R-13-08-22-G16 - 8/22/2013RESOLUTION NO. R -13-08-22-G16 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with APAC-Texas, Inc. for the 2012 Neighborhood Revitalization Street Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with APAC-Texas, Inc. for the 2012 Neighborhood Revitalization Street Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of August, 2013. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: 11114ji • ‘14at2t2'4-- SARA L. WHITE, City Clerk 0112 1304; 00280422 flOUNO ¢lN 8.l i.14G rev, 08/12 Department: Transportation EXHIBIT II A Contract Quantity Adjustment/Change Order 'Project 2012 Neighborhood Revitalization Street ;Name: Project City Project ID Number AAO5REVIT Justification Page 1 of 3 Date: 7/29/13 Change Order/Quantity Adjustment No. 1 After starting the construction, we found areas that did not have to be repaired to the level that was previously thought. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Prlce Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount 0/0 Change -$94,984.88 -$94,984.88 $0.00 $0.00 0.00 0.00 0.00 -$94,984.88 895090 895090 Prepare'. ti -, Kathy Garner, Accounts Receivable, APAC Texas Wheeler 5/21/13 nature Printed Name, Title, Company Date v157--/1/ iA/rk:47—/t°f4-A/Iltitil6F-r\ —1"13/CE-L*' te)-C () Contractor: Signature Printed Name, Title, Company Date City Project �},, Manager: �. P(I � 7i�.�r%} ) 6 C7 d/" /4,,, f .- Signature Print Name, Title Mayor/City Manager Date Signature Printed Name, Title Date rev, 08/12 Item # Contract Quantity Adjustment/Change Order Project Name: 2012 Neighborhood Revitalization Street Project Quan. Adj./Change Order No.: 1 Chan a Order Data Item Description QtY. Page 2 of 3 Unit Price Amount Contract Time Adjustment Da s $0.00 $0.00 $0.00 $o.00 $0.00 $0.00 $o.00 $o.00 $o.00 $0.0o $0.o0 $0.0o $0.00 $o.00 $0.00 $0.00 $o.00 $0.00 $0.00 $0.o0 $0.o0 $0.0o $0.o0 $o.00 $0.00 HtM';11>N.K:3� fl SAS rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: :2012 Neighborhood Revitalization Street Project Quan. Adj./Change Order No.: 1 uantit A 1 'ustment Data Page 3 01'3 Bid Item # Item Description Ty D HMAC Unit Qty. Unit Price Amount Contract Time Adjustment Pavement repair Surface milling Edgemiliing RR curb tons tons RR driveway RR sidewalk Manhole adjustment Valve adjustment Sidewalk ramp RR valley gutter Traffic control sy sy If sf sf ea ea ea sf mo Pavement marking If -500.85 -211.49 85.50 -$42,822.68 $160.00 -$33,838.40 -1300 $3.80 -$4,940.00 2349 $2.80 $6,577.20 136 $60.00 $8,160.00 -240 $30.00 47,200.00 -50 $55.00 -$2,750.00 -8 -1 -1 $550.00 -$4,400.00 $450.00 -$450.00 $2,000.00 -$2,000.00 -0.5 $8,000.00 -$4,000.00 -537 $1.00 -$537.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -$94,984.88 0 City of Round Rock Agenda Item Summary Agenda Number: G.16 Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with APAC-Texas, Inc. for the 2012 Neighborhood Revitalization Project. Type: Resolution Governing Body: City Council Agenda Date: 8/22/2013 Dept Director: Gary Hudder, Transportation Director Cost: $94,984.88 Indexes: CDBG HUD Entitlement Grants; General Self -Financed Construction Attachments: Resolution, Exhibit A, Map Text of Legislative File 13-628 In 2012 the City of Round Rock approved the Street Maintenance Program (Neighborhood Revitalization) that is a street rehabilitation project that provides an essential function in maintaining our