Loading...
R-13-09-12-H11 - 9/12/2013RESOLUTION NO. R -13-09-12-H11 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Aaron Concrete Contractors, LP for the Gattis School Road Left Turn Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Aaron Concrete Contractors, LP for the Gattis School Road Left Turn Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of September, 2013. ATTEST: SARA L. WHITE, City Clerk 0112.1304. 00281628 ALAN MCGRAW, Mayor City of Round Rock, Texas rev, 08/12 Department: Transportation Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Left Turn Lane City Project ID Number TX02GATWD Justification EXHIBIT I Date: 8/9/13 Page 1 of 3 Change Order/Quantity Adjustment No. 1 Installation of Irrigation for Sonoma HOA, and Rolling Ridge Subdivision. Intersection work that needed to be adjusted at Rusk Road and Rolling Ridge. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract lime: Signatur City Project Manager: (, c - Signature Mayor/City Manager Amount $618,995.50 -$4,975.82 -$4,975.82 $614,019.68 0/0 Change 0.00 $37,384.47 0.06 $37,384.47 0.06 $651,404.15 $32,408.65 108 0 3 111 Submitted for Approval e 1 -e(I , e 7 l`(-1) ea- 110.A5,p/ ,C 'rty oF12d,,,!/f?erf -- �%I f //3 Printed Name, Title, Company Date Approvals Aaron Cabaza, Gen. Partner, Aaron Concrete Contractors, LP. 8/9/13 �yPrint(ed Name, Title, Company ( /f� Date 1Z �7F` 1�iI$ e, e,,'ett ��1}grl�ef �t" Jt' aro d�/ E !/ ! Printed Name,`7itle Date Signature Printed Name, Title Date rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Left Turn Lane Quan. Adj./Change Order No.: 1 Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 0-16" SURFACE MILL SY 405 $24.24 $9,817.20 0-4" SURFACE MILL SY 166.3 $18.50 $3,076.55 HMAC PVMT (TY C)(64-22)(2") SY 550.9 $12.58 $6,930.32 IRRIGATION WORK @ ROLLING RIDGE LS 1 $2,332.00 $2,332.00 IRRIGATION WORK @ SONOMA HOA LS 1 $12,589.00 $12,589.00 REFL TY I & II PVMT MARK(W)(8")(SLD) LF 130 $2.55 $331.50 REFL TY I & II PVMT MARK(W)(ARROW) EA 1 $185.50 $185.50 REFL TY I & II PVMT MARK(W)(DBL ARROW) EA 1 $238.50 $238.50 REFL TY I & II PVMT MARK(W)(WORD) EA 1 $227.90 $227.90 CITY OF ROUND ROCK PORTION LS 1 $1,656.00 $1,656.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $37384.47 0 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Left Turn Lane Quan. Adj./Change Order No.: 1 Page 3of3 Bid Item # Item Description P Unit Qty. Unit Price Amount Contract Time Adjustment (Mug) 2 REMOVE PC CONC. CURB & GUTTER LF 17.21 $4.00 $68.84 3 REMOVE PC CONC SDWLK & DRVWY SF 2366.95 $2.00 $4,733.90 5 STREET EXCAVATION CY -144 $20.00 -$2,880.00 7 TRANSITION MILLING (0-3/4") SY -49 $11.00 -$539.00 8 EDGE MILLING (0-3/4") SY 21 $6.00 $126.00 9 HMAC PVMT (TY B)(64-22)(BASE)(8") SY -183.7 $35.00 -$6,429.50 10 HMAC PVMT (TY B)(64-22)(BASE)(6") SY 93 $27.00 $2,511.00 11 D -GR HMA (METH)TY F SAC -B SY -562 $7.00 -$3,934.00 12 PC CONC CURB & GUTTER LF 130.43 $8.00 $1,043.44 13 NEW PC CONC SDWLK (5") SF -146.05 $6.00 -$876.30 15 PC CONC DRIVEWAY SF 157 $7.00 $1,099.00 19 NATIVE SEDDING FOR EC METHOD SY 1685 $0.50 $842.50 20 FILTER CURB INLET PROTECTION EA -1 $80.00 -$80.00 21 SILT FENCE FOR EC LF 1307.15 $2.00 $2,614.30 23 REMOVING AND RELOCATING MAILBOX EA -1 $160.00 -$160.00 30 REFL PMVT MARKERS (TY 1-C) EA 47 $5.00 $235.00 31 REFL PMVT MARKERS (TY II -A -A) EA 14 $5.00 $70.00 32 REFL TY 1 & II PVMT MARK(W)(4")(BRK) LF 610 $5.00 $3,050.00 33 REFL TY 1 & II PVMT MARK(W)(12")(SLD) LF 1 $5.00 $5.00 35 REFL TY 1 & II PVMT MARK(Y)(4")(BRK) LF -70 $2.00 -$140.00 36 REFL TY 1 & II PVMT MARK(Y)(4")(SLD) LF 239 $1.00 $239.00 37 ELIM EXIST PVMT MARKINGS LF -6575 $1.00 -$6,575.00 $0.00 $0.00 $0.00 TOTALS: -$4,975.82 0 ROUND ROCK, TEXAS PURPOSE PA4IOtt PROSPERITY City of Round Rock Agenda Item Summary Agenda Number: H.11 Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with Aaron Concrete Contractors, LP for the Gattis School Road Left Turn Project. Type: Resolution Governing Body: City Council Agenda Date: 9/12/2013 Dept Director: Gary Hudder, Transportation Director Cost: $32,408.65 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Resolution, Exhibit A, Map Text of Legislative File 13-692 Item Summary: As a part of the Arterial Improvement Program - Bottleneck Projects, City staff elected to do a corridor enhancement/safety