R-13-08-22-G11 - 8/22/2013RESOLUTION NO. R -13-08-22-G11 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Atkins North America, Inc. for the Creek Bend Boulevard Project; and WHEREAS, Atkins North America, Inc. has submitted Supplemental Contract No. 4 to the Contract to modify the provisions for the scope of services; and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 4 with Atkins North America, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 4 to the Contract with Atkins North America, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of August, 2013. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 5114/14/L - SARA L. WHITE, City Clerk 0112.1304;00280381 EXHIBIT „A„ STATE OF 'TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS NORTH AMERICA, INC. ("Engineer") ADDRESS: 6504 Bridge Point Parkway, Suite 200, Austin, TX 78730 PROJECT: Creek Bend BouIevard This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins North America, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of January, 2012 for the Creek Bend Boulevard Project in the amount of $179,898.43; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on July 12, 2012 to amend the scope of services and to increase the compensation by $805,808.42 to a total of $985,706.85; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on December 14, 2012 to amend the scope of services and to increase the compensation by $21,570.57 to a total of $1,007,277.42; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on March 8, 2013 to amend the scope of services and to increase the compensation by $49,900.00 to a total of $1,057,177.42; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $160,332.84 to a total of $1,217,510.26; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev.12/01/08 0199.7202; 00278538 84275 ST33CBDR 1 II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $160,332.84 the lump sum amount payable under the Contract for a total of $1,217,510.26, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. ATKINS NORTH MERIW By: Date CITY OF ROUND ROCK By: APPROVED AS TO FORM: Alan McGraw, Mayor Stephan L. Sheets, City Attorney Date Supplemental Contract 0199.7202; 00278538 ST33CSDR 2 Rer.12/01 /08 84275 ADDENDUM TO EXHIBIT B Engineering Services PROJECT DESCRIPTION This Supplemental Contract consists of a geophysical study being done in order to assess the presence of voids and related features along the proposed Creek Bend Blvd alignment from station 11+30 to station 23+25. TASK 1: SURVEYING — Not Included with this Supplemental TASK 2: ROUTE STUDY — Not Included with this Supplemental TASK 3: ENVIRONMENTAL STUDIES 1. Atkins will provide oversight during the geophysics study being performed by Round Rock Geophysics, LLC 2. Round Rock Geophysics, LLC will conduct a geophysical study within the proposed Creek Bend Blvd right-of-way from station 11+30 to station 23+25. The objective of this study is to assess the presence of voids and related features via a noninvasive technique that retains the biological integrity of the subsurface voids. The proposed geophysical method is called seismic refraction tomography, which uses compressional wave (P- wave) and shear wave (S -wave) travel time measurements, thereby creating 2D and 3D images of the subsurface velocity structure. Data will be collected along seven parallel lines oriented along the proposed alignment of Creek Bend Blvd and spaced approximately 20 feet apart. Each line will have a survey length of approximately 400 feet. There will be a total of 7 shot points per line and a geophone spacing of 5 -foot. A land streamer with 8 -Hz vertical geophones will be used to collect data. A minimum depth of exploration of 25-35 feet is planned. The field data will be downloaded and processed using industry standard software packages. The RREG report will include: • Description of the data acquisition procedures • Equipments and software used for data collection • Data quality and site condition • Data processing procedures • Results of data processing (2D and 3D displays) • Interpretation of the final results in terms of characterizing the void and associated features, • Conclusion and recommendation • Final site visit would be planned to mark the horizontal dimensions of the void on the surface. Page 1 of 2 TASK 4: PRELIMINARY DESIGN/30% PLANS — Not Included with this Supplemental TASK 5: PROJECT MANAGEMENT 1. Subconsultant management and other project management duties. TASK 6: DIRECT EXPENSES — Not Included with this Supplemental TASK 7: WATER IMPROVEMENTS — Not Included with this Supplemental TASK 8: UTILITY LOCATIONS/LAYOUTS — Not Included with this Supplemental TASK 9: GEOTECHNICAL DESIGN — Not Included with this Supplemental TASK 10: 60% PLANS — Not Included with this Supplemental TASK 11: 95% PLANS — Not Included with this Supplemental TASK 12: 100% PLANS/FINAL SUBMITTAL — Not Included with this Supplemental NOT INCLUDED WITHIIN THIS SCOPE The following items are not included with this scope. These items, if necessary, would be added to the scope through a supplemental agreement. 