Loading...
R-14-02-13-H2 - 2/13/2014RESOLUTION NO. R -14-02-13-H2 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with RePipe Construction, LLC for the 2011-2012 Wastewater Collection System Rehabilitation Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 2 to the Contract with RePipe Construction, LLC for the 2011-2012 Wastewater Collection System Rehabilitation Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of February, 2014. ALAN MCGRAW, Mayor City of Round Rock, Texas ATTEST: avia- SARA L. WHITE, City Clerk 0112 4304;00291569 cw Contract Quantity Adjustment/Change Order rev, 08/12 Department: Utilities and Environmental Services Project 2011 - 2012 Wastewater Collection Name: System Rehabilitation City Project ID Number ww05rhb2011 Justification Page 1 of 5 EXHIBIT Date: 1/14/14 Change Order/Quantity Adjustment No. 2 Quantity Adjustment/Change Order No. 2 is needed for final quantity adjustments on all bid items for this project and to add two Change Order items; two (2) Grate Inlets and two (2) Drop Bowls. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Pius Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Signature Eddie Zapata, Project Manager - Senior Printed Name, Title, Company ti riii* Contractor: ,. (.L Sam Cocke, Project Manager Amount $1,536,866.40 $21,733.00 -$109,920.88 -$88,187.88 $1,448,678.52 $24,140.00 $5,708.00 $29,848.00 0/0 Change 0.02 0.00 0.02 -$58,339.88 230 0 90 320 1/15/14 Date Signature City Project Manager: Printed Name, Title, Company Eddie Zapata, Project Manager - Senior t117J1'1 Date Signature Mayor/City Manager Printed Name, Title Alan McGraw, Mayor Date Signature Printed Name, Title Date rev, 08112 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Change Order Data Page 2 of 5 Item # Item Description CO 2-1 Drop Bowl UnitC^ EA Qty. Unit Price Amount Contract Time Adjustment Da s 2 $1,254.00 $2,508.00 CO 2-2 Grate Inlets EA 2 $1,600.00 $3,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0o $0.00 $0.0o $0.00 $0.00 $0.0o $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Page 3 of 5 Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment tnmicl 1 8" PVC SDR -26 Sewer Pipe 0'-8'deep, by open cut LF 1 $57.00 $57.00 3 8" HDPE DR -17, IPS Sewer Pipe, by pipe enlargement LF -522 $95.00 -$49,590.00 4 8" CIPP Liner LF 7 $23.75 $166.25 5 10" HDPE DR -17 IPS Sewer Pipe, by Pipe Enlargement LF 525 $145.00 $76,125.00 6 10" CIPP Liner LF -8 $25.00 -$200.00 7 18" HDPE DR -17 IPS Sewer Pipe, by Pipe Enlargement LF -2 $245.00 -$490.00 8 18" CIPP Liner LF -7 $150.00 -$1,050.00 9 36" CIPP Liner LF 1 $116.00 $116.00 10 6" Sewer Service Line Reinstatement with service cleanout EA -42 $925.00 -$38,850.00 11 Internal Service Line connection where external connection is not feasible EA 17 $100.00 $1,700.00 12 Remove and replace 48" Dia. Manhole 0'- 6' deep including Biotech Armor Additive EA 4 $4,575.00 $18,300.00 13 Remove and replace 48" Dia. Manhole, extra depth, including Biotech Armor Additive VF 8.08 $525.00 $4,242.00 14 Remove and replace 48" Dia. Manhole Drop Manhole, 0'-6' deep, including Biotech Armor Additive EA -1 $4,800.00 -$4,800.00 15 Remove and replace 48" Dia. Manhole Drop Manhole, extra depth, including Biotech Armor Additive VF -9 $525.00 -$4,725.00 17 Connect to Existing Manhole EA 1 $2,850.00 $2,850.00 18 Asphalt Street Pavement TN 13.75 $460.00 $6,325.00 21 Concrete Curb and Gutter Repair LF 30.5 $35.50 $1,082.75 22 Concrete Paving (driveway,sidewalk) SF 202.6 $12.00 $2,431.20 23 Flowable Fill per Technical Spec Attachment A CY 334 $117.00 $39,078.00 24 Seeding/Sodding to Match Existing SY 1233 $10.50 $12,946.50 25 Tree Protection LS -1 $800.00 -$800.00 26 Tree Replacement Planting EA -3 $1,775.00 -$5,325.00 27 Fence Repair, Remove/Replace, to match existing LF -34 $24.00 -$816.00 28 Trench Safety LF 244.45 $2.50 $611.13 29 Pre -Construction