roadways. The project that was currently completed provided pavement and concrete repairs in the Green Hill Subdivision. This project also qualified for CDBG funds that were used for this roadway rehabilitation, and supplemented our General fund. The City of Round Rock approved a contract with APAC-Texas, Inc. for this project in the amount of $895,090.00. During the course of the project, City Staff, and APAC-Texas, Inc. were able to define areas that had been identified for repairs, that were not as critical as previously thought. The result was a reduction in cost of $94,984.88. Cost: $94,984.88 Source of Funds: CDBG and General Self -financed Construction Staff Recommends Approval. City of Round Rock Page 1 Printed on 8/19/2013 EXECUTED ORIGINAL DOCUMENT FOLLOW . ,)r- IIII1.11111p A it ,4,A,' rev, 00112 Department: Transportation Contract Quantity Adjustment/Change Order Project 2012 Neighborhood Revitalization Street 'Name: Project City Project ID Number AAO5REVIT Justification Page 1 of 3 Date: 7/29/13 Change Order/Quantity Adjustment No. 1 After starting the construction, we found areas that did not have to be repaired to the level that was previously thought. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract lime: Prepare Ignature Contractor: City Project Manager: Mayor/City Manager Signature Ignature fl4/ Signature 6fb Amount 9/o Change -$94,984.88 -$94,984.88 $0.00 $0.00 0.00 0.00 0.00 -$94,984.88 895090 895090 Kathy Garner, Accounts Receivable, APAC Texas Wheeler Printed Name, Title, Company Approvilts'. 5/21/13 Date 15W LAerk;arr"4.44difekte4--r\. 1)4 Printed Name, Title, Company Date P'(/ )( ,R),zl?���,I. Name, Title Prince kie/t ti‘iI Printed Name, Title 7-Z4-13 Date .2z • L Date rev, 0812 Contract Quantity Adjustment/Change Order Project Name: '2012 Neighborhood Revitalization Street Project Quan. Adj./Change Order No.: 1 Change Order Data Page 2 of 3 Item # Item Description UnitQ � Amount Contract Time Adjustment ment (pays) C.�. - '...` $0.00 $0.00 $0.00 _. _■ $0.00 $0.00 $0.00 _. $0.00 _- $0.00 _. $0.00 $0.00 _■ $0.00 $0.00 _■ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ,w, rr r rev, 08112 Contract Quantity Adjustment/Change Order Project Name: '2012 Neighborhood Revitalization Street Project Quan. Adj./Change Order No.: 1 Page 3 of 3 4uanacy An uscmens uma i.`,,�.'"'`^'w4r_y'+s.k'.a«fi„k"�,'t✓S;S Bid item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Ty D HMAtons -500.85 85.50 442,822.68 Pavement repair tons -211.49 $160.00 -$33,838.40 Surface milling sy -1300 $3.80 44,940.00 Edgemilling sy 2349 $2.80 $6,577.20 RR curb If 136 $60.00 $8,160.00 RR driveway sf -240 $30.00 -$7,200.00 RR sidewalk sf -50 $55.00 -$2,750.00 Manhole adjustment ea -8 $550.00 -$4,400.00 Valve adjustment ea -1 $450.00 -$450.00 Sidewalk ramp ea -1 $2,000.00 -$2,000.00 RR valley gutter sf -128 $53.00 -$6,784.00 Traffic control mo -0.5 $8,000.00 -$4,000.00 Pavement marking If -537 $1.00 -$537.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 A �^ OtA -$94,984.88(Y 0 CC 0 J_ S w w 0 J CL CC w CL J AO O Nat/ VS3 CC 0 X > LUO U 0 0 Z 0 / Mcr w >- 0 0 0 S ONISIa z Z cr 0 a0 a3AOa >- U 0 0 m 7� 4./ NCL0 w / 1 1 1 ?JO aN39MOl1IM RI GETO DR w N 3Ab ld S3WVr 003 0 m w J a a 0 I �ilO 000MH1d3H 0 0 cc 0 J J a x re cem as 000MSN2:1V3 re 0 as NO1SV3 0 0 as Ol31dN30 as 03WVO 2710 32:1o1NaV2:19 210 N330839V 41 0 m cc w w J 1-- 1- w m 0 J 0 w 0 w criW 4- 0 03 2