Loading...
CM-2018-1708 - 5/11/2018mv,01116 Department: Project Name: City Project ID Number Vendor Justification Page I of 3 Contract Quantity Adjustment/Change Order Utilities and Environmental Services Forest Creek Lift Station Rehabilitation Date: 4/27/18 Change Order/Quantity FCLST Adjustment No. 1 Austin Underground, Inc. P. O. Box 5650 - Lago Vista Texas 78645 512-535-3285 Company Name Address Phone No. Zuanttty adjustment / Change Order #1 Is needed for Bid Item adjustments and additional Change Order items required not in Bid list. SUMMARY Original Contract Price: Previous Quantity Adjustment(s)- This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Qean. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared City Project Mayor/City Manager Submitted for Approval r r Eddie to Senior Signature Printed Name, Title, � r .f Approvals John Fenley, Senior Project M+ Printed Name, Title, Company Eddie Zatrata. Senior Proiect P Laurie i ,q- � adP- /17,PJ 0 Amount % Change $591,493.31 $0.00 $175.00 $175.00 $591,668.31 $0.00 0% $47,209.00 8% $47,209.00 80/0 $638,877.31 $47,384.00 150 0 62 212 Date s -I( -d `=__ Contract Quantity Adjustment/ Change Order Project Name: Forest Creels Lift Station Rehabilitation Quan. Adj./Change Order No.: Chane Order nata Pugs 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da CO -1 Fencecrete in lieu of Wrought Iron Fencing LF 140 $84.46 $11,824.40 CO -2 Generator Enclosure LS 1 $6,334.00 $6,334.00 CO -3 Steel Encasement of existing wateline LF 20 $252.20 $5,044.00 CO -4 Concrete Encasement of 15" wastewater line LF 5 $742.20 $3,711.00 CO -5 Radio Tower Replacement LS 1 $18,210.00 $18,210.00 CO -6 Credit for furnishing radio EA -1 $1,314.40 -$1,314.40 CO -7 84" Valve Vault Riser Section EA 1 $755.00 $755.00 CO -8 Generator Run Status and Failure Alarm LS 1 $2,645.00 $2,645.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change order f Project Mame: Forest Creek Lift Station Rehabilitation Quan. Adj./Change Order No.: elemanti r%m#- Contract rime Bid Item # item Description Unit Qty. Unit Price Amount Adjustment 11 Pipe 4" Dla. PVC Sch. 40 LF 25 $65.00 $1,625.00 21 Native Grassland Seeding and Planting SY 290 $7.00 $2,030.00 New fencing, including posts an accessories for Wrought Iron and 26 Fencecrete Extensions LF -68.00 $60.00 -$4,080.00 28 Electrical Canopy Framing and Metal Deck LS 0.05 $12,333.00 $600.00 $0.00 Time extension request for material and equipment submittals and delivery $0.00 62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 to -nn M 0 m m =n >;a �m m �X �r o z z )ocument Palh- 0 -%Workspaces GIS%;UIIIdies workspaceWAPS1BassMap.mxd J a Q � ® o ®° SrgN 1 OP 7 a� I ���� � fo _0 ir- y� Isco m 0 0 o ® o ® '90 8 cz Qp a m 0 ® 7mC ° ID 0 A o o �► F o� A �s e? r- o A hoe CA 1 0 ' SHA K LOOP _ ,,,n 4 , 0 City of Round Rock JR0unro Rock Agenda Item Summary wn�N. Agenda Number: Title: Consider executing Quantity AdjustmentlChange Order No. 1 with Austin Underground, inc. for the Forest Creek Lift Station Rehabilitation Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/11/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $47,384.00 Indexes: Self -Financed Wastewater Construction Attachments: QA-CO#1.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1708 Consider executing Quantity Adjustment/Change Order No. 1 with Austin Underground, inc. for the Forest Creek Lift Station Rehabilitation Project. The Forest Creek Lift Station was constructed in 1992 and provides service to the Forest Creek Subdivision area. As Forest Creek Subdivision developed, four additional lift stations were installed and all flows from these lift stations drain to the Forest Creek Lift Station. The lift station is in need of rehabilitation and a backup generator. Engineering services with Lockwood, Andrews, and Newnam, Inc. (LAN) for preliminary design of the Forest Creek Lift Station was approved October 30, 2015. The study consisted of rehabilitation of the existing wet well and mechanical components replacement, as well as a new backup generator. Relocating the lift station was also considered. On April 14, 2016, a Supplemental Agreement No. 1 was approved for engineering design and construction phase services of the Forest Creek Lift Station based on recommendations from the recently completed preliminary design report. On December 21, 2016, eight bids were submitted and the lowest bid in the amount of $558,316.60 was submitted by Central Road & Utility, LTD (CRU). On January 26, 2017 City of Rounditck Page 1 Printed on 5/10/2018 Agenda !tear Summery Continued (CM -2019-1708) City Council awarded project to CRU but after award it was discovered that CRU was performing poorly on other City projects. Based on this information it was determined to not issue Notice to Proceed and select next lowest bid. Austin Underground, Inc. submitted the second lowest bid at $591,493.31. Austin Underground recently completed Lake Creek 2 and Lake Creek 3 Wastewater Line Improvements on time and within budget. Quantity Adjustment 1 Change Order No.1 is needed for final bid item adjustments, add 62 additional days to construction, and include other items unforeseen during construction. QAICO No. 1 is for $47,384 which brings the total construction contract to $638,877.31. Cost. $47,384.00 Source of Funds: Self -Financed Wastewater Construction City ofRound Rock page 2 Printed an S/10/nois