R-13-12-19-G9 - 12/19/2013RESOLUTION NO. R -13-12-19-G9
WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with
Chasco Constructors for the Kenney Fort Boulevard (Arterial A) Project, and
WHEREAS, the Council has determined that it is necessary to make adjustments/changes to
the quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 6, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 6 to the Contract with Chasco Constructors for the Kenney Fort
Boulevard (Arterial A) Project, a copy of said quantity adjustment/change order being attached hereto
as Exhibit "A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 19th day of December, 2013.
ALAN MCGRAW, Mayor
City of Round Rock, Texas
ATTEST:
SARA L. WHITE, City Clerk
0112.1304, 00288251
rev. 05/12
Department Transportation
Project
Name
City Project
ID Number
Justification
Kenney Fort Blvd. (Arterial A)
TX02ARTA
Page 1 of 4
Date: 10/26/2013
Change Order/Quantity Adjustment
Contract Quantity Adjustment/Change Order
No.
6
Balancing change order to reconcile contract quantity line items that under or over ran due to project requirements
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus Quantity
Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
Prepared By
Chasco
Constructors
Engineer
City of Round
Rock
Submitted for Approval
Amount
$17,095,753.80
-$129,374.92
($17,503.23)r
($146,878.15)
$16,948,875.65
$906,825.47
$0.00
$906,825.47
$17,855,701.12
$759,947.32
730
Calendar Days
28
0
Calendar Days
Calendar Days
758 Calendar Days
Change
5.35%
0.00%
5.35%
Signature
£k/'
jj L/)
l
Signature i 1
Bill Stablein, Project Manager, CORR
Approvals
Signature
Date
11.12.) 3
Charles Glace Jr., President, Chasco Constructors Date
ii////3
David Hohman, Engineer, HDR D e
Signature
Alan McGraw, Mayor, City of Round Rock
•
EXHIBIT
irA»
Date
lillfor411.11,14,
rev. 05/12
Department Transportation
Project
Name
City Project
ID Number
Contract Quantity Adjustment/Change Order
Kenney Fort Blvd. (Arterial A)
TX02ARTA
Page 2 of 4
Date: 10/26/2013
Change Order/Quantity Adjustment
No.
6
- ' Change Order Data
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
rnucl
TOTALS:
$0.00
0
'~~
/ _--_--
rev. 05/12
Department Transportation
Project
Name
City Project
ID Number
Page 3 of 4
��r
Date: 10/26/2013
C��eO��������m�
Contract Quantity Adjustme�/Change�r�er
Kenney Fort Blvd. (Arterial A)
TX02A0A
No.
6
�� ��= ����� ��Quantity Adjustment Data
BidContract
Item
Item Description
Unit
Qty
Unit
AmountPe
Time
Adjustment
111==l
642
SILT FENCE FOR EROSION CONTROL INSTALL
LF
1,033.00
$2.00
$2,066.00
310 2002
PRIME COAT (AE -P)
GAL
-3,966.00
$3.85
-$15,269.10
340 2011
D -GR HMA(METH) TY -B PG64-22
TON
147.20
$03.00
'$9,273.00
340 2048
D'GKHMA(M[TH)TY'C5AC'BPG7O'ZZ
TON
625.68
$67.00
$11'920.56
416 2032
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF
2.50
$195.00
$487.50
416 2034
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF
3.00
$202.00
$786.0O
420 2033
CL S CONC (APPR SLAB)
CY
32.30
$230.00
$7,429.00
432 2002
RIPRAP (CONC)(5 IN)
CY
-57.75
$245.00
-$14'148.75
509
TRENCH EXCAVATION PROTECTION
LF
0.10
$2.00
$0.20
510
KCPIPE (CL DD(3OIN) INCLUDING
EXCAVATION AND BACKFILL
LF
'0.07
$51.00
-$3.57
502 2001
BARRICADES,SIGNS�NDTRA�R�MANDLING
MO
'1.00
$1,850.00
'$1,850.00
430
P.C.CONC CURB AND GUTTER COMPLETE
LF
'50.00
$9.70
'$485.00
618 2022
CONDT(PVC)(SCMD4O)(3")
LF
328.00
$7.20
$2,361.60
624 2014
