R-13-09-12-H12 - 9/12/2013RESOLUTION NO. R -13-09-12-H12 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Traffic Signal Construction Co., Inc. for the Signal Improvements on University at Teravista Club Drive, Sandy Brook Drive, College Park Drive, and on A.W. Grimes at Creek Ridge Boulevard Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Austin Traffic Signal Construction Co., Inc. for the Signal Improvements on University at Teravista Club Drive, Sandy Brook Drive, College Park Drive, and on A.W. Grimes at Creek Ridge Boulevard Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of September, 2013. ALAN MCGRAW, Mayor City of Round Rock, Texas SARA L. WHITE, City Clerk 0112.1304;00281629 rev. 1/10 EXHIBIT „A„ Contract Quantity Adjustment/Change Order Department: Transportation Administration Project University - Intersection Improvements - Traff Name: Signal- Road Markings City Project ID Number: 013- F S 1 (-7 Justification Date: Page 1 of 3 8/16/2013 Change Order/Quantity Adjustment No. 1 -REVISED Quantity overran expected quantity - Eliminate some Striping and Pavement Markings SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Pius Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Prepared by 1 J z i9j ly) Contra Appro nature Amount $750,474.20 $750,474.20 010 Change 0.00% $261.00 0.03% $261.00 0.03% -$14,952.20 -$14,952.20 $735,783.00 Signatures and Approvals Collette Phillips, Asst Controller 4/30/2013 City Staff Approval: Signature City Official Approval: Printed Name, Title and Company Date Ed Schroeder, Vice -Pres Printed Name, Title and Company Signature ((ciOP �'�j rel ���ne✓ Printed t,(ame and Idle 4/30/2013 Date L%— 2-C2- Date U Date Signature Printed Name and Title Date rev. 01/10 Contract Quantity Adjustment/Change Order Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 ELIMINATE EXISTING PAVE MARKS SF o $0.00 $0.00 87 $3.00 $261.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $0.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $0.00 $0.00 o $o.00 $o.00 o $0.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 o $o.00 $o.00 0 $0.00 $0.00 TOTALS: $261.00 0 rev. 01/10 Contract Quantity Adjustment/Change Order uantity Adjustment Data Page 3 of 3 TOTALS: -$14,952.20 0 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 12 10 16 18 20 22 23 24 25 26 27 29 31 32 33 35 36 37 38 39 51 52 53 54 55 56 70 72 82 CO 01 CURB RAMPS (TY 7) CURB RAMPS (TY 1) REMOVE RDWY ILM ASSMBLY COND (PVC SCH 80) 2 IN BORE COND (PVC SCH 80) 3 IN BORE ELC (NO 6) BARE ELC (NO 6) INSULATED ELC (NO 8) BARE ELC (NO 8) INSULATED GROUND BOX (TYA) W/APRON GROUND BOX (TYD) W/APRON ALUMINUM SIGNS (TYA) RPM (TY I -W) 8 IN SLD 100M REF PVMK (TY I -W) 12in SLD 100M RPM (TY I -W)24 IN SLD 100M RPM (TY I -W) DBL ARRW 100M RPM (TY I -W) WORD 100M RMP (TY I -Y) 4 IN SLD 100M REF PAVE MARKER (TY II -A -A) REF PAVE MARKER (TY II -C-R) TS CBL (TYA) 12 AWG/ 3 CON TS CBL (TYA) 14 AWG/ 2 CON TS CBL (TYA) 14 AWG/ 4 CON TS CBL (TYA) 14 AWG/ 7 CON TS CBL (TYA) 14 AWG/ 20 CON TS CBL (TYA) 18 AWG/ 2 CON VIVDS COMM CBL (COAXIAL) ETHERNET COAXIAL (CAT 5) OPTICOM CABLE -GTT MODEL 138 ELIMINATE EXISTING PAVEVMARKS LL] Q Q J J J J J J Q J J J d 6 J a d J "- J LL J U.. _-.I J J J 4 $1,200.00 $4,800.00 -4 $1,300.00 -$5,200.00 -1 $600.00 -$600.00 -479 $15.00 -$7,185.00 129 $17.00 $2,193.00 36 $0.80 $28.80 72 $1.00 $72.00 -634 $0.60 -$380.40 -158 $0.90 -$142.20 -3 $563.00 -$1,689.00 2 $831.00 $1,662.00 -306 $28.00 -$8,568.00 25 $5.00 $125.00 -3 $7.00 -$21.00 -39 $12.00 -$468.00 -2 $150.00 -$300.00 -1 $180.00 -$180.00 -200 $3.00 -$600.00 -20 $20.00 -$400.00 -14 $20.00 -$280.00 -351 $1.30 -$456.30 -39 $1.10 -$42.90 153 $1.30 $198.90 1818 $1.50 $2,727.00 274 $5.00 $1,370.00 16 $1.40 $22.40 -791 $2.50 -$1,977.50 -69 $3.00 -$207.00 363 $2.00 $726.00 -60 $3.00 -$180.00 $0.00 TOTALS: -$14,952.20 0 ROUND ROCK TEXAS PURPOSE PA4gN PROSPERITY City of Round Rock Agenda Item Summary Agenda Number: H.12 Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with Austin Traffic Signal Construction Co., Inc. for the Signal Improvements on University at Teravista Club Drive, Sandy Brook Drive, College Park Drive, and on A.W. Grimes at Creek Ridge Boulevard Project Type: Resolution