CM-2018-1698 - 4/27/2018STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.2 TO CONTRACT FOR ENGINEERING SERVICES FIRM: AECOM TECHNICAL SERVICES ("Engineer") ADDRESS: 9400 Amber len Boulevard Austin TX 78729 PROJECT: Darn 101— 30% Design _ This Supplemental Contract No. 2 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and AECOM Technical Services, hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 28th day of July, 2016 for the Dam 101 — 30N Design Project in the amount of $922,866.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on October 20, 2017 to amend the Contract to modify the work schedule; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to modify the work schedule; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4 Exhibit D Fee Schedule shall be amended, as set forth in the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract 0199.1756,00399611 CM -201t- /& Id' Rev.06 16 84275 AECOM TECHNICAL SERVICES By: —V4 Ross Gordon, Associate Vice President 423-2018 Date Supplemental Contract Rev.06:16 0199,1756;04399611 84275 CITY OF ROUND RO K APPRPNJED AS TO ORM: By: Steph n L. Sheets, City Attorney 4-21./? Date Supplemental Contract Rev.06. 16 0199.1756;00]99611 84275 ADDENDUM TO EXHIBIT B Engineering Services Proposed AECOM Scope of Work (SOW) City of Round Rock - Dam 101 - 30 Percent Design rev 2018-04-17 1. PROJECT DESCRIPTION No Changes. 2. SCOPE OF WORK The Scope of Work (SOW) includes the major tasks listed below_ • Task I - Project Management and Meetings. • Task 2 - Auxiliary Spillway Siting and General Arrangement. • Task 3 - Field Investigations. • Task 4 - Environmental Investigations, Permit Support. • Task 5 - 30 Percent Design Package. • Task 6 - Owner Contingency • Task 20 - Subcontractors • Task 30 - Expenses Task 1- Project Management and Meetings Time extension on contract and proportional hours allocation for all tasks. Support for City in discussions with agencies, landowners, and interlocal members. Task 2 — Auxiliary Spillway Siting and General Arrangement No additional work anticipated under this task. Task 3 Field Investigations No additional work anticipated under this task. However, potential for conducting groundwater monitoring events remains. (Not to exceed S5000). 30% Design B-1 07-06-16; rev 4/17/18 Task 4 Environmental Investigations/Permit Support Time extension on contract Task 4.2 Coordination of subcontractor for Jollyville PIataeu Salamander investigation. Discussions and integration into project. Task 4.3 Prepare for and attend informal pre -application meeting with USACE Ft. Worth District, to introduce the project. Intent is to obtain feedback from USACE on Nationwide Permit vs Individual Permit and input on mitigation. Task 4.5 Additional discussions, meetings, and project strategy based upon field information, constructability guidance, and permitting agency discussions`guidance. Above tasks not to exceed $25,000 Task 5 30 Percent Design Time extension on contract. Task 5.8 Preliminary value engineering review and management of dewatering during construction. Engineering support for City, to include items such as support for construction cost alternatives easements, drawings/exhibits for City support. (Not to exceed $16,000) Task 6 Owner Contingency Time extension for this contract. Work previously described or newly proposed under this task shall be reviewed and authorized by the Owner's Representative. Task 20 Subcontractors Time extension for this contract. 1. Engineering Solutions LLC. Preliminary value engineering review of dewatering during construction. (Not to exceed $4000). 2. Cambrian Environmental. Species reviews and coordination with permitting agencies. Scope and fee to be reviewed and authorized by Owner's Representative. 