Video Documentation LF 1 $17.00 $17.00 30 Pre -Construction Exploratory Excavation EA 2 $2,900.00 $5,800.00 31 Waterline lowering EA -1 $8,000.00 -$8,000.00 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Page 4 of 5 Bid Item # Item Description p Unit Qty. Unit Price Amount Contract Time Adjustment ![lgvcZ 33 Rock Excavation CY 432.68 $60.00 $25,960.80 34 Repair A/C Water Pipeline EA -1 $5,400.00 -$5,400.00 36 Sag Repair After Pipe Bursting LF -100 $10.00 -$1,000.00 37 Point Repair to Remove Obstruction Prior to Pipe Bursting EA -1 $2,000.00 -$2,000.00 38 6" PVC Private Sewer Service Line LF -100 $60.00 -$6,000.00 39 Relocate Storage Shed EA -1 $2,325.00 -$2,325.00 41 Replace Manhole Frame and Cover (non - bolted 24") EA -7 $875.00 -$6,125.00 42 Replace Manhole Frame and Cover (Bolted 24") EA -1 $1,050.00 -$1,050.00 43 Install Bolts and Gaskets for Bolt Down Covers EA -2 $350.00 -$700.00 44 Paved Frame and Grade Adjustment Sealing EA -8 $810.00 -$6,480.00 45 Non Paved Frame and Grade Adjustment Sealing EA -8 $650.00 -$5,200.00 46 Concrete Manhole Grade Adjustments VF -12 $265.00 -$3,180.00 47 Pressure Grout Manhole JT -17 $250.00 -$4,250.00 48 Pressure Grout Pipe Seal, Bench and Trough and Lower 18" of Manhole EA -10 $500.00 -$5,000.00 49 Cementitious Manhole Chimney Seal VF -2 $95.00 -$190.00 50 Apply Cementitious Coating to Manhole VF -36 $115.00 -$4,140.00 51 Apply Epoxy Coating to Entire Manhole VF -66 $90.00 -$5,940.00 52 Partial Replacement of Manhole VF -6 $2,800.00 -$16,800.00 53 Reshape Bench/Trough Sweep EA 3 $550.00 $1,650.00 58 Job 1005: Open Cut and Replace 10 LF of 27" PVC with 27" -PVC -F679 EA -1 $19,000.00 -$19,000.00 60 Additional Pipe Installed Varying in Diamenter from 6" to 27" LF 46 $385.00 $17,710.00 61 Project Sign Per Detail Plan EA -4 $2,000.00 -$8,000.00 A3 8" CIPP Liner LF -10 $23.75 -$237.50 A4 6" PVC Sewer Service Lines (Main to Property Line) w/Service Clean -Out EA -8 $1,000.00 -$8,000.00 A5 Sewer Service Reconnection Only EA -3 $775.00 -$2,325.00 A7 Remove and Replace 48" Diameter Manhole, Extra Depth VF -1.22 $525.00 -$640.50 A8 Connect to Existing Manhole EA 1 $3,300.00 $3,300.00 A9 Asphalt Street Pavement TN -38 $465.00 -$17,670.00 Al2 Concrete Curb and Gutter Repair LF -690 $35.00 -$24,150.00 A13 Remove and Replace Concrete Paving (Driveways and Sidewalks) SF -1450 $11.75 -$17,037.50 A14 Flowable Fill CY -275 $117.00 -$32,175.00 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Page 5 of 5 Bid Item # Item Description Unit Qty. Unit Price Amount A15 Seeding/Sodding to Match Existing SY 796 $9.50 $7,562.00 Contract Time Adjustment ( v5)_ A18 Rock Excavation CY -310 $59.00 -$18,290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.00 $0.00 $o.00 $o.00 $0.o0 $0.00 $0.00 $o.00 $o.00 $0.00 $0.00 $o.00 $0.00 $0.00 $0,00 $0.00 $0.00 $o.00 $0.00 $0.00 $0.00 $0.00 $0.o0 $0.o0 $0.00 Ls -$109,920.88 0 ROUND ROCK, TEXAS PURPOSE ALaOMPIOSPW x City of Round Rock Agenda Item Summary Agenda Number: H.2 Title: Type: Governing Body: Agenda Date: Dept Director: Cost: Indexes: Attachments: Department: Consider a resolution authorizing the Mayor to execute Quantity Adjustment/Change Order No. 2 with RePipe Construction, LLC for the 2011-2012 Wastewater Collection System Rehabilitation Project. Resolution City Council 2/13/2014 Michael Thane, Utilities and Environmental Services Director $104,212.88 Self -Financed Wastewater Construction Resolution, Exhibit A Utilities and Environmental Services Text of Legislative File 14-1119 The City is required to continue this program in order to comply with the Texas Commission on Environmental Quality's Edwards Aquifer Recharge Zone Protection Program, which requires that wastewater collection systems located over the Edwards Aquifer be inspected and rehabilitated every five years. The elimination of defects will not only help to