Loading...
Contract - Technology For Education - 4/26/2018 4PHUB „/'"""r Certified LVI SM—I&HtpabBy U-&11,db dB.An hgr P171"li �tt(f1'hP1SL' March 26, 2018 To: City of Round Rock Attn: Christopher Lopez (clopez@roundrocktexas.gov) Re: CORR—McNeil Road Fiber Optic Cable Extension—Conduit Extension Only DIR—TSO—3721 Zone 1, District 14 Standard Cabling Technical Support This letter is to provide you with pricing from Technology for Education, as indicated below, for the McNeil Road Fiber Conduit extension portion of the project. Conduit Installation—Material & Labor Cost $6,456.90 • Provide & Install one 2" conduit pathway with pull boxes, fittings, fasteners and hardware between the 2nd floor drop ceiling on the West side of City Hall, adjacent to skywalk, extending West across level 2 of parking garage to the southwest and northwest corners. • New conduit to capture existing conduit duct bank or transition to aerial attachment at the southwest corner of garage completing the connection to underground duct bank leading to PARD YARD installed by others. • At the Northwest corner of garage new 2" conduit will transition to an aerial attachment to capture west CORR Fiber Optic WAN establishment ROW. • Estimated time of completion is 1 week with accurate coordination by CORR and others. Terms and Conditions/Exclusions ➢ All work to be performed during normal business hours,Tam to 5:00pm,additional cost will apply if project requires after-hour or week end work. ➢ Excludes all coring,concrete cutting,floor penetrations,dirt work, road work and excavations. Should you have any questions or require further assistance please contact me at your convenience. Henry Castillo OPS Mgr. South Region/EE Design 512-819-6913 hen ry.castillo@tfeconnect.corn 658 Alliance Pkwy, Hewitt, Texas Ph. 254.741.2450 Fax 254.741.2779 www.tfeconnect.com Page 1 of 1 f Certified 4PHUB VENC Sw—bd, eoy,— Wmmm'S Buss ns EnteTpnist ki 1E March 26, 2018 To: City of Round Rock Attn: Christopher Lopez (clopez@roundrocktexas.gov) Re: CORR—McNeil Road Fiber Optic Cable Extension DIR—TSO—3721 Zone 1, District 14 Standard Cabling Technical Support This letter is to provide you with pricing from Technology for Education, as indicated below, for the McNeil Road Fiber cable extension project. Fiber Cable Installation—Material & Labor Cost $37,165.64 • Provide & Install 2—24 Strand Single-mode Fiber Cable between the PARD YARD IT rack and City Hall MDF. • Terminate all strands of Fiber using LC style connectors & place within existing Fiber Cabinet at PARD YARD and at City Hall MDF. • Install new fiber cables within existing Right of Way using a combination of Aerial and Underground Conduit duct banks. • Reroute existing south run of the TXDOT fiber cable to PARD YARD communications closet and terminate with LC style connectors. • Coordinate fiber optic activation and deactivation with CORR IT Department as required. • DEMO all existing fiber optic cable once new fiber is completed and activated. • Label and test fiber cable installed as required for entire length of installation. Terms and Conditions: ➢ All work to be performed during normal business hours,7:am to 5:00pm,additional cost will apply if project requires after-hour or week end work. ➢ CORR is responsible for all needed permits and permissions for attachments to utility poles and use of underground pathways. ➢ Excludes all coring,concrete cutting,floor penetrations,dirt work, road work and excavations. Should you have any questions or require further assistance please contact me at your convenience. Henry Castillo OPS Mgr. South Region/EE Design 512-819-6913 henry.castillo@tfeconnect.com 658 Alliance Pkwy, Hewitt, Texas Ph. 254.741.2450 Fax 254.741.2779 www.tfeconnect.com Page 1 of 1 �,,•'�"'� Certified 4PHUB Sw—i&RA-t.yU.dx d-ed 9.0-1 P.V— t i74Tll'ti'S�1LSCttC33 GIICC'Y(7715t'. TIVE April 9, 2018 To: City of Round Rock Attn: Bill Stablein (bstablein@roundrocktexas.gov) Re: CORR—City Hall to FS2 Fiber Optic Cable Installation DI R—TSO—3721 Zone 1, District 