Loading...
CM-2018-1700 - 4/27/2018SUPPLEMENTAL AGREEMENT NO. 1 TO "CITY OF ROUND ROCK AGREEMENT FOR CONSULTING SERVICES FOR THE CLEARWELL NO. 1 REHAB 2017 PROJECT WITH HOT INSPECTIONS. INC." CITY OF ROUND ROCK § STATE OF TEXAS § COUNTY OF TRAVIS § COUNTY OF WILLIAMSON § KNOW ALL BY THESE PRESENTS: THIS SUPPLEMENTAL AGREEMENT NO. 1 to "City of Round Rock Agreement for Consulting Services for the Clearwell No. 1 Rehab 2017 Project with HOT Inspections, Inc.," hereinafter called "Supplemental Agreement No. 1," is made by and between the City of Round Rock, Texas, a home -rule municipality, hereinafter called the "City" and HOT Inspections, Inc., hereinafter called the "Consultant." WHEREAS, the City and Consultant executed the referenced "City of Round Rock Agreement for Consulting Services for the Clearwell No. 1 Rehab 2017 Project," hereinafter called the "Agreement," on August 10, 2017 by Resolution No. R-20174657; and WHEREAS, the City desires to amend the Scope of Services to add additional services related to the welding and recoating of the Southeast Ground Storage Tank; and WHEREAS, it is necessary to amend the Scope of Services and the Fee provided in the Agreement; NOW THEREFORE, in consideration of the mutual promises and obligations in the Agreement and this Supplemental Agreement No. 1, the City and Consultant agree that said Agreement is amended and supplemented as follows: I. Section 3.01 of the Agreement is hereby amended to read as follows: 3.01 SCOPE OF SERVICES Consultant shall satisfactorily provide all services described herein and as set forth in Exhibit "B" and the Addendum to Exhibit "B" according to the schedule set forth in the attached Exhibit "C" titled "Work Schedule," and the Addendum to Exhibit "C," which 00399914 ss2 �2ort- iZaO documents is are incorporated herein for all purposes. Consultant's undertaking shall be limited to performing services for the City and/or advising City concerning those matters on which Consultant has been specifically engaged. Consultant hall perform services in accordance with this Agreement, in accordance with the appended proposal for services and addendum to proposal for services, and in a professional and workmanlike manner. II. Section 5.01 of the Agreement is hereby amended to read as follows: 5.01 CONTRACT AMOUNT In consideration for professional consulting services to be performed by Consultant, City agrees to pay Consultant in Accordance with Exhibit "D" entitled "Fee Schedule," and the Addendum to Exhibit "D;' which documents is are attached hereto and incorporated herein for all purposes, in payment for services and the Scope of Services deliverables as delineated in Exhibit "B" and the Addendum to Exhibit 1111." Nat -to -Exceed Total Payment for Services: Consultant's total compensation for consulting services hereunder shall not exceed Eighty Five Thousand Eight Hundred and NeA00 Dollars (S85 ' 800.00) Ninety -Three Thousand Seven Hundred Seventy and No/100 Dollars ($93.770.00). This Supplemental Agreement No. 1 shall amend the original Agreement only as set forth herein with no other changes in terms or conditions of the original Agreement. [Signatures on the following page.] 2 IN WITNESS WHEREOF, the City and Consultant have executed this Supplemental Agreement to be effective as of the last date of due execution by both parties. CITY OF ROUND ROCK, TEXAS By: Printer Title: Date S ATTEST: By. Sara L. White, City Clerk FOR C4Stephanp OVED AS TO FORM: By: L heets, City Attorney HOT INSPECTIO By: V Printed Nam1-11–jrLgw%,o*,jr Title: Date Signed: S"- # - / 8 OF Z% ., HOT Inspection Services Inc. Office: (5121244-2523 HOT i4oP.O. Box 1208 • Roeaid Rock, TX 786$0-4208 Fax: 1512) 465-5129 EXHIBIT "B" HOT Inspection's Supplemental Services Cleanvell No. 1 GST Improvements Proiect A. PRELIMINARY PHASE 1. Attend preliminary conference and site visit with the Owner regarding the inlet re - out project at S.E. GST. 2. Prepare a preliminary scope of work of the project indicating the optional solutions available, including probable cost based the site visit and conference. 