Governing Body: City Council Agenda Date: 9/12/2013 Dept Director: Gary Hudder, Transportation Director Cost: $14,952.20 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Resolution, Exhibit A, Map Text of Legislative File 13-693 Item Summary: In 2012 the City of Round Rock approved the a Signal Improvements Project that consisted of a total of four new traffic signals. The project added three new signals on University Blvd., and one on A.W. Grimes Blvd. The City of Round Rock approved a contract with Austin Traffic Signal Construction Co., Inc. for this project in the amount of $750,474.20. During the course of the project, City Staff, and Austin Traffic Signals were able to define areas that helped reduce the amount of work to be done as well as keeping the project under budget. The result was a reduction in cost of $14,952.20. This brings the new contract amount to a total of $735,783.00. Cost: $14,952.20 Source of Funds: Round Rock Transportation and Economic Development Corporation (Type B Corp) Action: Staff Recommends Approval City of Round Rock Page 1 Printed on 9/10/2013 EXECUTED ORIGINAL DOCUMENT FOLLOW Contract Quantity Adjustment/Change Order rev. 1/10 Department: Transportation Administration Project University - Intersection Improvements - Traff Name: Signal- Road Markings City Project ID Number: X DC TjZ F S I G7 Justification Date: Page 1 of 3 8/16/2013 Change Order/Quantity Adjustment No. 1 -REVISED Quantity overran expected quantity - Eliminate some Striping and Pavement Markings SUMMARY Original Contract Price: Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Original Contract Price Plus Change Order(s) Plus Quantity Adjustment(s): Original Contract Time: Contract Time Prior to this Change Order: Contract Time with All Approved Change Orders: Sim and Approvals Collette Phillips, Asst Controller Printed Name, Title and Company Ed Schroeder, Vice -Pres Printed Name, Title and Company City Staff Approval: City official Approval: Signatu me and Title P414 (WOO Vv, 14ef ro '- Printed Name and The Amount $750,474.20 $750,474.20 $261.00 $261.00 - $14,952.20 - $14,952.20 $735,783.00 0/0 Change 0.00% 0.03% 0.03% 4/30/2013 Date 4/30/2013 Date Date 9•(Z- l3 Date rev. 01/10 Contract Quantity Adjustment/Change Order Chance Order Data Page 2 of 3 Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 ELIMINATE EXISTING PAVE MARKS SF 0 $0.00 $0.00 87 $3.00 $261.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 0 $0.00 $0.00 TOTALS: $261.00 0 rm. 01/10 Contract Quantity Adjustment/Change Order Adjustment Data Page 3 of 3 TOTALS: Bid Item# Item Description and Change Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 12 10 16 18 20 22 23 24 25 26 27 29 31 32 33 35 36 37 38 39 51 52 53 54 55 56 70 72 82 CO 01 CURB RAMPS (TY 7) CURB RAMPS (TY 1) REMOVE RDWY ILM ASSMBLY COND (PVC SCH 80) 2 IN BORE COND (PVC SCH 80) 3 IN BORE ELC (NO 6) BARE ELC (NO 6) INSULATED ELC (NO 8) BARE ELC (NO 8) INSULATED GROUND BOX (TYA) W/APRON GROUND BOX (TYD) W/APRON ALUMINUM SIGNS (TYA) RPM (TY I -W) 8 IN SLD 100M REF PVMK (TY I -W) 12in SLD 100M RPM (TY I -W)24 IN SLD 100M RPM (TY I -W) DBL ARRW 100M RPM (TY I -W) WORD 100M RMP (TY I -Y) 4 IN SLD 100M REF PAVE MARKER (TY II -A -A) REF PAVE MARKER (TY II -C-R) TS CBL (TYA) 12 AWG/ 3 CON TS CBL (TYA) 14 AWG/ 2 CON TS CBL (TYA) 14 AWG/ 4 CON TS CBL (TYA) 14 AWG/ 7 CON TS CBL (TYA) 14 AWG/ 20 CON TS CBL (TYA) 18 AWG/ 2 CON VNDS COMM CBL (COAXIAL) ETHERNET COAXIAL (CAT 5) OPTICOM CABLE -GTT MODEL 138 ELIMINATE EXISTING PAVEVMARKS EA EA EA LF LF LF LF LF LF EA EA SF LF LF LF EA EA LF EA EA LF LF LF LF LF LF LF LF LF LF 4 $1,200.00 $4,800.00 -4 $1,300.00 -$5,200.00 -1 $600.00 -$600.00 -479 $15.00 -$7,185.00 129 $17.00 $2,193.00 36 $0.80 $28.80 72 $1.00 $72.00 -634 $0.60 -$380.40 -158 $0.90 -$142.20 -3 $563.00 -$1,689.00 2 $831.00 $1,662.00 -306 $28.00 -$8,568.00 25 $5.00 $125.00 -3 $7.00 -$21.00 -39 $12.00 -$468.00 -2 $150.00 -$300.00 -1 $180.00 -$180.00 -200 $3.00 -$600.00 -20 $20.00 -$400.00 -14 $20.00 -$280.00 -351 $1.30 -$456.30 -39 $1.10 -$42.90 153 $1.30 $198.90 1818 $1.50 $2,727.00 274 $5.00 $1,370.00 16 $1.40 $22.40 -791 $2.50 -$1,977.50 -69 $3.00 -$207.00 363 $2.00 $726.00, -60 $3.00 -$180.00 $0.00 TOTALS: