CM-2018-1740 - 6/8/2018 Page I of 3 Contract Quantity Adjustment/Change Order m,,ouic Department: Utilities&Environmeental Services Project Name: Greenlawn Wastewater Extension Project Date: 5/17/18 City Project Change Order/Quantity ID Number GRNA% Adjustment No. 1 Vendor Whitestone Civil Construction, LLC (512)963-7466 Company Name Address Phone No. Justification Request by South West Water Company(Windermere)for the City to add check valve assembly to Greenlawn Placa forcemain. Bore across Greenlawn because casing pipe was not in esmt. Wet well extension. 750VA Transformer. SUMMARY Amount %Change Original Contract Price: $116,185.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Atljustmen(s): $116,185.00 Previous Change Order(s): 0% This Change Order: $12,492.90 11% Total Change Order(s)To Date: $12,492.90 11% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Nus Change Order(s)]: $128,677.90 Difference between Original and Adjusted Contract Paces: $12,492.90 Original Contract Time: 90 Days Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 0 Submitted for Approval Prepared By: / Jeff Bell / Project Manager / City of Round Rock 5/17/18 ignature Printed Name,Title, Company Date Approvals .' Contractor A I J Carrie Lewis/ Member/Whitestone Civil Construction,LLC nMure Printed Name,Title,Company DaLe City Project Manager: Jeff Bell S.( . Si / Printed Name,Title ,}. h I Dale Mayor/CManagerlty a�N,ate''/1lI't'1'[L7' tQ1A.�[e Aad�C� t LTJ IY "an Qr �y I glie Signature ��� Printed Name,Titlea� Pegs 3 013 Contract Quantity Adjustment/Change Order OU16 Project Name: Greenlawn Wastewater Extension Project Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) 1 Vault&Check Valve Assemby 1 1 $2,162.20 $2,162.20 2 Bore under Greenlawn 1 1 $8,400.00 $8,400.00 3 Wet Well Extension 1 1 $1,183.20 $1,183.20 4 750VA Transformer 1 1 $747.50 $747.50 $0.130 $0.00 $0.00 .00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.130 $0.00 $0.00 0.130 $13.1313 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of Contract Quantity Adjustment/Change Order .n.outs Project Name: Greenlawn Wastewater Extension Project Quan.Adj./Change Order No.: 1 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 o.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 o.ao $0.00 $0.00 TOTALS:1 00 0 H 4 •' . _G PROPOSED 8" WASTEWATER LINE e v1 —-- __ \ 24 Q PROPOSED 12" �� 4_ e x WATER LINE ; Q� "PROPOSED 8" 12" WASTEWATER LINE � b 1 i F 9 I 16 � 1 a -, \ s .Y 6 N 0 .,' Legend r Area to be annexed • Pmposetl Wastewater Line 9 � 6 --• Pmposetl Waterline Existing Water Lines Existing Wastewater Lines N r*. GREENLAWN ANNEXATION W E WATER & WASTEWATER IMPROVEMENTS PROJECT City of Round Rock a0 a"s°ROC` Agenda Item summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Whitestone Civil Construction, LLC for the Greenlawn Wastewater Extension Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/8/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $12,492.90 Indexes: Self-Financed Wastewater Construction Attachments: QA/CO#1.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM-2018-1740 In January of 2013,the City involuntarily annexed a triangular piece of property located on the east side of IH-35 near the intersection of Greenlawn Boulevard and the northbound frontage road of I1-1-35. The original design proposed Round Rock serving wastewater to the property by gravity; however,the City was unable to obtain the required easements. Instead,the Utility staff designed"in house"for a grinder pump and force main to be connected to the newly constructed Wndermere Utility Company owned lift station to serve the Greenlawn Plaza property. Several items arose during construction that are required to be added to the contract. During negotiation meetings with Wndernere Utility Company, it was agreed that Round Rock would provide a check valve assembly and vault. Design intensions were to utilize an existing spare 4-inch conduit located in an easement. After exploratory excavation, it was concluded the existing 4-inch spare conduit is not located within the easement and the location is unknown. This required an unanticipated bore for the crossing of Greenlawn Blvd. During construction it was found that the existing gravity wastewater line was a fool lower than designed. The wet well for the grinder pump station was ordered based on"Record Drawings"and the wet well delivered was one foot too short; therefore, an extension was necessary to property complete the project. Because the electrical current from the building was 207 volts and the pumps need 220 volts, a step-up transformer had to be placed at the grinder pump control panel. These four items totaled$12,492.90. The Utility Staff requests City Manager approval for Change Order No.1 raising the original contract amount of $116,185 to$128,677.90. Cost:$12,492.90 Source of Funds: Self-Financed Wastewater Construction Citynl Rountl Rock ft,/ %r~.by s