7132019 1 1298 P-e-Uu Restaurant Perimeter Well Hensel Phelps Construction Co. HKS,Inc. 6242019 71912019 1 12%P-FEC doors 17'Walla Hensel Phefps Construction Co. HKS,Inc. 6262019 0 1300 P-Architectural RO Size Increase for CT Lauver Hemel Phelps Construction Co. HKS,Inc, 6252019 7132019 1 1301 C-CIF-24 Sv oij Change Hemel Phelps CcrstruotwnCo. HKS,fr c. 6252019 71320tH 1 1302 H•Porte Cochere C.—cror Roof W St—tur�Support Hensel Phelps Constructon Co. HKS lx. 6252019 7/2/2019 1 1303 H-Ter/azzo Curb at Guardrail Above Lobby Bar Hensel Phelps Construcdnn Co. HKS,Inc. 6262019 7132019 1 1304 P-FEC Doors in 12'Metal Framed Walls Hemel Phelps Construction Co. HKS.Inc. 6262019 7132019 1 1305 H-CMNer Refrgeram Mondor Hensel Phelps Construction Co- HKS,kit, 6262019 71162019 1 1306 P-Polycarbonate Light Gauge Framing Detail Hemel Phelps Conarucbon Co. HKS.Irc. 81262019 7212019 1 1307 6-8 Removal Hensel Phelps Construct-Co- HKS,Inc 8262019 0 1308 P-Sv.+m Suit Etdractw Drain Pipe Routing Hermes Phelps Construction Co. HKS,Inc. 6272019 5`512019 1 1309 H-Washer and Dryer Room Receptacle Clanacatlon Hensel Phelps Construction Co. HKS,Inc. 6272019 7/8/2019 1 1310 C•Waterproofing Detad at Stone/C,ne—ll Hensel Photos Construction Co. HKS..Inc. 6262019 1 13'11 H-Guest—Controls Confiner- 711/2019 0 1312 P-HVAC Grille Locations Hensel Phelps Cmstruction Co. HKS,Inc. 7=19 7122019 1 1313 H-ManakesRCahrg Soffit Dated ClarficaWns Hemel Phelps ColsVuction Co. HKS,Inc, 722019 7/162019 1 1314 S-A iflot"nAn hers Hensel Phelps Corsuoobon Co. HK5,Inc. 722019 722019 1 1315 H.P C-Terrazzo Fl—mg Desgn Conflmation Hensel Phelps Construction Co. HKS,ire 7122019 7/1&2019 1 1316 P-MUAF-1 Duct Ins.1- Hensel Phelps Construction Co. HK5,Inc 7/2/2019 7/3/2019 1 1317 H-T07 Oper ng Removal Hemel Phelps Corsuuct.on Co. HKS,Inc. 7132019 7/312019 1 1318 H-Marrakesh B-FWB-1 Tay Designation Hensel Phelps Construction Co. HKS.Inc. 713/2019 7182019 1 1319 H-Door Type Charges tie"'S ar Submittal Hermes Phe1Pe Construction Co. HKS,Inc. 7/3/2019 1 1320 M-5 Ninos To—.Roof Deck Toppi g Slab C.pfi—tical Hemel Phelps Construction Co. HKS,11, 7/3/2019 7/16/2019 1 1321 H-Door Charges as per Frelms Meatug Hensel Phelps Colstructlon Ca HKS.Inc- 713/2019 )242019 1 1322 H-Leve14 Sector G H .and K Domestic Water Rear Valve Access Door Coordination Hensel Phelps Comtrucbon Co. HKS,Inc. 7!32019 1 132'H-Reds Pan.Gelling Clarification Hensel Phelps Corutrucbon Ca HKS,Inc, 782019 7!182019 1 1324 P-Fund.—®B—l"s;Agey Design Hensel Phelps Construction Co. HKS,Inc 7182019 1 1326 P-Fir stopping (0 PJ Lund Hemel Phelps Comtiuctin Co. HKS,Inc. 7182019 7/162019 1 1327 H-Bulletm 04 Main Kitchen Hose Bib Conarmauch Hemel Phelps Construction Co. HKS,Inc 7/8/2019 7/82019 1 1328 H-Sector M R Server Room H1M-04 Fan Cotl Una Locetnn Adjustment Hensel Phelps Coratruchon Co. HKS,Inc. 7IW2019 71152019 1 1319 C-SO Light F,d.a D,—osuns Hemel Phelps Construction Co. MKS.Inc. 7/612019 722/2019 1 1330 H-Lobby&Spa Concrete Bench Removal Hensel Phalps Cotstnrction Co. HKS,ktc 7/6/2019 7/172019 1 1331 H-80H Finish Schedule Clarifications Hensel Phelps Cormtructipn Ca HKS,tiro. 71&2019 7/26,2019 1 1332 P-AMU-1 RAS-1 Hemel Phelps Construction Ga. HKS,I— 7/82019 &82019 1 1333 H.P-Hotel Pool—&CUP Piping Drain Pan Co Nt maucn Hensel Phelps Construction Co. HK5.Mc. 718=19 7/152019 1 1334 H-Hotel Room Numm,mg Clarmcatnn Helsel Phelps Corstrunt—Co. HKS,Inc. 77&2019 8/6/2019 1 1335 H-Expoeed OW Lies on Level 7 Sector L Corridor Haenel Phelps Castruc8on Co. HKS I— 7/8/2019 7/162019 1 1336 H-Mosaic Ttle Around Columns at Main Lobby and Lower Lobby Hemel Phelps Construction Co. HKS,Inc. 719/2019 1 1337 H-A6 FuI Hal"Wag at Mbing/Mtroo t,R—os Morsel Phelps Construction Co. HKS.1- 7792019 71172019 1 1336 H.P C-Knox Box Locations Haenel Phelps Cotstmedon Co. HK5.Inc. 7/1020198/5U019 1 1339 S,C-Loading Dock Footing Light Put.Conflict Hensel Phelps Cunt—Co. HKS,Inc. 7/102019 71152019 1 1339.0001 H-Double Cut Elevation Detail Design Cianficetiom Hensel Phelps Construction Co, 8112019 1 1339.A H-Double Cut Elevation Dem!Deetgn Clarifications Hensel Phelps Construction Co, HKS,Ino W1/2V19 1 1340 H.P.C-2—r Flosh Schedule Cfarenati—-Plastic Laminate Hemel Phelps Construction Co. HK5,inc. 71102019 1 1341 H,P.C- e,'r Fatmh Schedule Cie d:abon-Wall Panel Hensel Phelps Construction Co. HKS Inc 7!102019 7/292019 1 1342 H-Level 11 Sector J&K Dud Modification Hensel Phelps Carshuccon Co_ HKS,Inc, 7/102019 71152019 1 1343 Hemel Phelps Construction Co. 7/112019 0 1344 P-Women's Changing Room P1Q-21 Vent Ur1es Memel Ph®Ips Construction Co- HKS,Inc, 7/112019 7/182019 1 1345 H-Presidential Suite Soffit Extcvsmn W Conceal Pipes Hensel Ph."Construct—Co. MKS,Inc. 71112019 7/2212019 1 HENSEL PHELPS 201912r3 Plan, Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 1346 H-Level 10 Sector)Condensate Drain at BOH Sennce Elevator Lobby Hansel Phelps Construction Co. HKS,Inc. 7/1712019 71152019 1 1347 H-Level 9 Sector J&K OAHU Condersare Drain Routing Hensel Phetps Comtnaction Co_ HKS,Inc. 7/112019 711512019 1 1348 C,S-Sector C Basemenrt Wall Exposed Waterproofing Hensel Phelps Co. HKS,Inc, 7/112019 71232019 1 1350 H-Single Py Membrane Roofing Vapor Retarder Gelation Hansel Phelps Construction Co_ HKS.Inc_ 7/12/2019 7/162019 1 1352 P-Deletion of Plaster at Zulu Grill Hensel Phelps Construction Co_ HKS,Ins. 8/202019 &212019 0 1353 H-Puestroom Control Systems Confirmation Hensel Phelps Construebon Ca HKS,Inc 7112/2019 1 1354 P-EIFS Color Change Hensel Phelps Construction Co- HKS.Inc, 7/14/2019 7/162019 1 1355 H,P,C-12Dv Fife/Smoke Dampers Hensel Phelps Construction Co. HKS.Inc. 7/152019 7/152019 1 1356 H-Double C ut am Presidential Suite Fireplace Clarification Hensel Phelps Construction Co. HKS,Inc. 71512019 1 1357P-Trench Drain S2mg a Zulu Is Dry Storage P1 Y-04 Hensel Phelps Construction Co. HKS,Inc. 7/152019 1 1368 H-Single Pty Membrane Roofing Detail at Parapet Clarefcabon Hensel Phe"Costrutdn Co. HKS,Inc- 7/15/2019 7/23/2019 1 1359 H-Expansion Joint Cover Plate Mapficaton Hersh Pheeps Construction Co. HKS Inc. 71152019 7232019 1 1360 H-Leve19 Duct Modifoabons Hensel Phelps Construction Co_ HKS,Inc. 7/162019 7/222019 1 1361 H-Deletion of Counter Top and Partition Support Steel Hansel Phelps Construction Co. HKS,Inc. 7162019 7292019 1 1362 H-Level i and Leval 2 Lobby Columns Clare/icaton Hese)Phelps Construction Co. HKS.Ina. 7162019 8/612019 1 1362A H•Level t and I.eve!2 Lobby Columns Clertxabon-Kalahari Additional Comments Hensel Phelps Corstrutdn Co. HKS.Inc. 7162019 &212019 1 1363 P-Thema Elements and Furr-dovm m sector O Hmsel Phelps Construction Co. HKS,Inc, 7/172019 9/3/2019 1 1364 H-Single Pry Membrane Roofing Equipment Curb Detail Hensel Phelps Comtru lion Co HKS.111, 7/172019 72212019 1 1365 P_ Hensel Phelps Construction Co. HKS,Inc- 71172019 1 1386 H-Level i Sector M BCH Walls Confirmation Hansel Phelps Construction Ca HKS,ksc - 771812019 72512019 1 1367 H-Radial Pilaster Delete at Main Entrance Hensel Phelps Cors[ru=Co- HKS.frit. 7/182019 7/182019 1 13M H.C-Hotel and Convention Carter Egamion Jars Detail Modificabon al Laval Hansel Phelps Construction Co. HKS.kx, 7/182019 724/2019 1 1369 P•Overhead Door at Sector Q Hensel Phelps Construction Co HKS,lc. 7/192019 7/242019 1 1370 C-Video Wall Claribcabon Hensel Phelps Construction,Co. HKS,i- 7/192019 8121/2D79 1 1371 P-IWP Sign Rebcetwn Hensel Phelps Construction Co. HKS,Inc 7/192019 10/152019 1 1372 P-FEC Power Sources for EF4 and EFS Hensel Phelps Construction Co. HKS,Inc. 7202019 7/232019 0 1373 H-Level 1 Senor K Camera in Storage Room Clarification Hemet Phelps Costru lion Co. HKS,Inc. 7222019 7292079 1 1374 H-Level 10 Sector K CHW Routing Confirmation Hansel Phelps Construction Co. HKS,Im 7222019 72212019 1 1375 H-L2 Senor G 10 Sween Location Herwel Phelps Construction Co. HKS,loc. 7222019 &52019 1 1376 H-Lower Lobby Speaker Locations Hemef Phelps Costrucbon Co. HKS,mc, 7222019 821/2019 1 1377 H-Desert Ouse.Side Gn le Relocation Hersel Phelps Construction Co. HKS,Inc. 7/222019 &612019 1 1378 H-Level 9 Seem,M Ertl Suite DW 8 Level 7 Sector M CW Lines and Ceiling C1.11I anon Hensel Phelps Const—bon Co. HKS,Inc. 7232019 9212019 1 1379 P-AHU-P-1 Supply Duct Hensel Phelps Coratruction Co. HKS,knG 7232019 72412019 1 1380 H-Pre-Apply Traffic Coaling at 8a1cordes Dimension Hensel Phelps Construction Co. HKS,lie. 7232019 7252019 1 1381 H-BOH Restroom*11K-16 Hamsi Phelps Corstruton Co. HKS,Inc. 7232019 71252019 1 1382 C-Business Center Inerm"on Display Hese[Phelps Construct-Go HKS,Ina 7232019 1 1383 H-Sector J-K Storm Drain Reroute to Avod South Canopy Steel Hensel Phelps Construction Co. HKS,IM, 7242019 71262019 1 1384 H-Addmomil Plates for South Carmpy,Support Steel Hamel Phelps Construction Co- HKS,Inc. 7242019 8,72019 1 1386 C-East Entry Curtain Wall Conflict Hansel Phelps Construction Co. HKS,Int. 7252019 7252019 1 1386 H-Veda7l Fan Cod Une Supp"SuppHensel Phew Construction Co. HKS,lx, 7*52019 72&2019 1 1387 H-G--.Reatrooms Overhead PEX R-Branch Routrlg arid Suingrn Suing Conhranei on HenrPhelps Construction Co. HKS.Inc. 7252019 422019 1 1388 tight Pole Vibration Damperiers Hensel Phelps Construction Co. HKS,Inc, 7262019 1 1389 H-Level 10 Sector J 5creen Wall Embed Misplaced Hemel Phelps Construction Co. HKS,IM. &92019 &132019 1 1390 C-CIF 24 Conference Room Door and Lrte Clarddatron Hansel Phelps Construction Co. HKS.Inc 7272019 9/52019 1 1391 H.P,C,S-Audio Speakers Dasy Chain 6 OF Room Clareieaton Hensel Phelps Construction Co. HKS,Inc. 7292019 61282019 i 1392 H-OA Gr41e at Guestoom Conkdors Height Confirmation Hensel Phelps Construction Co. HKS.Inc. 7/302019 &12019 1 1393 H.P,C-Intend,Finch Schedule Gianhcabons-Wood Hensel Phelps Comlru lb Co- HK5,Inc. 7/302019 8162019 1 1394 H-Digital Files for EFIS and Custom Wall Coverings Hansel Phelps Construction Co. HKS,Inc. 7/302019 &212019 1 1395 H-C-04 Shaft Wag at DC Guesuoom Confirmation Hensel Phelps Construction Co. HKS la. 7!3012019 aw019 1 1396 P-Future Watenpark Raceways Hensel Phelps Construction Co_ HKS.Ua- 71312019 &52019 1 1397 H,C-ForklifWallet Jade Charging Station Hensel Phelps Construction Ca HWS,Inc. 71312019 &62019 1 1398 H-Curb for Roof Manifold and Valve Hensel Phelps Construction Co- HKS,Inc 77512019 8/62019 1 1399 H-C.,".Cut Elevation Detail Design CUnficabore Hensel Phelps Corstruton Co. HKS.Inc. 7/312019 6/12019 1 1399.A H-Double Cut Elevation Detail Design Clarftistlons Hansel Phelps C.,sen,lion Co. HKS,Inc. 8112019 10/142019 1 1400 5-Light Pole and!Communication Duttbank Discrepancy Hensel Phelps Comlruction Co. HKS,Inc. 7/312019 1 1401 H-FdrieaCeukr Door H1K-29AChangas Hemel Phelps Curstrution Co. HKS,Irx. 8112019 10/82019 1 1402 H-Guestroom and Condor LT Lighting Clandcations Hansel Phelps Construction Co. HKS,Int 8112019 8212019 1 1403 H-MAlwone and TV at Guestrooms Clarification Hensel Phelps Construction Co. HKS,Inc. 6)1/2019 0 1404 H-Level 1 Sector G Tex Mex Bar Elevabom Hemel Phelps Construction Go, HKS,Inc. 8/12019 &82019 1 1405 S.CC-Event Barn Fue Protection system Hensel Phelps Construction Co. HKS,Inc, 811/2019 &132019 1 1406 G-Atnival Lobby Wells Hensel Phelps Construction Co. HKS,Inc. &12019 1 1407 S.CC-Event Barn Mech.Discrepancy with Strolls Hansel Phelps Corstiuction Co. 8112019 0 14C` P-Indigo Retail C1leckout Desk Courtier Top Thickness Hensel Phelps Construction Co. HKS.Inc 62/2019 W72019 1 1409 C-BOH Restroom Paper Towel Dspenaer Clanifcetlon Hemel Phelps Construction Co. HK5.IM, 8212019 1 1410 H-Zekanaka Retail Layout Ciarif c hon s Hese)Phelps Construcbon Co. HKS,kic. 8/2/2019 9/10/2019 1 1411 H-Stair HST-06 Added Center Handrad Hensel Phelps Construct—Co. HKS,Inc. &212019 8/152019 1 1412 H-5 Ninos Tenaee C—m,ad Support Missed Embeds Hemsel Phelps Construction Co. HKS,Inc. 8152019 8KV2019 1 1413 H-Desert Queen Outlet Roughen Clanfication Hensel Phelps Construction Co. HKS,Inc 65,2019 &6/2019 1 1414 P-Mechanical Shad Embeds for Roof J—M Hetsel Phelps Corstrucbon Co. HKS,Inc. 8/5/2019 &142019 1 1415 P-Senor O Roof Drain Orientation Hensel Phelps Construction Co. HKS,m. 8152019 8/72019 1 1416 P-Joist and Duo Framing Conflict Hensel Phelps Construction Co. HKS,tic. &52019 6772019 1 1417 P-Dud Testing Repolremerts Hensel Phelps C.nalotion Co. HKS,Inc. 8/62019 &92019 1 1418 H,Mechan,eal Room FS Dampef Penetration Hanel Phelps Construction Co, HKS,Inc. 8152019 &72019 1 1419 H-J2 Revised Power 8 Data Roughen Around Elevator Lobby Hensel Phelps Construction Co. HKS.Inc. 8)512019 8/62019 1 1420 mG.H-Double Cut Column Cantilever Past Deck Edge Heel Phelps Corstrutwn CHKS,Inc &62019 &92019 1 1421 H-GD4 Shaft Wad at AQ Guo ,-.,Confirmation Hensel Phelps Comrructi Ca HKS,Inc. &02019 8172019 1 1422 H-Sector J Level 12 Missed Block Out Hensel Phelps C-1,co.n Co. HKS,Inc. &62019 &152019 1 1423 H-Double Cut Canopy Steel Column Top Connection Hensel Phelps Corstruchon Co_ HKS,roc &612019 8/9/2019 1 1424 P-Capping Elevator Shaft Hensel Phelps Construction Co. HKS,lc. &&2019 882019 1 1425 H•Double Cut and Sector H Eyebrow Canopy Bottom of Steel Column Connection Hamel Phe}ps Corstrucbon Co. HKS.Inc. 8162019 8/92019 1 1426 C-Loading Dock Finch Changes Hanel Phelps Construction Co. HKS,Inc W62019 1 1427 H-Gas Lane to South Canopy Fire Pits Hemel Phelps Construction Co. HKS,lc. 8/712019 8/212019 1 1428 P-Skylight Dotal Clashed— Hamel Phelps Costnition Co. HKS,Inc. 6172019 8/82019 1 1429 H-Pilaster Cap and$tune Parapet Flashing Details Clarification Hensel Phelps Comtruction Co- HKS.Inc. 8172019 &132019 1 1430 H.C-Waterp,eohng Delad for Hotel aril Convention Center Expansion Joint Hemel Phe"Ccnavucow Co. HKS,Inc. 8182019 9142019 1 HENSEL PHELPS tots 12 ca Plan. Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Rosporded Closed? 