protect the Edwards Aquifer, but will also reduce inflow and infiltration entering the City's wastewater collection system, thereby reducing the City's treatment cost. The work for this project was performed in sub -basins BC20-Z, CC32-Z, CC34-Z, CC35-Z, CC36-Z, CC37-Z, 0C24 -Z, 0C25 -Z and 0C26 -Z ( 2011 Year 1 - 2nd cycle and 2012 Year 2 - 2nd cycle). On July 31, 2012, six bids were submitted for this wastewater rehabilitation project. The lowest bid of $1,536,866.40 was submitted by RePipe Construction, LLC. This amount was below the engineer's estimate of $1,734,000. The Utility staff recommended approval of this contract to RePipe Construction, LLC, who performed necessary repairs and improvements to rehabilitate the wastewater collection system in the nine sub -basins. Quantity Adjustment/Change Order No. 1 was executed on July 5, 2013, which increased the contract amount to $1,582,739.40. The project has been completed and Quantity Adjustment/Change Order No. 2 is necessary for final quantity adjustments on all bid items for this project and to add two Change Order items; two Grate Inlets and two Drop Bowls. The final project cost after Quantity Adjustment/Change Order No. 2 is $1,478,526.52 which is a reduction of $104,212,88. With this final adjustment, the contract is $58,339.88 below the original contract cost of City of Round Rock Page 1 Printed on 2/13/2014 Agenda Item Summary Continued (14-1119) $1,536,866.40. Cost: $104,212.88 Source of Funds: Self -Financed Wastewater Construction Approval City of Round Rock Page 2 Printed on 2/13/2014 EXECUTED ORIGINAL DOCUMEN1S FOLLOW rev, 08/12 Contract Quantity Adjustment/Change Order Department: Utilities and Environmental Services Project 2011 - 2012 Wastewater Collection Name: System Rehabilitation City Project ID Number ww05rhb2011 Justification Date: 1/14/14 Change Order/Quantity Adjustment No. Page 1 of 5 2 Quantity Adjustment/Change Order No. 2 is needed for final quantity adjustments on all bid items for this project and to add two Change Order items; two (2) Grate Inlets and two (2) Drop Bowls. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Prepared By: Si. natur Contractor: City Project Manager: Mayor/City Manager 'gnature Signa gnature R -14-02-13-H2 Eddie Zapata, Project Manager - Senior Printed Name, Title, Company Sam Cocke, Project Manager Printed Name, Title, Company Amount 0/0 Change $21,733.00 -$109,920.88 -$88,187.88 $24,140.00 $5,708.00 $29,848.00 0.02 0.00 0.02 $1,478,526.52 -$58,339.88 230 0 90 320 1/15/14 Date Eddie Zapata, Project Manager - Senior Printed Name, Title Alan McGraw, Mayor Printed Name, Title V/ Date ?//4 te 2.(3t4 - Date rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Change Order Data Item Description Unit Qty Unit Price $1,254.00 Page 2 of 5 Amount Contract Time Adjustment Da s CO 2-2 Grate Inlets EA 2 $1,600.00 $3,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T.TAL : 57 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Page 3 of 5 Bid Item # 1 Item Description 8" PVC SDR -26 Sewer Pipe 0'-8' deep, by open cut Unit LF Qty. 1 Unit Price $57.00 Amount $57.00 Contract Time Adjustment 3 8" HDPE DR -17, IPS Sewer Pipe, by pipe enlargement LF -522 $95.00 -$49,590.00 4 8" CIPP Liner LF 7 $23.75 $166.25 5 10" HDPE DR -17 IPS Sewer Pipe, by Pipe Enlargement LF 525 $145.00 $76,125.00 6 10" CIPP Liner LF -8 $25.00 -$200.00 7 18" HDPE DR -17 IPS Sewer Pipe, by Pipe Enlargement LF -2 $245.00 -$490.00 8 18" CIPP Liner LF -7 $150.00 -$1,050.00 9 36" CIPP Liner LF 1 $116.00 $116.00 10 6" Sewer Service Line Reinstatement with service cleanout EA -42 $925.00 -$38,850.00 11 Internal Service Line connection where external connection is not feasible EA 17 $100.00 $1,700.00 12 Remove and replace 48" Dia. Manhole 0'- 6' deep including Biotech Armor Additive EA 4 $4,575.00 $18,300.00 13 Remove and replace 