R-2018-5547 - 6/14/2018 RESOLUTION NO. R-2018-5547 WHEREAS, Section 395.058 of the Texas Local Government Code ("the Act") requires the Capital Improvement Advisory Committee ("CIAC") to report to the City Council the progress of the capital improvements plan and any perceived inequities in implementing the plan or imposing the impact fee; and WHEREAS, the CIAC is also required to advise the Council of the need to update the land use assumptions, capital improvements plan and impact fees; and WHEREAS, the CIAC has submitted a Capital Improvement Plan Progress Semi-Annual Report; and WHEREAS, the City Council has reviewed the attached Capital Improvement Plan Progress Semi-Annual Report and has determined same to be in compliance with the Act,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Capital Improvement Plan Progress Semi-Annual Report, attached hereto as Exhibit "A" and incorporated herein, is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of June, 2018. CRAIG ORGPck. ayor City of ound Rexas ATTEST: L, A& - - SARA L. WHITE, City Clerk 0112.1804;00402411 EXHIBIT Y ROUND ROCK TEXAS UTILITIES AND ENVIRONMENTAL.SERVICES ' ,.`. Round W :* JL urflives was En'viaron IN Services rent Capital prove SUMMARY The Local Government Code Section 395.058 requires the Capital Improvement Advisory Committee (CIAC) to report to the political subdivision the progress of the capital improvements plan and any perceived inequities in implementing the plan or imposing the impact fee. Included herein is the semi-annual report for the reporting period of October 1, 2017 to April 1, 2018. This report includes an updated assessment of the actual growth rate in comparison to the projections and assumptions made in the report; projects completed or initiated during the period; and impact fees collected during the period. These comparisons are used as indicators of the need to update the land use assumptions, capital improvements plan or impact fees. The local government code also requires the Capital Improvement Advisory Committee to advise the City Council of the need to update the land use assumptions, capital improvements plan and impact fees. These items were last updated by the City in November 2015. 1 5/25/2018 Figure 1 represents Ground and Surface water use, along with the number of active water services over the past two years. Although the City continues to grow, the total water production has remained fairly level over the past two years. Part of this reason could be because water usage is dependent on weather patterns; however, the City's conservation and reuse water programs are also affecting the amount of potable water usage by the City. According to the Building Inspections Division, the City typically processes about 300 permits per month. In the first three months of 2018, they experienced a drastic increase in permits processed which is reflected in active services for the 2nd Quarter of FY-18. Figure 1 Water Treatment Plant 2,5W 35 34.5 2,00 r Cy 34 1,500 � ft 33.5 u V V - - -- to 0 at +� 33 a- 1,000 ._....... C U M 0 32.5 aC! Soo z 32 p ................................. ........ ........ ....................--. ,... . ............ ............. ... 315 Zr�d Qtr i Y .3rd Qtr�Y 4th Qtr FY 1st Qtr FY Ztt FY 3rd FY a 4th Qtr FY 1st qtr i Y 2nd Qtr FY 16 s '15 j '16 ` "i7 1 "17 ; '17 "17 IS 18 fAlwGraund Water 195,240,000 217,310,000 1 222,590,000 201,180,000 ' 23,840,000 20,710,000 217,810,000 3 167,410,000' 110,924,000 , J1 'Surface Water 1,211,910,000;1,412,060,000 2 044,500,0=1,379,790,000 ,25S,570,000 1,810,718,000 1,517,199,000 1,410,1$1,000 1,148,171,000 Active Services 32703 32732 32.930 33465 33595 33995 34179 33981 34706 2 5/25/2018 Figure 2 reflects the monthly potable water production over the past eight years. As can be expected, the average daily demand increases during the summer months; however, total water production is dependent on weather conditions, which effects discretionary water usage. Figure 2 40 Average Potable Daily Demand Each Month 35 30 25 24 i x 10 5 p+ r _ k Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec W20-10 62011 U- 201.2 Q 201; kJ2014 .?.015 U201-6W2.017 -J 2018 Figure 3 reflects the monthly potable treated water production and the Type I Reuse treated water production. The City's reuse water system began