1431 H,P,C,S-AN PP08 Sp—snit Documents ,' '' 7"'1'^ '"z'�' I"' Hensel Phelps Cowtnlction Co. HKS,Ino 8190019 91&2019 t 1432 H-Roller Shade Locations and Poway Requiremards Her" el Phelps Construction Co. HKS.Mc. 8/122019 &222019 1 1433 H-Level 9 Sector K DQ ROOM H9-316 Tub Confirmation Hensel Phelps Construction Co. HKS,Inc, 8/122019 &140019 1 1435 C-Plefunction Wood Ceiling Deletion Hensel Phelps Construction Co. HKS,Ino &120019 &1920tH 1 1436 C-0—,Supplied Light F,Aures Hensel Phelps Co?ruction Co. HKS,Inc. 8112/2019 -107150019 1 1437 C-Ballroom Dt,.Charges C1a0-110n Hensel Phelps Construction Co, HKS.Inc. &120019 9142019 1 1436 C-S",soe Elevators Host Beam Elevabon5 Hensel Phelps Construction Co. HKS,Inc, 8/122019 1 1439 P•FEC Security Camera Height Confirmation Hensel Phelps Construction Co. HKS,Inc 8/1212019 828/2019 1 1440 C-VaWted Drywak Ceiling Cliaftatlons Hensel Phelps Comtructon Co, HKS,Inc. &132019 802/2019 1 1441 H-Porte Cochem Connecta Steal COMM$ Helsel Phelps Cotruchon CO- HKS,km 8/132019 &"192019 1 1442 H-Fi lure Locatlom aria Dimensions at ADA Guestrooms Haase;Phelps Cooshucbon Co. HKS,l-,, 8/13/2019 ar=019 I 1443 H,P,C-Clock Receptacle for Paper Tavel Dispensers Hensel Phelps Construction Co. HKS,Inc. &152019 1 1444 H-Java-Marrakesh DOW—]Rough-in Clar4ica6ore Herne)Phelps Construction Co. HKS,Inc. 8/130019 9192019 1 1445 P•Laundry Equipment L"y Rotgh In C-filmahon Hensel Phelps Construction Co. HKS.Inc. 8/132019 81162019 1 1445.0001 d P-Laundry Equipment Utility Rough In Confirmation Hensel P1,4pe Cormiruohon Co. HKS,Inc. 8/162019 &1612019 1 1445A P-Laundry Equipment Utility Rough In Clenficatiors Hensel Ptelps Cotruction Co. HKS,Inc. &-16/2019 0 1446 H-Level 1 Sector M Hose Bib Location Confirmation Hensel Phelps Comb ucaon Co. HKS,Ire. 8/142019 &2212019 1 1447 H-Ceding,at Ice/Vendag Rooms Hensel Phelps Corshoobon Co HKS,tm 8/132019 81232019 Y 1448 H-Karoo Buffet Storage Lghtiog Layout Hansel Phelps Corstructton Co HKS,Ma 8/1412019 822/2019 1 1449 H-Last late Mop Sink Column Fun Out Modrfication Hensel Phelps Construction Co. HKS.Inc. &142019 914/2019 1 1450H-BC1490H Corridor Fuaure Hemel Phelps Construction Ce, HKS,Inc. 81160019 602/201$. 1 1451 H-Main Kitchen Doe'Type Changes CoiNRmalK Hensel Phelps Constrackon Co. HKS_Ino. 8j142019 9/52019 1 1452 H-VAV Ckr y Clanficahon Hemel Pr Jps Cormrucnon Co. HKS.Inc. &142019 9/10x2019 1 1453 H.H1 G.18 Borrowed Lrte Type Confirmation Hensel Phelps Co traction Co. HKS,Inc. 8114/2019 &1512019 1 1454 H-Zakaraka Retell Storefront Door Clarlfrcahon Hensel Phelps Construction Co. HKS,Inc. 8142019 9152019 1 1455 H-Edenor Signage Ciafkcebim Hensel Phelps Construct—Co, HKS,Mc. 81152019 &182019 1 1456 H.Exposed Steel F,nsh for Porte Coohene 6 Sown Canopy Hensel Phelps Construction CO. HKS,Inc. 81162019 8/23/2019 1 1457 H-HST-04 Leval l Wall Type Clarification Hensel Phelps Caatruchon Co. HKS,Inc. 81162019 9/512019 0 1458 H-5 Ninos Steel Posts Clarification Hemel Phelps Construction Co, HKS,Inc, 8/160019 0)192019 1 14% Hensel PnaWST.lotstructlon Co, &162019 0 1460 H-Whirlpool Tia,C-uwry Proppsai Hensel Phrelps Construction Co. HKS,ti c. 8/162019 &190019 1 $ 1461 H•Level 10 Seaor K Missed Block Out Hensel Phelps Construction Cu HKS,Atc &-1x2019 8/23/2019 1 { 1462 H-Staam Room Equipment Relocation Hensel Phelps Comtr-b-Co. HKS,tiro. &162019 &2212019 1 1463 P-FEC Dekted Walls Hensel Phelps Construction Co. HKS,Inc. 8/190019 9/102019 1 1484 H-Expansion Joan at Walkway Campy Hensel Phelps Corstruction Co HKS,Inc. 8262019 9152919 1 1465 H-DO Framing Conllroling Mn Receptacle Location Hensel Phelps Comtrumou Co. HKS,Inc. 8/192019 1 1466 P-Ceding Toa 0 Leser Tag Hemef Phelps Construction Co. HKS,Inc. 8/192019 6/22/2019 1 1467 H-Sector K Level 12 Se—e Elevator Embed too Low Hensel Phelps Construction Co. HKS,Inc. &192019 &2212019 1 1468 H-Last Baa Carhop Conf-re on Hensel Phelps CaBtruchon Co. HKS.Inc. 81192019 &262019 1 1469 H-Karoo Divider Conliirmaten Hemet Poulos Corctructlon CO HKS.I- 8/192019 9114!2019 1 1470 H-Cate G.W.Faux Skylight Deletron Hensel Phelps Construction Co. HKS.Int. &192019 0 147/H-Guestroom Comdor Fireshas Gonfa*netron Hemel Phelps Catruction Co. WKS.tnc. 6/190018 826/2019 1 t 1472 H,C,P-Tile Below Restroom Sok Confumatwn Hensel Phelps C-- 1tHKS,Inc. 8/190019 9/102019 1 1473 P-Decimal Circus for HVAC Egwpme Hensel Phelpe Combuct,on Co. HKS.Inc. 81192079 9/3/2019 1 1474 H-Sp.Pool.Bamboo Screen.Locker Room Clanhcet'iom Hansel Phelps Cotruct-Ca HKS,Inc 87192019 9/162019 1 1475 H-PWster Wall Bamboo Removal Contirmetwn Hensel Phelps Cormtructlon Co. HKS,Int. 8/192019 822/2019 Y 1476 11.5 Nooa Ceilingnd Chandelier ClwlKabon Hensal PI a sips Const ruckon Co. HKS,Inc. 8/192079 &140079 1 1477 H-5No-Tequila Wall Confirmation Hensel Phelps Construction Co. HKS Inc. 8/1912019 10032019 1 n� 1478 H-5 Ninos Fluor Pattern Contirmanon Hensel Phelps Comtruotion C. HKS.Inc. 81192019 91132019 1 1479 H-Spa Signage Blocking Dated Ciaukatio Hemet Phelps Corshuction Co.. HKS,h- 8/192019 1 1480 H-Lobby Fireplace Montt.Removal Confirmahon Hassel Phelps Comt—timi Co. HKS,Inc. &192019 9tW2019 1 1481H-DouMe Cut Patio Ceang Fen Clanfeation Hensel Phelps Construction Co. HKS,Ino. 8/192019 M 002019 1 1482 H-Lobby Fountain Power Confirmation Hemel Phelps Coretniohon C. HKS,Ino 8/192019 9762019 1 1483 H-Leve12 Elevator End-1 Well Coveni g Clairficatbn He,"Pheips Comucb tron Co. HKS,Inc. &102019 W1012019 1 1484 H-Oeor 5ubmenal Clanfical Hemel Flat pe Cerstrueaon Co. HKS,Inc. 8202019 923;2019 1 1485 P-VR and Escape Room Attractions(tp FEC Hemel Phelps Construction Co. HKS.Inc. 8200019 0 1486 H-Marrakesh Market Service Counter Pant-Clarification Hensel Phelps Construction Co. HKS.Int. 8202019 9162019 1 1487 P-Suspended Drywall Framing Support Hemel Phelps Canetrucbon Co. HKS,1- 8202019 911020"19 1 1488 H-Sector J Eyebrow Canopy Columns Harsol Phelps CoMilbuctlon Ca HKS Ina 8202019 9231419 1 1489 H-AHU Power Clanfication Hensel Phelps Coretruchon Co. HKS,Inc. 8212019 9/52019 1 1490 S-Remota Cartrol Vale add Bek Valve Hamel Pnelps Cotruction Co. HKS Inc 8212019 9/9/2019 1 1491 C-Pov.®r for AN Systems Hensel Prwa s C,.hsb ton Co. HKS.Iris, 8212019 9!1712019 1 1492 H.P.C-Remaming Finish Schedule Clanhcatids Hemel Phalps Corstrucl,on Co. HKS,Inc. 6212019 9192019 1 1493 P•Laser Tag W.U. Hensel Phelps Construction Co. HKS,Inc. 82112019 91102019 1 1494 P-B-L a Restewarh Cased Op—m Herset Phelps C.-ft-hon Co- HKS,Inc. 8212019 &2212019 1 1495 S-Event Bum Design Charratte Conf tmatiom Hemel Phelps Cutmct—Co. HKS,Int. 8222019 9/10/2019 1 1490 P-FEC Escalator Electrical ClanflcanPhelps on Hensel Comtructlon Co- HKS,W_ 8222019812U2019 1 1467S C-Event Barn Soraenmg Fence Hensel Phelps Comtruchon Co. HKS.Inc, 8022019 10/12019 1 1498 H-South Canopy Support Final Solomon Hansel Phelps Construction Co. HKS,1r>G 8/220019 0 1499 S,C-Event Barn AIC Building Automated System Hersal Phelps Comtru ou Co. HKS,Ir% 8/222019 91412019 1 1600 H-U9Mrcy Crcudry Cwthoatien Hansel Phelps Construction Co. HKS,Inc. 6022019 91100019 1 IW1 H-Sector J Storm Line Elevation Conflo t Hensel Phelps Construction Co. HKS 1- 8222019 0 1502 P-Laundry Hammer Arrester Layout Confirmation Hensel Pt Jps Comtruction Co. HKS,1— 802/2019 9/512019 1 1503 H-Low Roof Expansion Joa1t Kneu Wall Clantication Hensel Phelps Construction Co. HKS,tm, 8020019 9/130019 1 1504 C-LT-912 Light FiK"e Details Hemel Phelps Coiwtlmtion Co. HKS.Inc. 8232019 9/112019 1 15CAR C-Room Scheduler Revisan Hemel Phalpe Comhuot,n Co. HKS,1- 10/32019 19152019 1 1505 H-Mein Kechen Cart Wash Concrete Curb Clanfication Hemel Phelps Construction Co. HKS,Inc 8230019 0 1506 C-Door Submittal Clarrficahone Hensel Phelps Construction Co. HKS.I., 8,2_62019 0 1507 H-Flashing Detail W Parapet and Panel Joint trverseceons Hemel Phelps Corstruction Co. HKS,Inc. 8062019 9%1 x2019 1 15.18 H,P-Sector M Expansion J rut at FEC Clarification Hersei Phelps Construction Co. HKS,9e 81262019 9/122019 t 1509 C-2 Hour Fire Rated Lid Hereat Phelpe Comtruction Co. HKS,Int. 1272019 1 1510 H-C-Automatrc Door Operator Cl.rakavon Hem it Phelps Cotrucu-Co. HKS,Inc. 8270019 9240019 1 1510A H,P,C- Ph*,uouitry for Automatic Door Operators Hensel Ph ,Constructor Co. HKS,Inc. 10/162019 0 1511 C-Kilimanjaro B.•Fokt Door Debuts Hensel Phelps Construction Co. HKS,Inc. &272019 0 HENSEL PHELPS 26191203 Plan 9u, d. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Data Responded Closed? 1512 P.Lower Confumauon r' a ^,.; „ ��''. =° ° Q ,,, Hensel Phelps Corst[uction Co. HKS.Inc. 82712019 0 1513 H-FOH ADA Shower D+rnensions CttlMNosebW _ Hensel Pheips Corlstruclion Co. HKS,Inc.. 8272019 91112019 1 1514 H-Waksay Canopy Gutter and Fascia Clahlicatwn Hemet Phelps Construction Co. HKS,Inc, 8+281"019 9/122019 1 1515 P,Mang Valves for Stlower Fixtures SH-A&$Ha Hansel Pulps Construction Co. HKS,Vic, 828,2019 975/2019 1 1516 H-Parttion Type Conflicting with Receptacle Locations at Marakesh Cokimn Hemel Phelps Constntchon Co. HKS,Inc, 8282019 W122019 1 1517 H-Support for Cortmious Shaft Wal C-limiaeon Hemef Phelps Construction Ca MKS,Inc. 8282019 9/162019 1 1$18 P-Retail Store From Clanhi adon a Sector O Hensel Phelps Construction Co. HKS.Inc. 8282019 W1312019 0 1519 H-H2M-10 Storage Clarification Hensel Phelps Construction Co. HK$,Inc. 81282019 0 1520 H-Icemeker Domestic Water Radug Hansel Phelps Comhucton Co. HKS,Inc. 82912019 91672019 1 1521 H-Concrete Parapet Wal Feeling Detail Honest Phelps Construct-Co. HKS,inc. 8P,-92019 W1312019 1 1522 H-Overhead Coo,at Laundry Room Confirmation Hemet Phelps Car st wcn Ca HKS,lhc. 8292019 1 1523 S-Event Barn Door Hensel Phelps Construction Co. HKS Inc, 829,2019 9/9!2019 0 1524 H-Panel Joint and Root Flashmg Detail Clarification Hensel Phelps Construction Co- HKS.Inc. 8292019 9112P2019 1 1525 H.P,C-Trash Grommet Removal Hemet Phelps Construction Co. HKS,Inc. 829/2019 9/13/2019 1 1526 H-Ovvner Funnshed Light Fair—Goutiest. Hensel Phakrs Construction Co- HKS,lrc, 829t2019 0 1527 H-Bad Deterrent at Timber Canopies Hensel Phelps Construction Co. MKS,Inc. 8/292019 1 1528 H-Delenon of Bump Out at Lobby Fireplace Hemet Phelps Corstru won Co_ MKS,Inc, 8130/2019 1 1529 H-Sector J Rool Expansion Joint Connection to Vertical Exparson Joint Hensel Phelps Construction Co. HKS.Inc. 81302019 W172019 1 1530 H-J-B.L-1—at Marrakesh Restroom, Hemet Phelps Corshuclwn Co. MKS.If 8/302019 9112019 1 1531 H-Data Penway for Hospitality Suite Fiver Box Clanfignon Hemet Phelps Construction Ca HKS,Inc, 8/30'2019 9,9/2019 1 1532 P-FEC&IW P Finish Schedule Hemet Phelps Constr.—Co HKS,r% 81302019 10/12019 1 1533 H-Door Opening Charges Confirmation Per 8,29.2019 Meeting Hemet Phelps Cortruction Co. HKS,It- 9/312019 92412011/ 1 1534 P.5-Door SUUmdeai Clanficatrom Memel Phelps Constructton Co. HKS,Inc. 911012019 1 1535 P-Guardrail C Zulu G.A.&Two Story Cabanas Hensel Phelpe Construction Co. HKS,Inc. W42019 9102019 1 1536 P-Laser Tog Elecmcal Devices 8 Requirements Clarrfica— Hemel Phelps Construction Co_ HKS,Inc. 9/42019 10/112019 1 1537 H-Stag Pressurr,ation Ceiling Finish Hemet Phelps Constnuceon Co. MKS.Inc, 9/4/2019 91162019 1 1538 H-Rebcatron of Tub Bdwer Motor at Presidential SiAtes Corrtirmatan Hemet Phelps Corstr.1—Co. HKS,Inc. 942019 W16/2019 0 1539 H-Storm Drams Point Confli mabon Hemet Phelps Construction Co. HKS.Inc. 9/4/2019 913/2019 1 1540 H-Sector J Level 6 Laundry CMae Hereat Phelps Construction Co. HKS,Jr.. 9512019 9162019 1 1541 H-Spa Drapery and Wood Post Sween Hall Wale D9leeon Hemel Phelps Corehuclion Co. HKS,L— 9512019 91612019 1 1542 SC-Event Barn Fire Protection He—)Phelps Construction Co. HKS,Irrc, 9/52019 0 7543 H-Sector L Grade Beam Waterproofi'V Octad Clanficaeon Hemet PY 1ps Commacmh Co- HKS,Inc. 9/51419 10/32019 1 1544 H-Last Be.Coling Access Panel Confirmation Hemet Phelps Compact-Co. HKS,Inc. 9612019 91772019 1 1545 H-Double Cut Fseptace Clarification of Details Honest Phelps Construction Co. HKS,In, 9/62019 W172019 1 1546 Event Barn-Relocate CU-EB1 Hensel Phelps Cortru 1—Co. HKS,Inc. 9612019 9172019 1 1547 H-ADA Whirlpool Sure&ADA Hospitality Suite Confirmation Hemel Phelps Construction Co. HKS,Inc. 9142019 91172019 1 1546 C-Roof Coping Hensel Phelps Construction Co. HKS.Inc. W72019 1 1549 S-Retention Pord Water Features Hensel Phelps Construction Co. HKS,Inc. 9,72019 91172019 1 1550 H-Plurrip g Fhdures at Pre 4.hhal Surto Tubs Clarification Hereat Phelps Construction Co. HKS,tie, 9192019 0 1551 H-Oowtspout Dralelage Connection WSW-Lin. Hemet Phelps Construction Co. HKS,Inc, 91912019 9172019 1 1$52 H-Sector J en ei H Metal Cocking Confirmed— Hemel Phelps Comtrucnon Go HKS,Inc 9/9/2019 1 1553 H-Textured Acrylic Coating at Area WaRs Glorification Hereat Phelps Construen—Co. HKS,Inc. 992019 91172019 1 1554 C-Lucor Display Details Hemel Phelps Cortruchon Ca HKS,Inc. 9/92019 10/72019 1 1555 H-Supply Grille Clash M A0,(ADAI RAO,Poste-aal Suite and(ADA)PresWontl Sure Hensel Phelps Coretfuctlon Co. HKS,Inc. 91102019 W1712019 1 1556 H-Waterproofing Detad at Pipe and Duct ns Fenevahom Heel Phelps ConstruC.ction CHKS,Inc. 91102019 W172019 1 1557 H-Level 10 Sector J Misplaced Exhaust Fan Bbckout Hemel Phelps Construction Co. HKS,Inc. 91112019 9/192019 1 1558 S-Event Barn Hot Water Heater Hensel Phelps Construction Co. HKS,Inc. 9/112019 91172019 1 1559 H-Fnnaes Room TV Support Bracket ext Receptacle Cfant—ch Hemet pneII7s Construction Co, HKS,Inc, 9012D19 W172019 1 1560 H.Power tar Steam Room Equipment Clanficat— Hemel Phelps Construction Co. HKS,Inc. 9/1120/9 10132019 1 1561 H-Marrakesh Restroom,Cirwr Clarification Hereat Phelps Construction Co. HKS,Inc. 9/112019 930/2019 1 1562 H-Marrakesh Market Ktomo Flooring Coli—tion Hemet Phelps Com ucroon Co. HKS,Inc. 9/112019 9172019 1 1563 C-XS1 Fortune Details Hemet Phelps Const—ton Co. HKS,Inc. 9/122019 1 1563R C-XS1 Fudure Deteel5 Henget Phelps Caretrumon Co. HKS,Inc. 9/162019 9t242019 1 1564 H-Last 89e Folding Gale Soffit Attachmera ClazrFca6on