Loading...
R-13-11-14-H12 - 11/14/2013RESOLUTION NO. R-13-11-14-H12 WHEREAS, the Round Rock Transportation and Economic Development Corporation ("RRTEDC") has previously adopted a Transportation Capital Improvement Plan ("TCIP"), and WHEREAS, the RRTEDC wishes to amend said TCIP, and WHEREAS, the bylaws of the RRTEDC require that said amendments to the TCIP be approved by the City Council, and WHEREAS, the City Council wishes to approve said amendments to the TCIP, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the amendment to the Transportation Capital Improvement Plan approved by the Round Rock Transportation and Economic Development Corporation, which is attached hereto as Exhibit "A", is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of November, 2013. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1304; 00285918 1- W S X W No l 0 O 0- 5 U E 4) Q Q) o 2 5 a > N o c U_ E E • o > O U • W E v To o •Q O c 0 o_ m cn � c o m o. c c U N O 0 ce Amendment #31 -$1,000,000 0) n W t0 N 43 N N t0 u) N $150,000 0 N (0 r- EA 1 -$1,500,000 N N. V) $1,300,000 N N 00 (N O 0) V V) 0 N u) r- (0 V) 0 O 0 O 0 0 N to 0 O 0 O 0 N 68 0 O 0 O O u) C) V) 000,000,p$ N O V p H O O O 00 CO N (A O l0 V u) � M V) O N O u) O M O N 0 N En V) $11, 258,195 0 O 0 O (O 0 N (9 0 O 0 O 00) u) 69 $946,293 n u) (9 N (O N. 0) O 1- (fl O 0 0 0 O) (A $5,142,749 O 0 i 0 (O CC) 69 $4,600,0001 0) (A f,. 00 0^ O VI $2,775,2101 $2,465,8371 O 0 O 0 69 n O) O ((0 tri. (A 10 (00 N -(O 69 co 0 0 0 V) U .0 U N (0 .0 13 w "O (O 0 0 000'000'9$ 6ulpun,d iay1O 0) 00 003 A- to 0 u) O 07 0 A- O N V)V) $8,949,872 $2,741,000 0 0 (0 0 (NO O u7 0 63 $1,553,565 0r N 4N) '7 69 (1'... 130 0) 0) COLri _ V) Estimated Corporation Funding $15,818,000 u) (f) ED O) N (O 69 ('7 N 01 00 0 CO N V ) 0 0 0 O 0 0 N En0 0 0 0 O O 0) ui (6 CO CO N (O V 0) V) N (0 (0 n u) 00) V V) N (O n 0) co ,- V) O O O O V) $5,14Z749 0 0 (0 (O u) ('7 V) 000'009'4 0) u) n 00 O h (p V) $2,775,210 n CO (0 co- 0 N E9 O 0 0 O O M A- V) O 0 0 O O N V) O 0 0 O O ui V) O 0 0 O O O OO V) U ` « R 2 Q O U O N ED E (0 Winter 2006 Spring 2009 Fall 2017 On-going 0) CO 9) 0 Completed o m Spring 2012 Spring 2010 Winter 2012 Spring 2012 Ongoing C $) 0 Summer 2013 Summer 2015 Fall 2014 Winter 2012 Fall 2013 Work Description Preliminary engineering to establish alignment and ROW requirements. P.S.& E. Construction of Railroad overpass. Design, purchase right-of-way and construct 4 -lane divided arterial Acquire ROW for highway relocation and relocate City utilities. Preliminary engineering and final P.S.&E. Construction of MAD 4. Construct railroad grade separation Design and construct traffic signals, implement signal timing plans Miscellaneous consulting work in support of transportation programs and planning Construct half of a 4 -lane divided roadway Design intersection improvements including turns lanes, signal improvements and pedestrian accomodations. Develop conceptual schematic for MAD 6 between Mays Street and Red Bud Lane. Design and construct intersection improvements at various intersections from Sam Bass Road to IH 35. Design and construct Main Street to match new construction in SWDT. Includes storm sewer on Blair Street from Main Street to Florence Street Design a MAD 4 roadway, including plans, specifications and estimates, right-of-way determination and utility coordination. Design and construct