CM-2018-1788 - 8/10/2018ieou�aNacK,, mv,111/16 Department: Project Name: Gattis School Road Widening Date: 6/27/18 Change Order/Quantity Adjustment No. 3 FINAL Smith Contracting Co. 15308 Ginger st, Austin, Tx 78728 512-990-7640 Company Name Address Phone No. Contract Quantity Adjustment/Change Order Transportation City Project ID Number Vendor Justification Page 1 of 3 Final Quantity close out adjustments, etc. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Pius Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quart. Adj./Change Order: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for A roval Amount % Change $1,733,500.45 $45,534.65 -$10,659.57 $34,875.08 $1,768,375.53 $23,972.25 1% $17,726.65 1% $41,698.90 2% $1,810,074.43 $76,573.98 251 6 0 257 Prepared 8y: Sill Stablein, Project manager, City of Round Rock Sly nature Printed Name, Title, Company Date A* provats Contractor: Hardin Camp II, VP, Smith Contracting Co. Inc. 7/30/18 Signature Printed Name, Title, Company Date City Project Manager, _ 1 el �.. 1"ALA7 —31 -161 S€g re Printed Name, Title Date Mayor/City Manager Signature Printed Name, Title Date Cti -2c r& -f -W Page 2 of 3 Contract Quantity Adjustment/Change Order �wasoac - Project Name: Gattis School Road Widening Quan. Adj.{Change Order No.: 3 FINAL Chanue Order Data Item # Item Description Unit Qty. Unit Price Amount Contract Time us Adjustment Adjus(Das CO 3-1 REF PAV MRK TY -II W B" SLD LF 726 $0.81 $588.06 CO 3-2 REF PAV MRK TY -II W 12" SLD LF 718 $6.33 $4,544.94 CO 3-3 REF PAV MRK TY -II W 24 SLD LF 155 $10.93 $1,694.15 CO 3-4 REF PAV MRK TY -II W ARROW EA 11 $86.25 $948.75 CO 3-5 REF PAV MRK TY -II W DSL ARROW EA 1 2 $97.75 $195.50 CO 3-6 REF PAV MRK TY -II W WORD EA 5 $126.50 $632.50 CO 3-7 REF PAV MRK W/RET REQ TY -II -W 4" LF 1030 $0.63 $648.90 CO 3-B REF PAV MRK W/RET REQ TY -II Y 4" BRK LF 140 $0.63 $88.20 CO 3-9 REF PAV MRK W RET REQ TY -II Y 4" SLD LF 3055 $0.63 $1,924.65 CO 3-10 TRP MOBILIZATION ON COP #8 LS 1 $3,335.00 $3,335.00 CO 3-11 COP #11 ADDED PER WALK THRU LS 1 $2,376.00 $2,376.00 CO 3-12 FIRE HYDRANT ADJUSTMENT LS 1 $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 3 of 3 Contract Quantity Adjustment/Change Order Project Name; Gattis School Road Widening Quan. Adj./Change Order No.: 3 FINAL Quantity Adiustment Data Bid Item # Item Description Unit Qty. Unit Price Contract Time Amount Adjustment 11 BLOCK SODDING SY 86 $4.50 $387.00 13 D -GR TY -13 PG 64-22 TON 47.84 $90.00 $4,305.60 14 D -GR TY -C SAC -B PG 70-22 TON 52.14 $82.00 $4,275.48 17 PLANT: ASPH CONC PAV 2"-14" SY 2805 $3.20 $8,976.00 22 RCP PIPE 30 IN LF -12 $200.00 -$2,400.00 26 ADJUSTING MANHOLES FA -5 $2,000.00 -$10,000.00 28 REMOVE STR PIPE LF -52 $12.00 -$624.00 33 TEMP SED FENCE INLET PROTECTION LF -80 $9.00 -$720.00 50 WK ZN PAV MRK NON REM W 4" BRK LF 390 $1.40 $546.00 51 WK ZN PAV MRK NON REM W 4" SLD LF -12B $1.20 -$153.60 52 WK ZN PAV MRK NON REM