Loading...
CM-2018-1816 - 9/18/2018STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES FIRM: COBB FENDLEY & ASSOCIATES, INC. ("Engineer") ADDRESS: 505 East Huntland Drive, Suite 100, Austin, TX 7872 _ PROJECT: DB Woods 1 SH 29 30" Water Line Relocation This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Cobb Fendley & Associates, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract", on the 14th day of June, 2018 for the DB Woods / SH 29 30" Water Line Relocation Project in the amount of $111,868.00; and WHEREAS, it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $24,945.00 to a total of $136,813.00; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: Article 2. Eneineerina Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Article 4. Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $24,945.00 the maximum amount payable under the Contract for a total of $136,813.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follotit-] N4 2-414((e Supplemental Contract 0199 1818,00409049 Rev.06 16 84275 COBB FENDLEY & ASSOCIATES, INC. By: Dan Warth Vice -President September 11, 2018 Date Supplemental Contract Rcv.06.16 01991818 00409049 84275 CITY OF ROU D ROC1K By: Laurie Hadley, City Manager Date Supplemental Contract 0199 1818,00406735 APPR ED AS TO F RM: StOfin L. Sheets, City Attorney Rc%.06 16 84275 ADDENDUM TO EXHIBIT B Engineering Services Proposed Scope of Services City of Round Rock -- DB Woods at SH 29 Water Line Relocations This proposal is supplemental to the original scope of services authorized on June 14, 2018 for additional work due to the stand alone bid attached to this document as Exhibit C. This proposal assumes a 15 ft public utility easement (PUE) will be granted on the site to the southern extension of the project and a 25 ft easement on the church site. This proposal does not include alternatives analysis. CobbFendley will provide design, bid, and construction phase services for the installation of approximately 2,400 linear feet of 30" raw water line, 150 linear feet of 42" steel encasements, 150 linear feet jacking and boring a crossing under SH 29, and required appurtenances associated with the construction of SH 29 Roadway Improvements in Williamson County. At a Williamson County Utility Coordination meeting on 06107117, this project was discussed and it was determined that the existing raw water line was in conflict with the roadway and storm drainage, therefore was requested to be relocated. This proposal assumes that the waterline plans will be included in the PS&E for the drainage and roadway plans, and constructed by the roadway Contractor. Erosion and sedimentation controls and traffic control design are also to be included. Below is a detailed scope of services. I. Design Phase During the Design Phase, CobbFendley will prepare plans and compile specifications for the construction of the utility adjustments. Below is a detailed scope of services. The design phase assumes 60%, 90%, and 100% submittals to the City of Round Rock. A. Additional Plans. CobbFendley will prepare design plans for submittal to City of Round Rock at 60%, 90%, and 100% completion. We anticipate the following sheets to be included in our design set. Al. General Notes. Assemble a set of general notes using City of Round Rock and TCEQ standards. (1 Sheet) A2, Relocation Plans. Prepare plan sheets at a scale of 1" = 20' on 11"x17" plan sheets, with a true half size. Assumes 1 sheet for the water relocation plans. A3. Plan and Profile. Prepare plan and profile for the proposed water line as identified in the attached layout sheets. Assumes 6 sheets. A4. Detail Sheets. Prepare detail sheets showing standard construction details and special, project - specific details. Assumes 4 sheets. A5. Prepare Temporary and Permanent Erosion and Sedimentation Controls Sheets. Assumes 4 sheets plus details. A6. Prepare Traffic Control Plan Sheets. Assumes 2 sheets plus details. A7. Design calculations. Perform design calculations as necessary. B. Specifications. CobbFendley will assemble a full set of standard and technical specifications as well as the front end/contract documents to be included in the roadway contract documents. A table of contents listing the front end/contract documents, standard specifications, and technical specifications will be provided at 60%. A full set of utility specifications required will be provided with the 90% and 100% submittals for the water relocations and adjustments, erosion and sedimentation controls, and traffic control design for the project. City of Round Rock standard technical specifications will be used for this project. This proposal assumes that front end/contract documents will be provided by the City of Round Rock. C. Quantity Take -Off. CobbFendley will perform a quantity take off and prepare a bid form. A quantity take- off will be performed at 60%, 90% and 100% submittals. Bid items to be included in the bid form will be prepared by the roadway consultant. D. Cost Estimate. CobbFendley will prepare an opinion of probable construction cost for the 60% (+/-15%), 90% (+1-10%) and 100% (+/- 5%) submittals. E. QA/QC. CobbFendley will perform internal quality control reviews on the plans and specifications prior to each submittal to City of Round Rock. Cobb, Fendley & Associates, Inc. Page I of 3 July 27, 2018 Exhibit B City of Round Rock— DB Woods at SH 29 - Utility Relocations Scope of Services F. Prepare 3 submittal packages. CobbFendley will assemble plans and specifications and submit to City of Round Rock for review. This proposal assumes there will be 60%, 90%, and 100% Final Bid Set submittal We will provide six (6) sets of 11'x17" size plans and specifications for each submittal. G. Respond to comments. CobbFendley will review comments provided by City of Round Rock and review agencies and prepare a written response to the comments for inclusion with the subsequent submittal. H. Coordination/Review meetings This proposal assumes there will be four (4) coordination meetings with the Owner during the design phase. I. Approvals. Coordinate with City of Round Rock Engineering Department to obtain required approvals for construction. This proposal assumes that permits will be obtained by others. This proposal assumes that Williamson County will provide environmental clearance for this relocation as well as geotechnical information Design Engineering Phase services will be performed for a fee of $21,615 00 plus approximately $0.00 in expenses. 11. Bid Phase A_ This scope of services does not include any additional bid phase services. The bid phase services are included in the original executed document on June 14, 2018. If any additional bid phase services are encountered that are not listed in the approved original executed document then this will be considered additional services. Bid Phase services will be performed for a fee of $3,705.00 plus approximately $0.00 in expenses. Ill. Construction Phase CobbFendley will provide limited construction administration and observation assistance to the project and the City of Round Rock_ This proposal does not include inspection services. This proposal assumes construction duration of two (2) months. All scopes of services in this proposal are related to water utility relocations only. Below is a detailed scope of services for construction phase: A. Attend preconstruction meeting. B. Attend two (2) meetings when utility adjustments are in process, C. Attend periodic site visits. Assume monthly site visits (not coincident with progress meetings) for a total of two (2). D. Review project submittalslshop drawings. CobbFendley will review each submittal up to two (2) times. If the Contractor requires a third submittal, it will be reviewed as an additional service and at the Contractor's expense, as will be written in the contract documents. This proposal assumes ten (10) submittals. E. Respond to Requests for Information (RFI). CobbFendley will coordinate with City of Round Rock and Contractor on RFIs and respond with clarifications as needed. This proposal assumes eight (8) RFI. F. Change Orders. CobbFendley will assist City of Round Rock in negotiation and preparation of change order documents, should they be necessary. This proposal assumes one (1) change order. G. Final Walk Through and Punch List. CobbFendley will attend the final walk through and coordinate with City of Round Rock inspector on the punch list items. H. Project Close Out. CobbFendley will assist City of Round Rock on closing out the contract, reviewing final pay application and affidavits, and preparing a Concurrence Letter. 1, Record Drawings. CobbFendley will prepare a set of record drawings based on Contractor's redlines in the field. J. Pay Applications. CobbFendley will review pay applications and the City Inspector will verify quantities. CobbFendley will approve pay applications based on quantities reported by the Inspector. Assumes three (3) pay applications for the project. Cobb, Fendley & Associates, Inc. Page 2 of 3 July 27, 2018 Exhibit B City of Round Rock— DB Woods at 5H 29 - Utility Relocations Scope of Services The following items are not included in construction phase services: A. NIA Construction Phase services will be performed for a fee of $3,330.00, plus approximately $0.00 in expenses. City of Round Rock DB Woods at SH 29 Water Relocations Task Labor Expense Total Fee Design $21,615.00 $0.00 $21,615.00 Bid $0.00 $0.00 $0.00 Construction $3,330.00 $0.00 $3,330.00 Total $24,945.00 $0.00 $24,945.00 Also per the request of the Owner, CobbFendley is providing a fee estimate for easement preparation to include.