production in October 2012 with three customers: Old Settlers Park, Dell Diamond, and Forest Creek Golf Course. Since that time, the City has expanded the system to include Forest Creek HOA, Legends Village Subdivision, Austin Community College, Texas A&M Health Science Center, the Forest Grove and Vizcaya Subdivisions. The City continues to promote the reuse water system in the Northeast part of Round Rock and as depicted in Figure 3, the demand continues to grow. Figure 3 Potable vs. Reuse Water Average Daily Demand Each Month ;z 24 p 1� f � f 12 7 t (gA , , i +t � 1 , p tfp16 b f,7a;i�{tw,r Noutrilf-wr ("*,,rnkx`t Irt?Navy FokxrM';mIII AbirllM4.Y )JAW I,:ly Ait..a:i!t `?a>kaS.Lrrt+Cr 4 FY-13 Potable'Nater =,jFY-14 Potable Water m FY-1S Potable 01ater m FY-15 Potable Water FY-17 Potable Water ■FY-1S Potable Water uPeuse VI ater Figure 4 shows the number of single-family building permits issued annually. The number of new housing starts per year in the City of Round Rock has ranged from 222 to 592 over the past ten years. Single- family permits have remained steady over the past year due to new subdivisions available within the City. With the release of four new subdivisions, single-family permitting averaged about 60 permits per month for the second half of FY-17. Single-family building permits have continued to increase for the first half of FY-18 as well. Most of the activity is in the Vizcaya, Warner Ranch, Glen Ellyn, and Madsen Ranch subdivisions. Several Municipal Utility Districts (MUDs) located in Round Rock's extra-territorial jurisdiction (ETJ) continue to experience a steady number of single-family housing starts during this time as well. Figure 4 Annual Single-Family Building Permits Issued Residential & MUDs Soo 780 750 718 700 677 550 600 556 581 591 550 526 _ 535 Soo .. 464 450 ' 400 Yj 350 338 J 300 250 k F ( 3 200 150 4 1.00 50 .` t a f Q .. FY-2009 FY-2010 FY-2011 FY-2012 FY-2013 FY-2.01.4 FY-2015 FY-2016 FY-201.7 FY-2018 (tact-Mar) Round Fuck ■Paloma MUD f#1 a Paloma MUD 42 X Tera Vista 410 X Tera Vista#11 a Walsh Ranch -------------- 5 5/25/2018 Table 1 represents the number of multi-family building permits issued annually. During FY-07, a large number of new apartment complexes were constructed within the City. This is reflected in the amount of impact fees collected during that year. The following years did not see this amount of multi-family construction; however, the population continued to grow despite the fewer permits issued. In FY-14, there was an increase in the number of multi-family projects under construction; however, these projects were permitted in FY-13, as shown in the table below. Currently, there are two multi-family complexes, Ace Apartments and Holly Brook Apartments, under construction. Several other multi-family projects are in review. Table 1 Fiscal Yea�r Units Permitted FY 2005 538 FY 2006 56 FY 2007 2147 FY 2008 224 FY 2009 274 FY 2010 130 FY 2011 0 FY 2012 280 FY 2013 884 (124 LUES) FY 2014 334 (63.5 LUES) FY 2015 792 (302 LUES) FY 2016 608 (157 L UEs) FY 2017 330 (170 LUES) FY 2018 (Oct-Mar) 652 (32 7.5 LUES) Note: The number of LUES that were determined for these developments are shown in parenthesis. 6 5/25/2018 Table 2 reflects the number of new commercial building permits issued annually. Over the past several years the number of permits has been steady, ranging from 20 to 60 permits annually. However, from FY-13 thru FY-16, there was a significant increase in new commercial building permits, specifically for restaurants, hospitals, medical clinics, banks, convenient stores, and office buildings. Table 2 Commercial Fiscal YearBuilding FY 2009 30 FY 2010 29 FY 2011 27 FY 2012 20 (100 LUES) FY 2013 37 (185 L UEs) FY 2014 33 (165 L UEs) FY 2015 47 (202 L UEs) FY 2016 63 (442.5 L UEs) FY 2017 25 (168 L UEs) FY 2018 (Oct-Mar) 15 (73.5 LUES) Note: The number of LUEs for these developments is shown in parenthesis. In FY-17, commercial growth continued to be strong, even though the number of permits was down. Many of the permits issued in FY-17 were larger projects such as UPS. The Building Inspection's Division anticipates issuing approximately 45 permits in FY-18. Current permits are mostly hotels, strip centers, and office complexes. 