14 Standard Cabling Technical Support This letter is to provide you with pricing from Technology for Education, as indicated below, for the City Hall to FS2 Fiber cable installation project. Fiber Cable Installation —Material & Labor Cost $28,672.79 • Provide & Install 1 —24 Strand Single-mode Fiber Cable between the City Hall MDF and the FS2 server closet. • Terminate all strands of Fiber using LC style connectors & place within existing Fiber Cabinet at PARD YARD and at City Hall MDF. • Install new fiber cable from City Hall MDF in conduit pathway across parking garage, exit conduit at northwest corner and place on existing ONCOR utility pole adjacent to garage, follow ONCOR pole route to new duct bank pole riser provided by CORR. New fiber cable will enter CORR underground bank to FS2 server closet. • Coordinate fiber optic activation and deactivation with CORR IT Department as required. • DEMO all existing fiber optic cable once new fiber is completed and activated. • Label and test fiber cable installed as required for entire length of installation. Terms and Conditions: ➢ All work to be performed during normal business hours,Tam to 5:00pm,additional cost will apply if project requires after-hour or week end work. Y CORR is responsible for all needed permits and permissions for attachments to utility poles and use of underground pathways. Should you have any questions or require further assistance please contact me at your convenience. Henry Castillo OPS Mgr. South Region/EE Design 512-819-6913 henry.castillo@tfeconnect.com 658 Alliance Pkwy, Hewitt, Texas Ph. 254.741.2450 Fax 254.741.2779 www.tfeconnect.com Page 1 of 1 ` w MA, ST __W A- it A .Y .. :. PIMA _ . al , r n r moi. tl 44 v, .-. _ v ,•f' � p� •cam i - i .. -.... r � . t I AW t rf \ nv.. i } i. F,. a 5 r X f• 91. w 3 .► .,f :.rR t if[IV1f9HIILI� XlllENi[Ia.r' a: ._....... ••fir, }' r t ! -. � j: iR1#I6/rlfY��Mlt11L� s': if New Oncor Pole -w - r AVS r - E BAGDAD AVE cn T-y 9 swMarrr� AMMM w ° _ w 0" +1 Z- 014, Ui "-, a ., .•.: 4 ., , "aur Y 4_ OH-Utility Pole To be Removed r --- - n, • s. Bore for Underground r' UtilitiesOo t; \ s New Oncor Pole New Oncor Pole Aw CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. Technology for Education LLC 2018-338090 Hewitt,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/12/2018 being filed. City of Round Rock Date Acknowledged: 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. McNeil Road Fiber Fiber installation 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling intermediary Anderson,Teri Hewitt,TX United States X 5 Check only if there is NO Interested Party. 6 UNSWORN DECLARATION My name is Joanna Herrera and my date of birth is 09/21/1969 My address is 658 Alliance Parkway HewittT'1 1; �_ LISA (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in XTrT County, State of _ Texas on the I lih day of ASL 20jjk (month) (year) Signature of authors d agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.5523 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos.1-4 and 6 if there are interested parties. OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2018-338090 Technology for Education LLC Hewitt,TX United States Date Filed: 2 Name of governmental entity or state agency that is a party to the contract for which the form is 04/12/2018 being filed. City of Round Rock Date Acknowledged: 04/23/2018 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract. McNeil Road Fiber Fiber installation 4 Nature of interest Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermediary Anderson,Teri Hewitt,TX United States X 5 Check only if there is NO Interested Party. ❑ 6 UNSWORN DECLARATION My name is and my date of birth is My address is (street) (city) (state) (zip code) (country) I declare under penalty of perjury that the foregoing is true and correct. Executed in County, State of on the day of 20 (month) (year) Signature of authorized agent of contracting business entity (Declarant) Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.5523