3. Meeting with Owner discuss which plan of action, schedule and best value based on the projected outcome of each alternate. B. PRE CONSTRUCTION PHASE 1. Establish the scope of work and specifications based on the site surveys and research conducted. Prepare a document for TBI to submit a cost for a change order to conduct the proposed inlet re-route work. 2. Conduct a pre construction meeting with the Contractor. C. CONSTRUCTION PHASE 1. Conduct the necessary on site visits to provide Quality Assurance Surveillance and observe the progress and quality of the inlet re-route installation, welding and coatings repair executed work. 2. Conduct the pipe coating repairs on the interior and exterior of the tank. 3. Clean out the interior of the tank to removal all sediment and debris remaining in the tank since being drained in January 2018. 4. Disinfect per AWWA C652 Method 2 when City is ready to fill. Bac-t's shall be the responsibility of the City of Round Rock 5. Konzen, as an AWS Certified Welding Inspector and NACE Certified Coating Inspector, shall be on the referenced project. Inspection and testing visits will be strategic and at the discretion of the HOT Inspection Services. The services to be rendered will include the following: Welding Insvection o Review tank project drawings provided by TBI and approve for construction. o Observe and monitor the pipe inlet re-route and quality of workmanship. o Review welder qualification records, welding procedures. o Verify proper welding electrodes and electrode storage to be used on project. o Conduct inspections on shop fabricated components. Power Tool Surface Preparation and Coating Inspection o Pre -surface preparation inspection. o Measurement of ambient conditions. o Determination of surface preparation cleanliness and profile. o Inspection of application equipment. o Witnessing coating mixing. o Inspecting coating application. o Determination of wet film thickness. o Determination of dry film thickness. o Evaluating cleanliness between coats. o Evaluating cure. The inspection methods to be implemented for the surface preparation and coating inspections will consist of visual inspections, mil gauging, holiday testing, profile gauging and atmospheric measuring. All inspections will verify compliance with the AWWA D102-97 and contract specifications. The measurement of air temperature, surface temperature, humidity, dew point, coating thickness and holiday detection will be recorded in an inspector's logbook. Conduct with the Owner and contractor, a final inspection of the project to verify compliance with the Contract Documents and submit recommendations concerning project status, as it may affect Owner's final payment to Contractor. •t�'®T i HOT Ins, action Services,, Inc. Office: 1612) 244,2523 P.O. Box 1208 • Ro do Rock, TX 78684-1x48 Fax: (512) 485-5129 Exhibit C Work Schedule Clearwell No.1 GST Improvements Proiect S.E. GST Inlet Pine Re -Route Preliminary Phase 01/09/18- 01/18/18 Pre -Construction 01/19/18- 01/25/18 Construction Phase 02/20/18 -05/01/18 • TBI Crew to mobilize and re-route Inlet 02/20/18- 02/25/18 HOT Inspection to mobilize and coat pipe 04/03/18- 04/10/18 • HOT Inspection to pressure wash clean tank 04/11/18- 04/15/18 • HOT Inspection to Disinfect Tank TBD HOT HOT Inspection Services, Inc. Office: (6121244,2523 P.O. Box 1208 - Round Rock, TX 78690-1205 Fax: (512) 486.5129 140 Exhibit D Fee Schedule C(pilMell No.1 GST Improvements Project Providing personal services to the City of Round Rock for consulting, on-site project management, inspection and coating repairs for the Inlet Pipe Re -Route at the S.E. GST. Services to include: probable cost estimates, technical data, pre -construction, construction services and inspection. Total fee below is based on Preliminary, Pre -Construction Phase and the Construction Phase for the Inlet Pipe Re -Route. Preliminary Phase/Pre-Design $ 880.00 Pre -Construction Phase $ 660.00 Construction Phase Inspect TBI Work $ 880.00 Surface Prep and Coatings $ 3,600.00 Pressure Washing/Cleaning $1,100.00 Tank Disinfection $ 850.00 Total Pee $7,970.00 ACbRbP CERTIFICATE OF LIABILITY INSURANCE DATE IM MOATM 212312018 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsemenils). PRODUCER Watkins Insurance Group -Austin 3834 Spicewood Springs Rd, St Austin TX 78759 Ozer—Susan Hard PNONE FAX Fmo. 512-452-8877 Arc NOL512-452-0999 a+rul ADDRgsshordOwalkinsinsurancegroup.com INSURERS AFFORDING COVERAGE NAICS MED EXP (Any ons ersani S10000 PERSONAL d ADV INJURY S 300.000 GENERAL AGGREGATE 5 1.IX10 DDD INSURER A.