GROUND BOX TYD(16Z922)V/APRON
EA
8.00
$360.00
$2,880.00
628 2055
ELC SRV TYD120/24OO6O(NS)AL(E)PS(U)
EA
1.00
$3,650.00
$3,650.00
628 2346
ELC SRV TY D 120/240 060 (NS)AL(E)SP(0)
EA
-1.00
$3,340.00
-$3,340.00
666 2002
REFLPAVMRK TYI(m)4"(BKK)(O9OMlL)
LF
60.00
$0.60
¢39.60
666 2095
KEFLPAVMRK TYI(VY)(VVORD)(O9UMIL)
EA
-4.00
$118.00
'$472.8O
666 2104
KEFLPAVMRK TYI(Y)1''(DRK)(O90MlU
LF
55.00
$0.00
$33.00
666 2110
KEFLPAVMRK TYI(Y)4''(SLD)(09OMI[)
LF
'1,360.00
$0.60
'$810.00
666
PAINT MEDIAN CURB NOSE YELLOW
EA
'12.00
$103.00
'$1,236.00
672 2015
REFLPAVMRKRTYII-A-A
EA
27.00
$4.15
$112.05
672 2017
REEL PAVMRKKTYIl'C-R
EA
32.00
$4.15
$132.80
677 2001
ELIM EXT PAV MRK & MRKS (4")
LF
'7.00
$15.50
-$108.50
677 2019
ELIM EXT PAV MRK & MRKS (18")(YLDTRD
EA
-7.00
$15.45
'$108.15
678 2001
PAV SURF PREP FOR MRK ( 4")
LF
1,085.00
$6.00
$0,518.00
678 2003
PAVSURF PREP FOR MRK (8^)
LF
1.00
$6.00
*6.00
682 2001
BACK PLATE (12 IN) (3 SEC)
EA
1.00
$45.00
$15.00
682 2003
BACK PLATE (12 IN) (5 SEC)
EA
1.00
$55.00
$55.00
682 2022
VEH SIG SEC (12 IN) LED (GRN ARW)
EA
1.00
$175.00
$175.00
682 2023
VEH SIG SEC (12 IN) LED (GRN)
EA
3.00
$185.00
$555.00
682 2024
VEHSIG SEC (1ZIN) LED (YELARm)
EA
1.00
$200.00
$200.00
682 2027
VEHSIG SEC (1ZIN) LED (RED)
EA
2.00
$195.00
$390.00
682 2043
PED SIG SEC (12")(JlND)(UOUSINGONLY)
EA
2.80
$205.00
$410.00
684 2033
TRF SIG CBL (TY A)(14AWG) (7[0NDK)
LF
650.82
$1.40
$921.23
684 2046
TRF SIG CBL (TY A)(14AWG) (Z0[ONDR)
LF
560.98
$3.10
$1,119.04
684 2082
TRF SIG CBL (TY C)(18AWG) <ZCONDK>
LF
281.00
$0.70
$196.70
rev. 05/12
Department Transportation
Project
Name
City Project
ID Number
Kenney Fort Blvd. (Arterial A)
TX02ARTA
Page 4 of 4
Date: 10/26/2013
Change Order/Quantity Adjustment
Contract Quantity Adjustment/Change Order
No.
6
688 2001
PED DETECT (2 INCH PUSH BTN) W/ SIGN
EA
2.00
$210.00
$420.00
740 2001
ANTI -GRAFFITI COATING (PERMANENT)
SF
-31,636.00
$0.35
-$11,072,60
6266 2005
VIVDS COMMUNICATION CABLE (COAXIAL)
LF
371.00
$1.90
$704.90
8346 2001
ETHERNET CABLE CAT 5
LF
132.00
$5.60
$739.20
8708 2001
LED COUNTDOWN PED SIGNAL MODULE
EA
2.00
$257.00
$514.00
420 2049
CL S CONC (BRIDGE MEDIAN)
CY
2.50
$340.00
$850.00
416 2004
DRILL SHAFT (36 IN)
LF
-10.00
$90.00
-$900.00
416 2005
DRILL SHAFT (42 IN)
LF
-328.00
$148.00
-$48,544.00
416 2006
DRILL SHAFT (48 IN)
LF
-40.00
$191.00
-$7,640.00
420 2004
CL C CONC (BENT)
CY
-22.18
$580.00
-$12,864.40
420 2013
CL C CONC (MISC)
CY
14.33
$330.00
$4,728.90
420 2034
CL S CONC (BRIDGE SDWLK)
CY
34.98
$215,00
$7,520.70
416 2002
DRILLED SHAFTS 24" DIA
LF
140.00
$72.00
$10,080.00
506
MAJOR MANHOLE ADJUSTMENT 60 INCH DIA
EA
1.00
$6,400.00
$6,400.00
510
RELOCATE EXISTING FIRE HYDRANT
EA
-1.00
$4,300.00
-$4,300.00
511
ADJUST WATER VALVE
EA
2.00
$550.00
$1,100.00
510
Pipe, 12" D.I.P., Cl. 250, including excavation
and backfill
LF
7.00
$49.00
$343.00
501
Boring and Jacking, including 30" Steel casing
Pine
LF
-10.00
$385.00
-$3,850.00
620-2007
ELEC CONDR (NO. 4) BARE
LF
20.00
$2.40
$48.00
*
4ea - 4" Sched. 80 empty conduits
LF
178.00
$61.00
$10,858.00
213-120
GROUND BOX (TY A) (ONCOR)
EA
1.00
$255.00
$255.00
618 2018
CONDT (PVC) (SCHD 40) ( 2")
LF
91.00
$6.20
$564.20
618 2019
CONDT (PVC) (SCHD 40) ( 2") (BORE)
LF
117.20
$19.55
$2,291.26
*
3 - Street Stubout, 2 ea -4" conduits @ 80'
LF
-40.00
$28.00
-$1,120.00
TOTALS: ($17,503.23)
ROUND ROCK. TEXAS
PURPOSE. MACK rwsmart
City of Round Rock
Agenda Item Summary
