CM-2018-1864 - 9/18/2018Page 1 of z _ Contract Quantity Adjustment/Change Order rev, 01;16 Department: 23000 Project Name: Clay Madsen Soccer Field Project Date: 9 5 18 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Chasco Constructors P.O. Box 1057, Round Rock, TX 78680 _ 512-244-0600 Company Name Address Phone No. 3estiiication Adjustments made In the field necessitated the installation of a tree well, additional electrical work, and Fre lane striping. Changes to sad type were made to maximum useable field time. The new type of sod Comes out of dormancy 1-2 months earlier and goes into dormancy 1-2 months later in the year. This allows extended seasons without the maintenance and cost associated with overseeding. SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s); This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Pius Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Order; Time Adjustment by this Quan. Adj./Change Order: Amount % Change $639,915.50 $0.00 $fi39,915.50 . $0,00 0'/ 150 days N/A none $40,237.25 6% $40,237.25 6% $580,152.75 $40,237.25 New Contract Time: 150 days Prepared By: Rachel Morris Park DeveloRTent Specialist, CORR 9/5/18 Signature Printed Name, Title, Company Date IdV#YGf" - - Q Contractor: r� , kw City Project Mayor/City Signature Signature I- (J 6M -,-> ori -1AP � Printed Name, Title, Company Date Rachel Morris, Park Development Specialist 915118 �-*d((�-1 44hlf Contract Quantity Adjustment/ Change Order (lOIINO�p(,tee='.. I14. 41?li Project Name: Clay Madsen Soccer Field Project Quan. Adj./Change Order No.: r'hanna nmar nzFn Page 2 or 2 Xtem 1 Item Description Pan Changes Unit L5 Qty. 1 Unit Price $11,516.801 Amount $11,516.80 Contract Time Adjustment AdMay.justment 0 2 Tree Well Rock Wali LS 1 $2,970.00 $2,970.00 0 3 Electrical for Field Lighting Service LS 1 $4,700.00 $4,700.00 0 4 Fire Lane Striping L5 1 $1,250.00 $100.00 0 5 Sad Change LS 1 $19,800.45 $19,800.45 0 OCHASCO CONSTRUCTORS Change Order Project: 20-17131 CLAY MADSEN SOCCER FIELDS 1700 GATTIS SCHOOL ROAD ROUND ROCK, TX 78664 To Contractor. CHASCO CONSTRUCTORS P.O. BOX 1057 ROUND ROCK, TX 78680 The Contract is changed as follows: Change Order #1 2 Plan Changes 4 Tree Well Rock Wall 5 Electrical For Field Lighting Service 6 Fire Lane Striping 8 Sod Increase Change Order: 1 Date: 7/23/2018 Architect's Project - P.O. BOX 1057 ROUND ROCK, TX 78680 Ph a 512-244-0600 $11,516.80 $2,970.00 $4,700.00 $1,250.00 $19,800.45 Total: $40,237.25 The original Contract Amount was $639,915.50 Net change by previously authorized Change Orders $0,00 The Contract Amount prior to this Change Order was $639,915.50 The Contract will be increased by this Change Order In the amount of $40,237.25 The new Contract Amount including this Change Order will be $680,152.75 The date of Substantial Completion as of the date of this Change Order therefore Is NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACT AND OWNER. CHASCO CONSTRUCTORS ARCHITECT CONTRACTOR OWNER P.O. BOX 1057 ROUND ROCK, TX 78680 (Signature) (Signature) (Signature) BY By By Date Dale Date City of Round Rock ROUND ROCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Chasco Constructors for the Clay Madsen Soccer Field Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/14/2018 Dept Director: Rick Atkins, Director Cost: $40,237.25 Indexes: General Self -Financed Construction Attachments: CMSF - CO #1 Revised 9.5.18 - Signed by Chasco.pdf, LAF - Quantity Adjustment -Change Order #1 w- Chasco Constructors (00409003xA08F8), pdf Department: Parks and Recreation Department Text of Legislative File CM -2018-1864 Consider executing Quantity Adjustment/Change Order No. 1 with Chasco Constructors for the Clay Madsen Soccer Field Project. This item will authorize the City Manager to execute Quantity Adjustment/Change Order No. 1 with with Chasco Constructors for the Clay Madsen Soccer Field Project. Adjustments made in the field necessitated the installation of a tree well, additional electrical work, and fire lane striping. Changes to sod type were made to maximize useable field time. The new type of sod comes out of dormancy 1-2 months earlier and goes into dormancy 1-2 months later in the year. This allows extended seasons without the maintenance and cost associated with overseeding. The Clay Madsen Soccer Field Project includes: two full-size soccer fields, irrigation, field lighting, additional parking, sidewalk, and fencing. This project will replace two of the five soccer fields lost with the conversion of Luther Peterson Park to a city facility. Cost: $40,237.25 Source of Funds: General Self -Financed Construction City of Round Rock Page f Printed on 9/13/2048