Hensel Phelps Construction Ca HKS,Inc 9/122019 1 1565 C-Sales Office Door Change from HM to Wood Hensel Phelps Construction Co. HKS,Inc. 9/122019 9/172019 1 1568 P-Laser Tag Area Door Changes from Wood to HM Hensel Phelps Construction Co. HKS,Inc. 9/122019 9172019 1 1547 H-Exterior Wall Support at Redd's Pwno along Gridline HAF Hemel Phelps Cored coon Oo. HKS,1- 0/13/2019 9/202019 1 1568 S-Kalahari Blvd inlet Discrepancy Hemel Phokus Construction Co. MKS,In e. 9/132019 1 1569 H-Lobby Frepiace Bnc k C.,d r—ton Hemet Phelps Con,tructon Ca MKS,Inc. 9132019 W172019 1 1570 H-Guestroom Free Smoke Oampw Mounding Angle Hemel Phelps Construction Co- HKS IM, 9/132019 0 1571 P-CMU Contact at PST415 Hemet Phelps Construction Co. HKS,tic.. 9!132019 W172019 1 1572 H-Spa Sal[Room Foyer Sar Sgn Blocking and Electrical Clarification Hemet Phelps Construction Co, HKS,Inc 9/142019 917/2019 1 1573 S -Sector G Level 2 Structural Foam Hereat Phelps Construction Co. MKS,Inc. 9/162019 9/17/2019 1 1574 H-Marrakesh Market Coiling Door Overhead Duet Contim Hemet Phelps Construction Co. HKS,Inc. 9/162019 1 1575 H-Levet 4 Sector G Paapet Height Ciartoation Hensel Phelps Construction Co. MKS,Inc. 9116/2019 9/17/2019 1 1576 H-Canopies Lighting Clarflcation Hansel Phelps Comtruclon Co. HKS,Inc. 9162019 10162019 1 1677 H-Prosstao Relief Valve only at all Hotel Tower Pressure Reducing Valve Arse Pokes Clalrtication Hemet Phelps Construction Co. HKS,Inc. 91162019 9192019 1 1578 P-Room P1R HFCU-0416 Protective Coati,.;GI-fication Hemet Phelps Construction Go. HKS,Inc, 911612019 10/152019 1 1579 P-fur Deanbution Device Color Clarification Hemet Phelps Construction Co- HKS,Inc. 9/182019 0 1580 P-Sector P Main Gas Fiore Size Confirmation Hemet Phelps Corstructlon C. HKS,Ic. 9162019 917/2019 1 1581 H-Sector J South Canopy Steel at H89 Hemel Phetes Comtnwtlon Co. HKS,Mc, 9172019 91192019 1 1582 P-Demme-Catwalk at SLUR Hemet Phelps Curstrucfien Co. HK$,Inc. 9/172019 1 1583 S.0-Convention Center Downspott Locaho- Hemel Phelps Construction Co. MKS,Ino 9117/2019 1 1584 H-Guestroom Blocking Confirmation Honest Phelps Construction Co. HKS.Inc. 91172019 0 1585 S-Flagpole Location Hemel Phelps Cantnuction Ca MKS,Inc 9/172019 1 1566 H-McKeon Fire Door He1gM Confirmation Hensel Phelps Conetructlon Co. HKS,Inc, 9182019 9/18/2019 1 1587H-Levet 13 Expansion Joint and EWS Panel C--Cla,dkod n Howl Pf sdia Construchon Co. HKS,Inc. 91192019 9192019 1 1588 S-Even/Bern Heater Banquet Calmat act Power Connection Hamel Phelps Comtruction Co. HKS,Inc, 97192019 10132019 0 1589 P-Fire Rated Enclosure C Electrical Room Hensel Phelps Construction Co- HKS.Inc, 9232019 91302019 0 1590 S-Outdoor Spa Well Wall Change Hensel Phelps Construction Co. HKS,Inc. 92:32019 1 1591 H-Level 2 Sector G Men&W omens RR Exhaust Au Confirmation Hemet Phelps Construction Co. HKS Inc 9232019 9262019 1 1592 S,C,P-S83 Electrical from Event Barn Hensel Phelps C.rsti—tach Co. HKS,Inc, 9242019 9302019 1 1593 C-Porte Cachere/Loadi g Dock Venting Hemet Phelps Car traction Co. MKS.Inc 9242019 10!3/2019 1 1594 H-Level 10 Sector J Vert Lam Tormlwtion Clanlicahon Hemet Phelps Construction Go. HKS.Inc. 924/2019 9282019 1 1595 H-Level 8 to Larval 10 End of Sector Vestibule Well Type Hersal Phelps Cono1 action Co. HK$.Inc. 91242019 10/32019 1 HENSEL PHELPS 2019 12 G3 Pao. Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number 5ubject Author Company Answer Company Data Created Date Responded Closed? 1696 H-Leve14 Sector J Missing S—Sleeve at DG Hensel Phelps CorsnocUon Co. HKS,wo.. 92721019 9/302019 1 15971 H-Sector L Level 3-7 P..dential Swte Susie,Pan Clartgo'ioh Hanso9 Phelps Consta-fica,Co- HKS,tic. 92512019 1011512019 1 1598 H.P,C-Caging Deletion Above Walk-in Coolers.Fra.—and Hoods Hensel Phelps Corsa uclron Co. HKS.Inc. 91252019 10/10/2019 1 •04 Wt TOWif Paul CDWCWM06M For Ad ,..';a ,.,6 Hensel Phelps Construction Co. HKS.Inc. 9/262019 1 1602 H,C-Expansion Joint Roofing Detail at Hotel ant Convention Center Hensel Phelps Construction Co. HKS Inc. 926/2019 91302019 1 1603 H-5 Ninos Entry Wall Clanfi.ion Hensel Phelps Conshuct.11 Co. HKS,Inc. 9/262018 10/4/2019 1 1604 H-Last Bite Candy Shop Security Gut. Hensel Phelps CorstrucUon Co. HKS,itx. 9/262019 1 1605 H-Redd's Piano Metal Decklrg Fveproofrng Confirmation Hensel Phelps Construction Co. HKS,tic. 9262019 10/3/2019 1 1606 H-Receptacle at IDF Room HIK-24 Hensel Phelps Cory w,cn Co. HKS.Mc. 9262019 10!15/2019 1 1607 P-Spray Foam Q Skylights Hensel Phelps Const—ron Co. HKS,Ino 9262019 10r32019 1 1608 H-tC Support Room Borrowed LA.and Ceiling ClarJxation Hensel Phelps Construction C. HKS,Inc. 9272019 10/8/2019 1 1609 H-Hosprcalrty Su¢e Floorbox Location Hemel Phelps Construction Go HKS,Inc, 927/2019 10/312019 1 1610 H-J3 Wal Conflicting with Bus Duct Pathway in Electrical Room H4K-08 Hensel Phelps Construction Co. HKS.Inc. 02712019 10/32019 1 1611 H-Leve14 Sector J&K HF'3 LUM Fixaine Heruel Phi,"Cortstoccon Co. HKS.Inc. 9/272019 10117/2019 1 1612 H-Cor Ang Vector File For Exterior Graphic Art Hemel Phelps Construct-Co. HKS,Inc. 92812019 1 1613 H-Marrakesh Knee Wall&H Finish Cl h ication Hansel Phelps Constructor,Co. HKS,Inc. 6282019 9/30/2019 1 1614 H-Copier Machine in Room H1K-09 Receptade Cliirkwatien Hemel Phelps Corshumon Co. HKS,Inc, 9/28/2019 1012/2019 1 1615 P-Retail Entry from FEC Display Access Doors Addition Hansel Phelps Corehuct-Co_ HKS,Inc, 91302019 9/30/2019 1 1816 P-KLUX l&PL5)Conf—tion H-4 Phelps Coratruetion Co- HKS,hie. 9/302019 10/12019 1 1617 H-Palest.,Cokenn Added Flashings to RF1 1429 Hamel Phelps Corstrixtmn Ca HKS tris 9/302019 10/4/2019 1 1618 P-Laser Tag Wal Layout Hensel Phelps Construction Co. HKS,Inc. 10/12019 1014/2019 1 1620 H-Deletion of Chair Rail w Desert queen Goestrooms Hensel Phelps Corshuction CO HKS,loc. 10/112019 101152019 1 1621 P-B-L.(8-WP-1)Fire RiO g Hensel Phelps Construction Co- HKS.Irc. 10/2/2019 10/182019 1 1622 P-Crack C—ut Detail Clanl—t— Hensel Phelps Corsrtri.iction Co- HKS.Inc. 1022016 0 1623 H-5 Nmol Timber Frame Connection Hansel Phelps Constriction Co. HKS.Inc. 10122019 1 1624 H-P-Sector N&P Light r...Hegot Clarification Hensel Phelps Construction Co. HKS.he. 10!32019 10!112019 1 1625 P-Barret Calling Clarification Hamel Phelps Coristruca.h Co. HKS,Ins, 10132019 0 1626 H-Talet Paper Hoklai Lacahan Clarrticatroo at AO Bathroom Hensel Phelps Construction Go, HKS.Inc. 10/32019 0 1627 H-Additional Duplex at African queen Bedroom Hensel Phelps Go—.-Co- HKS,Inc. 10/32019 10/72019 1 1628P-Concealed Dishwasher Duct Material Fabrication Hensel Phelps Construction Co. HKS,1- 1042019 10/142019 1 1629ter P-Wapark Eery Slot Difluser&Duct S¢Ing Confi—hon Hensel Phelps Comtructlon Co. HKS,Ins. 10142019 101142016 1 1630 P-Bulletin#5-EP-1 B—P Pump Schedule Data Clanf cation Hemel Phelps Cor strict—Co. HKS.Inc. 10142019 10/72010 1 1631 P-Reoemptlon$tote Ught Future Elevations Hersgel Phelps Construclion Co. HKS,Inc. 10/42019 10/162019 0 1832 H-Level 2 Sector K Entrance Elevation Cl.h ic—o Helsel Phelps Construction Co. HKS,Inc. 10/72019 101152019 1 1633 H-Metal Pa-1 Z Furring Waterproofing Clanficabou Hensel Phelps Construction Co. HKS,1— 1082019 10162019 1 1634 H.P-L—Ify Compressor Room Modification Hensel Phelps Contruc"n Co. HKS.Inc. 10/82019 1 1636 S-Event Bern Brides Room Ctanflcanorn Hemel Phelps Construction Co. a HKS,Inc. 10/912019 101152019 0 1637 H-Karoo Entrance Screen Door Hansel Phelps Construction Co. 10/92019 0 1638 S-Removal of Grass Below Waterpark Slides Hensel Phetps Construction Co. HKS,Inc. 10/92019 0 12, H Phelps Construction Co. 101912019 1 P-Trash Compactors 1640 Herset Phelps Construct—Co. HKS.Inc. 10/10/2019 0 sw;� _ _" ..:u....s�� .s:�,..J€t$ W§'�'" :.: 1" �.�, •.Hsps,a� -�',:�rx 1642 5.H.P-Scott,Hotel and Parks Dovmspeut Location Hensel Phelps Colstnrction Co HKS.Iris. a lQ102019 IW142019 1 1843 H-HDMI Pathway w Hospitality Suites Hensel Phelps Consuunton Co. HKS.Inc. 10/102019 0 1644 H-SPA Reception Area Cardinal— Hansel Phelps Construction Ca HKS.Inc, 10/102019 101152019 1 1845 H-Leval 1 Sector H BOH Corridor Finishes U.hficavon Hensel Phelps C---t-Co HKS,Irc. 10/112019 101152019 1 1648 H-Lobby Trea Light F...Support Clarification Henei Phelps Construction Go. HKS,tnc. 1 011 12 01 9 larl5r2019 1 1647 H-Cottee&Gelato Bump Out Ctanf cabcn Hersal Phelps Construction Co. HKS lnc- 10/142019 10/172019 1 1648 S-CORR Sidewalk Cotdrol Joint Spacing Hensel Phelps Construction Co. HKS.Inc. 10/112019 0 1649 P-FEC Rest—(Sector N)Ceiling Clarif ation Hamel Phelps Corrtruction Co- HKS.Inc. 10/112019 0 1651 H.P-Naw Aurlw,.tone Between FEC and Hotel Hcvsal Phelps CorWruction Co. HK3.6x. 10/1212Dt9 0 1653 H-BOH 8 FOH Fishes Clarification Hensel Phelps Corstrucoon Co. HKS,Inc. 10/142019 10152019 1 1654 P-Sector O EA-or Cornet Material Confirmation Hemel Phelps Corstruclion Ga HKS,Inc. 101142019 101152019 1 1655 P, IWP Bars Grease Wast®Code Clarshc it— H-1 Phelps Construction Co. HKS,Inc. 10/14=19 U1,152019 1 1656 P EJ at Screen Wal Hensel Photos Corstructien Co. HKS.Inc. 10/1420191) 1657 P-File Pump Room Exhaust Lower Relocation Hensel Phelps Construction Co. HKS,Inc 10/142019 0 1658 H-Manager H21-1-24&PBX Operations H2J-01 Ceiing Height Confirmation Hensel Phelps Construction Co. HKS,Inc. 10/142019 10152019 1 1859 H-Calling Grid Attachment For Sesmic Coatch Detail Confirmation Hensel Phelps Construction Co. HKS.Inc. 10/152019 101172019 1 1680 H-LVO 1&2 Sector J&K Elevator Entry Framlig Detail Hansel Phelps Cotstructlon Co. HKS,Inc, 101/S2019 10/152019 1 1661 H-Bunk Room Solid Confirmation Hensel Phelps Comiruction Co. HKS,Iris. 10/72019 0 1683 C-$1.1 Ddfuser Loceti.- Hensel Pr 4 Cuistr-b-Co_ HKS,Ina 10/162019 10/162019 1 1864 P-Level 2 PST-CMU Clanfication Hersei Plmlps Construction Co, HKB.Inc. 10/162019 0 1665 P-Offire Window Ctanificaaon Hansel Phelps C--ruction Co, HKS,I— 1011612019 0 1666 P-Polycarbonate Parapet Curing- Hensel Phelps Construction Co. HKS,Inc, 101172019 10/17/2019 1 11367 C-Added Motors for Ragsiratron Doors Hensel Phelps Construction Cc. HKS.Inc. 1011712019 0 1668 H-Level'Sector J BOH Receptacle 8i Data Jack Clarification Hansel Phelps Construction Co. HKS Inc 1011 i 2019 0 1669 H-Spa Corridor Sconce Lght FK1um Elevatian Clartcation HerwN Phelps Coratn/ctlon Co. HKS,Inc. 1071712019 0 .tix 1673 P-FEC Entry P10-08 Door Openeigs Congrm.tion Hemel Phelps Construction Co. - 0/1612019 0 1674 P-Final Skykghl Detail Hensel Phelps Constrvc0on Co. X1192019 0 1678 H-Stpro Lo' Hensel Phelps Comtructon Co_ 'rf1'11019. 0 *01 19 ..'1t3T'-P-EsratetorPt PadrnsterOraln kpuGamells.. uxl3rzDl Hen.l Phayn Corstrucoon Cu .. i 1580 P-Zulu Grile1 ndenground Grease Waste Pipe MaterWl Type Repulnament Hem,.:Phelps C.ht—b.h Go. HKS.Iix. 10232019 0 1681 P-Plywood at 00H Corridor Hemel Phelps C.hel,uclion C. HKS,Inc. 10232019 0 1682 H-Level 1 Sector J C Rooms Mirror&P=T—el neer Corlhrrn d— Hartel Ptielps Construction Ca HKS,Inc. 10242019 0 HENSEL PHELPS 2019.12.03 Plan. Build. Manage. GMP Amendment No 1 Attachment 3 CONVENTION CENTER RFI LOG Number Subject Author Company Answer Company Date Created Date Responded Closed? 1685P-Borrowed LAes Sohadule Hensel Phelps Construction Co. HKS,Inc. '10/24120190 1686 P-Detall at 8-Lux Brick aM GL—g Hense4 Phelps Corset—on Co_ HKS,1-- 10124/2019 0 1687 P-CMU w Locker Room 3 Hensel Phelps Coret—ton Co. HKS,Inc. 16(25)2019 0 1688 P-B-L.Gee Piping for Cheese Maker 43562 Hensel Phelps C—ftucbon Co- HKS,Inc 10725/2019 0 1689 P-Sector 2-AHU-1 Supply aruf Return Due Floor Penatrenon Damper Requrtements Hensel Phelps Construction Co- HKS Inc. 102512019 0 1690 P•FEC d IN/P Flon—Td. Hansel Phelps Construction Co. HKS,i— 10/2512019 0 GMP Amendment No 1 Attachment 3 ATTACHMENT 3 (continued) The Guaranteed Maximum Price as set forth in this GMP Amendment No. 1 to Round Rock Convention Center Construction Contract includes costs associated with Requests for Information ("RFIs") as set forth in the RFI Log attached (highlighted in green) and as listed herein below: 0001 0072 0182 0345 0495 0733 0835 0906 1071 1190 1286 1406 1511 0003 0077 0195 0345A 0496 0737 0838 0922 1080 1190R 1287 1407 1523 0004 0078 0196 0353 0497 0738 0840 0923 1087 1190R1 1288 1409 1525 0006 0084 0203 0364 0513 0752 0841 0933 1096 1203 1289 1426 1542 0026 0085 0204 0365 0558 0756 0844 0933A 1107 1204 1301 1430 1546 0030 0086 0230 0379 0565 0764 0844A 0938 1112 1205 1310 1431 1548 0037 0088 0235 0384 0570 0773 0846 0940 1120 1206 1 1315 1435 1554 0039 1 0095 0255 0397 0577 1 0777 0846A 0945 1127 1217 1329 1436 1558 0040 0096 0260 1 0398 0596 0787 0847 0950 1127R 1232 1338 1437 1563 0041 0097 0261 0408 0597 0795 0855 0953 1128 1238 1339 1438 1563R 0042 0100 0271 0409 0598 0796 0860 0955 1130 1244 1340 1440 1565 0043 0105 0276 0426 0604 0797 0861 0956 1131 1248 1341 1443 1583 0044 0106 0279 0430 0610 0800 0862 0957 1132 1249 1348 1472 1592 0045 0111 0284 0431 0611 0801 0871 0985 1144 1250 1355 1491 1593 0046 0112 0287 0432 0616 0803 0876 1007 1158 1251 1368 1492 1598 0050 0113 0296 0433 0617 0806 0879 1008 1159 1257 1370 1497 1602 0061 1 0114 0314 1 0434 0617A 0808 0879A 1015 1166 1260 1382 1499 1663 0062A 0130 0320 0439 0618 0810 0889 1020 1167 1261 1385 1504 1667 0064 0145 0321 0446 0626 0811 0891 1037 1170 1273 1390 1504R 0065 0152 0326 0447 0651 0812 0895 1043 1172 1277 1391 1506 0067 0159 0327 0449 0661 0815 0898 1067 1174 1 1279 1393 1509 0068 0165 0328 0460 0697 0821 0902 1068 1175 1 1281 1397 1510 0069 0171 0338 0461 0699 0833 0902R1 1069 1187 1 1282 1405 1510A HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan, BL A. Manage. 