Agenda Number: G.9
Title: Consider a resolution authorizing the Mayor to execute Quantity
Adjustment/Change Order No. 6 with Chasco Constructors for the Kenney
Fort Boulevard (Arterial A) Project.
Type: Resolution
Governing Body: City Council
Agenda Date: 12/19/2013
Dept Director: Gary Hudder, Transportation Director
Cost:
Indexes: RR Transportation and Economic Development Corporation (Type B)
Attachments: Resolution, Exhibit A
Department: Transportation Department
Text of Legislative File 13-1003
The original contract for construction services was approved by the City Council on June 23,
2011 for the amount of $17,095,753.80 to extend Kenney Fort Boulevard from Joe
DiMaggio south to Forest Creek Boulevard.
Quantity Adjustment No. 1 added John Harris and Susan Hickox as additional insured and
reinforced concrete pipe was replaced with 36" corrugated concrete pipe for culvert the
crossing at the request of Union Pacific Railroad at the cost of $10,519.
Quantity Adjustment No. 2 was for quantity adjustments in railroad related work and field
related quantity changes at a cost of $34,007.70.
Quantity Adjustment No. 3 was for expected, but unknown railroad costs and street light
installation expenses at a cost of $540,949.30. Fourteen days were added to the
construction contract. The total cost of the construction contract would be $17,681,229.80.
Change Order No. 4 /Quantity Adjustment was for revisions to the storm sewer system 1A
and revisions to the intersection layout at Forest Creek Blvd. It also added joint restraints for
the 16 -inch waterline bore and the addition of a 24 -inch steel casing for a total cost of
$114,669.55.
Once the project was substantially complete and open to traffic, the City Manager asked
about the lack of planned landscaping to portions of the median. Weeds had grown up
City of Round Rock Page 1 Printed on 121712013
Agenda Item Summary Continued (13-1003)
rapidly due to seasonal rain, and were an eyesore on a brand new, expensive arterial road.
He asked the department to look into optional treatments to the median that would be cost
effective and not create new, additional, ongoing maintenance. Change order #5, addresses
this issue as well as some final adjustments to the project that were exposed during the
development of the punch list items.
The total cost of Change Order No. 5 is $ 77,305.00 with the addition of 28 calendar days to
the contract to complete the required work. This change order adds the decomposed
granite to the roadway medians, flumes at the MSE walls, and rock filter dams at the outfall
channel, revised traffic signalization at Forest Creek Intersection, holding of a utility pole
while trenching and the deduct of pavement marking revisions. The total contract price after
revisions is $ 17,873,204.35.
Change Order No. 6 is the final change order to adjust contract quantities for project close
out. This change order is a deduct ora negative in the amount of $(17,503.23). The
total contract amount after all adjustments is $17,855,701.12.
Staff recommends approval.
City of Round Rock Page 2 Printed on 12/17/2013
EXECUTED
ORIGINAL
DOCUMENT
FOLLOW
rev. 05/12
Department
Project
Name
City Project
ID Number
Justification
Transportation
Kenney Fort Blvd. (Arterial A)
TX02ARTA
Page 1 of 4
Date: 10/26/2013
Change Order/Quantity Adjustment
Contract Quantity Adjustment/Change r3rder
No.
