Loading...
CM-2018-1828 - 8/27/2018G ROUND ROLI{ ' e 11k' rev. 01:16 Department: Project Name: City Project ID Number Vendor Justification I'Llge I of I Contract Quantity Adjustment/Change Order Utilities and Environmental Services 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pip2 Burst Date: 8/14/18 Change Order/Quantity RHB16 Adjustment No. 2 T Gray Utility & Rehab Co., LLC P. 0. Box 2176 - Cypress, Texas 77410 281-455-0899 Company Name Address Phone No. Quantity Adjustment / Change Order #2 is needed for CIPP Liner repair in Settlement Drive not in Bid list. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s). Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)): Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan Adj./Change Order: Time Adjustment by this Quan. Adj./Change order: New Contract Time: Prepared By: Submitted for Approval Eddie Zapata, Senior Pra:.ect Ma Printed Name, Title, Company Approvals Amount % Change $536,350.00 $3,164.00 $0.00 $3,164.00 $534,514.00 $3,200.00 1% $29,000.00 5% $32,200.00 6% $571,714.00 $35,364.00 180 0 0 180 er Contractor: Gerald Haff auir, Pra ect Manager rePrinted Name, Title, Company —/go t City Project Q Manager: Eddie Za ata, Senior Project Manager �j g ignature Printed Name, Title ate Mayor/City ~ W� (4en►-[, A� Manager ACi manager y2 / Sign ure Printed Name, Title Date G11,1 -201S --I Ste I'aVe 2 oI 3 Contract quantity Adjustment/ Change Order x�wHuaoue 1, rtA, ,eV, 01 l6 Project Name: 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Quan. Adj./Change Order No.: Change Order Data Item # Item Description p Unit Qty. unit Price Amount Contract Time Adjustment (Days) CO2 -1 24" CIPP Liner LF 115 $180.00 $20,700.00 CO2 -2 Traffic Control LS 1 $2,300.00 $2,300.00 CO2 -3 Bypass Pumping LS 1 $6,000.00 $6,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Vage 3 of 3 Contract Quantity Adjustment/ Change Order NtltlNtl NtlCK i Y x4°. tev, 01 16 Project Name: 2016Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Quan. Adj./Change Order No.: Quantity Adjustment Data Bid Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment rnavci $DAO $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS 0.06 0 Date' 81412018 City of Round Rock 0'r JRLNO ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 8/24/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $29,000.00 Indexes: Self -Financed Wastewater Construction Attachments: QA -CO No. 2.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1828 Consider executing Quantity Adjustment/Change Order No. 2 with T. Gray Utility & Rehab Co., LLC for the 2016 Wastewater Collection System Rehabilitation - CIPP Liner and Pipe Burst Project. The City is required to continue our Wastewater Collection System Rehabilitation program in order to comply with the Texas Commission on Environmental Quality's (TCEQ) Edwards Aquifer Recharge Zone Protection Program which requires that wastewater collection systems located over the Edwards Aquifer be inspected and rehabilitated every five years. The elimination of defects will not only help to protect the Edwards Aquifer, but will also reduce inflow and infiltration entering the City's wastewater collection system, thereby reducing the City's treatment cost. The City has completed the inspection of 12 sub -basins to determine areas that require rehabilitation for this project. The work being performed under this contract includes sub -basins BC -01, BC20-Z, CC32-Z, CC34-Z, CC35-Z, CC37-Z, LC09-Z, LC15-Z, LC16-Z, LC17-Z, LC18-Z & LC19-Z. The project includes 2,450 linear feet of new 8 -inch through 10 -inch pipe installed by pipe bursting, 2,650 linear feet of 8 -inch through 42 -inch CIPP liner, and construction of six manholes. City of Round Rock Page f Printed on 8/ M018 Agenda hem SummarY Continued CM-2018-1828 T. Gray Utility Company was awarded this contract in the amount of $536,350. Quantity Adjustment/Change Order No. 1 (QA/CO No. 1) was approved on May 25, 2018, This QA/CO in the amount of $6,364 brought the total construction contract to $542,714. Quantity Adjustment/Change Order No. 2 (QA/CO No. 2) is needed for change order due to unforeseen items during construction related to the repair of a 24 -inch line. QA/CO No. 2 is for $29,000 which brings the total construction contract to $571,714. cost: $29,000 Source of Funds: Self -Financed Wastewater Construction City of Round Rack Page 2 Printed on 8123/2018