2019 2020 Line Unique Task ID Name Duration Start Finish December January February March Apnl : May June July 1 August September; October .November:December 9 .23 6 20 :3 :17 2 16 30 13 27 :11 25 :8 :22 6 20 3 :17 :31 14 :28 12 26 9 23 7 :21 1 0910 Executive Milestone Summary 685d 5/15/2018 A 1/26/2021 2 1050 Convention Center 563d 7/17/2018A 10/1/2020 Convention Center 3 1430 Exterior Skin&Roof 204d 3/14/2019 A 1/2/2020 Exterior Skin&Rod 4 30360 West Elevation-North End 185d 3/25/2019 A 11/13/2019 WestLvabon-North fine 5 68930 Install CFCP Panels-West Elevation-North End-Porte Cochere 10d 12/2/2019 12/13/2019 Instal CFCP Panels-West Elevalow-North End-Porte Cocheve I 6 30400 East Elevation 149d 5/31/2019A 1/2/2020 East Elevation 7 30960 Install CFCP Panels @ Restroom Bump-outs-East Elevation 15d 11/1312019 A 12/5/2019 Instal CFCP Panels @ Restroom Bumpouts-East Elevation j 8 30950 Install Canopy-East Elevation-North 7d 12/2/2019 12/10/2019 Ili Instar canopy-East Elevation-Nam I I 1 9 30970 Install Trellis Canopy-East Elevation South 15d 12/11/2019 1/2/2020 Instal Trois Canopy-East Elevation South I I 10 30440 Roof Systems&Equipment 139d 6/3/2019A 12/18/2019 Rod Systems&Equipment 11 68970 Rough in Roof Piping Vest Roofing Seq.3 C9 >C18 15d 10/14/2019 A 121412019 RoughnAodPgng&Test•RodngSeq.?C9->C18 12 68990 Rough-in Roof Piping&Test-Roofing Seq.5 CI >C9 15d 11/4/2019 A 12/9/2019 1 Rouglrin Rod Piping&Test-Roarng Seq.5 Cl•>C9 I I 13 59720 Install Lightning Protection 10d 11/11/2019 A 12/3/2019 lnstallighmrigPmtedion I I 14 68980 Insulate&Heat Trace Roof Piping-Roofing Seq.4 C9->C18 7d 12/5/2019 12/13/2019 E Insulate&Heat Trace Boor Pipng-Roofing seq.4 C9->C18 15 69000 Insulate&Heat Trace Roof Piping-Rouging Seq.5 CIL >C9 7d 12/10/2019 12/18/2019 Insulate&Heat Trace Roof Pp g-Roogiig Seq.5 Cl->C9 16 59710 Dry-in-Convention Center 12/13/2019 12/13/2019 D qn-Convention Center I I I 17 1440 Interior Build-out&Rough-in I20d 4/15/2019 A 2/25/2020 Interior Buidaut&RDW h 18 2560 Build-out-Level 1 220d 4/1512019A 2/25/2020 -- Bubwt•LemI 19 58370 Build-out-Leven-Priority Walls/Rooms North 220d 4/1512019A 2/15/2020 Build-out•Level 1-Priontywals Rooms-Norm j 1 20 46710 Buildout Electrical Rooms-Level 1-North 65d 7/3112019 A 12/4/2019 Bud-outcaicaIRom-Level 1-North 21 46730 Buildout MDF&IDF Rooms-Level 1-North 41d 8/5/2019 A 12/4/2019 BWNout MDF&MF Rooms-Level I-North 22 58520 Terminate Electrical Branch Circuits-Level 1-North 15d 12/2/2019 12/20/2019 Terminate Bectrical Branch Circuits•Level 1 J North I I 23 58550 Energize Main Equipment-Level 1-North 5d 12/16/2019 12/20/2019 Enerwe Main Equipment-Level 1-North I 1 I 24 58560 Energize Branch Panels/Circuits-Level 1-North 5d 12/23/2019 12/30/2019 Enmir,Branch Panels I Orcub-Level l•North I 25 58440 Terminate Data Wiring @ MDF/IDF Rooms-Level 1 North 15d 2/5/2020 2/25/2020 Terminate Dara Weng 0 MOF/IDF Rooms•Level 1 Nam 26 58380 Build-out-Level 1-Priority Walk/Rooms-South 98d 8/23/2019 A 1/14/2020 Bu"t-Level 1-Priority walls;Rom-South I I 27 45520 Set Electrical Equipment&Panels-Level 1-South 5d 11/25/2019 A 12/3/2019 Set Ectmcal Equpnent&Pane&-Level I-South I I 28 46780 Buildout IDF Rooms Level South 15d 12/2/2019 12/20/fN M BaHautmFRom-Level 1-South I I I ....._........ ......... ... . .............. 29 46770 Pull&Terminate Main Feeders Level South 10d 12/2/2019 12/13/2019 Pull&Terminate Man Feeders-Level 1- ...._.. ......... ...... ......... ........ I ... ....... ....._.... 30 58530 Terminate Electrical Branch Circuits-Level 1-South 15d 12/2/2019 12/20/2019 Tem nate Bectnral Branch Circuits•Level 1-South Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 1 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. Build, Manage. 2019 2020 Line Unique Task ID Name Duration Start Finish December, JanuaryFebmx : March : : Am August sa ember; October :November;December 9 23 6 20 3 17 2 16 30 13 2r :11 ;25 A 8 20 3 17 .31 :14 :28 12. 26 9 23 7 :21 31 58540 Energize Main Electrical Equipment-Level 1-South 5d 12/16/2019 12/20/2019 ®Enerybe Main Eletriral Equipment•Level 1•South 32 58450 Terminate Data Wining @ IDF Rooms-Level 1-South 15d 12/23/2019 1/14/2020 Tenninate Data Wining 0IDF Rooms-Levd 1-Saab I I g —_1111 ._...--- _. —_._ — ....... ---.. 1111.. ...__ -- — 33 58740 EnerizeBranchCircuits-Level I-South 5d 12/23/2019 12/30/2019 Eneryve&ancnGrtuas-evdt•5ad� 34 39520 Build-out-LevelI-BOH West 150 5/1/2019A 12/3/2019 Buic-out-Leval--West 35 39810 Pull Main Control Wire-Level 1-BOH West 5d 11/25/2019 A 12/3/2019 Pug Main control wire-Level 1-BOM West j I 36 39540 Build-out-Level l BUN ES t 12 b/3/2019A 12/4/2019 Buinout-Level 1-BOH East 37 45680 Wall Jose-in Inspection-Level 1-BOH East 5d 8/26/2019 A 12/3/2019 Wall noses Inspection-Level 1-BDr1 Fast 38 45690 Install GYP Board-Walls-Level 1-BOH East 6d 8/26/2019 A 12/4/2019 'Instar GYP Board-was-Level I-Ill w 39 45720 Pull Main Data/AV Wire-Level 1-BOH East 32d 9/23/2019 A 12/3/2019 PJ Main Data/AV Wire-Level I-BOH East j I I 40 45710 Pull Main Fire Alarm Wire-Level 1-BOH East 27d 9/30/2019 A 12/3/2019 Pull Main Fre Alarm Wire-Level 1-BOH East I I 41 45730 Pull Main Control Wire-Level l-BOH East 5d 11/25/2019A 12/3/2019 Pug Main control Wire-Level I-BOH Flet 42 39550 Build-out-Levell-Meeting Rooms 118d 6/1712019A 12/3/2019 .'ludkut- I-MeetgRooms 43 45920 Pull Main Control Wire-Level 1-MTGRooms 5d 11/25/2019A 12/3/2019 Pur Main Control Vim-Levdl•MTG Room 44 39560 T Build-out-Levels-South 8 0/26/2019A 1/2/2020 Buil6aut-Leval-South 45 45940 Rough-in OH Mechanical-Level 1-South 31d 8/26/2019 A 12/11/2019 RoughynoM Mechanical-Levd I•South 46 45960 Rough-in OH Plumbing Pipe-Level 1-South 27d 4h 10/7/2019 A 12/13/2019 Roogh-n OH Plumbing PR-Level 1•SaAh 47 45950 Rough-in OH Electrical-Level 1-South 10d 10/28/2019 A 12/6/2019 Roegh-in off Electrical-Lewd i-South I I 1 48 58350 Install Operable Partition Hardware&Accessories-Level 1-South 10d 11/12/2019 A 12/3/2019 Dow Opeade Partton Hardware 8 Accessaks•Level 1-South 49 46090 Wall Close-in Inspection-Level 1-South 2d 11/18/2019 A 12/11/2019 Wag aosHn Inspection-Level I-South 50 46110 Install GYP Board-Walls-Level 1-South 20d 11/18/2019 A 12/30/2019 Instal GYP Board-Wall-Level I-soutn I i 51 46020 Rough-in Plumbing @ Walls-Level 1-South 5d 11/25/2019 A 12/4/2019 I Roui P nibhg 0 Wags-Level 1-South I I I 52 46040 Pull Electrical Branch Circuits-Level 1-South 12d 12/2/2019 12/17/2019 Pug 9lect IBranchCircuits-LevelI-South .1.............111..t ...... . ......... ..........._..t.........._........._............... ..._...... ..._........................... 53 46100 Pull Main Control Wire-Level 1-South 5d 12/2/2019 12/6/2019 PJ Main Control Wire-Level I-South j 54 46070 Pull Main Data/AV Wire-Level 1-South 10d 12/4/2019 12/17/2019 Pug Main Data/AV Wue-Level 1-South I I I 55 46060 Test&Insulate Plumbing in Wall-Level 1-South 4d 12/5/2019 12/10/2019 ®Test&Inwlate Plumbiig in Wal-Level I•South! 56 45970 Rough-in OH Sprinkler-Level 1 South 10d 12/9/2019 12/20/2019 Rouvn•in off Spmlk-Lard I-SaAA _... ......--__ ... _.. . _.___.._. _1111._ ... L........_....__.—___.__._l� A_ 57 45980 Rough-in OH Controls-Level 1-South 7d 12/9/2019 12/17/2019 ®Roth i n a4 Control;-teed 1•somn ..... ..... _111............1........ ............................................_....... .............__.----.............. ................. .--.............. 1.....1...1...1..... ......................... 58 45990 Rough in OH Fire Alarm-Level 1-South 7d 12/9/2019 12/17/2019 ®Rough-in off Fre Alan-Level 1-South 59 46080 Pull Main Fire Alarm Wire-Level l-South 10d 12%18/2019 112/2020 Pug Main Fre Alarm Wire-Level l•Such I I 60 39580 Build out Levels Restrooms 119d 7/15/2019 A 1/2/2020 - Ou"-Lard l-Reshooms Kalahari Covention Center- November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 2 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. Build. Manage. 2019 2020 Line Unique Task I Narne Duration Start i Hnish -mber January February: Man;h ; April ; May j June J* I how 7sp_tember October ;November.December [P.F .23 16 :20, :17 2 16 130 A 127 Il 25� i8 i2Z A i2D 0 ;17 31 14 28 IZ J :21 feed I-Restroom Center 62 41390 Fit-up Carriers&Plumbing Racks-Level 1-Restroom Center 5d 11/21/2019 A 12/2/2019 fit-up,cart as&Plumbing Racks-Level 1-Restroom Center 63 41420 Frame Remaining Walls-Level 1-Resbwm Center 4d 11/26/2019A 12/11/2019 1 Remaining;-a-Level I-Restroom cerL .............................. ...............................I–I I – I................................. ................. ......................................................... ...................I - -- ..........f............ ......................................................f..................... 64 41450 Rough-in Wall Electrical Drop-Level I-Restroom Center 3d 11/26/2019 A 12/2/2019 Rougi w1l SKtrid Dmps-Level 1-Restroom or 65 41340 Rough-in OH Electrical-Level 1-Restroom Center 3d 142/2019 12/4/2019 1 Rough-in OH Elednal-Level I-Rest.Center 66 141410 1 Insulate Carriers&Plumbing Racks-Level 1-Restroom Center 3d 12/212019 12/4/2019 Insulate Carnes is Numbing Rads-Level I-Restroom Center 67 41400 Test Carriers&Plumbing Racks-Level 1-Restroom Center 3d 12/3/2019 12/5/2019 Tea D7&Plumbing Racks-Level 1-Restmom Center 68 41350 Rough-in OH Sprinkler-Level 1-Restroom Center 3d 12/4/2019 12/6/2019 1 Rough-in OH Sprinkler-Level 1-Restroom Center 69 41430 Wall Close-in-Level 1-Restroom Center 5d. 12/5/2019 12/11/2019 0 d Clr,se•in-Level I-R.Center 70 41360 Rough-in OH Controls-Level 1-Restroom Center 2d 12/6/2019 12/9/2019 1 Rough,,ri:off Controls-Level I-Restmoin Center 1 71 141370 1 Rough-in CH Fire Alan-Level 1-Restroom Center I 2dj 12/6/2019 1 12/9/2019 1 Rough OH Fire Q -teed I-Restroom carte 72 41440 Instal Sheathing/Gyp-Level 1-Restroom Center 4d 12/1412/17/2019 2019 11 Install Watthing/Gyp-Level 1-RestroomRestroomcense Level 1-Resboom South Ni 74 41540 Set Carriers&Plumbing Racks-Level 1-Restroom Southrriers&Plumbing Racks-Level 1-Restroom south21d 10/31/2019 A 12/2/2019 set Ca 75 41500 Rough-in OH Electrical-Level 1-Restroom South 3d 12/2/2019 12/4/2019 Rough-on 01i Elechal-Leyd I-Reston Sao I 76 41550 Fit-up Carriers&Plumbing Racks-Level 1-Restroom South 5d 12/2/2019 12/6/2019 Rup Ca7ers&Plumbing Rads-Level 1-Restroom South 77 41510 Rough-in OH Sprinkler-Level 1-Restroom South 3d 12/4/2019 12/6/2019 1 Roughin OH Sprinkler-Level I-Restroom South I 78 41520 Rough-in CH Controls-Level 1-Restroom South 2d 12/6/2019 12/9/2019 1 Rough ncontrols-Lad 1-Restroom South ................ I-Restroom 7 41530 Rough-in OH Fire Alarm-Level I-Restroom South 2d 12/6/2019 12/9/2019 Rough-moli Fire Alarm-Level estroom south' 91 ............................................. . ............. ....... 80 41560 Test Carriers&Plumbing Racks-Level 1-Restroom South 3d 12/9/2019 12/11/2019 1 Test Camas&Plumbing Rads-Level I-Restroom South 81 41580 Frame Remaining Walls-Level 1-Restroom South 4d 12/12/2019 12/17/2019 name Remaining wars-Level I-Restroom south 82 41610 Rough-in Wall Electrical Drops-Level I-Restroom South 3d 12/16/2019 ........... Ror Wal Eledmical Drops-Lad 1-Restroom South .......... ....... . ................................................................... .................................... ...... .......................................... ........................................... ................. 83 41570 Insulate Carriers&Plumbing Racks-Level I-Restroom South 3d 12/16/2019 12/18/2019 Insulate carriers&Plumbing Rads-Leivel I-Restroom Saint 84 41590 Wall Close-in-Level 1-Restroom South Sd 12/19/2019 12/26/2019 CIM&M-Level 1-Restroom South I 85 41600 Install Sheathing/Gyp-Level 1-Restroom South 4d 12/27/2019 1/2/2020 Instal Stwatturill/Gyp-Level 1-RerM South 86 58360 Build-out-Level 1-Testing&Insulation 23d 12/12/2019 1/15/2020 F Malkin-Level 1-Testing&Insulation 87 39840 Test Mechanical Duct-Level I 10d 121 1211/2019 12/26/2019 MTestmechana Duct-Ley8i ..........- .......................................- .11................... ................1 1 .............. .................... .................. .. . .................. ................................ 88 39850 Test Mechanical Piping-Level 1 10d 12/12/2019 12/26/2019 Test MechanKal Piping-Level I 89 39880 Insulate Mechanical&Plumbing Systems-Level I 20d 12/17/2019 1/15/2020 ubte MKhanal&Plumbing Systems-Level I I '1S/0 90 39860 Test Sprinkler Piping-Level 1 1� 12/23/2019 1/7/2020 Teo slinniff naafi-Level I r Kalahari Covention Center- November 2019 GMP Update DATA DATE:1211r20119 JOB#:7017134 VIEW Kalahari REV.DATE:12/12/20192:07:10PM PAGE 3 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Ptan. Br,'Id. Manage. 2019 2020 Line Unique Task I11 Name Duration Start Finish December: January February: March Ila June JuAugust Oebber November;December :9 :23 6 :20 :3 17 :2 :16 30 13 27 11 :25 :8 6 20 13 :17 :31 14 28 JZ 28 9 :23 :7 :21 91 39870 Test Plumbing Piping-Level l 8d 12/27/2019 1/8/2020 Test Wn QPON-LemI I I I 92 2570 Builcl-out-Level 2 117d 7/29/2019A 1/14/2020 Su"-L-M2 I I I 93 44580 Build-out-Level 2-Priority Wall/Rooms 117d 7/29/2039 A 1/14/2- ,.'. -q Bui6out-lend 2-ftncy Wale I Rooms 94 47020 Buildout Plumbing Room-Level 2 44d 9/20/2019 A 12/18/2019 Buiclout Plumdng Room-Lewd 2 95 46980 Pull&Terminate Main feeders-Level 2 49d 9/23/2019 A 12/2/2019PuI&Ten nate Main Feeders-Levd 2 96 11 46970 Buildout IN Rooms-Level 2 15d 12/2/2019 12/20/2019 Bwlduut WF Rooms-Lewd 2 I I I 97 58960 Terminate Electrical Branch Circuits 15d 12/2/2019 12/20/2019 Terminate Electrical Branch Circuit 98 58910 Energize Main Equipment-Level 2 5d 12/3/2019 12/9/2019 BV*e Man Equipment-Levd 2 I I I 99 58430 Terminate Data Wiring @ IDF Rooms-Level 2 15d 12/23/2019 1/14/2020 Temimate Data wiring 0 m2F Rooms•lewd 2 I I ........... ......-.......-..... ...._._. ........................_... ...._......... 