CM-2018-1892 - 10/1/2018Pav I o 3 Contract Quantity Adjustment/Change Order r fN Q, LC Department: Utilities and Environmental Services Project Name: Dry Branch Tributaries Channel Improvements Date: 9/19/i8 City Project Change Order/Quantity ID Number DRY9R Adjustment No. 2 Vendor Chasco Constructors P.O. Box 1057 Round Rock, TX 78680 512-244-0600 Company Name Address Phone No. justification L. Addition of wastewater service at 1107 Joyce Ln., Round Rock, TX 2. Extension of 18 -inch Dia. Steel Casing Pipe. 3. Credit for disposal of 1000 CY of excavated material near the construction site at 1000 Ray Berglund Blvd. SUMMARY Amount % Change Original Co tract Price: $1,328,052.00 A c,� L*, Previous Quantity Adjustment(s): $4,496.00 This Quantity Adjustment. -$20,055.00 Printed Name, Title, Company r Total Quantity Adjustment(s): -$15,559.00 Total Contract Price with Quantity Adjustments) $1,312,493.00 '' Previous Change Order(s): $49,526.00 4% This Change Order: $17,732.00 1% Total Change Order(s) To Date: $67,258.00 5% Adjusted Contract Price [Original Contract Price Plus City Project xv" Quantity Adjustment(s) Plus Change Order(s)): $1,379,75100 1[ x Difference between Original and Adjusted Contract Prices,. $51,699.00 Federico Sanchez Proect Manager, CORP, Original Contract Time; 240 Time Ad,ustment by p-evous Quan. Adj./Change Order: 21 Date Time Adjustment by this Quan. Adj./Change Order: 14 New Contract Time: 275 Mod Prepared By: A c,� L*, Federico Sanchez, Project Manager, CORR 2119118 5199ature . a Printed Name, Title, Company r Date _ Contractor:[ [' 6Ct7 Signature Printed Name, Title, Company Date City Project Manage Federico Sanchez Proect Manager, CORP, 9/19)18 g lure Printed Name, Title Date Mayor/City Manageruk— r + I r Signature Printed dame, Title- - - - - - - - - - - Da be V• r G Zat f-18 l 2 Contract Quantity Adjustment/ Change Order aac �. c IS Project Name: Dry Branch Tributaries Channel Improvements Quan. Adj./Change Order No.: Chance Order Data Page 2 of 3 Item # Item Description unit Qty. Unit Price Amount Contract Time Adjustment Da s WW Service to 1107 Joyce Ln. LS 1 $17,732.00 $17,732.00 14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $o. o - $0.00 $0.00 $0--00 $0.00 $0.00 $a.00 $0.00 $0.00 $0.()o $0.00 $0.00 $4.00 $0.00 $0.00 Contract Quantity Adjustment/Change Order Project Name: Dry Branch Tributaries Channel Improvements Quart. Adj./Change Order No. Ouantity Adiustment Data Page 3 of 3 Bid Item # Item Description Unit _ Unit Price Amount Contract rime Adjustrnent Credit for disposal of waste material - Item Description: Channel Excavation, Including Placement of excess materia in 2 fill disposal areas 1 and 3. ICY -5000 $5.00 -$25,000,00 0 Pipe, 18" Dia. Steel Casing, Including i8 Excavation, Bedding, and Backfill LF 43 $115.00 $4,945.000 $0.00 $040 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 $0.00 80.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.OD -moo a ;5.001 0 City of Round Rock f RDUND RDCK Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 2 with Chasco Constructors for the Dry Branch Tributaries Channel Improvements Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 9/28/2018 Dept Director: Michael Thane, Director of Utilities and Environmental Services Cost: $2,323.00 Indexes: 2014 Drainage Revenue Bonds Attachments: CO#2.pdf, LAF.pdf, MAP.pdf Department: Utilities and Environmental Services Text of Legislative File CM -2018-1892 Consider executing Quantity Adjustment/Change Order No. 2 with Chasco Constructors for the Dry Branch Tributaries Channel Improvements Project. The Dry Branch Tributaries Channel Improvements project is located north of Gattis School Road near the Joyce Lane and Ray Berglund Boulevard residential neighborhoods. The Dry Branch Tributaries Channel Improvements project will provide improvements for a portion of Dry Branch and an unnamed tributary to Dry Branch. The project will provide conveyance improvements for flood control and will correct erosion and protect City wastewater infrastructure. Quantity Adjustment/Change Order No. 2 (QA/CO No. 2) includes the addition of a new wastewater service for 1107 Joyce Lane, an extension of an additional 43 linear feet of steel casing pipe due to unexpected changes in topography at the site, and a credit given by the contractor for being able to dispose of excavated material at a location closer to the construction site and not the proposed disposal area No. 3 as planned. With the credit given for the waste material, this change order provides the City a credit of $2,323 after deducting the cost of the additional items, casing pipe, and wastewater service. QAICO No. 2 includes the cost of labor, additional materials, equipment for the work and the quantity adjustments credit agreed by Chasco. This QA/CO No. 2 is a reduction in ther City of Round Rock Page 1 Printed on 912712018 Agenda Item Summary Continued CM -2018-1892 contract amount by $2,323 which brings the new total contract amount to $1,379,751. Cost. $-2,323 Source of Funds: 2014 Drainage Revenue Bonds City of Round Rock Page 2 Printed on 9/27/2018 7tl,Ld0 NQS 5 MP -CV �4 5&G LOOP IA Q �a i ygjIM055 T ae ° 1-1 4 .ice U3 ' _p vcv 3a� 3�eiioG t a�°vn.. I RAY SO I JOYCE LN s r' - HatftB dlfd 05SIiuCDR }/ °al tia� 41 sbtrrr� I 4 ,,2 _ L m -ui.w4 piREN� dl �t THOR ELaER!NAY ONADAtER YlaLK ku G CO_ +ry o a � a _ r G 1I � ., u , d IU s� .-,. N) d0,0 G piGt's¢ 1C1N 4� �IHp 00 -IV '44es 4 3r Zu VriNDS01%GcC 0 pD xFpR ce d m I� d I 3I 1°avo y ¢a to s3ti3 a�4ti as ]kiHsno 5 MAYS ST _- 1SJ` SSY�--- 5 1 d♦ yils �TiaNvw . Sd 1 � 4 VR r Lb 51 -1 8a1N0ilINMVI __ .I I _LRIGGElkOIT ST 4' S, `�. �3 ¢� �- � hl a NYR�1 GE ST __;I d.r•- Y � I y. kVA.1 s S�iytitPpi► u1 _ 3I }a J 1010 `- a d m I� d I 3I 1°avo y ¢a to s3ti3 a�4ti as ]kiHsno 5 MAYS ST _- 1SJ` SSY�--- 5 1 d♦ yils �TiaNvw . Sd 1 � 4 VR r Lb 51 -1