R-2018-5609 - 7/12/2018 RESOLUTION NO. R-2018-5609 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation — Manhole Rehabilitation, Open Cut, and Point Repairs Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1,Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation — Manhole Rehabilitation, Open Cut, and Point Repairs Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12th day of July, 2018. CRAIG RGA -vlayor City of Round Ro , Texas ATTEST: 2M (,-1AN44P SARA L. WHITE, City Clerk 0112.1804;00404317 EXHIBIT Page 1of3 «A„ Contract Quantity Adjustment/Change Order ROUND ROCKd t rev,01/16 Department: Utilities and Environmental Services Project 2016Wastewater Collection System Rehabilitation-Manhole Rehabilitation,Open Name: Cut, and Point Repairs Date: 6/7/18 City Project Change Order/Quantity ID Number RHB16 Adjustment No. 1 Vendor T Gray Utility&Rehab Co., LLC P.O. Box 2176-Cypress,Texas 77410 281-455-0899 Company Name Address Phone No. Justification Quantity Adjustment/Change Order#1 is needed for Change Order items required not in Bid list. SUMMARY Original Contract Price: Amount %Change- ... $1,362,800.00 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 Total Contract Price with Quantity Adjustment(s): $1,362,800.00 Previous Change Order(s): 11 $0.00 0% This Change Order: Total Change Order(s)To Date: $57,950.00 4% Adjusted Contract Price [Original Contract Price Plus $57`950'00 4% Quantity Adjustment(s)Plus Change Order(s)): $1,420,750.00 Difference between Original and Adjusted Contract Prices: Original Contract Time: $57,950.00 Time Adjustment by previous Quan.Adj./Change Order: 180 0 Time Adjustment by this Quan.Adj./Change Order: 30 New Contract Time: 210 Submitted for Approvall Prepared By: ----�_ Eddie Zapata,Senior Project Manager 6/7/2018 Signatui e Printed Name,Title,Company Date Approvals Contractor: .. Gerald Hoffpauir, Project Manager '� Signature VPrinted Name,Title,Company City Project � � Date Manager: a Eddie Zapata Senior [' Prosect Manager Signa re Printed Name,Title 6/7/2018 Mayor/City Date Manager Craig Morgan, Mayor Signature Printed Name,Title Date Page 2 of-3 Contract Quantity Adjustment/Change Order �" ,�`rcn,rau cr•x , i rev,01/16 2016Wastewater Collection System Rehabilitation- Manhole Rehabilitation,Open Project Name: Cut,and Point Repairs Quan.Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment # Item Description Unit Qty. Unit Price Amount Adjusus(Das Construction Entrance;Site Clearing; CO-1 Erosion Control; Restoratoin LS 1 $7,500.00 $7,500.00 30 Reset and Reseal Manhole including CO-2 adjustment,seal, &grout EA 3 $1,500.00 $4,500.00 Remove&Replace MH Cone Section and CO-3 replace with 32"section EA 2 $61500.00 $13,000.00 MH Rehabilitation with Reliner cement& CO-4 Raven 405 EA 5 $61000.00 $30,000.00 CO-5 ITesting,Inspection,&Safety LS 1 $2,950.00 $2,950.D0 $0.00 $0.00 $4.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $4.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS. ____ Page 3 of 3 owl* Contract Quantity Adjustment/Change Order $k rev.01/Ic 2016Wastewater Collection System Rehabilitation - Manhole Rehabilitation,Open Project Name: Cut, and Point Repairs Quan,Adj./Change Order No.: 1 Quantity/adjustment Data i Contract Time Bid Item # Item Description UnitAdjustmentQty. Unit Price amount $0.00 $a.0o $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.oa $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o.a0 �`OTALS: o.®®