100 58920 Energize Branch Circuits-Level 2 5d 12/23/2019 12/30/2019 Eneigue Branch Grcuds-L-M2 10140130 Build-out-Level 2-BOH 102d 7/29/2019A 12/20/2019 Bui cut-Lad2-eaH 102 46240 Pull Electrical Branch Circuits-Level 2-BOH 15d 9/16/2019 A 12/4/2019 Pull ae cal Branch Crcuas-Levd 2.BOH 1 I l 103 46140 Rough-in OH Sprinkler-Level 2-BOH 10d 11/25/2019A 12/10/2019Rayhronspmkte-Lewd2-BOH I I 104 46260 Pull Main Data/AV Wire-Level 2-BOH 15d 12/2/2019 12/20/2019 Put Man DaWAV Wn_Lewd 2-BOLI I I 1 - ......._...._.. __ Main tiPur 105 46250 Pull Main Fire Alarm Wire-Level 2-BOH 10d 12/2/2019 12/13/2019 Pul Mae Alarm e-Lewd 2•8011106 46270 Pull Main Control Wire-Level 2-BOH 5d 12/2/2019 12/6/2019 err Main Contid wwe-Lewd 2-BOH I I I -- --------- 107 40140 Build-out-Level 2-Meeking ms&Corridors 89d 8/12/2019 A 9 eu,&ut-Lewd 2-Meeting Roam&Ca rida� I I 10846400 Pull Electrical Branch Circuits-Level 2-MTG Rooms&Corridors 15d 10/l/2019A 12/4/2019 Pulls icalBranchCrcuits-Lewd2-MM Room&Corrdas I � 109 46330 Rough-in OH Sprinkler-Level 2-MTG Rooms&Corridors 10d 11/11/2019 A 12/2/2019 Rough n OH Sprinkler-Level 2-MTG Rooms&Corridors 110 46430 Pull Main Data/AV Wire-Level 2-MTG Rooms&Corridors 18d 11/20/2019 A 12/17/2019 Put Main DaWAV Wire•Level 2•MTG Rooms&Cordaors 111 46440 Pull Main Fire Alarm Wire-Level 2-MTG Rooms&Corridors 10d 11/22/2019 A 12/9/2019 N Main Fre Alarm Win-Level 2-MTG Rooms&Conidas I 1 112 46460 Pull Main Control Wire-Level 2-MTG Rooms&Corridors 5d 12/2/2019 12/6/2019 w Main Contrd Wire-Level 2-MTG Rooms&Corridors 11340150 1 Budd-out-Level 2-Kalahari Balk-oom 85d 8/2612019A 12/26/2019, Buidout-Liver 2-Kalahan Ballroom I l I 114 46570 Pull Electrical Branch Circuits-Level 2-Ballroom 15d 10/24/2019 A 12/11/2019 Pur Electiul Branch Circuits-Level 2-Ballroom I I 115 46590 Pull Main Data/AV Wire-Level 2-Ballroom 15d 11/20/2019 A 12/12/2019 Put Main DaWAV Wre-Lad 2-Balmom 116 46490 Rough-In OH Electrical-Level 2-Ballroom 15d 12/2/2019 12/20/2019 Raoin OH Dattel aI-Lad 2•R*w _...........__ __.. . ........ .. _ _.._..__... J.--- 117 46600 Pull Main Fire Alarm Wire-Level 2-Ballroom 10d 12/2/2019 12/13/2019 Put Pum In unn'�e-Levd 2-Bn i I I ...... ......._...._.---- -........._.._......... .... I ... ..................--.._..._..__.......-........_..........w...........--------— 11846620 Pull Main Control Wire-Level2-Ballroom 5d 12/2/2019 12/6/2019 PJ Main control Wire-Lad 2-Ballroom 1 11946510 Rough-in OHSprinkler-Level 2-Ballroom 10d 12/12/2019 12/26/2019 Rough-in OHsprmae-Lwd2-Minicar, I 1 12040160 Buildout Level2-Restroonks 80d 8/28/2019A 12/20/2019 Lewd2•Rewooms Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/122019 2:07:10 PM PAGE 4 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. Build. Manage. 20" 2D20 -- Line Unique Task ID Name Duration Start Finish DML.,; Jantuary Felinary i Mardi , ,lune July i August Se ember; Odober ;November Do ;9 :23 16 20 :3. :17 :2 18 130 11 127 :11 25 ;8 j2O 13 :17 31 14 28 IZ 26 9 23 ;1 :21 Level 2-women's Restroom I I I 122425 90 Rough-in OH Sprinkler-Level 2-Women's Restroom 3d 12/2/2019 12/4/2019 Rough-m CH Sp rW-Level 2-Women's Restrooml I I 123 42600 Rough-in OH Controls-Level 2 Women's Restroom 2d 12/4/2019 12/5/2019 1 Rough n off Wow ns 2-Wons Restroom! ........... ........ ........ ................................................................................................... .......... _._.... 12442610 Rough-in OH Are Alarm-Level 2-Women's Restroom 2d 12/4/2019 12/5/2019 IRougb,oHFreAlarm-Lewd 2-womensR%1r7 Level 2-Men's Restroom I I I 126 42740 Rough-in OH Mechanical-Level 2-Men's Restroom 3d 11/4/2019 A 12/3/2019 Rough-in OH Mechanical-Level 2-Men's Restroom I I 127 42830 Frame Remaining Walls-Level 2-Men's Restroom 4d 12/2/2019 12/5/2019 Frame Remaining Wale-Level 2-Men's Restroom, 128 42750 Rough-in OH Electrical-Level 2-Men's Restroom 3d 12/3/2019 12/5/2019 Rough-n OH Dertn<al-Level 2-Men's Reumom 129 42840 Rough-in Wal Drops-Level 2-Men's Restroom 3d 12/4/2019 12/6/2019 ,Rough-in Wal Dmps-Level 2-Men's Restroom 130 42760 1 Rough-in OH Sprinkler-Level 2-Men's Restroom 3d 12/5/2019 12/9/2019 1 Roughin OH Sprinkler-Level 2-Men's Resnoom( I 131 42850 Insulate Carriers&Plumbing Racks-Level 2-Men's Restroom 3d 12/5/2019 12/9/2019 1 Insulate Carriers&Plumbing Rados-level 2-Men's Restmom 132 42770 Rough-In OH Controls-Level 2-Men's Restroom 2d 12/9/2019 12/10/2019 1 RougWil off controls-lewd 2-Men's Restroom ....... .............. _..... ............. .. ...... .. ..... .......... ......... ........................ -__-............. {... ........ 133 42780 Rough-in OH Fire Alarm-Level 2-Men's Restroom 2d 12/9/2019 12/10/2019 1 Rough-inoff Fire Alam,-level 2-Mens Restroom I l 134 42860 Wall Close-in-Level 2-Men's Restroom 5d 12/10/2019 12/16/2019 ®Wal Oose•in-Level 2-Men's Restroom ! ! ! 135 42870 1 Install Sheathing/Gyp-Level 2-Men's Restroom 4d 12/17/2019 12120/2019 11 InVSheathing/Gyp-Level 2-Men's Re;= 36 62600 BuiW-out-Level2-Testing&Insulation 28d —12/2/2019 1/10/2020 - Budout-Level 2-Testing&In:�6on l I 137 50140 Test Mechanical Piping-Level 2 10d 12/2/2019 12/13/2019 restMechanical Pgmp-Level2 I I I ..................._ ........ .................................. ............... ................................................. —...............---— ............................... ...... 13850130 Test Mechanical Duct-Level 2 lod 12/2/2019 12/13/2019 Test I hanicalDuct-Levd2 139 50160 Insulate Mechanical&Plumbing Systems-Level 2 20d 12/5/2019 1/3/2020 Insulate Mechanical&Plumtmg Systems-Level 2 140 50150 Test Plumbing Piping-Level 2 8d 12/16/2019 12/26/2019 Test Plumbing Piping-Level 141 50170 Test Sprinkler Piping-Level 2 10d 12/27/2019 1/10/2020 Test Spnnkkr Piping-Level I I l 142 63450 BuiW-out-Roof-Mechanical Systems 89 8/26/2019 A 1/2/2020 Bu"-Roof-Mechanical Systems 143 63470 Rough-in Mechanical Dud to Equipment Roof 24d 8/26/2019 A 12/2/2019 Rough Mechankai Dud to Equipment Root 144 63480 Rough-in Mechanical Piping to Equipment-Roof 46d 8/30/2019 A 12/5/2019 Rough n Mechanical Peng to Equipment-Roof 1 l I 145 63490 Rough-in Natural Gas Piping to Equipment-Roof 20d 11/25/2019 A 12/24/2019 Roughin Natural�Piping to Equipment-Roof ! 146 63520 Test&Insulate Mechanical Systems-Roof 15d 12/6/2019 12/27/2019 ®Test&Insulate Mechankal Systems-Roof 147 63500 Rough-in&Terminate Power to Equipment-Roof 10d 12/11/2019 12/24/2019 ®Rayh n&Tmninate Powe to Equipment-Roof 148 63510 Rough-in&Terminate Controls to Equipment-Roof 10d 12/18/2019 1/2/2020 Rough in&Terminate combos to Equipment-Roof I 1491450 Finishes 209d 8/1912019A 6/12/2010 "'Fnshes , 15032810 Finishes-Level! 191d[::8:/1:9::/:20:1:9 A 5/18/2020 Finishes-Levels' Kalahari Covention Center- November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07'10 PM PAGE 5 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Ptan. BD I ttl. bla13ge. [21,19 2020 Line Unique Task ID Name Duration Start Finish mber Janes February March rt May June : August :September October November December :23 6 :20 .3 :11 :2 16 30 13 27 ;11 25 -8 22 6 20 3 :17 31 14 28 12 26 9 23 :7 21 .a. Finishes-Crud 180 I I 15247050. Install Ceiling Grid Level BOH 5d 12/2/2019 12/6/2019 fgrnd-Levdl-BOH___.._._.... ...... .. ........_..153 47070 MEP Drops to Caping Grid-Level 1-BOH 5d 12/212019 12/6/2019 P Drops to Ce&N cnd-Level 1-BOHI f i....... ......... .........154 47100 Drop Ceiling Tile-Level 1-BOH 5d 12/2/2019 12/6/2019 p Ceing Tie-Level 1-Boll ....L....._.- L_. _.............I .....155 47170 Install Dock Levelers-Level 1-BOH 5d 12/2/2019 12/6/2019 tal Dock levelers-Level I-BOH I I I 156 47190 Apply EFS Soffit @ Loading Dock-Level 1-BOH 5d 12/2/2019 12/6/2019 AP*EIF5 sorra to Looting Doo Levd 1 BOH I 1 I 157 47200 Install Windows-Level 1-BOH 5d 12/2/2019 12/6/2019 Instal windows-Level I-ea L....... I I 158 47080 Above Ceiling Inspection-Level 1-BOH 5d 12/9/2019 12/13/2019 Above�Cereg Inspection-Lend I-BOH 159 47180 Install OH Doors&Specialties Level 1-80H 5d 12/9/2019 12/13/2019 ®InstalIOHDoors a specialties level 1 eon I I I ........ ........ ......... - 160 47520 Paint EIFS Soffit @ Loading Dock-Level 1-BOH 5d 12/9/2019 12/13/2019 ®Paint Eus SDKs 0 Loafing Dock-Level 1-BOH 161 47110 Trim-out Electrical Devices-Level 1-BOH 5d 12/16/2019 12/20/2019 Tmput blectrid Devkes-Level I-WH 162 47120 Trim-out Data/AV-Level 1-BOH 5d 12/23/2019 12/30/2019 Ti*FM DaWAV-Level 1-BOH i 163 47130 Trim-out Fire Alarm-Level 1-BOH 5d 12/3112019 1/7/2020 Tft-odFireAlan-Level I-BDH I I I 164 47210 Install Doors&Hardware-Level 1-BOH 5d 1/8/2020 1/14/2020 ®meal Doors&Had..-L IM I'-BOH 165 47160 Install Flooring-Level 1-BOH 10d 1/15/2020 1/28/2020 Instal ane-Level I•BOH 166 47140 Install Plywood Wainscott&Specialties-Level 1-BOH 5d 1/2912020 2/4/2020 ®Ina nnvood wakscdt&Spedalbes-Level I-BOH 167 47220 Final Coat Paint-Level 1-BOH 5d 2/5/2020 2/11/2020 ®Rial Coat Palen-Level 1-ea+ I l 168 47230 In-house/Contractor Punch List Level 1-BOH 5d 2/12/2020 2/18/2020 ®Ieaam/contraaor Pwrn List-Levd I-BOH-777 I I . 09 Fnsim-Level 1-Corridors-Nath I 170 47280 Frame Soffits/Ceiling-Level 1-Corridors-North 5d 12/2/2019 12/6/2019 name Sdrns/Celing-Level 1-Corridors-North i 171 47290 MEP Drops to Ceiling-Level 1-Corridors-North 5d 12/9/2019 12/13/2019 ®MEP Drops to Ceing-Level I-Conidurs- Notal I I 172 47300 Above Ceiling Inspection-Level 1-Corridors-North 5d 12/16/2019 12/20/2019 ®Above Ceiling Inspection-lcvd 1-condors-Nam 173 47310 Install Gyp Ceiling-Level 1-Corridors-North 5d 12/23/2019 12/30/2019 Ina Wrote-Level 1-Cornbs-North I I 174 47320 T/F/P Ceilings&Walls-Level 1-Corridors-North 5d 12/31/2019 1/7/2020 T/F/PCeiogs&orals-Level I-Condors-North L I 175 47410 Install Specialty Ceilings-Level 1-Corridors-North 5d 1/8/2020 1/14/2020 ®Ina spewty Cefngs-Lewd 1-Condors-Nam l 17647420 Install Wall Coverings-Level 1-Corridors-North 15d 1/15/2020 2/4/2020 Ina Wal coverings-Levdl-Conchs-Nath 177 47430 Install Millwork/Specialties-Level 1-Corridors-North 5d 2/5/2020 2/11/2020 ®Instal Mesal/sped tries-Level 1-Corridors-Nam I I 17847470 Trim-out Mechanical-LevelI-Corridors-North 5d 2/10/2020 2/14/2020 ®TrimoutNedarad-Level 1-Catrors-North I 179 47440 Trim-out Electrical-Level 1-Corridors-North 5d 2113/2020 2/1912020 Tw W EkNial-Level 1-Corridors-Nam I 180 48890 Trim-out Fire Protection-Level 1-Corridors-North 5d 2/18/2020 2/24/2020 ®Tnmout lee P elector•Level 1-Corridors-Nam Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 6 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. Bu':Id. Manage. 2019 2020 Line Unique Task ID Name Duration Start Finish December January February March April May June August Se ember October November;December 9 23 6 20 3 17 2 :16 30 13 27 11 :25 -8 :22 6 20 3 17 31 14 :28 12 26 9 :23 7 21 181 47450 Trim-out Fire Alarm-Level 1-Corridors-North 5d 2/21/2020 2/27/2020 ®Trim-out Fie IJami-Lewd 1•Comidors•north 182 47460 Trim-out Data/AV-Level 1-Corridors-North 5d 2/26/2020 3/3/2020 ®Trimout Date/AV-Level I-Condors-Norm I I 183 47490 Install Doors&Hardware-Level 1-Condors-North 5d 3/4/2020 3/10/2020 ®Instal Doors&Harmsare•Level I-Comdr-Nam 184 47480 Install Floors-Level 1-Corridors-North 10d 3/11/2020 3/24/2020 Install Priors-Level I-condors-north ' 185 47500 Final Paint-Level 1-Corridors-North 5d 3/25/2020 3/31/2020 Final Paint-Level 1-Corridors-Norm I j 186 47510 In-house/Contractor Punch List-Level 1-Corridors-North 5d 4/1/2020 4/7/2020 In-house/coraactor Penin List•Lewd 1•Comms-Norm I Finishes-Level 1-MaBng Reams: 188 47540 Frame Soffits-Level 1-Meeting Rooms 15d 11/11/2019 A 12/3/2019 Ram somas-Level 1-meeting Room I I I 189 47550 MEP Drops to Soffits-Level 1-Meeting Rooms 5d 11/20/2019 A 12/2/2019 MEP Drays In somas-Lr d I•Meeting Ram j j I 190 47570 Install Gyp Soffits-Level 1-Meeting Rooms 8d 12/3/2019 12/12/2019 Instal orp Somas-Lewd I-Me6ing Rooms I I I 19147580 T/F/P Soffits&Walls-Level 1-Meeting Rooms 5d 12/13/2019 12/19/2019 T/ryP somRs&Weis-Level l-Meetng Rooms 192 47700 Install Ceiling Grid-Level 1-Meeting Rooms 5d 12/20/2019 12/27/2019 wwceiling GM-Level I-Meeting Rooms 193 47710 Install MEP Drops to Ceiling Grid-Level 1-Meeting Rooms 5d 12/30/2019 1/6/2020 Instal MEP Drops to Ceing Grid-Level 1-Meeting Rooms I I 194 47560 Above Ceiling Inspection-Level 1-Meeting Rooms 5d 1/7/2020 1/13/2020 ®Above ceiing Inspection-Level 1'Meetng Room 195 47590 Install ACT Ceilings-Level 1-Meeting Rooms 5d 1/14/2020 1/20/2020 ®Instal ACTceings-Level 1-Meetng Rooms 196 47600 Install Wall Coverings-Level 1-Meeting Rooms 10d 1/21/2020 2/3/2020 IrtCalwal covenro-LeM I-Meeting Rom 197 47610 Install Millwork/Speciathes-Level 1-Meeting Rooms 5d 2/4/2020 2/10/2020 ®Instal Mh,,A/specanns-Level I-Meed g Rooms I I 198 47650 Trim-out Mechanical-Level 1-Meeting Rooms 5d 2/7/2020 2/13/2020 ®Tnmwt Mechanical-Level I-Meeting Rooms 199 47620 Trim-out Electrical-Level 1-Meeting Rooms 5d 2/12/2020 2/18/2020 ®Turnout Dectnc -Level I-Meeting Rooms 200 48880 Trim-out Fire Protection-Level 1-Meeting Rooms 5d 2/17/2020 2/21/2020 ®Tnmgr Fire Protection-Lewd 1-Meeting Rooms 201 47630 Trim-out Fire Alarm-Level 1-Meeting Rooms 5d 2/20/2020 2/26/2020 ®Trim-out Fre warm•Level 1-Meeting Rooms I I 202 47640 Trim-out Data/AV-Level 1-Meeting Rooms 5d 2/25/2020 3/2/2020 ®Tnnr Let D4AY-Lewd 1-Meeting Rooms 20347720 Install Operable Partitions-Level 1-Meeting Rooms 5d 3/3/2020 3/9/2020 ®Instal Parr-Level I-Meering Rooms j 204 47670 Install Doors&Hardware-Level 1-Meeting Rooms 5d 3/10/2020 3/16/2020 0 Instal Doors&Hardware•Level I-Meeting Room I 205 47660 Install Floors-Level 1-Meeting Rooms 10d 3/17/2020 3/30/2020 !Instal Poors•Lewd I-Meeting Rooms I 20647680 Final Paint-Level 1-Meeting Rooms 5d 3/31/2020 4/6/2020 Final Pant-evdl•Meet ng Rooms 207 47690 In-house/Contractor Punch List-Level 1-Meeting Rooms 5d 4/7/2020 4/13/2020 j®In-house/contractor Punch ust•lewd I•Meetm RoomsMill j a; Finishes•Lewd 1•Corridors-South I 209 47940 Tape&Bed Walls-Level 1-Corridors South 5d 12/9/2019 12/13/2019 ®Tape&Bin wars•Levd 1•condors so* 210 47950 Frame Soffits/Ceiling-Level 1-Corridors South 10d 12/16/2019 12/30/2019 wiftme somas/Wing-Level I•comms south Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#*7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 7 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 -Attachment 4 Plan. BL:Id Manage. 