Justification
COP 09; The Architect recommends Installing an attractive wood deck at the apprWate height In Neu of Installing the concrete slab. The proposed porch is to be decked In IPE
planks and painted. COP 014: In Change Order 11, to save cost, the solid stone masonry wail base was changed to a combination of stone and CMU. The Engineer has since
decided It was necessary to add halmntal steel mWorcing at the base of the wall to tte the two dMimNar materials together and help mltlgale any Issues that would arise. The
nerl reinforcing is Installed per the engineers directive. COP 012: In Change order s1 an amountwas credited back to the Owner for concrete demo work. The Contractor has
since had to demolish more concrete area than was antldpated and requests that the amount be put back Into the contract.
SUMMARY
Original Contract Price:
Previous Quantity Adjustment(s):
This Quantity Adjustment'.
Total Quantity Mustment(s):
Total Contract Price with Quantity Adjustnlent(s):
Previous Change Order(s):
This Change Order:
Total Change Order(s) To Date:
Adjusted Contract Price (Original Contract Price Plus
Quantity Adjustments) Plus Change Order(s)):
Difference between Original and Adjusted Contract Prices:
original Contract rime:
'erne Adjustment by previous Quan. Ad)./Change Order:
Time Adjustment by this Quan. Adj./Change Order:
New Contract Time:
Prepared Ely.,
Signature
Contr
signature
Project
Manager:
nature
mayor/city "I'My, ,a r
014-264-1-797
Aj?p
I woval
+M
120
10
70
200
$28,281.02 4%
$6,040.21 1%
$34,321.23 4%
;830,321.23
$34,321.23
3!2018
Printed Name, Tide, Company Wam
Printed Name, Tide, Company
& Gontstruction
Date
6 - 1 �t
RIi
Pap 2 of 3
4—*-- Contract Quantity Adjustment/Change Order
ow, 91/16
Project Name: 5tagemadh Inn Restoration
Quan. Adj./Change Order No.. 2
Manna nerve.• rlahs
, r
-
_--�
F ITI
-
.�
-
��
��rs■E
1 ,rl �■i■�
-
-
POSC 3 of 3
Contract Quantity Adjustment/Change Order
Lr, Dina
Project Name: Stagecoach Inn Resbnmtlon
Quan. Adj./Change Order No.: 2
andty Adiustment Data
-
�_
_-�Rmmlmmmff I ITI
Change Order Proposal
ARCHITt:M
Arehitexas
3601 South Congress Ave.
Suite D101
Austin, TX 78704
Project: Stagecoach Inn
Contractor ❑
Other ❑
Proposal Number: 009
Date of Issuance: 5/24/201_B
Date of Contract: 2/8/2018___
Owner: City of Round Rack
221 East Main Street City Project No. NIA
Round Rock, TX 78664 Contractor Proj. No. 18-1684 _
This Is nor a change order or a directive to proceed with she work described In theproposed snodulicnrions.
DESCRIPTION:
Provide wood deck at east entrance in lieu of concrete per PR #5.
Item #1— New Cedar Deck:
Labor Cost:
S 1,728.00
Material Cost:
995.00
Subtotal:
$2,723.00
Bonds & Insurance (3°!a):
$ 81.69
OH&P (15°%):
X70
Subtotal:
$ 3,225.39
Credit for Concrete:
525.00 (75 sf@ $7.00 per sl)
Total: S2,70039
Add Cost for IPE: S 855.21
Add Cost for Accoya: $2,145.13
Phoenix !Restoration and Construction, Ltd.
14032 Dlsrributlon Way, Farmer's Branch, TX 75234 0 214.902-0111 o 214.904-9635 (Fax)
Architexas
Owner
Architect
PROPOSAL REQUEST Contractor
PROJECT: Stagecoach Inn Relocation PROPOSAL REQUEST NO: 5
OWNER: City of Round rock
001 Round Rock Ave.
San Saba, TX 788131
TO: Dale Sellers
Phoenix 1 Restoratlon and
Constitutions Ltd.