7 5/25/2018 Table 3 and Figure 5 summarize the impact fees collected from FY-14 thru the first half of FY-18 for residential and commercial building permits. There has been a significant increase in the amount of impact fees collected during this time period due to the construction that occurred in single-family residential, multi-family residential and commercial developments. Table 3 Impact • Residential Water $ 961,767 $ 11616,580 $ 1,516,823 $ 21812,465 $ 1,687,594 �....................._.... __ �.....W.... ...... ... ._.._................................... ....... . .W.._ ..��__... ...W_..............._..... .. ..,. Commercial Water $ 941,463 $ 2,273,857 $ 21342,270 $ 915,617 $ 1,333,372 Wholesale Water $ 1,163,887 $ 1,035,951 $ 1,117,590 $ 818,121 $ 245,293 r._w.., w._.._ . __ _._. _._..._ ...... .... I Residential. Sewer $ 322,936 $ 618,240 $ 701,551 $ 1,201,518 $ 78S,6501 _. .... .. __ _ _ . ..._ .N .M. .... ..mmm._. .. .. _ . .__.................. ............. M Commercial Sewer $ 398,361 $ 1,084,193 $ 11020,587 $ 935,750 $ 555,250 Wholesale Sewer $ 920,972 $ 1,3041686 $ 11529,096 $ 11532,360 $ 208,482 i f Total Collected $ 4,709,386 $ 7,933,507 $ 8,227,917 $ 81215,831 $ 41815,641 8 5/25/2018 Figure 5 Impact Fees Collected FY 2014 - 2018 (Oct-alar) $9,000,000 'f — $7,933,507 $8,227,917 $8,215,831 $8,000,000 n. .. . w........ .. ..r .u:., r.....,..... $7,000,000 $6,000,000 ,` ;,._ __ —_$4,815,641 .... $4..709386 $5,000,000 -..:::a...:.....:..:. ......:. . m:..... aa _:: a....: _.,:.... xw.au::_.: ._ $4,000,000 may. $3,000,00041/ ` $2,000,001 � ��. .__._._. ..w_:... $1,000,000 p� 3 $0 3 FY-14 FY-15 FY-16 FY-17 FY-18(Oct-Mar) ■Residential water NCommercial water wholesale Water a Residential Sewer Commercial Sewer wholesale Sewer In 2015, the latest version of the water model assumed that 1,524 LUES per year would be added to the water system. For an impact fee of $4,025 per LUE, this would indicate that the City should have collected approximately $6.13 million per year in water impact fees if the City would be growing as projected. The wastewater model assumed that 1,089 LUEs would be added to the wastewater system per year. For an impact fee of $2,099 per LUE, this would indicate that the City should have collected approximately $2.29 million per year in wastewater impact fees if the City would be growing as projected. Comparing these assumptions to the actual impact fees collected indicates that new connections to our water and wastewater systems are occurring as projected. 9 5/25/2018 Table 4 provides population projections for Round Rock and Round Rock's ETJ over the coming years. These projections, anticipating a steady growth rate, indicate that in order to keep up with growth, capital improvements to the City's water and wastewater utility systems would be necessary. However, 2012-2018 estimates, shown in parenthesis, indicate the City's population growth rate is slightly slower than projected. Table 4 Inside City City's ETA Year -Projections Growth Rate Rro"ections Growth Rate 2010 (Census) 99,887 - 1411807 - 2011 100,659 � 0.8% m. 143,960 1.5% 2012 102,349 / (101,702) 1.7% (1.0%) 147,027 2.1% 2013 1041805 / (102,349) 2.4% (0.6%) 151,13311- 2.8% 2014 107,635 / (103,494) 2.7% (1.1%) 155,613 3.0% 2015 1101757 / (105,405) 2.9% (1.9%) 160,385 3.1% 2016 113,968 / (107,117) 2.9% (1.9%) 165,024 2.9% 2017 117,160 / (110,300) 2.8% (3.0%) 169,213 2.5% 2018 120,440 / (112,381) 2.8% (1.9%) 173,490 2.5% 2019 123,812 2.8% 1771859 2.5% m _ 2020 1271279 2.8% 1821323 2.5% 2021 130,461 2.5% 186,062 2.1% 2022 133,723 2.5% 189,881 2.1% 2023 137,066 2.5% 193508 1.9% 2024 1401492 2.5% 197,218 1.9% mm. 2025 143,302 mm 2.0% 200,312 1.6% 2026 146,168 2.0% 203,462 1.6% 2027 149,092 2.0% 206,670 1.6% 2028152,073 2.0% 209,651 1.4% 2029 155,115 2.0% 212,693 1.5% 2030immm 158 217 mT �P 2.0% 215 795 1.5% Notes: 2010 is the base year for these projections ( ) Annual Estimates by Planning & Development Services Department 10 5/25/2018 Table 5 provides a summary of the Water System Capital Improvement Projects that have been completed or are in progress since the last impact fee analysis was completed in November 2015. In addition, projects that are anticipated over the next 10 years are also shown below. Table 5 Impact Fee Completed Water Projects Completion Report Actual Cost Estimated Cost BCRUA Treated Waterline - Ph 1 Seg. 3 2015 $8,400,000 $8,749,000 University Blvd Waterline Ph 1 2015 $3,634,169 $1,877,000 Parcel 150 2015 $2,955,650 $3,144,000 CR 112 Phase 2 - 24" Waterline (890 PP) 2015 $1,188,049 $888,000 Water Dist. Master Plan & Impact Fee 2015 $138,000 $141,000 Creek Bend 12" Waterline 2016 $415,000 $415,000 Forest Creek Golf Course Reuse Rehab 2016 $150,000 $83,890 ............................................................