2019 2020 Line Unique Task ID Name Duration Start Finish December January February March April liby June Ju August se ember October November:December 9 23 6 :20 3 17 :2 a6 30 13 27 :11 25 :8 :22 6 20 3 17 31 14 :28 12 26 9 :23 :7 :21 211 47960 MEP Drops to Ceiling-Level 1-Corridors South 5d 12/31/2019 1/7/2020 NEP DrM to Ceing-Level 1-CWn DM South j 212 47970 Above Ceiling Inspection-Level 1-Corridors South 5d 1/8/2020 1/14/2020 ®Above Ceing Inspection-level 1-Condors south I I 213 47980 Install Gyp Ceiling-Level 1-Corridors South 8d 1/15/2020 1/24/2020 Insmll Gro Ceing-level 1 110omaors Boum I I 214 47990 T/F/P Ceilings&Walls-Level I-Corridors South 5d 1/27/2020 1/31/2020 ®T/F/P Ceino&Wak-Level l-Corridors South 215 48000 Install Spedalty Ceilings-Lead 1-Corridors South 5d 2/3/2020 2/7/2020 ®Install spetwy Leirr4s-Level I-Cam south 216 48010 Install Wall Coverings-Level 1-Corridors South 15d 2/10/2020 2/28/2020 Insw wall Covemo-levo 1-corraors Boum 1 I 21748020 Install Millwork/Specialties-Levell-Corridors South 5d 3/2/2020 3/6/2020 ®Inca MIvork/Spec"-Levell-Conklom Somh 218 48060 Trim-out Mechanical-Level 1-Corridors South 5d 3/4/2020 3/10/2020 ®TWKu Med and-level 1-Comdas SaAh 219 48030 Trim-out Electrical-Level 1-Corridors South 5d 3/6/2020 3/12/2020 ®Tdmout&coxal-Levd I-Comdas south I I 220 48110 Trim-out Fire Protection-Level 1-Corridors South 5d 3/10/2020 3/16/2020 ®T"t Fre Prd t.-Level I-Corridors south � 22148040 Trim-out Fire Alarm-Levell-Corridors South 5d 3/12/2020 3/18/2020 ®Tnmaut Fre Alarm-Levell-Corridors Southl 222 48050 Trim-out Data/AV-Level 1-Corridors South 5d 3/16/2020 3/20/2020 ®Tnmaut DaWAV-Level 1-Corridors South 223 48080 Install Doors&Hardware-Level 1-Corridors South 5d 3/23/2020 3/27/2020 ®Install Doors&Nar6mre-Level 1-Corrmrs South I 22448070 Install Floors-Levell-Corridors South 15d 3/30/2020 4/17/2020 Inca P.-Leve)l-Comdr;South � 22548090 FinalPaint-Levell-Corridors South 5d 4/20/2020 4/24/2020 Frw1Paint-Level 1-Condors south 22648100 In-house Contractor Punch List-Levell-Corridors South 5d 4/27/2020 5,/1,/2020 Inoue/ComctorPuMhlat-Levell-CorrdasSOLO 22740120 Finishes-Levell-Restrooms 92d 12/2/2019 4/9/2020 Nnmes-Levell-ReArwm I I North Level l-ReWm Nath 22941050 Tape&Bed Walls-Levell-Restroom North 2d 12/2/2019 12/3/2019 Tape eBed Wak-Levell-Restrum North i 230 41060 Frame Light Coves&Ceilings-Level 1-Restroom North 4d 12/3/2019 12/6/2019 Fame Light coves&CefirKis-Level I-Restroom Norm i 23141070 Install MEP Drops to Ceilings-Levell-Restroom North 4d 12/6/2019 12/11/2019 ®IrN veNoPstocerngs-Levdl-RestmomxNm 232 41080 1 Above Ceiling Inspection-Level 1-Restroom North 5d 12/12/2019 12/18/2019 ®Above Ceing mspedan-Level I-Retreom North 233 41090 Install GYP Ceilings-Level 1-Restroom North 4d 12/19/2019 12/24/2019 ®Irew Gr C -Level 1-RNrooro Nod 234 41840 T/F/P Walls&Ceilings-Level 1-Restroom North 5d 12/26/2019 1/2/2020 T/F/P Wak&Ceings-Level I-Resboom Nam I I 235 41850 Install Lights-Level l-Restroom North 3d 1/3/2020 1/7/2020 ®DrstaE Lights-Level I-Restroom Norm 236 41860 Instal Countertops-Level 1-Restroom North 3d 1/1/2020 1/9/2020 ®Insw countertops-Level I-Restroom North 237 41870 Instal Tile-Level 1-Restroom North 15d 1/10/2020 1/30/2020 Inca Tie-Levo 1-Rest Doth Nam 238 41910 Trim-out Ceilings-Level 1-Restroom North 3d 1/31/2020 2/4/2020 Tnnaut Ce f*-Level 1-Restroom Nam I I 23941920 Set Plumbing Fixtures-Levell-Restroom North 8d 2/3/2020 2/12/2020 set PlumdngFDMM-Lewd 1-ReswanNod 240 41930 Instal Partitions&Specialties-Level 1-Restroom North 6d 2/13/2020 2/20/2020 ®msw News&SPedabes-Level 1-Restroom Nalh' Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 8 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 -Attachment 4 Plan. Bu!Id. Manage. 2019 2020 Line Unique Task ID Name Duration Start Finish December Jarura FebruaryMardi r8 Woo Jure J August ,Se ember; October November December 9 :23 6 20 3 :17 2 16 30 13 27 11 25 8 22 6 20 3 17 31 14 28 12 26 9 23 7 21 241 41940 Clean-Level 1-Restroom North 3d 2/21/2020 2/25/2020 'Own•Lewd 1•Restroom North 242 41950 In-house/Contractor Punch List-Level 1-Restroom North 10d 2/26/2020 3/10/2020 In-house I Contractor Punch list-Level 1•Restroom Nod I P. Lewd 1•Restroom Cemer 244 41960 Tape&Bed Walls-Level 1-Restroom Center 2d 12/18/2019 12/19/2019 B Tape&Bed Wale-level 1-Restroom Cemex 245 41970 Frame Light Coves&Ceilings-Level 1-Restroom Center 4d 12/19/2019 12/24/2019 ®Fame Lot Cowes&Cdr gs•Level 1-& Center I t 246 41980 Instal MEP Drops to Ceilings-Level 1-Restroom Center 4d 12/24/2019 12/30/2019 ®Intal MEP Drops to Ceings-Level 1-Restroom Center1 1 I 247 41990 Above Ceiling Inspection-Level 1-Restroom Center 5d 1/8/2020 1/14/2020 ®Above Cein9 Inspection-Level 1•Restroom Center 248 42000 Instal GYP Ceilings-Level 1-Restroom Center 4d 1/15/2020 1/20/2020 ®total GYP Cdings-lewd I•Restroom Center 249 42010 T/F/P Walls&Ceilings-Level 1-Restroom Center 5d 1/21/2020 1/27/2020 ®T/F/P Wallis It Ceings-Level 1-Restroom Center I I 250 42020 Instal Lights-Level 1-Restroom Center 3d 1/27/2020 1/29/2020 1 Instar Lights-Lewd I-Restroan Ceder 251 42030 1 Instal Countertops-Level 1-Restroom Center 3d 1/29/2020 1/31/2020 1Instal Countertops-Level I-Restrain Center 252 42040 Install Tile-Level 1-Restroom Center 15d 2/3/2020 2/21/2020 Instar Tie-Lewd 1-Restroom Center 253 42050 Trim-out Ceilings-level 1-Restroom Center 3d 2/24/2020 2/26/2020 ®ToinoutCeings-Level I-Restroom Center I I 254 42060 Set Plumbing Fixtures-Level 1-Restroom Center 8d 2/25/2020 3/5/2020 set PlunI Fmures-Lewd I-Restroom center I I 255 42070 Instal Partitions&Specialties-Level 1-Restroom Center 6d 3/6/2020 3/13/2020 Instar Pa trtro s&Spetw s-Lewd 1•Rrstroan center 256 42080 Clean-Level 1-Restroom Center 3d 3/16/2020 3/18/2020 ®01-lewd 1-Resumm Center 257 42090 In-house/Contractor Punch List-Level 1-Restroom Center 10d 3/19/2020 4/1/2020 LMotee/Contractor Punch List-Level1-Restrain Center I I Level 1-Restroom South 259 41130 Tape&Bed Walls-Level 1-Restroom South 2d 1/3/2020 1/6/2020 Tape&&e Wals-level 1•Restroom South 260 42100 Frame Light Coves&Ceilings-Level 1-Restroom South 4d 1/6/2020 1/9/2020 ®Fame Lift Cowes&Ceings•Level l•Restroom south 261 42110 Instal MEP Drops to Ceilings-Level 1-Restroom South 4d 1/9/2020 1/14/2020 ®Instar MEP Drops to Ceings-Level 1-Restroom South I t 262 42120 Above Ceiling Inspection-Level 1-Restroom South 5d 1/15/2020 1/21/2020 ®Above Ceing Inspectron-Level 1-Restrain Sant 263 42130 Instal GYP Ceilings-Level 1-Restroom South 4d 1/22/2020 1/27/2020 ®Instal GYP Ceings-Lewd 1�Restroom South 264 42140 T/F/P Walls&Ceilings-Level 1-Restroom South 5d 1/28/2020 2/3/2020 ®TSF/P Wars&Ceilgs-Lewd 1-Restroom South I I 265 42150 Install Lights-Level 1-Restroom South 3d 2/4/2020 2/6/2020 1 Instar Lots-level 1 Restroom South I I 266 42160 Instal Countertops-Level 1-Restroom South 3d 2/6/2020 2/10/2020 ®Instar CountMops-Lad 1•Restroom South 267 42170 Instal Tile-Level 1-Restroom South 15d 2/11/2020 3/2/2020 Instar Tie-Lad 1-Restroom South I I 268 42180 Trim-out Ceilings-Level 1-Restroom South 3d 3/3/2020 3/5/2020 1 Tnmout Cerngs-Lad 1-Restroom South I I 26942190 Set Plumbing Fixtures-Level l-Restroom South 8d 3/4/2020 3/13/2020 Set Plumbing Fixtrrres-Lad l-Restroom South 270 42200 Instal Partitions&Specialties-Level 1-Restroom South 6d 3/16/2020 3/23/2020 ®Instar Partitions&Specelies-Lad I-Restroan South Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 9 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. Bu.ld. Manage, 2019 2020 Line Unique Task ID Name Duration Start Finish December Jana FebRary March April kby June Ju Aust September October November December 9 23 6 20 3 17 2 16 30 13 27 11 25 8 22 6 20 3 17 31 14 28 12 26 9 23 :7 21 271 42210 Clean-Level 1-Restroom South 3d 3/24/2020 3/26/2020 1 Clean-Level I-Restroom scum 272 42220 In-house/Contractor Punch List-Level 1- 10d 3/27/2020 4/9/2020 In-house/Contrador Punch List-Lead I- I Finishes-Lead•Kimanjaro Bafoan I 274 47730 Tape&Bed Walls-Level 1-Kilimanjaro Ballroom 5d 12/2/2019 12/6/2019 Tape B Bed Walls-level 1-Kimanjaro Balroom ' 275 47740 Frame Soffits-Level 1-Kilimanjaro Ballroom 20d 12/9/2019 1/1/2020 Frame Soffits-Level 1-Kimanjaro Balroom 276 47930 Black-out Ceilings Above Soffits-Level 1-Kilimanjaro Ballroom 10d 1/6/2020 1/17/2020 Blackout Cekgs Above Soffts-Level 1-K kmanjaro Bakoom l I 277 47750 MEP Drops to Soffits-Level 1-Kilimanjaro Ballroom 8d 1/8/2020 1/17/2020 MBP Drops to soffits-Level I-Lurlaro BA= 278 47770 Install Gyp Soffits-Level 1-Kilimanjaro Ballroom 10d 1/20/2020 1/31/2020 InsW Gypsoft-Level I-Kimaniama&= 279 47780 T/F/P Soffits&Walls-Level 1-Kilimanjaro Ballroom 10d 2/3/2020 2/14/2020 T/F/P Soffits&Wale-level 1-Kimanjaro Bain. i 1 280 47900 Install Ceiling Grid @ Registration/Offices-Level 1-Kilimanjaro Ballroo 6d 2/17/2020 2/24/2020 InsW Ceing Grid 0 Registration/Offices-Level l•Kimanjam 9ak00m 1 281 47910 Install MEP Drops to Ceiling Grid-Level 1-Kilimanjaro Ballroom 5d 2/19/2020 2/25/2020 ®instal MEP Drops to Ceiling W-Level 1-Kimanjaro Bakoom 282 47760 Above Ceiling Inspection-Level 1-Kilimanjaro Ballroom 5d 2/26/2020 3/3/2020 ®Above Ceing Inspection-Level I•munanjam ukoom 283 47790 Install ACT Ceilings-Level 1-Kilimanjaro Ballroom 5d 3/4/2020 3/10/2020 ®1mW ACT CeiV-Level 1-awnanjam Bahl' I 284 47800 Install Wall Coverings-Level 1-Kilimanjaro Ballroom 15d 3/11/2020 3/31/2020 Instal wal Coverings-Level 1-Ki nanjaro Balroom 28547920 Install Operable Partitions-Level 1-Kilimanjaro Ballroom 15d 4/1/2020 4/21/2020 Instal Operable Parutiom-Levdl-Kinaniaro Ballroom 286 47810 Install Millwork/Specialties-Level 1-Kilimanjaro Ballroom 5d 4/1/2020 4/7/2020 Instal Miivork/Specialties•Level 1;Kiknanjam Ballroom i 287 47820 Trim-out Mechanical-Level 1-Kilimanjaro Ballroom 5d 4/3/2020 4/9/2020 I®Tran-out Mechankal-Level 1.Or ania o Baioom 288 47830 Trim-out Electrical-Level 1-Kilimanjaro Ballroom 5d 4/7/2020 4/13/2020 ®Tnmout Fear al-Level 1-Kimanjam Balurn 289 48870 Trim-out Fire Protection-Level 1-Kilimanjaro Ballroom 5d 4/9/2020 4/15/2020 ®Trknout Fre Fotecoon-Level 1-Kvnaniaro Ballroom i 290 47840 Trim-out Fire Harm-Level 1-Kilimanjaro Ballroom 5d 4/13/2020 4/17/2020 ®Trmout Fra Warm-Level l-Kimanjam Balroom 291 47850 Trim-out Data/AV-Level 1-Kilimanjaro Ballroom 5d 4/15/2020 4/21/2020 I ®Thar out Data/AV-Level 1-Kimanjaro Balroom I 292 47860 Install Doors&Hardware-Level 1-Kilimanjaro Ballroom 10d 4/22/2020 5/5/2020 Instal Doors&Hwlwr -Level I-Ornanjaro Balkoom 293 47870 DO NOT Install Floors-Level 1-Kilimanjaro Ballroom ld 5/5/2020 5/5/2020 'DO NOT Instal Fours-level 1•Kilmaniaro Balsam.................... alsam i ......... .......... 294 47880 Final Paint-Level 1-Kilimanjaro Ballroom 5d 5/5/2020 5/11/2020 I ®Final Pam-Level l-Kimaniam Balmom l 295 47890 In-house/Contractor Punch List-Level 1-Kilimanjaro Ballroom 5d 5/12/2020 5/18/2020 I ®In-bom/Contractor Punch hat•Level 1•Kilnanjaro Babo m 29632820 Finishes-Level 2 137d 12/2/2019 6/12/2020 Fnts •Level 29740170 Finishes-Level 2-80H 40d 12/2/2019 1/28/2020 -Levei2-B01t 298 48910 Tape&Float Walls-Level 2-BOH 5d 12/2/2019 12/6/2019 1 Tape&FM wars-Level 2-BOH I I l 299 49110 Trim-out Mechanical-Level 2 BOH 5d 12/9/2019 12/13/2019 .. Trinrout Merhareral Level 2•BOH ( I I 300 49020 Install Plywood Wainscott&Specialties-Level 2-BOH 5d 12/9/2019 1 12/13/2019 ®imtal Rmood wainscelt&sped"•Lard 2i BOH Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 10 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan Bold. Manage. 2019 2020 Line Unique Task ID Name Duration Start Finish December: January February Mardi dl May June Ju August :Se ember October November.December 9 :23 16 20 :3 :17 :2 :16 130 113 127 :11 25 8 :22 16 120 13 :17 :31 :14 :28 IIZ 126 19 :23 :7 :21 301 48990 Trim-out Electrical Devices-Level 2-BOH 5d 12/16/2019 12/20/2019 ®Trili Decbnal DevKes-Level 2-WH I I I 302 49000 Trim-out Data/AV-Level 2-BOH 5d 12/23/2019 12/30/2019 Tw-out Data/AV-Level 2-60H I I I 303 49010 Trim-out Fire Alarm-Level 2-BOH 5d 12/31/2019 1/7/2020 Trip"Hire Alarm-Level2•BOII 304 49080 1 Install Doors&Hardware-Level 2-BOH 5d 1/8/2020 1/14/2020 ®Intal Doors a Hardvare-Level z•Boll 305 49030 1 Apply Flooring Treatment-Level 2-BOH 5d 1/15/2020 1/21/2020 ®Appf/Moonng Treatment-Level 2-11011 1 I 306 49090 Final Coat Paint Doors&Frames-Level 2-BOH 5d 1/15/2020 1/21/2020 ®noa coat Pam Doors 6 -Level 2.60H l 307 49100 1 In-house/Contractor Punch List-Level 2-BOH 5d 1/22/2020 1/28/2020 In-house/ConUXU Poch List-Level 2-BOH 30840180 Finishes-Level 2-Meeting Rooms 91d 12/1/2019 4/8/2020 __r I Finishes-Level 2-Meeting Room l l 309 48150 Tape&Bed Walls-Level 2-Meeting Rooms 5d 12/2/2019 12/6/2019 Tape&flea wads-Level 2-Meeting Rooms 1 l I 310 48160 Frame Soffits-Level 2-Meeting Rooms 8d 12/5/2019 12/16/2019 Frame Soffits-Level 2-Meeting Rooms I I I 311 48170 MEP Drops to Soffits-Level 2-Meeting Rooms 5d 12/12/2019 12/18/2019 ®MEP D ops to Soffits-Level 2-Meeting Rooms 312 48190 Install Gyp Soffits-Level 2-Meeting Rooms 5d 12/19/2019 12/26/2019 Instal Gro soffits-Level 2-MeeNg Rooms 313 48200 T/F/P Soffits&Walls-Level 2-Meeting Rooms 7d 12/27/2019 1/1/2020 TIF/P soffits awak-Level 2-Meeting Roans l I 314 48320 Install Ceiling Grid-Level 2-Meeting Rooms 5d 1/8/2020 1/14/2020 ®Instal Ceiirg Grid-Level 2-Meting Rooms 315 48330 Install MEP Drops to Ceiling Grid-Level 2-Meeting Rooms 5d 1/15/2020 1/21/2020 Instal MEP Drops to Ceiling Geld-Level 2-Meeting Rooms 31648180 Above Ceiling Inspection-Level 2-Meeting Rooms 5d 1/22/2020 1/28/2020 Above CeliInspecton-Levelz-MeetingRooms 317 48210 Install ACT Ceilings-Level 2-Meeting Rooms 5d 1/29/2020 2/4/2020 ®Instal Act ceilings-Level 2•Meeting Rooms l I 318 48220 Install Wall Coverings-Level 2-Meeting Rooms 5d 2/5/2020 2/11/2020 ®Instal wall Cover* Level 2.1 Rooms l I 319 48230 Install Millwork/Specialties-Level 2-Meeting Rooms 3d 2/12/2020 2/14/2020 'Intal ft wx/Walres.Level 2.Meng Room 32048240 Trim-out Mechanical-Level 2-Meeting Rooms 3d 2/17/2020 2/19/2020 1TntriMecl ical-Level2-MeetngRooms I I 321 48250 Trim-out Electrical-Level 2-Meeting Rooms 3d 2/19/2020 2/21/2020 ®TwW SKriral-Level 2-Meeting Roam l l 322 48860 Trim-out Fire Protection-Level 2-Meeting Rooms 3d 2/21/2020 2/25/2020 ®Trir a rt Fre Protection-Level 2-MeehN Rooms 323 48260 Trim-out Fire Alarm-Level 2-Meeting Rooms 5d 2/25/2020 3/2/2020 ®Tdmout bream-Level 2-Meeting Rooms 324 48270 Trim-out Data/AV-Level 2-Meeting Rooms 5d 2/27/2020 3/4/2020 Trm-M Data/Av-Level 2-Meeting Rooms I I 325 48340 Install Operable Partitions-Level 2-Meeting Rooms 5d 3/5/2020 3/11/2020 ®Instal Opesi Partitions-Level 2-Meeting Rooms 326 48280 Install Doors&Hardware-Level 2-Meeting Rooms 5d 3/12/2020 3/18/2020 ®Instal Doors®Hardware-Level 2-Meeting Roans 32748290 Install Floors-Level 2-Meeting Rooms 5d 3/19/2020 3/25/2020 ®listalFm-Level 2-Meeting Rooms l l 328 48300 Final Paint-Level 2-Meeting Rooms 5d 3/26/2020 4/1/2020 ®Final Paint-Level 2-Meeting Rooms I l 32948310 In-house'Contractor Punch List-Level 2 Meeting Rooms 5d 412!2020 4/8/2020 Io-house/contractor Punch List-Level 2-MeehgRooms 33040190 Finishes-Level 2-Kalahari Ballroom 137d 12/2/2019 6/12/2020 ==9 Brushes-Level 2-Wharf Ballroom ------ — ----- Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 11 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. 