Loading...
CM-2018-1769 - 6/29/2018City of Round Rock ROUND ROCK TD; Agenda Item Summary Agenda Number: Title: Consider executing a termination letter for the Contract for Engineering Services with Engineering 360, Inc. for the CMRC Multipurpose Building Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 6/29/2018 Dept Director: Rick Atkins, Director Cost: $0.00 Indexes: 2014 General Obligation Bonds Attachments: LAF - Termination for Engineering 360 Contract (00403893xA08F8), Termination Letter - Engineering 360, Inc. (CMRC Multipurpose Room) (00403599xA08F8) Department: Parks and Recreation Department Text of Legislative File CM -2018-9769 Consider executing a termination letter for the Contract for Engineering Services with Engineering 360, Inc. for the CMRC Multipurpose Building Project. This project included constructing a covered building over the tennis courts at Clay Madsen Recreation Center. However, the project cost estimates came in too high to construct, and PARD decided not to take the project to bid. Therefore, bidding assistance and construction administration for fabrication of the building will not be required and the termination of the contract is required. PARD has reevaluated the project scope and has decided to move forward with a fabric shade structure covering the courts instead. The fabric structure will provide much needed shaded space for programming of summer camps, exercise classes, and other programming. The project will still include site work related to drainage around the new structure and bus parking behind the new building. Additionally, this project will also bring all ADA deficiencies located at the main entrance to CMRC into compliance. A separate Agreement with the site work engineer (a subconsultant on this contract) will be drafted to include construction administration of those portions of the project. City o/ Round Rock Page 1 Pdnfed an &77018 EK TEXAS MTMENT June 29, 2018 Larry J. Fisher, President Engineering 360, Inc. 2300 Greenhill Drive, Suite 500 Round Rock, TX 78664 Mayor Craig Morgan Mayor Pro -Tem Writ Baese Councilmembers Tammy Young Rene Flores Matthew Baker Will Peckham Hilda Montgomery City Manager Laurie Hadley City Attorney Stephan L. Sheets Re: Termination Notification of a Contract for Engineering Services with Engineering 360, Inc. for the CMRC Multipurpose Building Project Dear Mr. Fisher: This correspondence shall serve as notice that the City of Round Rock, Texas (the "City") hereby terminates the City's Contract for Engineering Services with Engineering 360, Inc. for the CMRC Multipurpose Building Project (the "Contract") executed on April 10, 2015. Pursuant to Article 20 of the Contract, the Contract may be terminated: "(4) By City, for reasons of its own and not subject to the In oual consent of Engineer, upon not less than thirty (30) days' written notice to the Engineer. " The City has determined that it is not in the best interest of the City to continue this Contract to the end of its term and has chosen to re-evaluate the direction of the Project. Services performed to date have been completed to the City's satisfaction. Upon receipt of this notice, all services in connection with performance of this Contract shall be discontinued, if any services are currently being provided. No fees other than fees due and payable at the time of termination shall be paid by the City and the City shall be the sole judge of any fees due and payable. The City appreciates the services provided by Engineering 360, Inc. Should you have any questions, please do not hesitate to contact me. Sincerely, Au,uc>4da�, Laurie Hadley City Manager i,M-2019-171. CITY OF ROUND DOCK 221 Fast Main Street, Round Rock, Texas 78664 [131512.218.5401 • [F] 512.218.7097 - roundrocktexas.gov