R-12-09-27-G15 - 9/27/2012 RESOLUTION NO. R-12-09-27-G15 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with HDR Engineering, Inc. for the Kenney Fort Boulevard (Arterial A) Project; and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Contract No. 1 to the Contract to modify the provisions for the scope of services; and i WHEREAS, the City Council desires to enter into said Supplemental Contract No. I with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental 3 Contract No. I to the Contract with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. 3 The City Council hereby finds and declares that written notice of the date, hour, place and 3 subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, K Chapter 551, Texas Government Code, as amended. t 4 RESOLVED this 27th day of September, 2012. f ALAN MCGRAW, Mayor City of Round Rock, Texas r ATTEST: z SARA L. WHITE, City Clerk x 0:Awdox\SC0ntsV0112V1204MMCIPAL\00258463.D0C e EXHIBIT „A» STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING,INC. ("Engineer") ADDRESS: 4401 West Gate Blvd.,Suite 400,Austin TX 78745 PROJECT: Kenney Fort Boulevard(Arterial A) This Supplemental Contract No. 1 to Contract for Engineering Set-vices is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the"Engineer". a WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 8th day of September, 2011 for the Kenney Fort Boulevard (Arterial A)Project in the amount of$694,893.99;and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$166,358.00 to a total of$861,251.99; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: L t Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. IL Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by t $166,358.00 the lump sum amount payable under the Contract for a total of$861,251.99, as E shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental $' Contract in duplicate. z. Supplemental Contract Rev.12/01/08 0199.7182;00257434 84275 C 1 k 44s k" HDR ENGI NG,IN01, . B . Dat CITY OF ROUND ROCK' APPROVED AS TO FORM: By: Alan McGraw,Mayor Stephan L. Sheets,City Attorney Date i { i Supplemental Contract Rev.12/01/08 0199.7182;00257434 84275 2 ADDENDUM TO EXHIBIT B Engineering Services The Engineer will continue Construction Observation Services for the Project based on the remaining schedule and the estimated weekly hours per task shown in Exhibit D. These services are for the following specific portions of the Project. ■ Proposed UPRR facilities including bridge, track,and culverts ■ Brushy Creek bridge including sidewalks,median and bridge rails ■ Chandler Creek bridge elements including substructures,bean erection,slab, sidewalks medians and bridge rails ■ Retaining walls Professional Engineering Construction Observation ■ Maintain Request for Information(RFI) log. ■ Provide input to the City for the RFI. ■ Provide input to the City for Change Orders and coordinate minor change orders. ■ Maintain Shop Drawing submittal log. ■ Provide Shop Drawing Review. ■ Review and provide input to the City on the Contractor's monthly pay estimate. ■ Provide Geotechnical consulting during construction. ■ Provide Survey services for Construction Verification. Monitor Construction Activities ■ Perform observation of the construction of the Project to monitor general conformance with the Designer's PS&E and document construction activities using daily reports,journals,logs,or other, as necessary. ■ Monitor construction in the UPRR ROW for general conformance with UPRR specifications. ■ Work as an extension of City Project Manager's staff. 1 ' ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page x 4 4 4 F f 1 1 E f z r 1 i i i t t E i F § E Adderidum to Exhibit C Artaft"N'Project CWCA Schedule ............. tii A1416.NFL Chm C4ift Ii4. I [ 1. 717"a MMWIA3AM T40=11 PIM I-: ftv.. Cw—,v WMMMMMMW RMUOW ................ R.IdUpP.W.. Mkv— Ralad UD Tad Ed 110�— Row up W.". ........................................... ---------- -------- Addendum to Exhibit D Fee Schedule Total Total Other Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants TOTALS Task 1: Construction Administration 262 $35,792.00 $0.00 $0.00 $35,792.00 Task 2: Construction Observation &Coordination 451 $63,066.00 $7,500.00 $0.00 $70,566.00 Task 3: Construction Support Survey 0 $0.00 $0.00 $20,000.00 $20,000.00 Task 4: Geotechnical Construction Support 0 $0.00 $0.00 $40,000.00 $40,000.00 GRAND TOTAL: 713 $98,858.00 $7,500.00 $60,000.00 $166,358.00 ROUNDROCK,TEW City Council Agenda Summary Sheet PGRPOSE PASSIOK PROSPERITY. Agenda Item No. G15. Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 1 with Agenda Caption: HDR Engineering, Inc.for the Kenney Fort Boulevard (Arterial A) Project. Meeting Date: September 27, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: E Contracts with HDR Engineering, Inc. for the design and development of the Kenney Fort Project were approved by the City Council from May 2006 to June 2011. The engineering services contract for the construction phase of this project was approved by the City Council on September 8, 2011 for $694,893.99. Services included in the contract were construction observation; construction services for Union Pacific Railroad's bridge, track, and culverts; construction services for Brushy Creek Bridge, Chandler Creek Bridge, and retaining walls; input for RFI processing, change orders, and shop drawing review; F monitoring of construction activities; and maintenance of daily reports and photographs. f Supplemental Contract No. 1 for $166,358 is for additional work on the Union Pacific Railroad bridge, the Brushy Creek bridge, and the bridge across Chandler Creek. The total cost of the construction phase engineering services contract would be$861,251.99. Cost: $166,358 a t Source of Funds: Type B Corporation } r Recommended Action: Approval , x l F f f. 3 S t f i i S t tr t S i F j: p s i t t s 1 a. Y S j i Y 3 1 Y { i k STATE OF TEXAS § § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: HDR ENGINEERING,INC. ("Engineer") ADDRESS: 4401 West Gate Blvd., Suite 400,Austin TX 78745 PROJECT: Kenney Fort Boulevard(Arterial A) This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the"Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract', on the 8th day of September, 2011 for the Kenney Fort Boulevard (Arterial A)Project in the amount of$694,893.99;and i WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$166,358.00 to a total of$861,251.99; f NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract I I is amended as follows: I• i Article 2, Engineering Services and Exhibit B, Engineering_Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. i II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $166,358.00 the lump sum amount payable under the Contract for a total of $861,251.99, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. Supplemental Contract Rev.12/01/08 a 0199.7182;00257434 84275 1 -12-v9 -ZI -C.7(S HDR ENGI NG,IN . B a /2 Date CITY OF ROUND ROCK APP D AS TO ORM: By: /1'�' h. t Alan McGraw,Mayor Stephan . Sheets,City Attorney Date { i i a I I i i Supplemental Contract Rev.12/01/08 0199.7182;00257434 84275 2 i • i i ADDENDUM TO EXHIBIT B Engineering Services 3 The Engineer will continue Construction Observation Services for the Project based on the remaining schedule and the estimated weekly hours per task shown in Exhibit D. These services are for the following specific portions of the Project: a ■ Proposed UPRR facilities including bridge,track,and culverts s ■ Brushy Creek bridge including sidewalks,median and bridge rails ■ Chandler Creek bridge elements including substructures,bean erection,slab, 3 sidewalks medians and bridge rails { ■ Retaining walls s S Professional Engineering Construction Observation ■ Maintain Request for Information(RFl) log. ■ Provide input to the City for the RFI. ■ Provide input to the City for Change Orders and coordinate minor change orders. ■ Maintain Shop Drawing submittal log. P ■ Provide Shop Drawing Review. ■ Review and provide input to the City on the Contractor's monthly pay estimate. ■ Provide Geotechnical consulting during construction. { d ■ Provide Survey services for Construction Verification. Monitor Construction Activities ■ Perform observation of the construction of the Project to monitor general conformance with the Designer's PS&E and document construction activities using daily reports,journals,logs,or other,as necessary. ■ Monitor construction in the UPRR ROW for general conformance with UPRR specifications. ■ Work as an extension of City Project Manager's staff. e l I r 1 i i s i 3 3 i ADDENDUM TO EXHIBIT C a Work Schedule 3 Attached Behind This Page 4 E 3 t ¢E r k p� Y k p� E B f f f k {f{ t y f j� E t6 6 !k R 2�2 SS t K Addendum in Exhibk C Anefial"A"Project CM/CA Sd*dule e.ni .7. . M•i • •�^ . �^ h .a MkM RFL*wp DraWVi....w t1r DCON1' M.n Ilfn5 Az co+.nu�.r.�wuan.cowna�,�..wa.aon _ T,.a3on� waeioaon� I I I PNMDwMMD 71". i T.M n. ►Mw.. 9nmm.n Rolle UP ...... N.D.tl UDPW... P�.Mar eu.nW ewafs. D.PDMmnN I" MI.IpIP RoOw UP ri.k ROMe UD MDMbe.<> irimY T..lw ( CaMnrD MIMNeM P.D.1 Addendum to Exhibit D Fee Schedule Total Total Other TOTALS Task Labor Hours Loaded Labor Cost Direct Costs Subconsultants Task 1: Construction Administration 262 $35,792.00 $0.00 $0.00 $35,792.00 Task 2: Construction Observation &Coordination 451 $63,066.00 $7,500.00 $0.00 $70,566.00 Task 3: Construction Support Survey 0 $0.00 $0.00 $20,000.00 $20,000.00 Task 4: Geotechnical Construction Support 0 $0.00 $0.00 $40,000.00 $40,000.00 GRAND TOTAL: 713 1 $98,858.00 F7$7,500.00 $60,000.00 $166,358.00