6
(Balancing change order to reconcile contract quantity line Items that under or over ran due to project requirements
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment:
Total Quantity Adjustment(s):
Total Contract Price with Quantity Adjustment(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price [Original Contract Price Plus Quantity
Adjustment(s) Plus Change Order(s)]:
Difference between Original and Adjusted Contract Prices:
Original Contract Time:
Time Adjustment by previous Quan. Adj./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
Prepared By
Chasco
Constructors
Engineer
City of Round
Rock
P3►A);) C )
Signature
1
Submitted for Approval
Amount
$17,095,753.80
-$129,374.92
($17,503.23)
($146,878.15)
$16,948,875.65
$906,825.47
$0.00
$906,825.47
$17,855,701.12
$759,947.32
730
Calendar Days
28
Calendar Days
0 Calendar Days
758 Calendar Days
Bill Stablein, Project Manager, CORR
Approvals
% Change
5.35%
0.00%
5.35%
I (-22-13
Date
J) 1 2.
Signature
Signature
.1Z -11212-19'G 9
Charles Glace Jr., President, Chasco Constructors
David Hohman, Engineer, HDR
Alan McGraw, Mayor, City of Round Rock
Date
////37/3
Da e
12' l9• 13
Date
rev, 05/12
Department Transportation
Project
Name
City Project
ID Number
Kenney Fort Blvd. (Arterial A)
TX02ARTA
Page 2 of 4
Date: 10/26/2013
Change Order/Quantity Adjustment
Contract Quantity Adjustment/Change Order
No,
6
Change Order Data
Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
rn=„c\
TOTALS:
$0.00 1 0
rev. 05/12
Department Transportation
Project
Name
City Project
ID Number
Kenney Fort Blvd, (Arterial A)
TX02ARTA
Page 3 of 4
Date: 10/26/2013
Change Order/Quantity Adjustment
Contract Quantity Adjustment/Change Order
No.
6
Quantity Adjustment Data
Bid Item #
Item Description
Unit
Qty.
Unit Price
Amount
Contract
Time
Adjustment
it -,sn,
642
SILT FENCE FOR EROSION CONTROL INSTALL
, LF
1,033.00
$2.00
$2,066.00
310 2002
PRIME COAT (AE -P)
GAL
-3,966.00
$3.85
-$15,269.10
340 2011
D -GR HMA(METH) TY -B PG64-22
TON
-147.20
$63.00
-$9,273.60
340 2048
D -GR HMA(METH) TY -C SAC -B PG70-22
TON
625,68
$67.00
$41,920.56
416 2032
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF
2.50
$195.00
$487.50
416 2034
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF
3.00
$262.00
$786.00
420 2033
CL S CONC (APPR SLAB)
CY
32.30
$230.00
$7,429.00
432 2002
RIPRAP (CONC)(5 IN)
CY
-57.75
$245.00
-$14,148.75
509
TRENCH EXCAVATION PROTECTION
LF
0,10
$2.00
$0.20
510
RC PIPE (CL III)(30 IN) INCLUDING
EXCAVATION AND BACKFILL
LF
-0.07
$51.00
-$3.57
502 2001
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO
-1,00
$1,850.00
-$1,850.00
430
P.C. CONC CURB AND GUTTER COMPLETE
LF
-50.00
$9.70
-$485.00
618 2022
CONDT (PVC) (SCHD 40) (3")
LF
328,00
$7.20
$2,361.60
624 2014
GROUND BOX TY D (162922) W/APRON
EA
8.00
$360.00
$2,880.00
628 2055
ELC SRV TY D 120/240 060 (NS)AL(E)PS(U)
EA
1.00
$3,650.00
$3,650.00
628 2346
ELC SRV TY D 120/240 060 (NS)AL(E)SP(0)
EA
-1,00
$3,340.00
-$3,340.00
666 2002
REFL PAV MRK TY I (W) 4" (BRK)(090MIL)
LF
66.00
$0.60
$39.60
666 2095
REFL PAV MRK TY I (W) (WORD) (090MIL)
