CM-2018-1854 - 9/7/2018City of Round Rock
!p � 221 East Main Street
Round Rock, Texas
� 78664
!
ROUND ROCK Signature Copy
City Manager Item: CM -2018-1854
File Number: CM -2018-1854
Consider executing a Purchase Order to Technology for Education for fiber installation
from the City of Round Rock Wastewater Treatment Plant to Fire Station No. 8.
The City of Round Rock would like to obtain the services from Technology for Education (TFE) to
expand the existing citwide fiber network. This project will include cable to provide and install a 24
strand fiber optic cable, single -mode, OSP Rated, between the City of Round Rock Sewer Plant on
Hwy. 79 and Fire Station 8 on Red Bud Lane. Pricing includes all required aerial attachment
hardware, down guys, anchors and messenger wire. Provide and Install 2 Fiber Optic Enclosures
with adapter panels. Terminate, test and label as required. All permits and permissions to be
secured by the City of Round Rock prior to installation start date.
This project is related to item CM -2018-1855. Both fiber expansion projects will provide redundant,
high-speed fiber connectivity to the Wastewater Treatment plant as well as several other City
facilities including Fire Station B, RNR, Multipurpose Complex, Golden Gloves, and the Rabb House.
This will be a DIR contract purchase and was approved on the FY19 Authorized Purchase List,
Addendum #2, Line Item A143
Cost: $85,440.21
Source of Funds: Utility Fund
City Manager [,(
Date �`
City of Round Rock Page 1 Printed on 9/7/18
2 Sierra Way, Suite 105 1 Georgetown, Texas 78626 1 (P) 888.902,5563 1 www.tfeconnect.com
Date: August 30, 2018
To: City of Round Rock
Attn: Henry Belk
Re: CORR Sewer Plant to Fire Station 8
Fiber Cable Installation
TFE: DIR — TSO — 3721
Zone 1, District 14
Standard Cabling Support
This letter is to provide you with overall pricing and Scope of Work for the New Fiber Installation from CORR Sewer
Plant to Fire Station 118 for the City of Round Rock. If you have any questions or concerns please contact me at
your convenience.
CORR Sewer Plant to FS 8 Fiber Installation................................................................................... $85,440.21
Scope of Work
• Provide and Install a 24 strand fiber optic cable, single -mode, OSP Rated, between the City of Round Rock
Sewer Plant on Hwy. 79 and Fire Station 8 on Red Bud Lane. Pricing includes all required aerial attachment
hardware, down guys, anchors and messenger wire. Provide and Install 2 Fiber Optic Enclosures with
adapter panels. Terminate, test and label as required. All permits and permissions to be secured by the City
of Round Rock prior to installation start date.
For questions or concerns please contact me at your convenience.
Sincerely,
Henry Castillo
TFE I South Region Operations Manager
512-819-6913 Direct
henry.castillo@tfeconnect.com
zl
� � c
0 0 0
w
0 0 0
= O C u®7
r r r
11
qk
E r N P7
�a as
J
U
C
a.
C
U
a°
/w
m
�
O
o
c
W
—
C)
3
a
M
z
m
C
a
Co
Wo)
o
C f ami
U ro
04
d
E
a
�•
.fl
a `
Q
N 0
O
��
mao
a
= p
a
to
m
6g,
C
IL
u
Y
V
ch .c
�-
o
°'
fo
Z E
T �
'3
{a
p1
Q
Ix
cz
Q
LL
O
0
J
J
�
a
H
0
..1
� � c
0 0 0
w
0 0 0
= O C u®7
r r r
11
qk
E r N P7
�a as