R-14-02-27-I5 - 2/27/2014RESOLUTION NO. R -14-02-27-I5
WHEREAS, the Round Rock Transportation and Economic Development Corporation
("RRTEDC") has previously adopted a Transportation Capital Improvement Plan ("TCIP"), and
WHEREAS, the RRTEDC wishes to amend said TCIP, and
WHEREAS, the bylaws of the RRTEDC require that said amendments to the TCIP be
approved by the City Council, and
WHEREAS, the City Council wishes to approve said amendments to the TCIP, Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the amendment to the Transportation Capital Improvement Plan approved by the Round
Rock Transportation and Economic Development Corporation, which is attached hereto as Exhibit
"A", is hereby approved.
The City Council hereby finds and declares that written notice of the date, hour, place and
subject of the meeting at which this Resolution was adopted was posted and that such meeting was
open to the public as required by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act,
Chapter 551, Texas Government Code, as amended.
RESOLVED this 27th day of February, 2014.
ALAN MCGRAW, Mayor
City of Round Rock, Texas
ATTEST:
SARA L. WHITE, City Clerk
0112.1304; 00292943
c
O
w
O
o
U U
Ea)
EE
L Q
CJ) O
^2 ;
LL 0
c
• .—
E E
O O
> c
O 8
Q- W
E -0
c
Ts ca
ac
ca .2
0 is
c
0
Q
m c
o
Q�
c
co 0
I- O
ct
0
Q.
H C
O
V
O a
N C
2'E
.0 4
0
N
OD)
N
NJ
FyE9
N
_
0)
0
N
V
N
O
0
,n -
7)
NI -CO
E-
1
-$8,549,891
N
o
U
'°
O
O
O
CO
(h
an
(o
N
000'006'S$
000,000s
1 $946,2931
h
_
—
(0
69
N
(0
h
d)
(O
u9
0
0
0
O
0)
$5,142,749
$552,629
0
0
C
NJ
v»
0)
n
0
(5
O
N
(n
n
Ni
N.
CO
(n
CO
N»
0
0
O
(0)
va
CO
(n
r
E
$11,211,6051
En
(n
CO
0
or-
v
$2,966,743'.
v
U
(0
0
0
a1
0
Ea
c
u.
LL
0
L
6
o
O
0
0r_)
a0
fA
$1,553,565
$452,270
(^o
0)
0
((
E9
0
(o
,—
(0
69
Estimated
Corporation
Funding
$15,693,800
O 0
O o
O 0
O O
O 0)
Lri
E- N
('l
O)
N
V
0)
(n
$4,057,552
N
(0
I.
((00
`
(A
0
0
0
O
O)
»
$5,142,749
$552,629
0
0
N
N
f.
69N
0)
(n
�
O
N.
0
N
69
N.
(0
(n
0
69
$1,300,000
0
0
0
00
(n
(n
0
0
O
0
a -
69
$835,481
0)
0
((0
V
0
$2,966,743
Construction
Date
Summer 2011
Fall 2017
On-going
0)
C
O
C
O
Completed
0
F-
Spring 2012
Spring 2010
Winter 2012
Spring 2012
0)
O
W
0
0)
O
0
0
Summer 2013
Summer 2015
Fall 2014
Winter 2012
Fall 2013
Fall 2013
Summer 2012
Work Description
Preliminary engineering to establish alignment and ROW
requirements. P.S.& E. Construction of Railroad overpass.
Construct railroad grade separation
Design and construct traffic signals, implement signal timing
plans
Miscellaneous consulting work in support of transportation
programs and planning
Construct half of a 4 -lane divided roadway
Design intersection improvements including turns lanes,
signal improvements and pedestrian accomodations.
Develop conceptual schematic for MAD 6 between Mays
'Street and Red Bud Lane.
Design and construct intersection improvements at various
intersections from Sam Bass Road to IH 35.
Design and construct Main Street to match new construction
in SWDT. Includes storm sewer on Blair Street from Main
Street to Florence Street
Design a MAD 4 roadway, including plans, specifications and
estimates, right-of-way determination and utility coordination,
and cost sharing on right-of-way acquisition.
Design and construct Chisholm Trail Road as a MAD 4, and
build a public road to Special Event Center Property
Major maintenance of various arterials throughout the City
FY 12-17
Design and construct projects which remove bottlenecks in
the system.
Create a Railroad Quiet Zone between CR 172 and St.
Williams Street
Design and construct new entrance and exit ramps,
obilterate old ramps, and add a lane to the frontage roads.
Includes pedestrian accomodations and environmental
documents.
Design and construct a MAD 4 roadway with a bridge over
Brushy Creek and Hairy Man Road. Includes all right-of-way
acquisition, environmental work, etc.
Design and construct a MAD 4 roadway, including relocation
of utilities, etc.
Design and construct sidewalk and pedestrian improvements
and add additional pavement to allow a center turn lane
within these limits. Work also includes lighting on the UPRR
bridge and gateway features at the entrance to downtown
Design and construct street and pedestrian improvements on
the remaining streets in southwest downtown. Inlcudes San
Saba, Liberty, Blair, and Bagdad.