- The Hartford 29424 INSURER 8: INSURED HOTIN-1 Hot Inspection Services Inc. John Konzen INSURER C: P O Box 1208 INSURERD: Round Rock TX 78684 INSURER E: INSURER F: COMBINED ING LIMIT(Ex acciderAlS COVERAGES CERTIFICATE NUMBER:saa1sss78 REVISION NUMBER! THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS; EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR NSR TYPE OF INSURANCE LI POCY NUMaER POLICY EFF POLICYEkP LIMITS A TMERCIALGENERALLIABROY Y CLAIMS -MADE X OCCUR GENL AGGREGATE LIMIT APPLIES PER: POLICY PRO- JECT LOC OTHER: ESSBAPV1a8D 3218015 3'2112019 EACHOCCURRENCE 1 350DOW _5=GE TO RENTED PREMISES (En occurrence) $300,000 MED EXP (Any ons ersani S10000 PERSONAL d ADV INJURY S 300.000 GENERAL AGGREGATE 5 1.IX10 DDD PRODUCTS - CO MPIOP AGG S 1,000,000 $ A AUTOMOBILELIABILITY ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS HIRED X NON43WNED AUTOS ONLY AUTOS ONLY IX Y eSSBAPV1Od0 31218018 3218019 COMBINED ING LIMIT(Ex acciderAlS BODILY INJURY (Perperson) S BODILY INJURY (Per sccidenl) S PROPERTY DAMAGE S Par atddenl S UMBRELLA LIAO EXCESS LIAR HCLAIMS-MADE OCCUR EACH OCCURRENCE S AGGREGATE S DED RETENTIONS S A WORKERS COMPENSATION AND EMPLOYERS LIABILITY Y 1 NER ANYPROPRIETORIPARTNERIEXECUm/E ❑ OFFICERIMEMBER EIICLUDEW (Mandatory In NH) Ir as, descries und er rRIPTION OF OPERATIONS eel w NIA 05MCAT2222 1711118017 7211012010 X STATUTE DTH' E.L EACH ACCIDENT $ 100.000 E.L DISEASE -EA EMPLOYEE' S 1W OW E.L DISEASE -POLICY LIMIT S 500.000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (AGGRO I III. Additional Remarks Schedule, maybe attached It MGM spat* Is nqulndl City of Round Rock is additional Insured an the general liability and auto liability policies, per blanket endorsements, where required by written contract City of Round Rock 221 E Main St Round Rock TX 78664 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORDMD REPRESENTATIVE /u// " 1988-2815 ACORD CORPORATION. All richis reserved ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD City of Round Rock ROUND ROCK Agenda Item Summary Tr' j Agenda Number: Title: Consider executing Supplemental Agreement No. 1 with HOT Inspections, Inc. for consulting services for the Clearwell No. Ground Storage Tank Rehab 2017 Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 4/27/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $7,970.00 Indexes: Self -Financed Water Construction Attachments. LAF - Supplemental Agreement No. 1 with HOT Inspections, Inc. (00399923xA08F8).pdf, Suppl 1 to HOT Inspections Agreement Final (04-23-18) (00399918xA08F8).pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1700 Consider executing Supplemental Agreement No. 1 with HOT Inspections, Inc. for consulting services for the Clearwell No. Ground Storage Tank Rehab 2017 Project. This item is to increase the personal services contract with HOT Inspection Services by $7,970. The Clearwell No. 1 Rehabilitation Project was awarded to Tank Builders, Inc. on October 26,2017. During this project, Utility Staff determined issues with the inflow piping of the Southeast Ground Storage Tank (SE GST) that required correction. Tank Builders, Inc. was authorized to make the necessary welding repairs and recoating by an approved change order on March 23,2018. HOT Inspections Services, Inc. is under contract to provide inspection services for the Clearwell No. 1 Rehab 2017 project. The City asked John Konzen of HOT Inspection Services, Inc. to oversee the welding and recoating of the SE GST repairs for an agreed amount of $7,970. This will increase his original personal services with HOT Inspection Services, Inc. contract to $93,770. City otRound Rock Page 1 Printed on 4/28/2018 Agenda Item Summary Contlaued (C*2018.1700) Cost: $7,970 Source of Funds: Self -Financed Water Construction Cityof Round Rock Page 2 Printed on 4/2&2018