14032 Distribution Way
Farmers Branch, TX 74234
DATE: 05/i8/2018
ARCHrrECT'S PROJECT NO: 1714
REQUEST FOR: Constructing new wood deck at
east entrance porch.
Please submit an itemized quotation for changes In the Contract Sum and/or Time Incidental to proposed
modifications to the Contract Documents described herein. THIS 15 NOT A CHANGE ORDER NOR A DIRECTIVE TO
PROCEED WITH THEWORK DESCRIBED HEREIN.
DESCRIPTION:
1. Provide cost/credit to Owner to provide new wood deck at east entrance patio in lieu of the concrete slab
that was Initially designed. Wood deck should be constructed per the attached details, provide alternate
costs for either Epay wood floor or Accoya wood floor In Ileu of the cedar wood Floor as shown in the
attached details.
Quote cost/credltfor Item no. i
S Materlais
ADD cost for Epay wood floor In lieu of cedar
ADD cost for Accoya wood floor In lieu of cedar
S Materials
Attachments:
SK -05 Deck Section Details (B.Sxi 1)
SK -06 Deck Wan Detail 111 xl 7)
By: Christopher Collins
Copies To: joelle Jordan; Stanley Graves
N
O
w
I
gig ;
gib
f •�
46
�. f • 1
� �v
N
ps
\�
16
00
i
1 F it•
g ••1t•
N•••f 5
K •t 15�•N1/ l/
Change Order Proposal
ARCHITECT.•
Architrm
3601 South Congress Ave.
Suite D101
Austin, TX 78704
Project: Stagecoach Tnn
Owner: City of Round Rock
221 East Main Street
Round Rock, TX 78664
Contractor ❑
Other ❑
Proposal Number: 010
Date of issuance: 5/24/2018
Date of Contract: 2/8/2018
City Project No. WA
Contractor Proj. No. 18-1684
This Is not a change order or a dlrecdre to proceed with the work described In the proposed amodifleallons.
DESCRIPTION:
Additional cost for stainless steel reinforcing at perimeter walls as requested by engineer.
Labor Cost: $ 664.00
Material Cost: $ 469.61
Subtotal: $1,333.81
Bonds & Insurance (30/6): $ 40.01
OH&P (151/6): 206.07
Total: $1,5799.89
Phoenix I Restoration and Construction, Ltd.
14032 Distribuilon Way, Farmer's Branch, TX 75234 to 214.902.0111 a 214.904-9635 (Fax)
SPARKS ENGINEERING, INC.
STRUCTURAL EVALUATION, DESIGN AND Tt STINC,
May 14, 2018
Sent via .mall to ccalllns®archltexas.cam F Pages
RE: Reconstructed Wall Detall-Stagecoach Inn Relocation
Dear Mr. Collins,
It Is my understand that the detail for the base of the walls at the new site has been amended to use CMU
and stone throughout, as opposed reconstructed stone as originally designed. At your request, I have
reviewed your detail of this condition. The primary structural requirements are as follows:
1. The CMU shall be solid units or hollow units filled with masonry grout conforming to ASTM C476. The
grout shall have a minimum compressive strength of 2000-ps1. Pre-packaged core fill grout for this
application are available and generally acceptable.
3. The Joint between the existing limestone wall and the CMU/stone wall shall Include horizontal Joint
reinforcement. Reinforce continuously with stainless steel wire mesh (3x3 -W3, lapped two grids) or
heavy, stainless steel, 3 bar ladder mesh
a�1aM
LO611SOpIjReR '�
"110MONTAL 1OI
= p��rtpqppHT
REINFORLEAIEN!
Iaboelelsat rllt t VAX
ca�s+rAeldelLsrla,raEr � rews R.ax
Nassr>tet:R�asur
W/CELLS GROUTED
tr>at11aa1W4uaLdal �. .i. 1.jl�rr .
IIf.Illlrt. — � .
• ' . tr
Please contact our office with any questions regarding these requirements. �•������
SPARKS ENGINEERING, INC. .oy*SoFT.9�t1
Texas Registered Engineering Firm F-00515 �ov;
/,..4 ......................
Zach Webb, P.E. j..............................