- Survey nclude:Survey Controls. Record Right -of -Way research, easement survey, and ownership research associated with the Raw Water Line area only. See the Survey proposal attached to this document at the end for project location, assumptions. and exclusions. Here is a basis of compensation associated with Survey Easement Services: Basic Survey Services: $5.800..00 CFA Provided Ownership Research: $600.00 Cobb, Fendley & Associates, Inc. Page 3 of 3 July 27, 2018 Exhibit B ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page E z I�Is 10 I 9 v n i oa CL L a U% ko ti m 4 0 - 00 G O m m m c w N m co N cc00 M ~ ~ w N m -g d p3 N w C A O V c E u ca E a O a O a V LL � ct IL � ILL IL ti IL LL WU N N H ^N �m rel q IR O O O O O O O O O a a M rte. vi 9 v n i oa CL L G O 3 c 3 m v m m -g d p3 N w C A O V c E u ca E a O a O a V N y 1; (n Ch I LL WU �O ��N ^N �m nl IR 46 IIti T YC 9 v n i oa CL ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page )) §# �) Jk 7 \ § � §§ 6§§§90 § m#m ■sa m m __ 2 C,.Cl §§ �§ 1 $ 2§ a ci - 222°° ����)»" �) o$ __ ";■- _ ; ■ ; �§ 0§ 4|o _£ ��� o§ R R0•gosv0•0e � - k §� ! � § I k. § 0§ Kia ;k )l��})( - $! A •o;lS 7\� J )ƒ&!IJl2 om 2�] LL: $�) � acs 7 0 § ��® I - t� oe \) c °§ m Ln k■tea -2 �!§ w a ; a-• §K � � #§ & m f= I ■§ cn`�a a22;m . § . ) 2; ##!#Itai A2� �Caoa�o l mdaujUae= 2 a £acn \ § � §§ 6§§§90 §§ ■sa __ 000000 C,.Cl 101 1 0§ om a �) o$ 07 �§ 0§ o§ o§ ! � § k. § ;k )l��})( •o;lS 7\� J )ƒ&!IJl2 k§� LL: $�) \ § � ? ft 0»849p00c Jk§asa cl �7 o§ �§ �§ �§ 8 m « � e§ �# a k- |§)�7|■|.k ;a ) � = 1777 ,3■ ) II�(j•ir °fƒ �«■��8���� | d ai d 6ujU. :e is o !tea ? ft City of Round Rock ROUND ROCK TEYAS Agenda Item Summary Agenda Number: Title: Consider Supplemental Contract No. 1 with Cobb Fendley & Associates, Inc for the D13 Woods 1 SH 29 30" Water Line Relocation Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/14/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $24,945.00 Indexes: Self -Financed Water Construction Attachments: LAF - SC#1 w- Cobb Fendley Associates - DB Woods - SH 29 30' Water Line Relocation (00409039xA08F8).pdf, SC#1 w -Cobb Fendley Associates - DB Woods - SH 29 30' Water Line Relocation (00409055xA08F8).pdf, 30-inRWL Reloc—CC Map.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1816 Consider Supplemental Contract No. 1 with Cobb Fendley & Associates, Inc for the DB Woods / SH 29 30" Water Line Relocation Project. This item is for the additional engineering work associated with designing, bidding and construction the raw water line project independently of the SH 29 TxDOT project. The City of Round Rock has two waterlines that convey raw water from Lake Georgetown to the City's water treatment plant. One of the raw waterlines was installed in 1995 in the SH 29 ROW. Williamson County in conjunction with TxDOT is widening SH 29 near DB Wood Road and the present location of our 30 -in raw waterline would be located beneath the curb and gutter in conflict with the new storm sewer assignment. The City is in process of coordinating with the City of Georgetown (COG) to relocate our line within an existing COG utility easement outside the proposed ROW. In June, the City contracted Cobb Fendley to perform the engineering design and limited construction phase services for relocation of our raw waterline for $111,868. Afterwards, a tract of land adjacent to out existing waterline was sold and is now under development planning with COG. In order to place our raw water line within an easement, our raw water line would have to be constructed prior to the SH 29 TxDOT project. Additional work by City of Round Rock Page i Printed on 91112018 Agenda Item Summary Continued Gid -2018-1816 Cobb Fendley will be necessary to complete this task and they have provided the required change of scope and fee. The Utility Staff Requests the City Manager to approve Supplemental Contract No. 1 with Cobb Fendley & Associates to perform the tasks in the additional scope for relocation of our raw waterline for $24,945. This amends the original contract amount of $111,868 to $136,813. Cost: $24,945 Source of Funds: Self -Financed Water Construction City of Round Rock Page 2 Printed on 9/13/2018