1. Subsurface void(s) entry and exploration, biological surveys, and/or surveying and mapping. 2. Coordination with any state or federal agency. DELIVERABLES 1. Geophysical Study Report Page 2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page c $ 1 lq Q i 3Z 1 l it � yy� 5001 8 ; 2 L 3 Q l __..r,A Pap toft AT KINS Creek Bend Blvd Extension Supplemental 4 - Attachment C _ 3_ $ R a 1 ,1 gp 110 u9 Wig i - 3 0 3 2•1 r i i I m a a •• c 67 Ti T> 3 s e G s 11 < 4 W i _ o A 4a�i=i44'tt 4 o gp §aAAIA§:So < tt. 4 o i•a < < (< �d� tIl a o i Io � Chi I is, lo 1 11 < !< 14 a o .. ,yId10 It < o - < < kkkk PIP�r.s��3'! 41440 n to rn- sties=81xA.F < a Pn 8 < < o e 3 � i1 g .< < i,4 o o2 ,g t< la i& !I 3 l< 'o� �o l'` i C I+'i ? 1 I� j I d A'aAA�AjAF;AKIF,ahA 14 In t • 117A$44 - .,r, t�nnn� 'o� ' i o; 3 g 8A K '� is € aiZi ti i n n s 8 g 1 n S o, B !t. a} , 8 a' 1 • gal -, t 2 t a . g .e Y I4 FF g 'g ioda u1 pp 3 Other I I TOTALS Direct Costs Subconsultants Not performed with this Supplemental Agreement 44.0 $ 7,003.10 $ - $ 149,700.00 $ 156,703.10 Not performed with this Supplemental Agreement 24.0 $ 3,629.74 1 $ - $ - $ 3,629.74 Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement GRAND TOTAL: 68 $ 10,632.84 _ $ - $ 149,700.00 $ 160,332.84 1 Total I Loaded Labor Cost Total Labor Hours .,v co co 1— 1 ! l ask '1 : Surveying Task 2: Route Study Task 3: Environmental Studies Task 4: Preliminary Design/30% Plans Task 5: Project Management Task 6: Direct Expenses Task 7: Water Improvements Task 8: Utility Locations/Layouts Task 9: Geotechnical Design Task 10: 60% Plans Task 11: 95% Plans Task 12: 100% Plans/Final Submittal 'tN ) Nn fM 00 V) 00 O. N r. til en W M v i �-+ O Overhead Rate = Profit Rate = ROUND ROCK, TEXAS ! PURPOSE PASSIM PROWERRY City of Round Rock Agenda Item Summary Agenda Number: G.11 Title: Consider a resolution authorizing the Mayor to execute Supplemental Contract No. 4 with Atkins North America, Inc. for the Creek Bend Boulevard Project. Type: Resolution Governing Body: City Council Agenda Date: 8/22/2013 Dept Director: Gary Hudder, Transporation Director Cost: $160,332.84 Indexes: 2007 General Obligation Bonds Attachments: Resolution, Exhibit A, Seismic Survey Plan Text of Legislative File 13-576 On January 26, 2012, an engineering services contract for $179,898.43 with Atkins North America, Inc. was approved by the City Council. Services covered in this contract were 30% schematic drawings for a four lane divided roadway connection Wyoming Springs Drive and Creek Bend Circle. Supplemental Contract No. 1 was approved on July 12, 2012 by the City Council at a cost of $805,808.42. Services covered under this contract amendment included 100% plans, specifications, and estimates; and bidding and construction phase services. Supplemental Contract No. 2 was approved by the City Council on December 14, 2012 for $21,570.57. Additional services were needed to study and define limits of the voids along the proposed Creek Bend Boulevard alignment encountered during geotechnical drilling. Supplemental Contract No. 3 was approved on March 8, 2013 at a cost of $49,900 by the City Manager. Services were needed to study and define limits of a void between Station 23+25 and Station 27+25. Supplemental Contract No. 4, at a proposed cost of $169,332.84, is needed to further define the limits of the voids along the remainder of the proposed Creek Bend Boulevard corridor from Station 11+30 to Station 23+25. The total cost of engineering services with Atkins North America, Inc. would be $1,226,510.26. City of Round Rock Page 1 Printed on 8/19/2013 Agenda Item Summary Continued (13-576) Cost: $160, 332.84 Source of Funds: 2007 GO Bonds Staff recommends approval. City of Round Rock Page 2 Printed on 8/19/2013 EXECUTED ORIGINAL DOCUMENT FOLLOW STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL CONTRACT NO. 4 TO CONTRACT FOR ENGINEERING SERVICES FIRM: ATKINS NORTH AMERICA, INC. ("Engineer") ADDRESS: 6504 Bridge Point Parkway, Suite 200, Austin, TX 78730 PROJECT: Creek Bend Boulevard This Supplemental Contract No. 4 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Atkins North America, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 26th day of January, 2012 for the Creek Bend Boulevard Project in the amount of $179,898.43; and WHEREAS, the City and Engineer executed Supplemental Contract No. 1 on July 12, 2012 to amend the scope of services and to increase the compensation by $805,808.42 to a total of $985,706.85; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on December 14, 2012 to amend the scope of services and to increase the compensation by $21,570.57 to a total of $1,007,277.42; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on March 8, 2013 to amend the scope of services and to increase the compensation by $49,900.00 to a total of $1,057,177.42; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $160,332.84 to a total of $1,217,510.26; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 2, Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum To Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum To Exhibit C. Supplemental Contract Rev.12/01/08 0199.7202; 00278538 84275 ST33CBDR 'x -13 -mob -22-61( II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $160,332.84 the lump sum amount payable under the Contract for a total of $1,217,510.26, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. ATKINS NORTH AMERICA, INC. Al By: �G 7-// -/J Date CITY OF ROUND ROCK By: rY)�� Alan McGraw, Mayor Date UA1 e2i 2tX ' Supplemental Contract 0199.7202; 00278538 ST33CBDR 2 APP VED AS T I FORM: Steph n L. Sheets, City Attorney Rev.12/01/08 84275 ADDENDUM TO EXHIBIT B Engineering Services PROJECT DESCRIPTION This Supplemental Contract consists of a geophysical study being done in order to assess the presence of voids and related features along the proposed Creek Bend Blvd alignment from station 11+30 to station 23+25. TASK 1: SURVEYING — Not Included with this Supplemental TASK 2: ROUTE STUDY — Not Included with this Supplemental TASK 3: ENVIRONMENTAL STUDIES 1. Atkins will provide oversight during the geophysics study being performed by Round Rock Geophysics, LLC 2. Round Rock Geophysics, LLC will conduct a geophysical study within the proposed Creek Bend Blvd right-of-way from station 11+30 to station 23+25. The objective of this study is to assess the presence of voids and related features via a noninvasive technique that retains the biological integrity of the subsurface voids. The proposed geophysical method is called seismic refraction tonography, which uses compressional wave (P- wave) and shear wave (S -wave) travel time measurements, thereby creating 2D and 3D images of the subsurface velocity structure. Data will be collected along seven parallel lines oriented along the proposed alignment of Creek Bend Blvd and spaced approximately 20 feet apart. Each line will have a survey length of approximately 400 feet. There will be a total of 7 shot points per line and a geophone spacing of 5 -foot. A land streamer with 8 -Hz vertical geophones will be used to collect data. A minimum depth of exploration of 25-35 feet is planned. The field data will be downloaded and processed using industry standard software packages. The RREG report will include: • Description of the data acquisition procedures • Equipments and software used for data collection • Data quality and site condition • Data processing procedures • Results of data processing (2D and 3D displays) • Interpretation of the final results in terms of characterizing the void and associated features, • Conclusion and recommendation • Final site visit would be planned to mark the horizontal dimensions of the void on the surface. Page 1 of 2 1 TASK 4: PRELIMINARY DESIGN/30% PLANS — Not Included with this Supplemental TASK 5: PROJECT MANAGEMENT 1. Subconsultant management and other project management duties. TASK 6: DIRECT EXPENSES — Not Included with this Suppleinental TASK 7: WATER IMPROVEMENTS — Not Included with this Supplemental TASK 8: UTILITY LOCATIONS/LAYOUTS — Not Included with this Supplemental TASK 9: GEOTECHNICAL DESIGN — Not Included with this Supplemental TASK 10: 60% PLANS — Not Included with this Supplemental TASK 11: 95% PLANS — Not Included with this Supplemental TASK 12: 100% PLANS/FINAL SUBMITTAL — Not Included with this Supplemental NOT INCLUDED WITHIIN THIS SCOPE The following items are not included with this scope. These items, if necessary, would be added to the scope through a supplemental agreement. 1. Subsurface void(s) entry and exploration, biological surveys, and/or surveying and mapping. 2. Coordination with any state or federal agency. DELIVERABLES 1. Geophysical Study Report Page 2 of 2 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page 4 � 8 I 3 a c.Kla iliw 81 8 Z Ne Creek Bend Blvd Extension Supplemental 4 - Attachment C C i iI i # iii Fi 8A1 g 1 .� a I♦ W a 8 "gs to a 111 1 $ a I I1 LLf 1 !!!!LHE! fill'� §$Nally y 1 Ts_ 11 i e v r.,-ats� g $F$$$$ e : e ; iii, Ili ;1 E=#AA.AAAA v exe)..2aea _ e o X i i � $ nxsadgpg 1o;o oI �tg - J I -I/ t !Qs( i '511 iII 3 ci TOTALS Not performed with this Supplemental Agreement 44.0 $ 7,003.10 1 $ - 1 $ 149,700.00 1 $ 156.703.10 Not performed with this Supplemental Agreement r, C6 N CO M 69 EI, tt ti of N (0M to O N Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement Not performed with this Supplemental Agreement 68 I $ 10,632.84 $ - $ 149,700.00 $ 160,332.84 Subconsultants Other Direct Costs Total Loaded Labor Cost Total Labor Hours Y H to 1- ITask 1: Surveying Task 2: Route Study ITask 3: Environmental Studies ITask 4: Preliminary Design/30% Plans ITask 5: Project Management ITask 6: Direct Expenses ITask 7: Water Improvements Task 8: Utility Locations/Layouts Task 9: Geotechnical Design ITask 10: 60% Plans Task 11: 95% Plans Task 12: 100% Plans/Final Submittal GRAND TOTAL: N cn 't N cn c'l o0 vi 00 o fV VI : CN�� VD MVI �--� O Atkins Raw Labor = Atkins Overhead =