project along Gattis School Road. This project created a center turn lane between Via Sonoma Trail to 500' west of Rolling Ridge Drive. In February of 2013, the City awarded the construction contract to Aaron Concrete Contractors, LP for the sum of $618,995.50. As part of this project, staff worked with the Sonoma HOA and two homeowners on Rolling Ridge Drive to repair damage to underground irrigation systems that occured. During construction it was also discovered that there were some significant grade issues at the intersections of Rusk Road at Gattis School Road, and Rolling Ridge Drive at Gattis School Road, that had not been accurately defined in the plan set by Seiler/Lankes. The result of these field changes to the project created additional costs to the contractor in the amount of $32,408.65. This brings the new contract amount to a total of $651,404.15. Cost: $32,408.65 Source of Funds: Round Rock Transportation and Economic Development Corporation (Type B Corp) Action: Staff Recommends Approval City of Round Rock Page 1 Printed on 9/10/2013 EXECUTED ORIGINAL DOCUMEN1S FOLLOW t rev, 08/12 Department: Transportation Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Left Turn Lane City Project ID Number TX02GATWD Justification Date: 8/9/13 Change Order/Quantity Adjustment No. Page 1 of 3 1 Installation of Irrigation for Sonoma HOA, and Rolling Ridge Subdivision. Intersection work that needed to be adjusted at Rusk Road and Rolling Ridge. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: ,Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount $618,995.50( -$4,975.82 -$4,975.82 $614,019.681 $37,384.47 $37,384.47 $651,404.15 $32,408.65 108 0 3 111 0/0 Change 0.00 0.06 0.06 Contractor: City Project Manager: Mayor/City Manager (2 -I -E -(i Aaron Cabaza, Gen. Partner, Aaron Concrete Contractors, LP. 8/9/13 Printed Name, Title, Title, Company Date / �eI)P/We,Irelf ht.An5ir,((iXdF ilc/�Uc/L t%fT/(3 Printed Name,Title Date Ah MCtW MAyerir Printed Name Title 9./2. (3 Date rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Left Turn Lane Quan. Adj./Change Order No.: 1 Change Order Data Page 2 of 3 Item # Item Description Unit QtY• Unit Price Amount 0-16" SURFACE MILL 0-4" SURFACE MILL SY 405 $24.24 HMAC PVMT (TY C)(64-22)(2") SY 166.3 $18.50 SY 550.9 $12.58 IRRIGATION WORK @ ROLLING RIDGE IRRIGATION WORK @ SONOMA HOA LS 1 $2,332.00 LS 1 $12,589.00 REFL TY I & II PVMT MARK(W)(8")(SLD) LF 130 $2.55 $9,817.20 $3,076.55 $6,930.32 $2,332.00 $12,589.00 REFL TY I & II PVMT MARK(W)(ARROW) REFL TY I & II PVMT MARK(W)(DBL ARROW) EA 1 $185.50 EA 1 $238.50 REFL TY I & II PVMT MARK(W)(WORD) CITY OF ROUND ROCK PORTION EA 1 $227.90 LS 1 $1,656.00 $331.50 $185.50 $238.50 $227.90 $1,656.00 TOTALS: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $37384.47 Contract Time Adjustment (Days) 0 Contract Quantity Adjustment/Change Order Project Name: Gattis School Road Left Turn Lane Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Page 3 of 3 Bid Item # Item Description Unit QtY• Unit Price Amount 2 3 5 7 8 REMOVE PC CONC. CURB & GUTTER REMOVE PC CONC SDWLK & DRVWY STREET EXCAVATION LF 17.21 $4.00 SF 2366.95 $2.00 TRANSITION MILLING (0-3/4") EDGE MILLING (0-3/4") CY -144 $20.00 SY -49 $11.00 $68.84 $4,733.90 -$2,880.00 SY 21 $6.00 - $539.00 9 HMAC PVMT (TY B)(64-22)(BASE)(8") SY -183.7 $35.00 10 11 12 13 15 19 20 21 HMAC PVMT (TY B)(64-22)(BASE)(6") D -GR HMA (METH)TY F SAC -B PC CONC CURB & GUTTER SY 93 $27.00 $126.00 -$6,429.50 SY -562 $7.00 NEW PC CONC SDWLK (5") PC CONC DRIVEWAY LF 130.43 $8.00 $2,511.00 -$3,934.00 SF -146.05 $6.00 $1,043.44 NATIVE SEDDING FOR EC METHOD FILTER CURB INLET PROTECTION SILT FENCE FOR EC SF 157 $7.00 SY 1685 $0.50 - $876.30 $1,099.00 EA -1 $80.00 $842.50 LF 1307.15 $2.00 23 30 31 REMOVING AND RELOCATING MAILBOX REFL PMVT MARKERS (TY 1-C) EA -1 $160.00 -$80.00 $2,614.30 REFL PMVT MARKERS (TY II -A -A) EA 47 $5.00 -$160.00 EA 14 $5.00 $235.00 32 33 REFL TY 1 & II PVMT MARK(W)(4")(BRK) REFL TY 1 & II PVMT MARK(W)(12")(SLD) LF 610 $5.00 LF 1 $5.00 $70.00 $3,050.00 35 REFL TY 1 & II PVMT MARK(Y)(4")(BRK) LF -70 $2.00 36 37 REFL TY 1 & II PVMT MARK(Y)(4")(SLD) ELIM EXIST PVMT MARKINGS LF 239 $1.00 $5.00 -$140.00 LF -6575 $1.00 $239.00 -$6,575.00 TOTALS: $0.00 $0.00 $0.00 -$4,975.82 Contract Time Adjustment laycl 0