EA
-4.00
$118.00
-$472.00
666 2104
REFL PAV MRK TY I (Y) 4" (BRK)(090MIL)
LF
55.00
$0.60
$33.00
666 2110
REFL PAV MRK TY I (Y) 4" (SLD)(090MIL)
LF
-1,360.00
$0.60
-$816.00
666
PAINT MEDIAN CURB NOSE YELLOW
EA
-12.00
$103.00
-$1,236.00
672 2015
REFL PAV MRKR TY II -A -A
EA
27.00
$4.15
$112.05
672 2017
REFL PAV MRKR TY I I - C-R
EA
32.00
$4.15
$15.50
$132.80
-$108.50
677 2001
ELIM EXT PAV MRK & MRKS (4")
LF
-7.00
677 2019
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
EA
-7.00
$15.45
-$108.15
678 2001
PAV SURF PREP FOR MRK ( 4")
LF
1,085.00
$6.00
$6,510.00
678 2003
PAV SURF PREP FOR MRK ( 8")
LF
1.00
$6.00
$6.00
682 2001
BACK PLATE (12 IN) (3 SEC)
EA
1,00
$45.00
$45.00
682 2003
BACK PLATE (12 IN) (5 SEC)
EA
1.00
$55.00
$55.00
682 2022
VEH SIG SEC (12 IN) LED (GRN ARW)
EA
1.00
$175.00
$175.00
682 2023
VEH SIG SEC (12 IN) LED (GRN)
EA
3.00
$185.00
$555.00
682 2024
VEH SIG SEC (12 IN) LED (YEL ARW)
EA
1,00
$200.00
$200.00
682 2027
VEH SIG SEC (12 IN) LED (RED)
EA
2.00
$195.00
$390.00
682 2043
PED SIG SEC (12")(2 IND)(HOUSING ONLY)
EA
2.00
$205.00
$410.00
684 2033
TRF SIG CBL (TY A) (14 AWG) ( 7 CONDR)
LF
658.02
$1.40
$921.23
684 2046
TRF SIG CBL (TY A) (14 AWG) (20 CONDR)
LF
360.98
$3.10
$1,119.04
684 2082
TRF SIG CBL (TY C) (18 AWG) ( 2 CONDR)
LF
281.00
$0.70
$196.70
rev. 05/12
Department Transportation
Project
Name
City Project
ID Number
Kenney Fort Blvd. (Arterial A)
TX02ARTA
Page 4 of 4
Date: 10/26/2013
Change Order/Quantity Adjustment
Contract Quantity Adjustment/Change Order
No.
6
688 2001
PED DETECT (2 INCH PUSH BTN) W/ SIGN
EA
2.00
$210.00
$420.00
740 2001
ANTI -GRAFFITI COATING (PERMANENT)
SF
-31,636.00
$0.35
-$11,072.60
6266 2005
VIVDS COMMUNICATION CABLE (COAXIAL)
LF
371.00
$1.90
$704.90
8346 2001
ETHERNET CABLE CAT 5
LF
132.00
$5.60
$739.20
8708 2001
LED COUNTDOWN PED SIGNAL MODULE
EA
2.00
$257.00
$514.00
420 2049
CL S CONC (BRIDGE MEDIAN)
CY
2.50
$340.00
$850.00
416 2004
DRILL SHAFT (36 IN)
LF
-10.00
$90.00
-$900.00
416 2005
DRILL SHAFT (42 IN)
LF
-328.00
$148.00
-$48,544.00
416 2006
DRILL SHAFT (48 IN)
LF
-40.00
$191.00
-$7,640.00
420 2004
CL C CONC (BENT)
CY
-22,18
$580.00
-$12,864.40
420 2013
CL C CONC (MISC)
CY
14.33
$330.00
$4,728.90
420 2034
CL S CONC (BRIDGE SDWLK)
CY
34.98
$215.00
$7,520.70
416 2002
DRILLED SHAFTS 24" DIA
LF
140.00
$72.00
$10,080.00
506
MAJOR MANHOLE ADJUSTMENT 60 INCH DIA
EA
1.00
$6,400.00
$6,400.00
510
RELOCATE EXISTING FIRE HYDRANT
EA
-1.00
$4,300.00
-$4,300.00
511
ADJUST WATER VALVE
EA
2.00
$550.00
$1,100.00
510
Pipe, 12" D.I.P., Cl. 250, including excavation
and hackfill
LF
7.00
$49.00
$343.00
501
Boring and Jacking, including 30" Steel casing
Pine
LF
-10.00
$385.00
-$3,850.00
620-2007
ELEC CONDR (NO. 4) BARE
LF
20.00
$2.40
$48.00
4ea - 4" Sched. 80 empty conduits
LF
178.00
$61.00
$10,858.00
213-120
GROUND BOX (TY A) (ONCOR)
EA
1.00
$255.00
$255.00
618 2018
CONDT (PVC) (SCHD 40) (2")
LF
91.00
$6.20
$564.20
618 2019
CONDT (PVC) (SCHD 40) ( 2") (BORE)
LF
117.20
$19.55
$2,291.26
*
3 - Street Stubout, 2 ea -4" conduits @ 80'
LF
-40.00
$28,00
-$1,120.00
TOTALS: ($17,503.23)