R-2014-1392 - 5/8/2014RESOLUTION NO. R-2014-1392 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Patin Construction, LLC for the Southwest Downtown Infrastructure Improvements — San Saba Street and West Liberty Avenue Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Patin Construction, LLC for the Southwest Downtown Infrastructure Improvements — San Saba Street and West Liberty Avenue Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 8th day of May, 2014. ATTEST: SARA L. WHITE, City Clerk 0112.1404: 00297712 ALAN MCGRAW, Mayor City of Round Rock, Texas Contract Quantity Adjustment/Change Order rev, 08/12 Department: Transportation Project Name: SWDT San Saba and West Liberty Avenue City Project ID Number Justification Quantity Adjustment/Change Order # 3 is needed to adjust additional quanities required to complete nessesary work for the project, additional work included; Additional conduits required for Dry utility connections, Additional 12" Waterline install, Additional 6" Wastewater main for connections, Additional curb and gutter -valley gutter. TX22ARFA I EXHIBIT „A» Date: 4/9/14 Page 1 of 4 Change Order/Quantity Adjustment No. 3 SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Amount $3,470,511.001 $0.00 $341,947.00 $341,947.00 $3,812,458.001 1 $166,900.87 $0.00 $166,900.87 $3,979,358.87 270 13 61 344 $508,847.87 rApproval Todd Keltgen Transportation Manager City of Round Rock Printed Name, Title, Company Pmms" �. Printed Name, Title, Company Contractor: Signature Signature City Project Manager: Mayor/City Manager 0.04 0.00 0.04 Date Printed Name, T Signature Printed Name, Title Date rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: SWDT San Saba and West Liberty Avenue Quan. Adj./Change Order No.: 3 Change Order Data Page 2 of 4 Item # Item Description Unit Qty Unit Price Amount Contract Time Adjustment (Days) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $a.00 0 r- ICV, 08/12 Contract Quantity Adjustment/Change Order Project Name: SWDT San Saba and West Liberty Avenue Quan. Adj./Change Order No.: 3 Page 3 of 4 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (r►avc) ,S ti Pa 6 , . Tree Protective Fencing Type A Chain Link fence, Temporary Tree Protection Fencing, LF 641 $ 3.00 $1,923.00 10 Silt Fence and /or Triangular Filter Dike complete in place, maintained thoughout the project. LF 114 $ 2.00 $228.00 16 Remove Existing Chain Link Fence and Re- install main gates and driveway gate on property Owners property. LF 31 $ 20.00 $620.00 29 Construct Portland Cement Reinforced Concrete Sidewalks to 4 -Inch Thickness, complete in place per square foot (as needed to match ROW back to walk on site at each address) SF 597 $ 6.00 $3,582.00 32 Portland Cement Reinforced Concrete Driveway, SF 785 $ 6.00 $4,710.00 33 Portland Cement Reinforced Concrete Curb & Gutter LF 213 $ 20.00 $4,260.00 34 Portland Cement Reinforced Concrete Valley Gutter LF 142 $ 42.00 $5,964.00 48 120V, 20A GFI Receptacle With Single Gang Back Box 2-3/4" and Single Gang Vertical In- Use Cover EA 1 $ 375.00 $ 375.00 49 Electric Pull Box, H2O load capable color to match EA 2 $ 630.00 $1,260.00 51 pavers Grass Sodding. SY 245 $ 6.00 $1,470.00 53 4" SCH 40 PVC IRRIATION SLEEVE, FITTINGS & APPURTS LF 197 $ 5.00 $985.00 54 SCH 40 PVC IRRIGATION LINE MCL ALL FITTINGS/APPURTS LF 1215 $ 1.20 458.00 $1,458.00 58 IRRIGATION VALVES W/BA I ERY OPERATED SOLENOID, CAST IRON VALVE BOX EA 1 $ 280.00 $280.00 59 TREE BUBBLERS, INCL 4' OF FLEX PIPE, FITTINGS/APPURTS EA 32 $ 26.00 $832.00 60 INSTL OF ST TREE INCL EXCAVA (6'X6'X30"), PLANTING MIX, TREE INSTL (TREES PROVIDED BY RR), MULCH INSTL (PROVIDED BY RR) EA 2 $ 270.00 $540.00 65 6" PVC ASTM D2241 SDR26 PIPE LF 115 $ 70.00 $8,050.00 rev, 08/12 Page 4 of 4 Contract Quantity Adjustment/Change Order 71 73 79 83 93 94 96 98 99 RECONNECT EXIST WWTR SERV W/NEW 4" DIA (MIN) TRANSITION PIPE FRM EXIST SERV TO NEW STUBS, SERV SZ SHALL MATCH EXIST WHERE EXIST IS LARGER THAN 4" DIA PIPE 107 108 12" PIPE (PVC AWWA C-900 CL 200, OR DI AWWA C-100 MIN, CL 200) 109 12" GATE VALVE LF 200 $ 60.00 $12,000.00 LF 84 $ 50.00 $4,200.00 EA 2 $ 2,950.00 $5,900.00 FIRE HYDRANT ASSY INCL LEADS & 6" GATE VALVE TRENCH DRAIN (TY A) & GRATE 8" X 10' (EJIW #V-7381) 110 EA $ 4,800.00 $4,800.00 LF -10 $ 300.00 -$3,000.00 TRENCH DRAIN (TY A) & GRATE 10" X 10' (EJIW #V-7382) 112 PVC, 6" DIA, EXCAVA/BKFL LF 20 $ 320.00 LF 90 $ 50.00 $6,400.00 $4,500.00 RCP, 12" DIA, EXCAVA/BKFL LF 4 $ 70.00 $280.00 RCP, 18" DIA, EXCAVA/BKFL E2 - DUCT BANK (ELEC & COMMUNICATIONS) LF 8 $ 80.00 $640.00 LF 56 $ 190.00 $10,640.00 10 EA 4" SCH 40 PVC CONDUITS IN DUCT BANK (COMMUNICATIONS) E4 - DUCT BANK (ELEC & COMMUNICATIONS) LF 1303 $ 170.00 $221,510.00 LF 54 $ 220.00 $11,880.00 E4W - DUCT BANK (ELEC & COMMUNICATIONS) E6 - DUCT BANK (ELEC & COMMUNICATIONS) LF 7 $ 230.00 $1,610.00 LF 119 PRECAST CONC TRANSFORMER PAD EA 85 1 $ 250.00 $ 2,800.00 TOTALS: $21,250.00 $2,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $341,947.00 0 EXECUTED ORIGINAL DOCUMEN1S FOLLOW Contract Quantity Adjustment/Change Order ROUND ROCK IEXAS rev, 08/12 Department: Transportation Project Name: SWDT San Saba and West Liberty Avenue City Project ID Number TX22AREA Justification Quantity Adjustment/Change Order # 3 is needed to adjust additional quanities required to complete nessesary work for the project, additional work included; Additional conduits required for Dry utility connections, Additional 12" Waterline install, Additional 6" Wastewater main for connections, Additional curb and gutter -valley gutter. Page 1 of 4 Date: 4/9/14 Change Order/Quantity Adjustment No. 3 SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Pius Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Contractor: City Project Manager: Mayor/City Manager Si • nature Signature R-2014-1392 Amount % Change L L $0.00 $341,947.00 $341,947.00 $3,812,458.00 $166,900.87 $0.00 $166,900.87 270 13 61 344 $3,979,358.87 $508,847.87 0.04 0.00 0.04 Todd Keltgen Transportation Manager City of Round Rock Printed Name, Title, Company ,,;„/-?,., Printed Name, Title, Company Printed Name, Ti G�VII Nlotjov - Printed Name, Tit e Date 23/y ate Date Date ROUND ROCK. �F.