Design and construct road repairs for pavement failures in La
Frontera
Project Limits
From Joe DiMaggio Boulevard to
1000 feet south of US 79
At Union Pacific Railroad
Various locations
From RM 620 to Brightwater
Boulevard
1000 feet in all directions of
intersection; schematic from Mays
Street to Red Bud Lane
Sam Bass Road to IH 35
Main Street, San Saba to Blair
Street with storm sewer on Blair
Street
Westinghouse Road to University
Boulevard
1900 feet north of Wolle Lane to
Wolle Lane
Various locations
Various locations
UPRR, between CR 172 and St.
Williams
Old Settlers Boulevard to US 79
Creek Bend Circle to Wyoming
'Springs Drive
FM 3406 to Sam Bass Road
Brushy Creek bridge to the
UPRR/Lake Creek Bridge
Various location in southwest
downtown
Various streets in La Frontera
Project Name
Kenney Fort Boulevard (Arterial
A)
RM 620
Traffic Signals
Transportation Consulting
Wyoming Springs Drive
South Mays at Gattis School
Road
FM 3406
Main Street Project 2, 3 and 7
FM1460 North of University
Chisholm Trail 3
Major Maintenance Program
Arterial Improvement Program
Railroad Quiet Zones
IH 35 ramp reversals and
frontage roads
Creek Bend Boulevard
Chisholm Trail Road
Mays Street
Southwest Downtown
La Frontera Streets
O
O
a
O 0
1— rt+
E
2 Q.
O
2 ;
a Qi
C U
a)
E E
O O
>
O U
W
• c
as co
• O
O co
c to
O O
ca N
C
o
C
NU
N
a
O
D.
_
0
H G
E
N L-
0 d
cE
i_ Q
c_
0
o
o
o
n
fA
0
0
O
0
0
(77,,EA
0
0
O
o
v
_
0
.61--
r
co-
(A
o
NEA
0
co
O
i
DI
M
4
O
O
N O
O 0
o v
�0
O
H
CO (
u)
(O
(n0
Eft
0
0
O
0
LO (0
0
0
O
(0
0
Di
((3
00
0
0
O
0
0
N
EA
0
0
O
0
v
N
E9
000'09£$
000'09Z$
000'00£$
0
0
O
0
i»
0
O
0
(0
0
O
n
i
$13,714,410
5124.349.8 34
$381,935 369
$506,285,204
L
d
L_
O
CO
LO
17.LL
$21 363 570
$261,172,658
$282,536,228
O
c o
In
y 0 c o
m
E O (n
._ O. -
N O LL
W U
0
0
0
0
v LA
U)
0
0
o
0
(n
0
0
0
O
N
E9
000,000,Z$
000'009$
$13,714,410
S102 986.264
$135,700,5901
$238,686,854
0
0
0
0
v
D1-(»
f9
0
0
0
0
M
0 0
0 0
0 0
0 o
(0) N
EA (A
0
0
o
O
(H
0
0
0
v
(H
0
O
_
u0 Ua
to 0
0 0
U CO
F
TBD
TBD
O
CO
F
O
CO
H
TBD
Winter 2012
(lN
O
N
To
LL N
V
N
O
N
LL
Spring, 2014
NI-
, -
O
O1
c
V)
Work Description
Design road repairs for pavement failures in La Frontera
Design and construct sidewalks on various arterials
throughout the City
Major bridge maintenance on arterial bridges throughout the
city.
Design and construct a six -lane divided section, with
sidewalks and a raised median. To include utility relocation
and right-of-way acquisition.
Design and construct half of a 4 lane divded arterial.
Design and construct the realignment of Cypress Boulevard
with Eagles Nest
Retain consultant to identify needs and priorities for future
(traffic management center; provide funding for citywide traffic
signal radio network.
Utility reimbursement for right of way
Develop master infrastructure plan for downtown
Design commercial collector roadway
Develop conceptual buidout plan for Gattis School Road, and
acquire right-of-way and/or easements.
Purchase right-of-way for arterial within Round Rock
jurisdiction
Design and construct street and pedestrian improvements on
Round Rock Avenue, Main Street and Mays Street.
Total Current Projects
Total Completed Projects
Total TCIP Projects
Project Limits
Various streets in La Frontera
Various locations
Various locations
IH -35 frontage road to Sunrise
Road
From current end west of Seton
I Hospital south and east to A. W.
LGrimes Boulevard
At Cypress Boulevard/Eagles Nest
and Sunrise Road
City wide
(0
rX
0
m
Greenlawn Blvd. to Gander
Mountain
Greenlawn Blvd. to Red Bud Lane
Within Round Rock jurisdiction
Round Rock Avenue, Main Street
and Mays Street between Brushy
Creek and UPRR
Project Name
La Frontera Streets Phase 2
Arterial Sidewalk Program I
Major Bridge Maintenance
University Boulevard
Seton Parkway, Phase 2
Cypress Boulevard realignment
Traffic Management Center
Arterial H
Downtown Infrastructure
Improvements
Gander Mountain Way
Gattis School Road
Kenney Fort Boulevard right-of-
way
Southwest Downtown Phase 5
c
0
c
c 0
• c
LL c 0
m U
a) c
a) ON
LL a) UE
a� mots 16
• o
u u u
a)-0 U -O