ZACHAFIY D. WEBB
Ir.o:. 114611
5-14-2018
933 North Flores Street - San Antonio, Texas 79212 - 210 229 0669
H
P
T
R
J"rTrMRUAU [3ENEWT400 13EXEMMM
❑euw�r ❑N,p
II roaandn ensl anehpnan,, Mr. ._ _
�nasure �-.
"TAL AMCtINT+
HETOUE 707H FpLLOWtH3Hq��
AkasAla SLg4rt 7b Clra� WIDhoNMfsb
Change Order Proposal
ARCHITECT.
Architexas
360I South Congress Ave.
Suite D101
Austin, TX 78704
Project: Stagecoach inn
Owner: City of Round Rock
221 East Main Street
Round Rock, TX 78664
Contractor ❑
Other [j
Proposal Number: 012
Date of Issuance: 5/24/2 0]
Date of Contract: 2/8/2018
City Project No. N/
Contractor Proj. No, 18-1684
Thir Is not a change order or a dlrecrlpe to proceed with rhe work described in the proposed mod(Jleatiaim
DESCRIPTION:
CO Proposal #03 provided a credit for deleting a portion of the concrete slab demolition shown in the drawings.
The actual amount of concrete demolition now done exceeds the amount shown in the original drawings. The
charges below are equal to the amount credited in CO Proposal #03.
Concrete Demolition PrIce: $ Z0.8
Subtotal: $763.90
Bonds & Insurance (3%9): $ 22,91
OR&P (I5%): S 118.01
Total Amount: $ 9Q4.72
Phoenix / Restoration and Construction, Ltd.
14032 Distribution way, Farmer's Branch, TX 75234 a 294-902.0119 a 214.904.9635 (Fax)
City of Round Rock
I0T
ROUND Nta aROCK Agenda Item Summary
Agenda Number:
Title: Consider executing Quantity Adjustment/Change Order No. 2 with Phoenix I
Restoration and Construction, Ltd. for the Stagecoach Inn Relocation Project.
Type: City Manager Item
Governing Body: City Manager Approval
Agenda Date: 6/22/2018
Dept Director: Brad Wiseman
Cost: $6,040.21
indexes: Hotel Occupancy Tax Fund
Attachments: LAF - Quantity Adjustment -Change Order #2 w- Phoenix 1 Restoration and
Construction (00403339xA08F8).pdf, Change Order #2 -Stagecoach Inn
Relocation REVISED 6-13-18 - Signed.pdf
Department: Planning and Development Services Department
Text of Legislative File CM -2018-1758
Consider executing Quantity Adjustment/Change Order No. 2 with Phoenix I Restoration
and Construction, Ltd. for the Stagecoach inn Relocation Project.
This additional cost associated with this change order are for three items: a wood deck
under the east porch, steel reinforcing at the perimeter walls, and additional concrete
demolition.
The wood deck was originally proposed to be a concrete slab to have a straight flat
approach when the building was relocated. The GC did not believe this was necessary for
the building move, so a credit was issued for the concrete, and the added cost is the
difference in cost to add a deck for access to the entry door.
Concerning the steel reinforcing, the base walls were originally designed to be solid stone.
Phoenix 1 requested the change to CMU because setting the existing stone walls down
onto a stone base would have been much more complicated and unstable by his
experience. The structural engineer was on site for an inspection at the time that the base
walls were being constructed and immediately provided a directive to the contractor to
provide horizontal reinforcing. As a solid stone base, the stone would be bonding to itself
City of Round Rock Page 1 Printed on 8!21/2018
Agenda Item Summary Continued CM -2018.1758
and the mortar mechanically through the natural pattern in the stone. Since the CMU is flat,
the steel reinforcing is imbedded in the mortar and used to create a better mechanical
connection to the stone.
The concrete demolition added cost was incurred for demolition of more concrete than
was shown in the architectural drawings for the slab at the original site.
The contract will also be extended by 70 days to complete the stone work at the site. The
project was delayed slightly by the building mover back in April, thus ultimately delaying the
overall project timeline.
Cost: $6,040.21
Source of Funds: Hotel Occupancy Tax Fund
City otRound Rock Page 2 Printed on 4/21/2018