Chisholm Trail Road as a MAD 4, and build a public road to Special Event Center Property Major maintenance of various arterials throughout the City FY 12-17 Design and construct projects which remove bottlenecks in the system. Create a Railroad Quiet Zone between CR 172 and St. Williams Street Design and construct new entrance and exit ramps, obilterate old ramps, and add a lane to the frontage roads. Includes pedestrian accomodations and environmental documents. Design and construct a MAD 4 roadway with a bridge over Brushy Creek and Hairy Man Road. Includes all right-of-way acquisition, environmental work, etc. Design and construct a MAD 4 roadway, including relocation of utilities, etc. Design and construct sidewalk and pedestrian improvements ,and add additional pavement to allow a center turn lane within these limits. Work also includes lighting on the UPRR bridge and gateway features at the entrance to downtown Project Limits From Joe DiMaggio Boulevard to 1000 feet south of US 79 From FM 1460 to CR 122 University Boulevard to 900' North of US79 At Union Pacific Railroad Various locations From RM 620 to Brightwater Boulevard 1000 feet in all directions of intersection; schematic from Mays Street to Red Bud Lane Sam Bass Road to IH 35 Main Street, San Saba to Blair Street with storm sewer on Blair Street Westinghouse Road to University Boulevard 1900 feet north of Wolle Lane to Wolle Lane Various locations Various locations UPRR, between CR 172 and St. Williams Old Settlers Boulevard to US 79 Creek Bend Circle to Wyoming Springs Drive FM 3406 to Sam Bass Road Brushy Creek bridge to the UPRR/Lake Creek Bridge Project Name Kenney Fort Boulevard (Arterial A) Old Settler's Blvd./Kiphen Road (CR 113) FM 1460/AW Grimes RM 620 Traffic Signals Transportation Consulting Wyoming Springs Drive South Mays at Gattis School Road FM 3406 Main Street Project 2, 3 and 7 FM1460 North to University Chisholm Trail 3 Major Maintenance Program Arterial Improvement Program Railroad Quiet Zones IH 35 ramp reversals and frontage roads Creek Bend Boulevard Chisholm Trail Road Mays Street r mendment # 0 O 0 0 0 1- . ., 7 d .2 C 0 0 c E o` a 2 N p LL w 0 U y N 0 O 0 ork Descri.tio moi' EMII1IE O O O O O O 69 O O O O O 0 O 0 O 69 0 3 0 c 0 0 3 N O 3 > v0 Southwest Downtown (0 co69 v (o 00csi) Summer 2012 J 0 E co a O (0 a 'O O 7 0) 0 'O 0 c OI 0 O` 0 LL Various streets in La Frontera La Frontera Streets 0 0 EA 0 a0 H )0 c 6 03 g_ E 0) 0 a. O 0 0 (0 0 0 Various streets in La Frontera La Frontera Streets Phase 2 O O O O O O O 69 0 O 0 0 m H (0 0 O c O 0 3 O) 'O 0 wU 0 L C CO 0 c O N O O o -c Various locations Arterial Sidewalk Program O O O O6,3 0 0 0 to 0 0o H 0 0 O) 0 0 N co 0) (0 co O 0 c 0) E 'O a O N• U Various locations Major Bridge Maintenance 0 0 0 0) H C co 0 00) L_ c O 0 0 N 0 0) 82 C ''(;1 0 N U OS E c m 0) 0 0 m 0) O c O 0 C04) (0 0 M 0 = o University Boulevard O O o m H_ rn U O O O 69 0 0 0 O 0 m H Design and construct half of a 4 lane divded arterial O 0) Q o `oma N 41-,,) c 0 0 O L N O o > _ m EE O o E LL 2 0 Seton Parkway, Phase 2 O O O O V O O O (n O 0 0 69 0 m H 0 m 0 (0 0) U c E To d 0 7 N c 8 z (0 (0 0) 0 W 0 L_ 0 3 0) Z N CO L11 O CO N a o 0 m o Cul E) 0 0 C U U ¢ 0 Cypress Boulevard realignment O O O 69 0 0 co 69 Winter 2012 0) U Traffic Management Center O O O O O 69 O O O 0 69 0 O 0 0 O LL 0 (0 0 0 c 0 0 O O O O N 69 0 00 0 N 0 O 0 •4- O O O O O 0 O 0 Design commercial collector roadway Gander Mountain Way 0 O 0 0 (0 LL Greenlawn Blvd. to Red Bud Lane I Develop conceptual buidout plan for Gattis School Road Gattis School Road 0) crJ C E E o > C y y C • o 0 N d 0) (0 C_ c U LL LL O 5 L N 4, y c O) 0 .