_....................-......................................_-........_..........__............................................._..___ __ ..-- ------ ...........................__----- -------...._.................__............_.-- -_........_...._..............__............_................_._..._ Arterial H Waterline 2017 $856,400 $1,503,000 $17,737,268 $16,800,890 Impact Fee Updated Water Projects In Progress Completion ; Report Actual Cost Estimated Cost South 81 Elevated Storage Tank Pump 2018 $157,000 $157,000 BCRUA Water Treatment Plant - Ph 1B 2018 $34,000 $31,000 .................................._............_...._.._......___ _ ..._ _ ......................................_......._..........................................................._........ ...............__................................._.........._..-........................ _ ........................................................... BCRUA Water Treatment Plant - Ph 1C 2020 $4,465,000 $4,152,000 Arterial A Waterline - 24" (Kenny Ft. Blvd.) 2022 $5,024,000 $5,024,000 $9,680,000 $9,364,000 11 5/25/2018 Estimated Impact Fee Updated Upcoming Water Projects Completion Repo Estimated Cost Estimated Cost Water Dist. Master Plan & Impact Fee 2019 € $66,000 $150,000 ................................................................................................................................................................................................. ........_......»......»_.._.......».......».........»»._...._.........................................»............_.._..»..__......................................................................... ._...._............................................................................. Meadow Lake Lines 2019 E $2,367,000 $2,367,000 Saddle Brook Waterlines 2019 $629,000 $629,000 Arterial H Phase II 2019 $1,470,500 $2,941,000 South Creek Waterline 2020 $1,604,000 $1,604,000 Palm Valley Waterline 2020 $1,180,000 $1,180,000 ...........................................................................................................»_.»............_..............................._...._._......._.............._._... .._._......___..............................................................».»....�...._..»__.................................................._.............._........_..__.»_....................... .................................._............... . Avery Center East 2020 $41160,000 $4,160,000 Southeast Red Bud Lane Waterlines �mm 2021 $629,000 $629,000 Brenda Lane Waterlines 2021 ( $2,074,000 $2,074,000 _ _......_................................................._.. ___......................................_......__.._..___...»._._............... Palm Valley Phase II 2021 $1,002,000 $1,002,000 Water Dist. Master Plan & Impact Fee 2022 $148,000 $154,000 ___........._.... _ ...».»_...»_».._..._..............................»._»_........_..._._....._.._._...»._......._...__....._........................... Gattis School Road 2023 ( $1,130,600 $5,653,000 _._.._.......__._....._..._............_....._._...____....__.._ �_ _.._.___._.__ ___.. Round Rock Glen Waterlines 2024 $2,715,000 $2,715,000 East Loop II 2024 $7,795,000 $7,795,000 _.._ _ ._._....... South Creek Phase II 2024 [ $2,419,000 $2,419,000 Water Dist. Master Plan & Impact Fee 2024 $75,000 $75,000 ................................................................................................................................................................................................. .._.............__............._........»..................._.............»........_.................»...».....».».».».........................................»_...._....._................._......... ................................................_.