%AS rev, 08112 Contract Quantity Adjustment/Change Order Project Name: SWDT San Saba and West Liberty Avenue Quan. Adj./Change Order No.: 3 Chan e Order Data Page 2 of 4 Item # Item Description Unit Qty. Unit Price Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ROUND ROCK TEXAN rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: SWDT San Saba and West Liberty Avenue Quan. Adj./Change Order No.: 3 Quantity Adiustment Data Page 3 of 4 Unit LF Qty. 641 Unit Price $ 3.00 Amount $1,923.00 Contract Time Adjustment Bid Item # 6 Item Description Tree Protective Fencing Type A Chain Link fence, Temporary Tree Protection Fencing, 10 Silt Fence and /or Triangular Filter Dike complete in place, maintained thoughout the project. LF 114 $ 2.00 $228.00 16 Remove Existing Chain Link Fence and Re - Install main gates and driveway gate on property Owners property. LF 31 $ 20.00 $620.00 29 Construct Portland Cement Reinforced Concrete Sidewalks to 4 -Inch Thickness, complete in place per square foot (as needed to match ROW back to walk on site at each address) SF 597 $ 6.00 $3,582.00 32 Portland Cement Reinforced Concrete Driveway, SF 785 $ 6.00 $4,710.00 33 Portland Cement Reinforced Concrete Curb & Gutter LF 213 $ 20.00 $4,260.00 34 Portland Cement Reinforced Concrete Valley Gutter LF 142 $ 42.00 $5,964.00 48 120V, 20A GFI Receptacle With Single Gang Back Box 2-3/4" and Single Gang Vertical In- Use Cover EA 1 $ 375.00 $375.00 49 Electric Pull Box, H2O Load capable color to match EA 2 $ 630.00 $ 1,260 00 51 pavers Grass Sodding. SY 245 $ 6.00 $1,470.00 53 4" SCH 40 PVC IRRIATION SLEEVE, FITTINGS & APPURTS LF 197 $ 5.00 $ 985 00 54 SCH 40 PVC IRRIGATION LINE INCL ALL FITTINGS/APPURTS LF 1215 $ 1.20 $1,458.00 58 EA 1 $ 280.00 $280.00 IRRIGATION VALVES W/BA I I'ERY OPERATED SOLENOID, CAST IRON VALVE BOX 59 TREE BUBBLERS, INCL 4' OF FLEX PIPE, FITTINGS/APPURTS EA 32 $ 26.00 $ 832 00 60 INSTL OF ST TREE INCL EXCAVA (6'X6'X30"), PLANTING MIX, TREE INSTL (TREES PROVIDED BY RR), MULCH INSTL (PROVIDED BY RR) EA 2 $ 270.00 $540.00 65 6" PVC ASTM D2241 SDR26 PIPE LF 115 $ 70.00 $8,050.00 Contract Quantity Adjustment/Change Order ROUND ROCK TEXAS Page 4 of 4 71 RECONNECT EXIST WWTR SERV W/NEW 4" DIA (MIN) TRANSITION PIPE FRM EXIST SERV TO NEW STUBS, SERV SZ SHALL MATCH EXIST WHERE EXIST IS LARGER THAN 4" DIA PIPE LF 200 $ 60.00 $12,000.00 73 12" PIPE (PVC AWWA C-900 CL 200, OR DI AWWA C-100 MIN, CL 200) LF 84 $ 50.00 $4,200.00 79 12" GATE VALVE EA 2 $ 2,950.00 $5,900.00 83 FIRE HYDRANT ASSY INCL LEADS & 6" GATE VALVE EA 1 $ 4,800.00 $4,800.00 93 TRENCH DRAIN (TY A) & GRATE 8" X 10' (EJIW #V-7381) LF -10 $ 300.00 -$3,000.00 94 TRENCH DRAIN (TY A) & GRATE 10" X 10' (EJIW #V-7382) LF 20 $ 320.00 $6,400.00 96 PVC, 6" DIA, EXCAVA/BKFL LF 90 $ 50.00 $4,500.00 98 RCP, 12" DIA, EXCAVA/BKFL LF 4 $ 70.00 $280.00 99 RCP, 18" DIA, EXCAVA/BKFL LF 8 $ 80.00 $640.00 107 E2 - DUCT BANK (ELEC & COMMUNICATIONS) LF 56 $ 190.00 $10,640.00 108 10 EA 4" SCH 40 PVC CONDUITS IN DUCT BANK (COMMUNICATIONS) LF 1303 $ 170.00 $221,510.00 109 E4 - DUCT BANK (ELEC & COMMUNICATIONS) LF 54 $ 220.00 $11,880.00 110 E4W - DUCT BANK (ELEC & COMMUNICATIONS) LF 7 $ 230.00 $1,610.00 112 E6 - DUCT BANK (ELEC & COMMUNICATIONS) LF 85 $ 250.00 250.00 $21,250.00 119 PRECAST CONC TRANSFORMER PAD EA 1 $ 2,800.00 $2,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 "• $341,947.00 0