81: d Menage. 2019 2020 Line Unique Task ID Name Duration Sart Finish December Januaq :February March April ; Way June J August September October November:December 9 23 16 :20 3 :17 :2 :16 130 113 127 11 25 :8 22 16 120 13 17 :31 1/ :28 112 126 9 :23 :7 21 331 48350 Tape&Bed Walls-Level 2-Kalahari Ballroom 5d 12/2/2019 12/6/2019 Tape®Bed Walk-level 2-Kalahari Ballroom 332 48360 Frame Soffits-Level 2-Kalahari Ballroom 20d 12/5/2019 1/3/2020 Fame Sft-Lewd 2-Kalahari Balroom I I 333 48370 MEP Drops to Soffits-Level 2-Kalahari Ballroom 8d 1/6/2020 1/15/2020 MBP Drops to solffts-Lewd 2-Kalahari Baroom ! ! 334 48390 Install Gyp Soffits-Level 2-Kalahari Ballroom 10d 1/16/2020 1/29/2020 Instal oro Sodlk-Lewd 2-Kalahari Ballroom 335 48400 T/F/P Soffits&Walls-Level 2-Kalahari Ballroom 10d 1/30/2020 2/12/2020 T/F/P soffits&walk-level 2-Kalahari Umonn 33648520 Install Ceiling Grid-Level 2-Kalahari Ballroom 10d 2/13/2020 2/26/2020 Install CdN6rd-Level 2-KalahanBallroom l I 337 48530 Install MEP Drops to Ceiling Grid-Level 2-Kalahari Ballroom 10d 2/20/2020 3/4/2020 Bnw MEP Dropsto Ceiling w-Level 2-Kalahari Baroom 338 48380 Above Ceiling Inspection-Level 2-Kalahari Ballroom 5d 3/5/2020 3/11/2020 ®Above fro inspection-level 2-Kalahari Ballroom j 339 48410 Install ACr Ceilings-Level 2-Kalahari Ballroom 10d 3/12/2020 3/25/2020 Inthl ACT Ceilings-level 2-Kalahan Balrodn I 340 48420 Install Wall Coverings-Level 2-Kalahari Ballroom 15d 3/19/2020 4/8/2020 Install Wall cwerap-Level 2-Kal hW Ulroorn 341 48430 Install Millwork/Spedalbes-Level 2-Kalahari Ballroom 5d 4/9/2020 4/15/2020 ®msW mbak/speclalaes-Led 2-Kdaw Ballroom 342 48440 Trim-out Mechanical-Level 2-Kalahari Ballroom 5d 4/13/2020 4/17/2020 j ®Trmout Mechanlral-Level 2.Kalahan Baroom j 343 48450 Trim-out Electrical-Level 2-Kalahari Ballroom 5d 4/15/2020 4/21/2020 I ®Tnmout EledrrA-Level 2-Kalahen Baroom I 344 48850 Trim-out Fire Protection-Level 2-Kalahari Ballroom 5d 4/17/2020 4/23/2020 I ®Trmout Fire Protecbon-Level 2-Uhhan Baroom ! 345 48460 Trim-out Fire Alarm-Level 2-Kalahari Ballroom 5d 4/21/2020 4/27/2020 ®Tnmod Fre Alarm-Level 2-Kalahari Baborm 346 48470 Trim-out Data/AV-Level 2-Kalahari Ballroom 5d 4/23/2020 4/29/2020 j ®Tnmout Data/AV-Level 2,-Kalahan Baroom j 347 48540 Install Operable Partitions-Level 2-Kalahari Ballroom 10d 4/24/2020 5/1/2020 I Install opeatle Paftons-Level 2-Kalahan Balrooin 348 48480 Install Doors&Hardware-Level 2-Kalahari Ballroom 5d 5/8/2020 5/14/2020 I ®Instal Doors&Hardware-Leel 2-Kalahan Baroom 349 48490 Install Floors-Level 2-Kalahari Ballroom 10d 5/15/2020 5/29/2020 j Instal Floors,-Level 2-Kalahan Baroom j 350 48500 Final Paint-Level 2-Kalahari Ballroom 5d 6/1/2020 6/5/2020 I ®bow Pant-level 2-Kalahan Bal. 35148510 In-house/Contractor Punch List-Level 2-Kalahari Ballroom 5d 6/8/2020 6/12/2020104,elContradorPunchust-Lade-Kalahanearoom 352 40200 Finishes-Level -Restrooms 92d 12/2/2019 4/9/2020 Finishes-Level 2-ReMo ms 353 47.239 Wo , ,`, 9 L women's Restroom 354 42250 Tape&Bed Walls-Level 2-Women's Restroom 2d 12/2/2019 12/3/2019 Tape It. Ovals-Level 2-Women's Restroom j l I 355 42260 Frame Light Coves&Ceilings-Level 2-Women's Restroom 4d 12/3/2019 12/6/2019 Fame Light Coves&Ceilings-Level 2-Wow's Restroom I I 356 42270 Instal MEP Drops to Ceilings-Level 2-Women's Restroom 4d 12/6/2019 12/11/2019 ®Instal MEP Drops to cerrgs-Level 2-Women's Restroom 357 42280 Above Ceiling Inspection-Level 2-Women's Restroom 5d 1/13/2020 1/17/2020 ®Above Ceiling Inspection-Lad 2-Women's Restroom I I 358 42290 Install GYP Ceilings-Level 2-Women's Restroom 4d 1/20/2020 1/23/2020 ®ImGI GYP Ceilings-Level 2-Women's Restroom I I 359 42300 T/F/P Walls&Ceilings-Level 2-Women's Restroom 5d 1/24/2020 1/30/2020 ®T/F/P Walk&Ceings-Level 2-Women's Restroom 360 42310 Install Lights-Level 2-Women's Restroom 3d 1/31/2020 2/4/2020 1 instal Lots-Level 2-Women's Restroom Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 12 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Ptln. Build, 14en3ge. 2019 : 2020 Line Unique Task ID Name Duration Start Finish December Jam February March ri Way June July 1 August Se ember October :November December 9 ;23 6 :20 :3 17 2 16 30 13 27 11 :25 8 22 6 20 3 17 31 14 28 1Z 26 9 23 ;7 21 361 42320 Install Countertops-Level 2-Women's Restroom 3d 2/4/2020 2/6/2020 ®InsW Countertops-Levd 2-women's Restroom I I 362 42330 Install Tile-Level 2-Women's Restroom 15d 2/7/2020 2/27/2020 Instal Tit-Level 2-Women's Restroom I I 363 42340 Trim-out Ceilings-Level 2-Women's Restroom 4d 2/28/2020 3/4/2020 ®TwroutCd gs-Lo-el 2-Women's Restmom 36442350 Set Plumbing Fixtures-Level 2-Women's Restroom 8d 3/2/2020 3/11/2020 Set PlumbhgRdLm-Leal 2-Women's Restroom 365 42360 Install Partitions&Specialties-Level 2-Women's Restroom 8d 3/12/2020 3/23/2020 0 Instar Pa &Speoiltes-Led 2-Women's Restroom i 366 42370 Clean-Level 2-Women's Restroom 3d 3/24/2020 3/26/2020 1 Clean-Level 2-Women's Restroom L I 367 42380 In-house/Contractor Punch List-Level 2-Restroom North 10d 3/27/2020 4/9/2020 In-house/Contractor Punch Lst-evd 2-Restroom North 42240 Men's Restroom 70 ,,1223 201 _- 3/3f( 020.: Men's Restroom 369 42390 Tape&Bed Walls-Level 2-Men's Restroom 2d 12/23/2019 12/24/2019 1 Tape&Md Walls-Lem 2-Mm's Restroom 1 I 370 42400 Frame tight Coves&Ceilings-Level 2-Men's Restroom 4d 12/24/2019 12/30/2019 ®Frame ught Coes&cel ngs-Level 2-Men's Restroom 1 371 42410 Install MEP Drops to Ceilings-Level 2-Men's Restroom 4d 12/30/2019 1/3/2020 Instar nO Drops to ceugs-Level 2-Mens Restroom 372 42420 1 Above Ceiling Inspection-Level 2-Men's Restroom 5d 1/6/2020 1/10/2020 ®above Ceing Inspection-teed 2-Men's Restroom i 373 42430 Instal GYP Ceilings-Level 2-Men's Restroom 4d 1/13/2020 1/16/2020 ®Inew GYP Ceirgs-Levd 2.Men's Restroom I I 374 42440 T/F/P Walls&Ceilings-Level 2-Men's Restroom 5d 1/17/2020 1/23/2020 ®T/FIP W&&Como-Level 2-Men's Restroom 375 42450 Install Lights-Level 2-Men's Restroom 3d 1/24/2020 1/28/2020 ®Insall Lights-Level 2-Men's Restroom 376 42460 Install Countertops-Level 2-Men's Restroom 3d 1/28/2020 1/30/2020 1 ImW Countertops-Level 2-Mm's Restroom i I 377 42470 Install Tile-Level 2-Men's Restroom 15d 1/31/2020 2/20/2020 Instal Tie-Level 2-Men's Restroom I I 378 42480 Trim-out Ceilings-Level 2-Men's Restroom 3d 2/21/2020 2/25/2020 Trm-out cdiirge-Leel 2-Men's Restroom I I 379 42490 Set Plumbing Fixtures-Level 2-Men's Restroom 8d 2/24/2020 3/4/2020 Set Mumbup Fixtures-Levd 2-Mm's Restroom i 380 42500 Install Partitions&Specialties-Level 2-Men's Restroom 6d 3/5/2020 3/12/2020 Instal Partitions&spedanes-Led 2-Mm's Restroom i 381 42510 Clean-Level 2-Men's Restroom 3d 3/13/2020 3/17/2020 ®aean,-Level 2-Men's Restroom 382 42520 In-house/Contractor Punch List-Level 2-Men's Restroom 10d 3/18/2020 3/31/2020 Inhouse/Contractor Punch List-Level'2-Mm's Restroom 12 4_0W .gi\ I fin"-Level 2-Condors 1 I 384 40220 1 Tape&Bed Walls-Level 2-Corridors 5d 12/9/2019 12/13/2019 Tape&sed walls-Level 2-Corridors I I I 385 48550 Frame Soffits/Ceiling-Level 2-Corridors 10d 12/16/2019 12/30/2019 Frame Sara/Cdog-Level 2-Condors I I 386 48560 MEP Drops to Ceiling-Level 2-Corridors 5d 12/23/2019 12/30/2019 ®MEP Drops to Ceing-Level 2-Corridors! 387 48570 Above Ceiling Inspection-Level 2-Corridors 5d 12/31/2019 1/7/2020 Move Ceing Inspection-Level 2-&n&rs i 38848580 Install Gyp Ceiling-Level 2-Corridors 8d 1/8/2020 1/17/2020 Instal Gyp CAW I I 389 48590 T/F/P Ceilings&Walls-Level 2-Corridors 5d 1/20/2020 1/24/2020 ®T/F/P Cei gs&Woe-level 2-cocheo s 390 48600 Install Specialty Ceilings-Level 2-Corridors 5d 1/22/2020 1/28/2020 ®Instar Spedaltr Ceiino-Levd 2-comm Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 13 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Ptan, Bella Manage. 2019 : 2020 -- Line Unique Task ID Name Duration Start Finish December: Jana February March MN May June July 1 August 5a ember October November December 9 :23 6 20 :3 17 2 16 30 13 27 11 25 :6 :22 6 20 3 17 :31 14 26 12 26 9 23 :7 21 39148610 Install Wall Covetings-Level 2-Corridors 15d 1/24/2020 2/13/2020 Instar wall coven"R"-Level 2-Corridors I I 392 48620 Install Millwork/Specialties-Level 2-Corridors 5d 2/14/2020 2/20/2020 ®Instar MAvork/5peda z-Level 2-CoMdms I I 393 48630 Trim-out Mechanical-Level 2-Corridors 5d 2/18/2020 2/24/2020 ®Tnwut Medwdal-Level 2-Connors ! 39448640 Trim-out Electrical-Level 2-Corridors 5d 2/20/2020 2/26/2020 ®Tnmout Electrical-Level 2-Corridors 395 48840 Tdm-out Fire Protection-Level 2-Corridors 5d 2/24/2020 2/28/2020 ®Tmrout Fre Protectem-Level 2-Corridors I I 3%48650 Thm-out Fire Alarm-Level 2-Condors 5d 2/26/2020 3/3/2020 ®Tnmr out Fm Atom-Level 2-Comdors l 39748660 Trim-out Data/AV-Level 2-Corridors 5d 2/28/2020 3/5/2020 ®TdmMDan/AV-Level 2-Comolors .. ................._._........ .. ._....._ ._._..._.. .- I .... ..-_ ._._.. 398 48670 Install Doors&Hardware-Level 2-Corridors 5d 212812020 3/5/2020 ®Insall Doors a March are•Level 2-Corridors ........... :..._._.. 39948830 Install Ornamental Guardrail @Escalators-Level 2-Corridors 15d 2/28/2020 3/19/2020 InsrOrnamental Guardrail @Escalators-Level 2-Cornd: i 400 48680 Install Floors-Level 2-Corridors 15d 3/6/2020 3/26/2020 Insall rbors-Levd 2-Corridors 401 48690 Final Paint-Level 2-Corridors 5d 3/27/2020 4/2/2020 Int evd 2-"'o" 402 48700 In-house/Contractor Punch List Level 2-Corridors 5d 4/3/2020 4/9/2020 i®rn4wuse/contractor Punch Lst-Level 2-condors i- r �; 1;, Fnshea-level 2-East Lobby I 404 48710 Tape&Bed Walls/Soffits-Level 2-East Lobby 5d 12/2/2019 12/6/2019 Tape i quad wallsI sorra-Level 2-eau Lobby I I I 405 48730 Frame Ceilings @ Rafters-Level 2-East Lobby 10d 12/9/2019 12/20/2019 Frame ceinys @ Rafters-Level 2-East Loan 406 48750 MEP Drops to Ceiling-Level 2-East Lobby 6d 12/23/2019 12/31/2019 MEP Drops to Ceirg-Level 2•East Lobby I I 407 48760 Above Ceiling Inspection-Level 2-East Lobby 5d 1/2/2020 1/8/2020 ®Above Cabs Inspection-Level 2-Past Labe/ I I L I I 408 48770 Install Gyp Ceiling-Level 2-East Lobby 6d 1/9/2020 1/16/2020 ®Insall Gyp Ceintl-Level 2•East Lobby 409 48780 T/F/P Ceilings-Level 2-East Lobby 5d 1/17/2020 1/23/2020 ®T/F/P Cav-Level 2-East + I I 410 48720 Install Wood Rafters-Level 2-East Lobby 15d 1/24/2020 2/13/2020 Insall wood Rafters-Level 2-East Lamy I l 411 48790 Trim-out Mechanical-Level 2-East Lobby 5d 2/14/2020 2/20/2020 ®Trinout Machan,"•Level 2-Eau Lobby I ! 412 48800 Trim-out Electrical-Level 2-East Lobby 5d 2/18/2020 2/24/2020 ®Tnmout E1ed kd•Level 2•Eau Lobby 413 48820 Trim-out Fire Protection-Level 2-East Lobby 5d 2/20/2020 2/26/2020 ®Tri"ut Fre Protection•Level 2•East Lobby I I 414 48810 Trim-out Fire Alarm-Level 2-East Lobby 5d 2/24/2020 2/28/2020 Trim-out Fre Alarm-Level 2-East Lamy l I 415 48900 In-house/Contractor Punch List Level 2 East Lobby 5d 3/16/2020 3/20/2020 ®"use/Contractor Punch Lest-Level 2 Eau Lobb/ 4161470 Conveyance 229d 5/24/2019 A 4/17/2020 Conveyance 417 37330 Service Elevator 48d 12/10/2019 2/17/2020 6erv¢e E>ervamr i l 418 37370 Install Elevator Rails-Service Elevator 10d 12/10/2019 12/23/2019 Instar Elevator Pais-semce Elevator I I I 419 37380 Set Equipment-Service Elevator 5d 12/24/2019 12/31/2019 set Equipment•Sam Elevator ! I l 420 37390 Set Door Frames-Service Elevator 5d 1/1/2020 1/8/2020 ®sd Door Fames-le vee Elevator' Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:10 PM PAGE 14 of 17 LFILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. Bu::id. Manage. 2019 2020 Line Unique Task ID Name Duratl0n start Finish December Jana Fetiniary Mardi April : May June juk 1 August :Se ember: October November,Derahe mr 9 :23 6 20 :3 17 :2 :16 30 13 27 11 :25 :8 22 6 20 3 17 :31 :14 :26 12 26 9 :23 ;7 :21 421 37400 Close-up Hoist Way-Service Elevator 5d 1/9/2020 1115/2020 ®Closimp Hoot Way-Sm"Elevator 422 37410 Build Cab-Service Elevator 8d 1/16/2020 1/27/2020 Band Cab-sevlce Bettor! I I 423 37420 Wiring&Testing-Service Elevator 15d 1/28/2020 2/17/2020 Wiring&Testing-Service 9evator 424 37340 Passenger Elevator 43d 1/28/2020 3/26/2020 Passenger Elevator 425 37450 Install Elevator Rails-Passenger Elevator 5d 1/28/2020 2/3/2020 ®insW ee wrP&-PeumgerElevator I I 426 37460 Set Equipment-Passenger Elevator 5d 2/4/2020 2/1012020 ®set Equipment-Passenger E63W I I 427 37470 Set Door Frames-Passenger Elevator 5d 2/11/2020 2/17/2020 ®Set Door karna-Passeiger Elevat 428 37480 Close-up Hoist Way-Passenger Elevator 5d 2/18/2020 2/24/2020 ®aos"P Hoist Way-Passenger Ekvator 429 37490 Build Cab-Passenger Elevator 8d 2/25/2020 3/5/2020 &uid Cab-Passenger deYator I l 430 37500 Wiring&Testing-Passenger Elevator 15d 3/6/2020 3/26/2020 Wiing&Testng-PassengerSm t, 1 1 431 37350 Escalators 229d 5/24/2019 A 4/17/2020 " Etns 43237520 Escalator-Hook-up&Fit-up 10d 3/2/2020 3/13/2020 aR-4 433 37530 Escalator-Trim 15d 3/16/2020 4/3/2020 Eli Esrahtor-Tim I I 434 37540 Escalator-Start-up&Testing 10d 4/6/2020 4/17/2020 I E.W.