30% Design B-2 07-06-16; rev 4197118 ADDENDUM TO EXHIBIT C Work Schedule The attached schedule below provides approximate durations associated with the anticipated milestones. The durations are approximate, and are dependent on field work, which may be subject to weather events and property owner access conditions. As such, the durations may extend beyond that shown. Award Est NTP."' Executed contract 7.28/16 (City Council) 8.'3116 Task Approx. Duration Approx. Start Approx. End (Original) (Extended) 1. Project Management 12 mos. 8/4/16 8/30/18 2. Auxiliary Spillway Siting 3 mos. 8/15/16 11/15/16 3. Field Investigations 7 mos. 8/15/16 8/30/18 4. Env. Invest/ Permit Support 12 mos. 8/25/16 8/30/18 5. Preliminary'301.o Design l 1 mos. 9/27/16 8/30/18 ADDENDUM TO EXHIBIT D Fee Schedule First Revision AECOM proposes to perform the scope of work described above on a time and materials basis in accordance with mutually -agreed to terms and conditions in a Contract between AECOM Technical Services, Inc. and City of Round Rock. The estimated cost for this work is presented in the table below. Task Task Description Estimated Cost % of Project 1 Project Mana ement, Landowner Coord., Meetings $98,000 11.9% 2 Auxiliary Spillway Siting and General Arrangement $43,066 5.2% 3 Field Investigations $100,600 12.2% 4 Environmental Investigations/ Permit Support $141,700 17.2% 5 30% Design $245,000 29.7% Total Subcontracting $177,000 21.5% Total Reimbursable Expenses $18,000 2.2% Project Total without Contingency $823,366 100% 6 Owner Contingen2y $99,500 Project Total with Contingency: $922,866 • See attached Rate Schedule (Original Contract) Information for Professional Services Agreement TIME D MATERIALS C N R CT Project Information Project Name Dam 101 — 30% Design Project Description Dam 101 preliminary design including remaining geotechnical investigation, additional environmental investigations, design i refinements and 30% plans and estimates. Project ID Number DAM101 City of Round Rock Staff Information Owner's Representative Alysha Girard Phone 512-218-6646 Mobile 512-801-4453 Fax 512-218-5536 Email Address agirard@roundrocktexas.gov Proposed 6su+asil-Date-City Manager 27 April 2018 Professional Service Provider's Information Name of Company AECOM Technical Services Name of the Principal Signing the Time and Materials Contract/Title Ross Gordon; Assoc. Vice President Business Address (address for all notices to be mailed) 9400 Amberglen Blvd- Austin, TX 78729 Name of Project Manager i Darrell L. Jones, PE Title Sr. Project Manager Phone Number 512 419-5897 Fax Number 512 454-8807 Email Address darrell.iones@aecom.com Work Product Information Work Completion Date - DATE EXTENSION ONLY August 31, 2018 Service Cost $ 922,866 EGEND CreekY iap� ."� • '4 •rc�lra` Damage Center FEMA Floodplain City of Round Rock ' ' R� AND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Supplemental Contract No. 2 with AECOM Technical Services for the Dam 101 - 30% Design Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/27/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: Indexes: Self -Financed Drainage Construction Attachments: SC#2, LAF, Info Sheet, Map Department: Utilities and Environmental Services Text of Legislative File CM -2018-1698 Consider executing Supplemental Contract No. 2 with AECOM Technical Services for the Darn 101 - 30% Design Project. The original Engineering Services Contract with AECOM Technical Services, Inc. was for the preliminary design and analysis work for Dam 101. The preliminary design phase included the remaining geotechnical investigation, additional environmental investigations, preliminary easement delineations, and 30% plans and construction estimates. The contract's major milestones were accomplished as planned in July 2017. An initial date extension to April 2018 was executed to leverage the contract savings and continue design progress while the Inter -Local Agreement (ILA) and final design contract were negotiated. This second Supplemental Contract extends the contract time to August 31, 2018 to continue work while the ILA and final contract are finalized. The consultant team will pursue environmental and permitting tasks along with other minor design tasks. Dam 101 is a joint project between the Upper Brushy Creek Water Control Improvement District (UBCWCID) and the City to substantially lessen the frequency and depth of flooding along Lake Creek, particularly in the Greater Round Rock West area. The UBCWCID and City signed an ILA that assigned responsibility for coordinating design, Cky a1 Round Rack Page i Printed on *26MIS Agenda Item Summar Continued (CM -2016-1096) construction, and funding of Dam 101 to the City. The UBCWCID is contributing $6 Million to the project and will operate and maintain the dam when complete. Per the ILA, the City already received the initial payment of $2 Million. Source of Funds: Self -Finance Drainage Construction City of Round Rock Page 2 Printed on 4/20/2018