(0 C O .- 3 O_ C LL 0 U 0)) H c LL 0) 0 E N 0 o (0 m .> i AROUND ROCK TEXAS P RIVg r.zio,1 FRWsiArtx City of Round Rock Agenda Item Summary Agenda Number: H.12 Title: Consider a resolution approving the action of the Round Rock Transportation and Economic Development Corporation in amending the Transportation Capital Improvement Program (TCIP). Type: Resolution Governing Body: City Council Agenda Date: 11/14/2013 Dept Director: Gary Hudder, Transportation Director Cost: Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Resolution, Exhibit A Department: Transportation Department Text of Legislative File 13-890 This amendment to the Transportation Capital Improvement Program includes the following : New Projects: 1) Arterial H Utility Reimbursement, $300,000 for right-of-way. 2) Downtown Improvements Project, $120,000 for infrastructure planning. 3) Gander Mountain Way, $100,000 for plan development. Project Decreases: 1) Creek Bend Boulevard, budget reduction of $3,500,000, using funds on projects about to be bid for construction ($1,300,000 transfered to Chisholm Trail Phase 3). 2) CR 113/Kiphen Road/Old Settlers Boulevard, budget reduction of $268,759, project closed out. 3) FM 1460/A.W. Grimes Boulevard, budget reduction of $256,782, project closed out. 4) Arterial A/Kenney Fort Boulevard, budget reduction of $1,000,000, project nearing completion. 5) FM 3406, budget reduction of $1,500,000, project funded out of remaining General Obligation Bonds. 6) Southwest Downtown Projects 2,3 and 7, reduce budget $17,251, project closed out. 7) IH 35 Ramp Reversals, reduce budget by $7,200,000, seeking funding from state or Federal Highway Administration for this project. 8) 2012-2016 Street Maintenance, reduce budget by $4,302,825, to focus on more local street improvements. City of Round Rock Page 1 Printed on 11/12/2013 Agenda Item Summary Continued (13-890) 9) S. Mays at Gattis, reduce budget by $175,210, to cover actual contracted engineering costs (funds were transfered to bottlenecks). Project Increases: 1) Bottlenecks, budget increase of $675,210, to fund construction of bottleneck projects throughout the community. 2) Cypress Boulevard, increase budget by $1,400,000, higher than expected estimated construction costs. 3) University Boulevard, increase budget by $750,000, to complete design work for the project. 4) Mays Street Reconstruction, increase budget by $4,000,000, to cover increased construction costs. 5) Southwest Downtown Phase 4, increase budget by $3,000,000, to cover increased construction costs. 6) Consulting, increase budget by $150,000, to cover future planning activities. 7) Quiet Zones, increase budget by $2,000,000, to pay for construction of the project. 8) Arterial Sidewalks, increase budget by $150,000, to add sidewalks along South Mays Street. 9) Chisholm Trail Phase 3, increase budget by $1,300,000 from for additional construction costs. These amendments to the TCIP result in a net reduction to the overall TCIP budget of -$4,275,617. Staff recommends approval. City of Round Rock Page 2 Printed on 11/12/2013