-SWV Testing I I 4351450 Commissioning 192d 12/3/2019 9/1/2020 Canml wing 43666710 Convention Center-Commissioning Complete 9/1/2020 9/1/2020 i i Convention Center-Commissoning Complete 437 37550 Conveyance 15 6/10/2020 6/30/2020 1 Comeyance l 438 37620 Escalator QEI 5d 6/10/2020 6/16/2020 I ®Es alas Q. 1 439 37600 Service Elevator QEI 5d 6/17/2020 6/23/2020 i ®s7vke Emtor QS 1 440 37610 Passenger Elevator QEI 5d 6/24/2020 6/30/2020 I 19 Passenger Sevam QE I 441 66660 Elevator&Escalator QEI Complete 6130/2020 6/30/2020 I ♦Elevator&Ewlitor QEI Complete 44237560 Mechancial Systems 174d 12/30/2019 9/1/2020 NemantWsystese 443 75920 Rip&Flush CHW System 7d 12/30/2019 1/8/2020 go&Nash am systen 444 37630 Factory Start-up Air Handling Equipment-CC 5d 1/15/2020 1/21/2020 0 W" t I 445 37650 Point to Point Controls-CC 30d 2/26/2020 4/7/2020 I mtofttCO"-CC 446 37660 Pre-functional Equipment&System Checks-CC 30d 4/8/2020 5/19/2020 Wunctional Eq%p &System Checks-CC 447 66750 Test&Balance-CC 50d 5/20/2020 7/30/2020 i Test&Balm-CC 448 37670 Functional Equipment Testing-CC 23d 7/31/2020 9/1/2020 I I NndiomlE upnentTesting-Cc 449 37570 Electrical Systems 150d 12/3/2019 7/2/2020 amb"syyuerns 450 37750 Power 52d 12/3/2019 2/14/2020 Power Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:11 PM PAGE 15 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 -Attachment 4 Plan. BL A. M1 nage. 2019 2020 Une Unique Task ID Name Duration $tart Finish December Jana February Mardi April way June July 1 August Se ember October November;December 9 23 6 20 3 17 2 16 30 13 27 11 25 8 22 6 20 3 :17 31 14 28 12 26 9 23 7 -.21 45137790 Start-up Main Electrical Gear-Level 2 Main Electric Room 5d 12/3/2019 12/9/2019 Start-up MinElectcalGear-Level 2MamSechiicRoam I I 452 68060 UL Test Grounding System-Convention Center 5d 12/4/2019 12/10/2019 UL Test Goudng System-Corwetbn Center I I 453 59270 Power Available-Convention Center 12/9/2019 12/9/2019 power Available-Convetiion center 45476050 Set Emergency Generator-Loading Dock Exterior 5d 1/13/2020* 1/17/2020 Set Emergency Generator-Loafing Dock Exterior 455 50320 1 Start-up Emergency Generator-Loading Dock Exterior 5d 1/20/2020 1/24/2020 ®start-up Emergency Genemta-laadmg Dor&Eaeior l l 45650330 Load Bank Test Emergency Generator-LocadingDockExterior 5d 1/27/2020 1/31/2020 ®LoadBankTestEmergecyGenerator-LocatingDockExtenur l l 457 37800 Test Automatic Trasnfer Switches-Level 2 Emergency Electrical Room 5d 2/3/2020 2/7/2020 ®Test Automatic Tresnde Switches-level 2 Emergency 6ectmil Room 458 37810 Test Emergency Power Functionality-Convention Center 5d 2/10/2020 2/14/2020 ®Test Emergency Power Nnctiunakty-convention ceder I I 459 59290 Power Complete-Convention Center 2/14/2020 2/14/2020 ♦PowerComplee-ConvenW Center I i h35d 4/26/2020 6/16/2020 I Fre 1h 461 37820 As-built Fire Alarm Documents&System Programming 15d 4/28/2020 5/18/2020 As-bwk Fie Alan Doaments&system Pregamvning 462 37830 In-house Fire Alarm Functionality Testing 15d 5/19/2020 6/9/2020 i inhouse tie Alarm Functiomaky Testhg I 463 37840 AH)Fire Harm Testing 5d 6/10/2020 6/16/2020 1 ®AW Re Alarm TeVing 465 58400 Data Wire Terminations Complete-Level 1-North 3/3/2020 3/3/2020 Data WireTem natimrs Complete-Level l-North; 46658410 Data Wire Terminations Complete-Level 1-South 4/21/2020 4/21/2020 I Data wire Terminations ComP4te-Lem 1-South j 467 58420 Data Wire Terminations Complete-Level 2 4/29/2020 4/29/2020 1 Data wire Terminatons Complete-Lewd2 l 468 38710 Ring-out&Verity Data Drops-Convention Center 15d 4/30/2020 5/20/2020 1 Ring-ad&VerAyiData Drops-Convention Center 469 38720 Test&Document Data System Functionality-Convention Center 15d 5/21/2020 6/11/2020 i Test&Document Data system Functionak-con vention carte 470 38730 Verify/Test AV Device Functionality-Convention Center 15d 6/12/2020 7/2/2020 I veiny/Test AVDevicerundionaky-Con.wnceter 471375$0 Plumbing Syswm 75d 12/19/2019 4/3/2020 Plumbing System I 1 472 37700 Certify Back-flow Preventers-Convention Center 5d 12/19/2019 12/26/2019 ®cemy Back-flow Preventers-Comvemion Center 473 76060 Purge Natural Gas System-Convention Center 3d 12/26/2019 12/30/2019 ®Purge natural Gas system-Convention Curter i 47437690 Factory Start-up Plumbing Equipment&Pumps-Convention Center 5d 1/15/2020 1/21/2020 ®spy yup numbing Epwknem&Pumps-convention Center 1 l 475 37680 Chlorinate&Flush Plumbing System-Convention Center 10d 3/16/2020 3/27/2020 Chlorinate&Fksh Pkimbing system-Com ton cute l 476 37710 TAB Plumbing&Adjust Fixture Flows-Convention Center 5d 3/30/2020 4/3/2020 TAB Plumbing&Athirst Future Pours-convention Center 477 65160 Plumbing Complete-Convention Center 4/3/2020 4/3/2020 APlumbog Complete-Covetion cerRe i 478 37590 Fire Protection 25d 5/27/2020 6/30/2020 I Fre Protection I 47937720 Start-up&Test Dry-pipe Systems 10d 5/27/2020 6/9/2020 I swp&Test arpveSystem 1 480 37730 Adjust Stand-pipe Flows 10d 6/10/2020 6/23/2020 ®just stan(i-ye flows Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:11 PM PAGE 16 of 17 FILTER:In Progress/Not Started Tasks HENSEL PHELPS GMP Amendment No. 1 - Attachment 4 Plan. 3L IC, Manage. 2019 2020 Line Unique Task ID Name Duration Start Finish December Jana February March June J Aust September 1 October November;December :9 23 6 :20 :3 17 :2 :16 30. 13 27 :11 25 A 22 6 20 3 :17 31 :14 :26 IZ 28 9 :23 7 21 48137740 Final AH]Walk 5d 6/24/2020 6/30/2020j ®Final AID Wok j 482 1480 FFE&OSE 104d 5/6/2020 10/1/2020 I `-- ----`----- ` " FiFE&OSE 4831490 FFE&OSE-Levell 104d 5/6/2020 10/1/2020 r FE&OSE-Levdl 484 50230 Deliver&Install OFCl Items-Levell 15d 5/6/2020 5/27/2020 Deliver&Instal 0FC1 items-Lewd 1 48566800 Staging for Hotel FIFE-Levell-Kilimanjaro Ballroom 60d 6/17/2020 9/10/2020 i Shwglw Hotel FFE-Level l-Kinanpm 486 50220 Deliver&Install FFE Items-Level 1 15d 6/19/2020 7/10/2020 DAM sWW FIT item-Led 11 487 66810 Install Flooring-Level 1-Kilimanjaro Ballr000m 15d 9/11/2020 10/1/2020 Instal Hoaing-Level I-Kitrnanpro 488 1500 FFE&OSE-Level 2 50d 6/1/2020 8/10/2020 i FFE&osE-Led 2 j 489 50240 Deliver&Install OFCI Items-Levell 15d 6/1/2020 6/19/2020 I Delrwer&Instal 0FCI Items-Level 2 j 490 1510 Deliver&Install FFE Items-Level 2 15d 7/21/2020 8/10/2020 I ! Deliver&Nstal FR Items-Levd 2 '49166520 Punch List 89d 5/27/2020 10/1/2020 Punch tat 492 66470 Convention Center Complete 10/1/2020 10/1/2020 i *CmvenbonCenter CDm*te 49366530 Punch List-Levell 20d 5/27/2020 6/24/2020 1 Is tat-Level 1 i 494 59570 In-house/Contractor Punch Complete-Level 1 5/27/2020 5/27/2020 ! In-house 1 Contractor Punch Complete-Level 1 495 50280 0/A/E Punch List Walk-Level 1 4d 5/28/2020 6/2/2020 o/A/E Punch tat wale-Level I 496 50290 Correct Punch List Items-Level 1 12d 6/3/2020 6/18/2020 i coat Punch tat Items-Lewd 1 497 66550 Final Sign-off Punch List-Level 1 4d 6/19/2020 6/24/2020 I ®Fal 50.0Punch LIR-Level I 49866540 Punch List-Levell 20d 6/19/2020 7/20/2020 ! Punch Let-LeM2 499 59580 In-house/Contractor Punch Complete-Level 2 6/19/2020 6/19/2020 Io-lquse/Contact«Punch Cwnpkte-e o 2 500 50300 0/A/E Punch Ust Walk-Level 2 4d 6/22/2020 6/25/2020 ( ®;/ATE Punch List Walk-Levd 2 501 50310 Correct Punch List Items-Level 2 12d 6/26/2020 7/14/2020 I Coned Punch Let Items-Level 21 502 66560 Final Sign-off Punch List-Level 2 4d 7/15/2020 7/20/2020 ®Final sgr dr Punct,Let-Lewd 2 .................................................................---............................................................................................................................... ......................................................................----...................................................................................._........................................ ................._.................................... ...........................I......................................................................I........................................... ............................ 1 I I I I I i I I I I i I I 1 I 06 RESPONSIBILITY MASONRY SUB Kalahari Covention Center - November 2019 GMP Update DATA DATE:12/1/2019 JOB#:7017134 VIEW:Kalahari REV.DATE:12/12/2019 2:07:11 PM PAGE 17 of 17 FILTER:In Progress/Not Started Tasks GMP Amendment No. 1 Attachment 5 HENSEL PHELPS Plan. Build. Manage. JOBSITE OFFICE 501 South Kenny Ft. Round Rock,Texas 78665 November 18, 2019 KR Acquisitions, LLC P.O. Box 590 Wisconsin Dells, WI 53965 Attention: Dale Hensen Subject: Kalahari Resort and Convention Center—Extended Preconstruction Services Mr. Hensen, Hensel Phelps anticipates executing the Guaranteed Maximum price for both the Convention Center and the Hotel, Parks and Site within the next few weeks. When these GMP's are executed it will bring closure to the preconstruction phase of the project and as a result Hensel Phelps is looking to resolve our extended preconstruction services cost. Preconstruction Schedule- The original RFP schedule indicated that preconstruction would begin on June 12, 2017 with construction starting on November 3, 2017. Design would be completed in phases with final Construction Documents issued on May 25, 2018. The actual dates were significantly different with preconstruction starting as scheduled on June 12, 2017 followed by construction starting on May 15,2018 and final Construction Documents being received on October 5, 2018. These documents required major Bulletin's 1,2, and 3 to incorporate and correct design issues found by the project team taking the actual completion of the Construction Documents to April 24, 2019. These dates resulted in 6.5 additional months of preconstruction services before construction began and an additional 5-12 months of extended design time depending on your interpretation of when actual final completion of Construction Documents was achieved. MEP Preconstruction- Hensel Phelps has been informed verbally that you have been unsatisfied with our efforts to manage the design assist MEP subcontractors that were brought onto the project early. We understand that our management of the cost to complete budgets established as part of their procurement process leaves some area for improvement on our part. The project was able to procure 4 Mechanical and 4 Electrical subcontractors for a single project in the busiest market central Texas has ever seen ensuring the project had the craft resources needed. Those subcontracts did assist with an unanticipated complete redesign of the electrical system and the pricing effort associated with it. In addition they were crucial to understanding the cost implications of design changes late in the Construction Document process that allowed for Value Engineering to help bring the cost closer to the original budgets established by these early MEP subcontractors. Design Completion- The impact of the fall out between HKS and Kalahari resulted in additional work for the Hensel Phelps preconstruction team beyond what would be anticipated on a typical project. The request for Hensel Phelps to assist with the development of finish schedules in the public spaces, back of house spaces, restaurant spaces, and the redesign efforts associated with the exterior amenity areas, and other critical areas of the resort has resulted in additional preconstruction services from Hensel Phelps and in particular Kelli Mitchell and the resources that support her. GMP Amendment No. 1 Attachment 5 HENSEL PHELPS Plan. Build. Manage. Guaranteed Maximum Price Proposal process- Hensel Phelps has also been asked to submit multiple GMP's as part of the preconstruction process which takes a significant effort on our part to prepare, internally review, assemble, submit and review with Kalahari. This process has been repeated multiple times with numerous meetings held to review pricing that has been developed as a result of design modifications to the Construction Documents and specifically core and shell aspects of the project along with the finishes throughout the resort. Hensel Phelps has attached to our letter email correspondence from March 14, 2018 outlining our extended preconstruction services concerns a year and a half ago. Our organization to date has incurred over $2.5 million in preconstruction service cost on this project and only proposed to provide $765,000 in preconstruction cost. In lieu of Hensel Phelps submitting for our entire cost as a result of the key issues above we request that Kalahari allows us to bill for the outstanding preconstruction balance of$112,963 and to retain permanently the agreed upon 25%give back if awarded the Construction phase. Hensel Phelps appreciates the compliments made by Mr. Nelson and members of the Kalahari Team who recognize and appreciate the expertise, hard work and dedication the Hensel Phelps team has put forth to get the project in the position it is today. We appreciate your continued support and the efforts of the entire project team to bring this project to a successful completion. Should there be any questions regarding the above, please contact the undersigned. If you concur with our proposed resolution to the extended preconstruction services please sign and process the attached pay application. Sincerely, H'EfNS((EL PHELPS CONSTRUCTION CO. Michael Orlowski Project Executive