Loading...
R-12-10-25-H12 - 10/25/2012 RESOLUTION NO. R-12-10-25-1112 N i I { WHEREAS, the City of Round Rock has duly advertised for bids for the Bowman Road Neighborhood Revitalization Project, and WHEREAS, Fencecrete America, Inc. has submitted the lowest responsible bid, and WHEREAS, the City Council wishes to accept the bid of Fencecrete America, Inc., Now Therefore f- BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Fencecrete America, Inc. for the Bowman Road Neighborhood Revitalization Project. r The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, k. Chapter 551, Texas Government Code, as amended. RESOLVED this 25th day of October, 2012. s' ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: s z SARA L. WHITE, City Clerk O:\wdox\SCClnts\0l 12\1204\MUNICIPAL\00260444.DOC/rmc { s ( HUGGINS/SEILER iib EAST MAIN i &ASSOCIATES, LP ROUND ROCK,TEXAS 78664 Consulting Engineers t September 27,2012 f Mr.Joe Bledsoe Project Manager a: Transportation Department City of Round Rock 2008 Enterprise Drive 3; Round Rock,TX 78664 RE: Bowman Road Neighborhood Revitalization Program Recommendation for Award of Bid Dear Mr. Bledsoe, Huggins/Seiler & Associates, LP (H/SA) has reviewed the two bids received on September 25, 2012 from Fencecrete America, Inc. and Patin Construction, LLC for the Bowman Road Neighborhood Revitalization Program. Z This project is for the installation of precast concrete fence along both sides of Bowman Road, between Sunrise ' Road and Mays Street. The total amount bid for this work as submitted by each contractor is as follows: z< ) Fencecrete America, Inc. $ 657,265.45 Patin Construction, LLC $ 1,454,197.00 A detailed Bid Tabulation of each bid is attached.Our Opinion of Probable Cost for this work was$685,830.20. # We have verified the accuracy of all calculations in each bid; each was found to be correct as submitted. Additionally, each contractor submitted the required Bid Bond as well as the Statement of Bidder's Safety Experience. Based on our review and analysis of each bid, we recommend that the contract for this contract be awarded to Fencecrete America,Inc.in the total amount bid of$657,265.45. If you have any questions or require additional information,please advise. Sincerely, Thomas G. Martin, P.E. HUGGINS/SEILER&ASSOCIATES,LP Cc: Bill Huggins,Huggins/Seiler and Associates Chris Huggins,Huggins/Seiler and Associates Attachment I f k, f t, Z jj i PHONE(512) 828-04o6•FAx(512) 828-0429• www.hsaengineering.com i THE CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Transportation Department 2008 Enterprise Dr. BY: T.G.Martin,P.E. Round Rock, Texas. 78664 DATE September 25,2012 (512)218-6605 SHEET: 1 of 1 BID TABULATION .......... .. ................. .......... CONTRACT : Bowman Road Neighborhood Revitalization Fencecrete America,Inc Patin Construction,LLC LOCATION : 2008 Enterprise Drive Statement of Safety? Yes Statement of Safety? Yes Round Rock,Texas 78664 Adendum(s)? N/A Adendum(s)? N/A Bid Bond? Yes Bid Bond? Yes ............. .......... .... ....... ............ APPROX. UNIT UNIT ITEM UNIT QTY. PRICE COST PRICE COST 100. Preparing Right-Of-Way STA 60.4 $ 831.99 $ 50,252.20 $ 2,000.00 $ 120,800.00 101. Filter Curb Inlet Protection LF 181 $ 3.50 $ 633.50 $ 12.00 $ 2,172.00 102. Rock Berm LF 132 $ 18.00 $ 2,376.00 $ 35.00 $ 4,620.00 103. Stabilized Construction Entrance EA 2 $ 350.00 $ 700.00 $ 1,500.00 $ 3,000.00 104. Tem ora Erosion Control Logs LF 994 $ 3.50 $ 3,479.00 $ .6.00 $ 5,964.00 105. Remove&Reinstall Temporary Erosion Control Logs LF 1,800 $ 3.50 $ 6,300.00 $ 8.00 $ 14,400.00 106. Mobilization LS 1 $ 300.00 $ 300.00 $ 70,000.00 $ 70,000.00 107. Precast Concrete Fence LF 7,543 $ 73.25 $ 552,524.75 $ 152.00 $ 1,146,536.00 108. Wrought Iron Gate(Walk) EA 17 $ 845.00 $ 14,365.00 1,765.00 $ 30,005.00 109. Wrought Iron Gate(Drive) EA 11 $ 1,795.00 $ 19,745.00 3,600.00 $ 39,600.00 110. Wood Fence Tie In EA 70 $ 65.00 $ 4,550.00 $ 150.00 $ 10,500.00 111. Chain Link Fence Tie In EA 24 $ 85.00 $ 2,040.00 $ 150.00 $ 3,600.00 TOTAL: $ 657,265.45 $ 1,451,197.00 f 6 X ROUND ROCK,TEXAS City Council Agenda Summary Sheet a PURPOSE.PASSION.PROSPERUY. Agenda Item No. H12. Consider a resolution authorizing the Mayor to execute a contract with Fencecrete Agenda Caption: America, Inc.for the Bowman Road Neighborhood Revitalization Project. Meeting Date: October 25, 2012 Department: Transportation Staff Person making presentation: Gary Hudder Transportation Director Item Summary: As a part of the Neighborhood Revitalization Program and "Great Neighborhoods Old & New" Strategic Goal, the City has decided to do a corridor enhancement along Bowman Road. This project will replace current wood/chain fence with a concrete fence similar to the one that was done for Sunrise Road. The bid opening for the construction services contract for the Bowman Road Neighborhood Revitalization Program was held on September 25, 2012 at 2:00 p.m. A total of two sealed bids were received. After reviewing and certifying the attached bid tabulation, Huggins/Seiler & Associates LP and the Transportation Department staff recommend that Fencecrete America, Inc, with a base bid of $657,265.45, be awarded the contract for the construction of this project. Cost: $657,265.45 Source of Funds: General Self-Financed Construction Recommended Action: Approval