CM-2018-1709 - 5/11/2018Page t of Contract Quantity Adjustment/ Change Order IIOiN1011Ga 1..,;..g rev, OIJ16 Department: Transportation Project Name: Gattis School Road Widening Date: 4/26/18 City Project Change Order/Quantity ID Number Adjustment No. 2 Vendor Smith Contracting Co. 15308 Ginger st, Austin, Tx 78728 512-990-7640 Company Name Address Phone No. 3ustification Quantity adjustents, etc. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Amount % Change $1,733,500.45 $1,019.20 $44,515.45 $45,534.65 $1,779,035.10 $21,343.75 1% $2,628.50 0% $23,972.25 1% $1,803,007.35 $69,506.90 Original Contract Time: 251 Time Adjustment by previous Quan. Adj./Change Order: 6 Time Adjustment by this Quan. Adj./Change Order: 15 New Contract Time: 272 Submitted for Approval Prepared By: Bill Stablin, Project manager, City of Round Rock 4/26/18 Signature Printed Name, Title, Company Date Approvals Contractor: Hardin Camp II, VP, Smith Contracting Co. Inc. 4/26/18 . Signature City Project Manager: PIA Mayor/City Manager All, Zof r,�767 Printed Name, Title, Company Date - 30-1g f a Contract Quantity Adjustment/Change Order lto ,t. A' 16 Project Name: Gattis School Road Widening Quan. Adj./Change Order No.: Chanee nrriar Flat= Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Adjusus(Das COP 10 GALVANIZED STEEL PLATE INSTALL LS 1 $2,628.50 $2,628.50 1 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 r Pap 3 of ml�, Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Widening Quan. Adj./Change Order No.: Quantity Adiustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment 2 REMOVING SIDEWALKS SY 73 $19.00 $1,387.00 5 3 REMOVING DRIVEWAYS SY 225 $21.00 $4,725.00 5 REMOVING CONCRETE MISC SY 33 $30.00 $990.00 1 8 EXCAVATION ROADWAY CY 69 $40.00 $2,760.00 10 FURNISH & PLACE TOPSOIL 4" SY 1769 $1.00 $1,769.00 12 VEGETATIVE WATERING MG 1 14 $25.00 $350.00 14 D -GR TY -C SAC -B PG70-22 TON 109.75 $120.00 $13,170.00 1 19 FLOWABLE FILL {TRENCHES & ]UNCTION BOX ON GATTIS) CY 21 $150.00 $3,150.00 1 38 CONC CURB & GUTTER TY II LF 324 $15.00 $4,860.00 42 CONC SIDEWALKS 5' SY 115 $68.00 $7,820.00 5 89 PORTABLE CHANGEABLE MSG SIGN DAYS 21 $60.00 $1,260.00 98 CONDUIT PVC 4" LF 47 $42.00 $1,974.00 1 145 ETHERNET CABLE CAT 5 LF 12 $7.10 $85.20 151 OPTICOM CABLE MODEL 138 LF 21 $5.25 $110.25 153 ETHERNET CABLE CAT 6 FOR PTZ LF 12 $8.75 $105.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 City of Round Rock C K ITEXAS u"ORO Agenda Item Summary Agenda Number: Title: Consider executing Quantity AdjustmentlChange Order No. 2 with Smith Contracting Co. Inc. for the Gattis School Road Widening Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 5/11/2018 Dept Director: Gary D. Hudder, Transporatation Director Cost: $47,143.95 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: QA -CO #2 Department: Transportation Department Text of Legislative File CM -2018-4709 Consider executing Quantity Adjustment/Change Order No. 2 with Smith Contracting Co. Inc. for the Gattis School Road Widening Project. On August 10, 2017 a construction contract with Smith Contracting was approved by City Council in the amount of $1,733,500.45. Quantity Adjustment/Change Order #1 was approved by City Manager for additional traffic control and signal modifications. Amount for COMA #1 was $22,362.95 increasing the total contract amount to $1,755,863.40. This change order/quantity adjustment #2 contains items for additional sidewalk both the removal and reconstruction, additional curb and gutter for proper tie-ins at the side roadways. Additional traffic control by means of changeable message boards. Also included is additional cable for opticom and ethernet connections for the new traffic signal. Flowable fill used in some of the trench work for installing utilities and steel plates across drainage culverts to maintain ADA compliant walkways. The total for both the change order and the quantity adjustment is $47,143.95 increasing the overall contract amount to $1,803,007.35 Cosi: $47,143.95 01y otRound Rock Page 1 Printed on 5HO12018 Agenda Item Summary Continued CM-2018-7709 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page 2 Printed on 5110/2078