Loading...
CM-2018-1904 - 10/15/2018Page I ora Contract Quantity Adjustment/Change Order mv, OU16 Department: TRANSPORTAION ADMINISTRATION Project Name: City Project ID Number AW GRIMES - AT TOWN SQUARE - NEW TRAFFIC SIGNAL date: 9/20/18 Change Order/Quantity Adjustment No. 1 Vendor AUSTIN TRAFFIC SIGNAL CONST. CO., IN( PO BOX 130 ROUND ROCK, TX 78680 512-255-9951 Company Name Address Phone No. Justification ADD SCOPE FOR COND, WIRE, SPRINKLER REPAIR AD] FOR OVER-UNDER RUNS ON QUANTITY OF LINE ITEMS SUMMARY Original Contract Price: Previous Quantity Adjustment(s): This Quantity Adjustment: Total Quantity Adjustment(s): Total Contract Price with Quantity Adjustment(s): Previous Change Order(s): This Change Order: Total Change Order(s) To Date: Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s) Plus Change Order(s)]: Difference between Original and Adjusted Contract Prices: Original Contract Time: Time Adjustment by previous Quan. Adj./Change Omer: Time Adjustment by this Quan. Adj./Change Order: New Contract Time: Submitted for Approval Amount % Change $254,595.55 -$7,000.00 -$7,000.00 $247,595.55 0°% $10,814.11 $10,814.11 $258,409.66 $3,814.11 COLLETTE PHILLIPS, ASST CONTROLLER, AUSTIN TRAFFIC Prepared By: Z`'& 2TZ a '+ SIGNAL CONST. CO INC. 9/20/18 Signature Printed Name, Title, Company Date Contra • ;P�ED SCHROEDER,VP, AUSTIN TRAFFIC SIGNAL CONST. CO., INC. 9/20/18 SiViature Printed Name, Title, Company Date City Project Mayor/City 2 pIS-m&4 I i sr •Lddt- j Name, Tide /y 6-45-( r �, 4°% 4% Contract Quantity Adjustment/Change Order r«. dlrjs Project Name: AW GRIMES - AT TOWN SQUARE - NEW TRAFFIC SIGNAL Quan. Adj./Change Order No.: Change Order Data Page 2 or Item # Item Description Unit Qty. Unit Price Amount Contract Time Adjustment Da 9001-60 1 CONDUIT (6 IN) ADAPT -CONNECT LF 120 $60.00 7,200.00 9001-0620 ELC (NO 4) INSULATED LF 1095 i.80 $1,971.00 9002-6002 WATER SPRINKLER LEAK REPAIR LS 1 $1,643.11 $1,643.11 $0.00 $0.00 0.001 $0.00 $0.00 $0.00 $0.00 $0.00 .00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 r . 4 . , ' . Page 3 of 3 ItI Contract Quantity Adjustment/ Change Order rw.006 Project Name: AW GRIMES - AT TOWN SQUARE - NEW TRAFFIC SIGNAL Quan. Adj./Change Order No.: Ouanttty Adiushnant Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment 5 CURB RAMPS (TY -10) EA -2 $3,500.00 -$7,000.00 $0.00 $0.00 $6300- $0.00 $0.00 $.-0 $4.04 0.00 $0.00 $0.00 $ .00 0.001 0.00 0.00 $0.05 $0.00 .0 $0.00 $0.00 0.00 0.D0 $4.00 $0.40 $0.00 City of Round Rock ROUND ROCK TL,�A._ Agenda Item Summary Agenda Number: Title: Consider executing Quantity Adjustment/Change Order No. 1 with Austin Traffic Signal Construction Company, Inc. for the Traffic Signal at A.W. Grimes Bouelvard and Town Centre Drive Project. Type: City Manager Item Governing Body: City Manager Approval Agenda Date: 10/12/2018 Dept Director: Gary Hudder Cost: $3,814.11 Indexes: RR Transportation and Economic Development Corporation (Type B) Attachments: 2060 - Chg Order #1 - AW Grimes -Town Square -partial signatures Department: Transportation Department Text of Legislative File CM -2018-1904 Consider executing Quantity Adjustment/Change Order No. 1 with Austin Traffic Signal Construction Company, Inc. for the Traffic Signal at A.W. Grimes Bouelvard and Town Centre Drive Project. The Transportation Department requests that the City Manager, on behalf of the City Council, consider a resolution to approve Change Order/Quantity Adjustment #1 for the Traffic Signal Project at AW Grimes Blvd. & Town Centre Dr. The Traffic Signal at AW Grimes Blvd. & Town Centre Dr. consisted of improving the intersection with traffic signals, overhead illumination, and safer pedestrian facilities. The project was awarded to Austin Traffic Signal Construction Company, Inc. (ATS) with an initial contract price of $254,595.55. The Transportation Department requests that we change the contract to include bid items for 6" conduit, #4 insulated wire, and irrigation repairs. The total amount of Change Order #1 equates to $10,814.11. Additionally, the Transporation Department request that the contract quantities be adjusted to decrease the number of curb ramps constructed. The total amount of Quantity Adjustment #1 equates to -$7,000.00. The new proposed contract price with adjustments will be $258,409.66. The Transportation Department recommends approval of Change Order #1, and Quantity Adjustment #1, for a total difference between Original and adjusted City of Round Rock Page 1 Printed on 40/11/2016 Agenda Item Summar +Continued (CM -2019-1904) contract price of $3,814.11. Staff recommends approval. Cost: $3,814.11 Source of Funds: RR Transportation and Economic Development Corporation (Type B) City atRound Rock Page 2 Printed on 10/11/2019