__............. Water Dist. Master Plan & Impact Fee 2025 ( $158 000 $158,000 2.0 MGD Elevated Storage Tank (PP 890) 2025 $7,138,000 $7,138,000 BCRUA Water Treatment Plant - Ph 1D 2025 $12,905,000 $12,905,000 BCRUA Intake & RW Line Ph2A, Seg. 2026 $57,895,705 $57,895,705 Sam Bass Phase I 2026 $14,469,000 $141,469,000 .............._......._....................................._.......................................................... East Loop III 2027 $7,171,000 _ $7,171,000 West Loop 2028 $17,818,000 $17,818,000 Sam Bass Phase II 2030 $1,578,000 $1,578,000 $163,300,805 $168,567,705 12 5/25/2018 Table 6 provides a summary of the Wastewater System Capital Improvement Projects that have been completed or are in progress since the last impact fee analysis was completed in November 2015. In addition, projects that are anticipated over the next 10 years are also shown below. Table 6 Completed Wastewater Projects Completion Impact Fee Report Actual Cost Estimated Cost McNutt Creek C3 2014 $11191,000 $940,000 McNutt Creek C9 2015 $2,046,000 $1,471,000 Chandler Creek 1 (Upper) 2015 $552,000 $573,000 ............................._......................................................................................................................_.................__..._........................ ...................................................._........_._..........._......_........_......_.............._....._..........................._.........................................._........ ._......_...................._............_.................................... Lake Creek 2 2017 $2,652,000 $1,916,000 Lake Creek 3 2017 $591,000 $563,000 McNutt Creek C2 (referred to as C5) 2018 $1,324,000 $1,762,000 Brushy Creek 5 2018 $288,000 $282,618 ............................_......................................._.................___________.___.__.________ __ _.__._..---._-. $8,644,000 $7,507,618 Wastewater Projects in Progress ' Completion ; Impact Fee Report Updated Actual Estimated Cost Cost Brushy Creek 2 2019 $685,000 $349,000 Brushy Creek 4 2019 $173,000 _ � $173,.0.00.. ... ._._.... $173,00.0 ............_ _. � . . .. . ..... . WWTP Expansion12022 $41,600,00030053500 ... ................_._..._.................___......_...................._......_.._.._..._...._.........__.____..__._._.___.__....._............. $42,458,000 $30,575,500 Estimated ` Impact Fee Report ' Updated Upcoming Wastewate, vProjects Completion Estimated Cost Estimated Cost McNutt Creek C10 2019 $1,014,000 $1,265,887 Lake Creek 1 2019 $1,995,000 $2,400,000 ........._.._..____..._.._.__...__..._------_.._._...__._._......._......___...._._.._. McNutt Creek C4 2020 $734,000 $765,875 Chandler Creek 3 2021 $753,000 $857,680 Lake Creek 4 2021 $2,235,053 2,235,000 .............._............................................................................................................................._.. .........._............_.....___............. .................I..........__....................._......_._.�.......................................................... ... Chandler Creek 2 2022 $520,000 $520,222 McNutt Creek 15 (referred to as 12) 2024 i $528,000 $527,897 -_ .................................................................. _ . . . .. .............................._ ...........__..................................._....................._._ Hilton Head LS 2024 $11,000 $17,000 13 5/25/2018 Upcoming Wastewater Projects Estimated Impact Fee Report Updated Continued... Completion Estimated Cost Estimated Cost McNutt Creek C12 2024 $949,000 $1,204,491 ............._....................................__._. ... McNutt Creek D2 2025 $3,678,000 $3,339,000 SE Annex LS 2025 $820,000 $819,036 ........_..........._......................................................................................_......___......__...._.._...__......_........_.....__._....... ._.... _.__...._..........._....................................._..............._.._._._...__._............................._.................................................__............................ ............................................ ........... McNutt Creek D4 2025 $1,394,000 $1,131,502 Forest Creek LS 2026 $1,211,000 $1,600,000 Forest Creek 2 2026 $2,148,000 $2,148,396 ............ Onion Creek 1 2026 i $359,000 $1,500,000 McNutt Creek C6 2027 $207,000 $790,782 ......................................................................