W 8' SLD LF 215 $2.75 $591.25 54 WK ZN PAV MRK NON REM Y 4 SLD LF 3229 $1.10 $3,551.90 55 WK ZN PAV MRK NON REM W 8 SLD LF -72 $8.00 -$576.00 57 WK ZN PAV MRK REMOV REFL TY I -C EA -24 $11.00 -$264.00 58 WK ZN PAV MRK REMOV REFL TY II -A -A EA -20 $11.00 -$220.00 59 WK ZN PAV MRK REMOV TRAF BTN TY W EA -30 $9.50 -$285.00 60 WK ZN PAV MRK REMOV TRAF BTN TY Y EA -60 $9.50 -$570.00 61 WK ZN PAV MRK REMOV W 4" SLD LF -56 $1.30 -$72.80 62 WK ZN PAV MRK REMOV Y 4 SLD LF -230 $1.40 -$322.00 63 WK ZN PAV MRK SHT TERM TAB TY W LF -367 $3.25 -$1,192.75 64 WK ZN PAV MRK SHT TERM TAB TY Y-2 LF -231 $3.25 -$750.75 65 WK ZN PAV MRK TY I W 8" SLD 100 MIL LF 54 $1.75 $94.50 66 WK ZN PAV MRK TY I W 12" SLD 100 MIL LF 102 $5.00 $510.00 67 WK ZN PAV MRK TY I W 24" SLD 100 MIL LF 4 $10.00 $40.00 68 WK ZN PAV MRK TY I ARROW 100 MIL LF 1 $125.00 $125.00 70 REFL PAV MRK TY WWORD 100MILL LF 2 $150.00 $300.00 71 REFL PAV MRKTY1 Y12"SLD 100MILL LF -12 $5.00 -$60.00 72 RE PM/RET REQ TY 1 W4"BRK100MILL LF -29 $0.90 -$26.10 73 RE PM WIRETREQ TY I Y4"BRK 1 00M] Li LF -72 $0.90 -$64.80 74 RE PM WIRETREQ TY I Y4"SLD 1 OOM I LL LF -464 $0.75 -$348.00 75 REEL PAV MRKR TY I -C LF 1 40 $8.00 $320.00 76 REEL PAV MRKR TYII-A-A LF -22 $6.50 -$143.00 77 ELIM EXT PAV MRK & MRKS 4" LF -1671 $1.50 -$2,506.50 78 ELIM EXT PAV MRK & MRKS 8" LF -1 $3.00 -$3.00 79 ELIM EXT PAV MRK & MRKS 12" LF -7 $5.00 -$35.00 Bl ELIM PAV MRK & MRKS ARROW EA -1 $270.00 -$270.00 90 AJDUST EXIST WATER VALVE EA 5 $300.00 $1,500.00 95 CONDT PVC 2" BORE W/GROUT LF -55 $85.00 -$4,675.00 97 COND PVC 3" BORE W/GROUT -110 $90.00 -$9,900.00 $0.00 $0.00 City of Round Rock { ROUNDROCKK 1EXAAgenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 3 with Smith Contracting Co. Inc. for the Gattis School Road Widening Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 8/10/2018 Dept Director: Gary D. Hudder, Transportation Director Cost: $7,067.08 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: CO #3 Revised 7-31-18 Department: Transportation Department Text of Legislative File CM -2018-1788 Consider executing Quantity Adjustment/Change Order No. 3 with Smith Contracting Co. Inc. for the Gattis School Road Widening Project. This change order/quantity adjustment #3 contains items for the final close out of the contract. The change order items in this include overages in the striping, road markings, additional work on the new median noses and additional striping. The total for the change order items is $17,726.65. The quantity adjustment is for items either not used or the quantities were incorrect in the original contract. The total for the quantity adjustment is a negative $10,659.57. The total for both the change order and the quantity adjustment is $ 7,067.08 This will zero out the bid items in the contract. Cost. $7,067.08 Source of Funds: RR Transportation and Economic Development Corporation City of Round Rock Page f Printed on aMI2018