48" Dia. Manhole, extra depth, including Biotech Armor Additive VF 8.08 $525.00 $4,242.00 14 Remove and replace 48" Dia. Manhole Drop Manhole, 0'-6' deep, including Biotech Armor Additive EA -1 $4,800.00 -$4,800.00 15 Remove and replace 48" Dia. Manhole Drop Manhole, extra depth, including Biotech Armor Additive VF -9 $525.00 -$4,725.00 17 Connect to Existing Manhole EA 1 $2,850.00 $2,850.00 18 Asphalt Street Pavement TN 13.75 $460.00 $6,325.00 21 Concrete Curb and Gutter Repair LF 30.5 $35.50 $1,082.75 22 Concrete Paving (driveway,sidewalk) SF 202.6 $12.00 $2,431.20 23 Flowable Fill per Technical Spec Attachment A CY 334 $117.00 $39,078.00 24 Seeding/Sodding to Match Existing SY 1233 $10.50 $12,946.50 25 Tree Protection LS -1 $800.00 -$800.00 26 Tree Replacement Planting EA -3 $1,775.00 -$5,325.00 27 Fence Repair, Remove/Replace, to match existing LF -34 $24.00 -$816.00 28 Trench Safety LF 244.45 $2.50 $611.13 29 Pre -Construction Video Documentation LF 1 $17.00 $17.00 30 Pre -Construction Exploratory Excavation EA 2 $2,900.00 $5,800.00 31 Waterline lowering EA -1 $8,000.00 -$8,000.00 rev, 08/12 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Page 4 of 5 Bid Item # 33 ..,��+u `s , .S :: as Item Description Rock Excavation } 3 <ci+*f.: Unit �.. CY h,c u" 'M:.W.*F:rS. ?''-te ie'l, Qty. 432.68 Unit Price _.> Amount Contract Time Adjustment $60.00 $25,960.80 34 Repair A/C Water Pipeline EA -1 $5,400.00 -$5,400.00 36 Sag Repair After Pipe Bursting LF -100 $10.00 -$1,000.00 37 Point Repair to Remove Obstruction Prior to Pipe Bursting EA -1 $2,000.00 -$2,000.00 38 6" PVC Private Sewer Service Line LF -100 $60.00 -$6,000.00 39 Relocate Storage Shed EA -1 $2,325.00 -$2,325.00 41 Replace Manhole Frame and Cover (non - bolted 24") EA -7 $875.00 -$6,125.00 42 Replace Manhole Frame and Cover (Bolted 24") EA -1 $1,050.00 -$1,050.00 43 Install Bolts and Gaskets for Bolt Down Covers EA -2 $350.00 -$700.00 44 Paved Frame and Grade Adjustment Sealing EA -8 $810.00 -$6,480.00 45 Non Paved Frame and Grade Adjustment Sealing EA -8 $650.00 -$5,200.00 46 Concrete Manhole Grade Adjustments VF -12 $265.00 -$3,180.00 47 Pressure Grout Manhole JT -17 $250.00 -$4,250.00 48 Pressure Grout Pipe Seal, Bench and Trough and Lower 18" of Manhole EA -10 $500.00 -$5,000.00 49 Cementitious Manhole Chimney Seal VF -2 $95.00 -$190.00 50 Apply Cementitious Coating to Manhole VF -36 $115.00 -$4,140.00 51 Apply Epoxy Coating to Entire Manhole VF -66 $90.00 -$5,940.00 52 Partial Replacement of Manhole VF -6 $2,800.00 -$16,800.00 53 Reshape Bench/Trough Sweep EA 3 $550.00 $1,650.00 58 Job 1005: Open Cut and Replace 10 LF of 27" PVC with 27" -PVC -F679 EA -1 $19,000.00 -$19,000.00 60 Additional Pipe Installed Varying in Diamenter from 6" to 27" LF 46 $385.00 $17,710.00 61 Project Sign Per Detail Plan EA -4 $2,000.00 -$8,000.00 A3 8" CIPP Liner LF -10 $23.75 -$237.50 A4 6" PVC Sewer Service Lines (Main to Property Line) w/Service Clean -Out EA -8 $1,000.00 -$8,000.00 A5 Sewer Service Reconnection Only EA -3 $775.00 -$2,325.00 A7 Remove and Replace 48" Diameter Manhole, Extra Depth VF -1.22 $525.00 -$640.50 A8 Connect to Existing Manhole EA 1 $3,300.00 $3,300.00 A9 Asphalt Street Pavement TN -38 $465.00 -$17,670.00 Al2 Concrete Curb and Gutter Repair LF -690 $35.00 -$24,150.00 A13 Remove and Replace Concrete Paving (Driveways and Sidewalks) SF -1450 $11.75 -$17,037.50 A14 Flowable Fill CY -275 $117.00 -$32,175.00 Bid Item # A15 A18 Contract Quantity Adjustment/Change Order Project Name: 2011 - 2012 Wastewater Collection System Rehabilitation Quan. Adj./Change Order No.: 2 Quantity Adjustment Data Item Description Seeding/Sodding to Match Existing Rock Excavation Unit SY CY Qty. 796 -310 Page 5 of 5 Unit Price Amount Contract Time Adjustment $9.50 $59.00 $7,562.00 -$18,290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 T• A : -$109,920.88 0