R-13-11-26-F2 - 11/26/2013RESOLUTION NO. R -13-11-26-F2 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Austin Constructors, LLC for the 2013 Sidewalk Gaps Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Austin Constructors, LLC for the 2013 Sidewalk Gaps Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 26th day of November, 2013. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: SARA L. WHITE, City Clerk 0112.1304;00287110 rev, WIG Department: Transportation Department EXHIBIT 1 J "A' » ,I Contract Quantity Adjustment/Change Order Project Name: 2013 Sidewalk Gaps City Project TXOSSDW ID Number Justification Page 1 of3 Date: 10/17/13 Change Order/Quantity Adjustment No. 1 During construction of this project, Oty staff discovered additional sidewalk gaps that needed to be connected. These area will provide a safe route for pedestrians traveling in these areas. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Contractor: City P Manager: Signature Amount $267,000.00 $28,940.00 $28,940.00 $295,940.00 $0.00 $53,991.50 $53,991.50 $349,931.50 $82,931.50 0 18 18 Submitted for Approval 0/0 Change Jessie B Guzman, General Manager, Austin Constructors, LLC 9/11/13 Printed Name, Title, Company Approvals Date Jessie B Guzman, General Manager, Austin Constructors, LLC 9/11/13 Printed Name, Title, Company Date 0.00 0.18 0.18 Signature Mayor/City Manager Printed Name, Title Date Signature Printed Name, Title Date rev. Ub/12 Contract Quantity Adjustment/Change Order Project Name: 2013 Sidewalk Gaps Quan. Adj./Change Order No.: 1 Change Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Concrete Sidewalk SF 5125 $3.90 $19,98750 2 Type 1 Curb Ramp EA 1 $600.00 $600.00 $0.00 5 Grading SY 1377 $12.00 $16,524.00 6 Topsoil CY 136 $28.00 $3,808.00 _ 8 Seeding Hydraulic method SY 1989 $6.00 $11,934.00 $0.00 Relocate Bollard EA 1 $250.00 $250.00 Curb LF 74 $12.00 $888.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $53991.50 0 rev, Ud11L Contract Quantity Adjustment/Change Order Project Name: 2013 Sidewalk Gaps Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Page 3 of 3 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Davol 7 Bermuda sod SY -1500 $5.00 -$7,500.00 9 Irrigation line adjustment EA 6 $260.00 $1,560.00 10 Irrigation Head adjustment EA 13 $140.00 $1,820.00 14 Erosion control LS 0.44 $21,000.00 $9,240.00 15 Traffic control LS 0.44 $4,500.00 $1,980.00 4 Dectectable Warning surface for type 1 or II curb ramp EA -1 $120.00 -$120.00 5 Grading SY 1083 $12.00 $12,996.00 13 Remove & replace concrete driveway SF 1494 $6.00 $8,964.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $28,940.00 0 ROUND ROCK. TEXAS nnPOR AMOK naaamnx City of Round Rock Agenda Item Summary Agenda Number: F.2 Title: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 1 with Austin Constructors, LLC for the 2013 Sidewalk Gaps Project. Type: Resolution Governing Body: City Council Agenda Date: 11/26/2013 Dept Director: Gary Hudder, Transportation Director Cost: $82,931.50 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: Resolution, Exhibit A, Map Department: Transportation Department Text of Legislative File 13-922 In May, 2013, as part of the plan to keep the community safe and increase mobility, the City awarded the 2013 Sidewalk Gaps Project to Austin Constructors in the amount of $267,000.00. Sidewalk gaps completed under this program included Old Settlers Boulevard, Sunrise Road, and US HWY 79 in front of HEB. This project was funded in part by $300,000 provided by Amendment #29 of the Transportation Capital Improvement Program, as well as $115,163.35 from developer participation. During the course of construction, Transportation Department staff identified additional sidewalk gaps that could benefit from available funds. These included two additional areas on Sunrise Road, an area on Joe Dimaggio Boulevard just west of Kenney Fort Boulevard, and a small segment of sidewalk on Bowman Road between Onion Creek Village Drive and North Mays Street. The cost for these additional portions of sidewalk was $82,931.50, bringing the total cost to the project to $349,931.50. COST: $82,931.50 SOURCE OF FUNDS: Round Rock Transportation and Economic Development Corporation (Type B) Staff recommends approval. City of Round Rock Page 1 Printed on 11/22/2013 EXECUTED ORIGINAL DOCUMENT FOLLOW ev, U,1L Department: Transportation Department Contract Quantity Adjustment/Change Order Project Name: 2013 Sidewalk Gaps City Project Tx05sDW ID Number Justification Page 1 of 3 Date: 10/17/13 Change Order/Quantity Adjustment No. 1 During construction of this project, city staff discovered additional sidewalk gaps that needed to be connected. These area will provide a safe route for pedestrians traveling in these areas. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Contractor: City P Manager: Signature Mayor/City Manager Sig ture Signature 12/6-1,[46-2-, Amount $267,000.00 $28,940.00 $28,940.00 $295,940.00 $0.00 $53,991.50 $53,991.50 $349,931.50 $82,931.50 0 18 18 Submitted for Approval 0/0 Change Jessie B Guzman, General Manager, Austin Constructors, LLC 9/11/13 Printed Name, Title, Company Approvals Date Jessie B Guzman, General Manager, Austin Constructors, LLC 9/11/13 Printed Name, Title, Company Date iff-ed>vei✓` ire`; eT/fl,a,,,,ja, Printed Name, Title Date Date am() kil`/-kraw.4 hitayd\- Printed Name, Title 0.00 0.18 0.18 rev.uui4 Contract Quantity Adjustment/Change Order Project Name: 2013 Sidewalk Gaps Quan. Adj./Change Order No.: 1 Change Order Data Page 2 of 3 Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment (Days) 1 Concrete Sidewalk SF 5125 $3.90 $19,987.50 2 Type 1 Curb Ramp EA 1 $600.00 $600.00 $0.00 5 Grading SY 1377 $12.00 $16,524.00 6 Topsoil CY 136 $28.00 $3,808.00 8 Seeding Hydraulic method SY 1989 $6.00 $11,934.00 $0.00 Relocate Bollard EA 1 $250.00 $250.00 Curb LF 74 $12.00 $888.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $53991,50 0 2V, US/12 Contract Quantity Adjustment/Change Order Project Name: 2013 Sidewalk Gaps Quan. Adj./Change Order No.: 1 Quantity Adjustment Data Page 3 of 3 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment !Daus) 7 Bermuda sod SY -1500 $5.00 -$7,500.00 9 Irrigation line adjustment EA 6 $260.00 $1,560.00 10 Irrigation Head adjustment EA 13 $140.00 $1,820.00 14 Erosion control LS 0.44 $21,000.00 $9,240.00 15 Traffic control LS 0.44 $4,500.00 $1,980.00 4 Dectectable Warning surface for type 1 or II curb ramp EA -1 $120.00 -$120.00 5 Grading SY 1083 $12.00 $12,996.00 13 Remove & replace concrete driveway SF 1494 $6.00 $8,964.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $28,940.00 0