R-13-09-26-H11 - 9/26/2013RESOLUTION NO. R -13-09-26-H11 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction for the Chisholm Trail Road Phase 3 Improvements Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with Cash Construction for the Chisholm Trail Road Phase 3 Improvements Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of September, 2013. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1304;00282481 �,.q Iry w'v11 NIH. K. II.Xh1 ev, 08/12 )epartment: Transportation Contract Quantity Adjustment/Change Order EXHIBIT Page 1 of 3 3roject Chisholm Trail Road Phase 3 Vame: Improvements Date: 8/6/13 :ity Project [D Number TX04CHS3 Justification Change Order/Quantity Adjustment No. 2 :n order to accelerate the schedule we decided to deduct the base out of a portion of the project, and use black base instead. Also, to use a trencher to cut the rock instead of hammer it out with an excavator. iUMMARY )riginal Contract Price: previous Quantity Adjustment(s): -his Quantity Adjustment: "otal Quantity Adjustment(s): "otal Contract Price with Quantity Adjustment(s): Irevious Change Order(s): -his Change Order: -otal Change Order(s) To Date: 1djusted Contract Price [Original Contract Price Plus quantity Adjustment(s) Plus Change Order(s)]: >ifference between Original and Adjusted Contract Prices: )riginal Contract Time: ime Adjustment by previous Quan. Adj./Change Order: ime Adjustment by this Quan. Adj./Change Order: Jew Contract Time: ontractor: ity Project lanager: layor/City lanager Signature Signature Signature B.J. Cash, Cash Construction Printed Name, Title, Company B.J. Cash, Cash Construction Printed Name, Title, Company Amount $3,354,101.00 -$38,000.00 $298,830.00 $260,830.00 . $3,614,931.00 $94,190.00 $72,440.00 $166,630.00 $3,781,561.00 $427,460.00 180 Calendar Days 0 Calendar Days 0 180 Calendar Days 0/0 Change 3% 2% 5% Calendar Days S/a'ul3 Date b/Z,l/ i3 Date Bill Stablein, Project Manager, CORR Printed Name, Title Alan McGraw, Mayor, CORR Printed Name, Title Date Date ev, 08112 Contract Quantity Adjustment/Change Order Project Name: Chisholm Trail Road Phase 3 Improvements Quan. Adj./Change Order No.: 2 Change Order Data Page 2 of 3 Item # Item Description ® Qty. Unit Price 116 Rock Trenching for Storm Sewer CY 3622 Amount Contract Time Adjustment Da s $72,440.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Chisholm Trail Road Phase 3 Improvements Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Page 3 of 3 Bid Item # 9 7 Item Description Unit HOT MIX ASPHALT CONCRETE PAVEMENT TYPE B (PG64-22) FLEXIBLE BASE Qty. Unit Price Amount Contract Time Adjustment v Ton CY 5300 $77.00 -3,122 $408,100.00 $35.00 -$109,270.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $298,830.00 0 ROUND ROCK, TEXAS PURPOSE Y/SCOR PROSPERITY City of Round Rock Agenda Item Summary Agenda Number: H.11 Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with Cash Construction for the Chisholm Trail Road Phase 3 Improvements Project. Type: Resolution Governing Body: City Council Agenda Date: 9/26/2013 Dept Director: Gary Hudder, Transportation Director Cost: $371,270.00 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Resolution, Exhibit A Text of Legislative File 13-722 Item Summary: On February 14, 2013, the City Council awarded the construction services contract for Chisholm Trail Road Phase 3 to Cash Construction ata cost of $3,354,101. The initial contract was for the construction of a five lane urban roadway with curb and gutters and a three lane access drive for the Sports Complex. Quantity Adjustment/Change Order No 1 deducted 192 linear feet of twenty-four inch (24") drill shaft at a cost reduction of $38,400. Added to the construction contract were 192 linear feet of thirty inch (30") drill shaft; one storm trooper frame and installation of a control manhole; and additional fencing for the Lane property at a cost of $94, 190. The cost of Quantity Adjustment/Change Order No. 1 was $55,790. Quantity Adjustment/Change Order No 2 substitutes rock trenching (rock saw) in lieu of hydraulic rock hammering and replaces flexible base with hot mix asphalt concrete pavement type B (Black Base). The net cost increase of Quantity Adjustment/Change Order No. 2 would be $371,270. This change is necessary as a result of addtional work related to the water quality treatment facilities construction, and delays to work progress on Chisholm Trail Road construction, resulting from delays in the relocation of third party utilities. This will cut 123 construction days from the contract and ensure the completion of the roadway by the scheduled opening of the Sports Complex. The total cost of the construction contract would be $3,781,161.00. Cost:$371,270.00 Source of Funds: Transportation and Economic Development Corporation City of Round Rock Page 1 Printed on 9/23/2013 EXECUTED ORIGINAL DOCUMEN1S FOLLOW rev, 08/12 Department: Transportation Contract Quantity Adjustment/Change Order Project Chisholm Trail Road Phase 3 Name: Improvements City Project ID Number TX04CHS3 Justification In order to accelerate the schedule we decided to deduct the base out of a portion of the project, and use black base instead. Also, to use a trencher to cut the rock instead of hammer it out with an excavator. Page 1 of 3 Date: 8/6/13 Change Order/Quantity Adjustment No. 2 SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Amount $3,354,101.00 -$38,000.00 $298,830.00 $260,830.00 $3,614,931.00 % Change $94,190.00 $72,440.00 $166,630.00 3% 2% 5% $3,781,561.00 $427,460.00 180 Calendar Days 0 Calendar Days 0 Calendar Days 180 Calendar Days Prepared By: Sign re Contractor: City Project Manager: B.J. Cash, Cash Construction Printed Name, Title, Company Si•'.ture B.J. Cash, Cash Construction Printed Name, Title, Company gnature Alan McGraw, Mayor, CORR Printed Name, Title bin/ 13 Date Bill Stablein, Project Manager, CORR Printed Name, Title Mayor/City Manager Signature isfZ�! 13 Date Date g.2�•(3 Date rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Chisholm Trail Road Phase 3 Improvements Quan. Adj./Change Order No.: 2 Page 2 of 3 Unit CY Qty. 3622 Unit Price $20.00 Amount $72,440.00 Contract Time Adjustment Da s Item # Item Description 116 Rock Trenching for Storm Sewer $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: Chisholm Trail Road Phase 3 Improvements Quan. Adj./Change Order No.: 2 Page 3 of 3 Bid Item # 9 Quantity Item Description Unit Ton Adjustment Data Qty. 5300 Unit Price $77.00 Amount $408,100.00 Contract Time Adjustment HOT MIX ASPHALT CONCRETE PAVEMENT TYPE B (PG64-22) 7 FLEXIBLE BASE CY -3,122 $35.00 -$109,270.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 • L : $298,830.00 0