_..............................._.........._...___._...._......_.._...._...._._._.__. Onion Creek 2 2027 $214,000 $1,348,025 ._.._.................._......___.._.....__...____..____ __-_._ . _._ __..............._._.. ( _____..__._._._.........._........................................__.._._..__._._..............._..................................._.......... . Spanish Oak 1 2027 $1,492,000 $1,491,858 McNutt Creek D5 2028 1 $691,000 $748,000 __._.........._..................._............................___.........____.......................................................... Mayfield Park 2 2028 $1,960,000 $1,960,456 McNutt Creek C8b 2028 F $823,000 $706,355 ................_...__.............................................__..................__.................................._.............. Mayfield Park 1 2028 $393,000 $393,290 . ............................................................._......__......_.___.._._...___.._._.._...._ ___._. Stone Oak LS 2028 $295,000 $295,000 i $24,424,000 j $28,065,805 Report Completed Reuse Projects Completion Impact Fee RepActual Cost Estimated Cost Reuse Phase II 2015 $2,108,500 $2,108,500 Reuse Phase VI 2016 $900,000 $900,000 Reuse Phase IV-B 2016 $3,719,000 $3,013,152 $6,727,573 $6,021,652 Upcoming Reuse Projects Estimated Impact Fee Report Updated Completion Estimated Cost Estimated Cost Reuse Phase V - Stony Point High School 2022 F $558,376 ' $600,000 $558,376 $600,000 14 5/25/2018 Figure 6 provides a comparison of the Single-Family Residential Utility Rates for Round Rock customers versus surrounding Central Texas City and Municipal Utility Districts. As depicted, Round Rock utility rates remain some of the lowest in the region. Figure 6 Single-Family Residential Water and Wastewater Rates Comparison (monthly cost)* $lso . ... ... ..... ...... . tic>7.8�. $160 $159.35 $140 S139.34 $124.00 $123.75 $122.40 $120 5106.30 $:100 S99.6U $96.69 59Z.�f5 590.7`() $86.70 $80 $$1.33 570.60 $61.80 $53.65 $60 $40 $20 $0 nil Y. l -q- i�C� 4��tifl a(Nater a Wastewater * assumes 10,000 gallons water & 8,000 gallons wastewater used 15 5/25/2018 Table 7 compares Round Rock's Water and Wastewater Impact Fees to other Central Texas cities. Historically, Round Rock had one of the highest total impact fees charged for new connections to the water and wastewater systems. However, several of the surrounding cities have increased their fees over the past few years and have surpassed Round Rock. Round Rock's philosophy is for new customers and developments to pay for the capital improvements that are required due to the growth. Table 7 WastewaterArea Impact Fee Comparison ast C-ty/utility Water dated Manville WSC 2008 __.___.. .....w...�.w _._..�...�.�..�._.. �.�_____ .�..w,... $2,800_. n/a._ ..m....... $2,800._.... i Brushy Creek MUD 2012 $2,095 ]--$i 804 $3,899 Cedar Park 2013 $2f250 $2fOOO $4,250 ; P Hutto 2013 $3,625 i 2 128 $5f753 k San Marcos 2014 $2,285 __.�........$3,506 $5,791 Jonah Water SUD7? 2013 r $5 000 $1f068 $6,068 ._ _ �_. __ 3 r ` Round Rock 2016 $4,025 $2,099 $6f124 i Pflugerville 2014 $4,241 _$2f725 $ 725 s 6 966 8 I s Leander 2017 $4309 $2,820 $7,129 M _ Austin ...a., 2014 ..... $5,400 .. $2,200 . .:.....,... ,.m..__ $7,600 _....n...b :Georgetown 1 2017 1 $7,039 $2,997 $10,036 16 5/25/2018 CONCLUSION AND RECOMMENDATIONS The CIAC and City Council approved the new Impact Fees which went into effect March 1, 2016. Although the projected population growth in Round Rock is proceeding at a slightly slower rate than what was anticipated in the impact fee report, this has not caused a significant concern since the number of connections to the water and wastewater systems are occurring at the projected rate anticipated by the City. As a result of the potential volatility in growth rates and infrastructure requirements, the City recommends the impact fees be reviewed every three to four years so that the fees are set according to the growth patterns and needs of the water and wastewater utility system improvements. It is anticipated that we will update our Water and Wastewater Master Plans in 2018 or 2019. Following the Master Plan update, we will review our adopted impact fees. The next Capital Improvements Plan Progress Report will be presented to the CIAC and to the City Council in approximately six months. 17 5/25/2018